Loading...
HomeMy WebLinkAboutFDP201800004 On-Call Contract Project Quote 2018-02-23Pricing Schedule TOTIER CREEKPARKACCESS ROAD IFB #2017-08093-09 ON -CALL CONTRACT PROJECT ORDER QUOTE ITEM # DESCRIPTION UNIT QUANTITY UNIT COST TOTAL 1 SM-9.5A Street Paving TN $ 80.24 $ 2 SM-9.5D Street Paving TN $ 80.24 $ 3 SM-9.5A Parking Lot, less than 250 TN TN $ 80.50 $ 4 SM-9.5A Parking Lot, greater than 250 TN TN $ 83.60 $ 5 BM-25.0 Base Mix, greater than 250 TN TN $ 80.09 $ 6 Milling, Per SY/Inch over 2" SY $ 2.85 $ 7 Milling, 0"-2" Less than 1,000 SY (Patching) SY $ 3.71 $ 8 Milling, Parking Lot 0-2" SY $ 2.29 $ 9 Milling, Streets 0-2" SY $ 3.33 $ 10 Misc. Patching BM-25 TN $ 149.61 $ 11 Misc. Patching SM-9.5A TN $ 170.65 $ 12 Driveway Restoration (2" SM-9.5A) SY $ 36.41 $ 13 Street Edge Repair SQ. FT. $ 12.15 $ - 14 21-A Base (Delivered) TN 580 $ 20.75 $ 12,035.00 15 Excavating - backhoe, dumptruck, laborer DY 3 $ 1,967.90 $ 5,903.70 16 Grading - Grader, roller, dumptruck, laborer DY - $ 1,464.48 $ - 17 Asphalt Curb LF $ 18.00 $ 18 Asphalt Swale (2' Width) LF $ 14.44 $ 19 Aspahlt Sidewalk (5' Width) LF $ 11.44 $ 20 Speed Hump SQ. FT. $ 9.51 $ 21 Parking Lot Sealing SQ. FT. $ 0.13 $ 22 Crack Filling LF $ 1.11 $ 23 Slurry Seal SQ. FT. $ 1.96 $ 24 Type B, Class I, 4" Pavement Marking, Complete in Place LF $ 1.24 $ 25 Type B, Class I, Crosswalks, Arrows, and Symbols, Complete in Place SF $ 13.10 $ 26 Type A, 4" Pavement Marking, Complete in Place LF $ 0.46 $ 27 Type A, Crosswalks, Arrows, and Symbols, Complete in Place SF $ 1.31 $ 28 Traffic Control - 2 flagmen, signs, Workzone Trained Supervisor DY $ 1,179.72 $ 29 Asphalt Trail, less than 8' width (2" SM-9.5a) TN $ 248.45 $ 30 Asphalt Trail, greater than 8' width (2" SM-9.5a) TN $ 149.75 $ 31 Asphalt Trail (handwork) TN $ 371.87 $ - Repair 15" Culvert Pipe (Approximtely 201,F) LS 1 $ 750.00 $ 750.00 TOTAL LUMP SUM QUOTE $ 18,688.70 IFB 92017-08093-09