Loading...
HomeMy WebLinkAboutWPO201600083 Checklist - Project Closeout (Administrative) WPO VSMP 2017-06-16WATER PROTECTION (REVIEW) FILE CLOSEOUT AT TIME OF ENGINEERING APPROVAL/DENIAL IMAGING CENTER INSTRUCTIONS CHECKLIST The Lead Engineer is to complete this form within 30 days of final action of WPO plan; place the completed form in the WPO folder and forward to the Imaging Center for digital closeout into LaserFiche. Once items have been placed in LaserFiche,Imaging Center staff will forward back to the Engineering Department. WPO# 201600083 PROJECT TITLE Better Living Berkmar Drive FULL NAME OF ENGINEER Matt Wentland FINAL ACTION DATE: 06/16/2017 CountyView — Li Limits of Disturbance Area(Ac)updated Status/Status Date updated Hardcopy— File Folder Closeout: All items listed should be placed in project folder,in reverse chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file,place an"N/A" next to the check box. The Lead Reviewer/Engineer has the discretion to include any item deemed necessary to provide clarity to the file,please indicate that item on the"Other" lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or, if the document is already in digital format,can be saved to LaserFiche. Please provide the digital location path/name) of the document in the space provided. Application(signature copy) Scan Saved location Approved E&S Plan and/or SWM Plan and/or SWPPP(stamped"Approved") Scan Saved location Approved Mitigation Plan(stamped"Approved") Scan Saved location SWM Maintenance Agreement(executed and recorded) Scan Saved location SWM Deed/Easement Plat(recorded) Scan Saved location Nutrient Credit Agreement(recorded) Scan Saved location Calculations stamped"Approved" Scan Saved location Bond Estimate Scan Saved location ACOE/ACSA/VDOT Approval Letter(s) Scan Saved location Other(Please explain)Geotechnical Report • Scan Saved location At the Engineer's discretion, copies of unapproved plans/plats may be placed in the file if they lend clarity to the review at a later date. If such plans are included, they should be clearly marked as unapproved and contain a note clarifying why it was included. Scan Saved location