Loading...
HomeMy WebLinkAboutSUB201700108 Correspondence 2017-11-07 Christopher Perez From: Alan Taylor <alan@riverbenddev.com> Sent: Tuesday, August 15, 2017 12:25 PM To: Christopher Perez Cc: Moore, Adam PE (VDOT; 'Deel,Justin (VDOT)'; Matthew Wentland Subject: RE: Road Plan and BLA conversation for Hyland Park(formerly Fontana 4C) I'll get with Scott on it. Thanks for sending. From:Christopher Perez [mailto:cperez@albemarle.org] Sent:Tuesday,August 15,2017 12:14 PM To:Alan Taylor<alan@riverbenddev.com> Cc: Moore,Adam PE (VDOT<Adam.Moore@vdot.virginia.gov>; 'Deel,Justin (VDOT)'<Justin.Deel@vdot.virginia.gov>; Matthew Wentland<mwentland@albemarle.org> Subject: RE: Road Plan and BLA conversation for Hyland Park(formerly Fontana 4C) Alan, RE: Road Plan and BLA conversation for Hyland Park(formerly Fontana 4C) I want to be clear the engineering of this road needs to assure the Cascadia/Fontana Connector(Delphi Lane)actually connects to the portion of the connector road on the Cascadia's side. VDOT needs to be good with the alignment be it's a public road. I do not believe the two roads must be offset like on the application plan. I believe they could lineup like they are depicted on your current road plan. To which VDOT had no issues with the alignment. Christopher P.Perez I Senior Planner Department of Community Development(County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From:Christopher Perez Sent:Tuesday,August 15,2017 12:02 PM To: 'Alan Taylor'<> Cc: Moore, Adam PE (VDOT) <Adam.Moore(«@vdot.virginia.gov>; 'Deel,Justin (VDOT)'<Justin.Deelc vdot.virginia.gov>; 'mwentland@albemarle.org'<mwentland@albemarle.org> Subject: RE: Road Plan and BLA conversation for Hyland Park(formerly Fontana 4C) Alan, RE: Road Plan and BLA conversation for Hyland Park (formerly Fontana 4C) I assume you are talking about the Cascadia/Fontana Connector(now named Delphi Lane) and Brunello Court (now named Glenleigh Road). That is the sort of details that would flush out in the road plan review with special attention paid to VDOT's comments on this aspect of the plan. Attached are the 1st round of VDOT's review comments on your road plan, to which they did not comment on the alignment. Thus I believe this is how they want it for acceptance into the state system and how I believe it should go based on road plans reviewed under Steve Driver's older version. The road plans that VDOT currently reviewed have these two roads lined up. Christopher P.Perez I Senior Planner Department of Community Development(County of Albemarle,Virginia 1 (14 • 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From:Alan Taylor Imailto:alan@riverbenddev.com] Sent:Tuesday,August 15, 2017 11:44 AM To:Christopher Perez<cperez@albemarle.org> Subject: RE: Hyland Park- BLA Exhibit(004).pdf Thanks for sending. Do you want us to offset the roads like that? • From:Christopher Perez [mailto:cperez@albemarle.org] Sent:Tuesday,August 15,2017 11:34 AM To:Alan Taylor<alan@riverbenddev.com> Subject: RE: Hyland Park- BLA Exhibit(004).pdf Alan, Attached is a scanned version with my highlighting on it. From:Alan Taylor[mailto:alan@riverbenddev.com] Sent:Tuesday,August 15,2017 11:12 AM To:Christopher Perez<cperez@albemarle.org> Subject: Hyland Park- BLA Exhibit(004).pdf 2 Sowe COUNTY OF ALBEMARLE Department Community Development 8 a-ra Planning Services Division :41$ireI . 401 McIntire Road North Wing• Charlottesville,Virginia 22902-4596 Phone: (434)296-5823 • Fax: (434)972-4035 Transmittal From: Christopher Perez Date: 08/02/17 To: OMatt Wentland-Engineering 0 0 0 0 0 0 0 0 0 JOB #/FILE NAME:SUB-2017-108 FONTANA 4C BLA with lot 118. We are sending you the following items: ® Attached or ❑ Under separate cover ❑ Copy of Letter ❑ Prints ❑ Plans ❑ Plats ❑ Specifications ❑ Other # of Date Description Copies 1 7/12/17 BLA These are transmitted as checked below: ® For review and comments ® For approval ❑ Other Remarks: Matthew this needs to be reviewed in concert with the road plans for Fontana. This is the land w tonys house (118) that needs to be added to the rest of the parcel per the rezoning. THIS PLAT SHOULD NOT BE APPROVED TILL THE ROAD PLAN IS APPROVABLE TO ASSURE THE EASEMENT FOR R/W & GRADING IS ADEQUATE. Comments are due in City View or email by: 08/02/17 Signature: Christopher Perez