Loading...
HomeMy WebLinkAboutSDP201700079 Review Comments Final Site Plan and Comps. 2018-02-13County of Albemarle Department of Community Development Memorandum To: Megan Nedostup From: Emily Cox Date: 13 Feb 2018 Subject: Old Trail Village -Block 32 - ISP (SDP201700079) The initial site plan for Old Trail Block 32 has been reviewed by Engineering. The following comments will need to be addressed before approval: 1. WPO Plan must be approved before final site plan can be approved. 2. Road Plan must be approved before final site plan can be approved. 3. VDOT approval and entrance permits will be necessary. 4. Final Site Plan, WPO Plan and Road Plans will have to show compliance with the re- zoning and master SWM Plan. 5. Remove lots that are in the WPO Buffer. 6. Lots 1 and 2 are shown in the floodplain. This may require a special permit. 7. Ensure the steep slope hatching is showing up on all sheets. It did not print very well. 8. Show the DB & PG for all existing easements. 9. Proposed easements should be centered on the proposed storm pipes. 10. Adjust contours/grading behind lots 6-24. They are overlapping/touching. Proposed slopes steeper than 2:1 must specify low maintenance ground cover (not grass). 11. Ensure adequate outfall for all storm drains. Some structures and outlet protection appear to be missing. (Ex. Strs. # 1 & #75) 12. Topography source from 2012 is not sufficient. Please provide more updated topography. 13. Label the radii and entrance type at Old Trail Drive.