Loading...
HomeMy WebLinkAboutARB201800007 Application 2018-03-01Albemarle Cot ty Co m m L n ity D&ml o p m ent Cepartmerrt 4. . cI nti re Road Ch arl ottesvi I I e, VA 22932-4996 Voice : j434j 298-5832 Fax : (334) 972-4126 Planning Application TMPJ 03200-00-GU-043C0 owner's). COLUMBIA II HOLLYMEAD LLC C/O PROPERTY TAX DEPT Application # ARB201800007 Legal Description ACfIEl4�6E - - 62 CAPITAL ONE BANK'"....,..__.__.._._.._.�x,s...___._ �r..__._�..,..-...�..�..� -.G. Magisterial Dist. Rio ri .t Land Use Primary Commercial F+ Current AFO Not in A/F District Current Zoning Primary Planned Development Mixed Commercial +� 4.r APPLICATION INFORMATION -- Street Address 95 CONINIUNITY ST CHARL0TTESVILLE, 22911 Entered By Jennifer Smithl rf Application Type Architectural Review Board Project I FULTON BANK - AMENDMENT Received Date O1/09f18 Received Date Final Submittal Date O1/22j1� Total Fees 242 Closing File Date Submittal Date Final i � Total Paid 242 Revision Number Comments � ..�_-- —--�_....___...�.__�ti...y...---...__..r�...._..�..-.....,.._..._....�,..,.....�,.,..�.�.-.- ---.�_..._.._..-v.:....._..�....�.,.._..�.,..�....,.�_w�a 1 Legal Ad w SUB APPLICATION(s) SLb 0+--� - — _--- — — - �- Revisions toiCertificateofA ro riateness PP P : 01J22/ 18 --- APPLICANT / CONTACT INFORMATION CortactT _ Nacre _ �. —_ Address _ L_iLrState — _---?.t�---PFeareCeJl '_tivse-r :c--'.a-: COLUMW R HOW MEN) LLC C'o ' P 0 BOY 790630 SAN VNTONIO TX • 7E=79- ?-�-=y MICHAEL NEFF- NSWGROUND 15+450 SOUTH OUTER FORTY CHESTERFIELD, 163017 6368905132 .........................FULTON BANK................................................................... ....€ ONE PEPIN SQUARE................................ LANCASTER, PA...... ... € 17602............................. .7172912757..................................................... Signature of Contractor or Authorized Agent date Architectural Review Board Application 0 Part A: Applicant, Contact and Parcel Information Project Name: Fulton Bank Tax map and parcel(s): Physical Street Address: 95 Community Street Contact Person: Michael Neff Business Name: NewGround Address 15450 South Outer Forty Drive Daytime Phone O 636-898-8132 City Chesterfield Fax # ) grate MO Zip 63017 E-mail mnefF@newground.com Owner of Record: Fulton Bank Address One Penn Square Daytime Phone (__) 717-291-2767 City Lancaster Fax # O State PA Zip 17602 E-mail tcaln@fult.com Part B: Review Tv a and Fee Select review type Review by the Architectural Review Board Conceptual Plan/Advisory Review (for a Special Use Permit or a No Fee Rezoning) Preliminary/Initial Review of a Site Development Plan No Fee Final Review of a Site Development Plan $1075.00 X Amendment to an approved Certificate of Appropriateness $ 242.00 Building Permit Review $ 634.00 County -wide Certificate of Appropriateness Structures 750' or more from the EC, no taller than 5 stories No Fee Structures located behind a structure that fronts the EC No Fee Personal wireless service facilities No Fee Fencing or Equipment or Lighting No Fee Additions to ARB-approved buildings No Fee Minor amendments to site or architectural plans No Fee Building permits where the change is 50% or less of the altered elevation No Fee NOTE: For SIGNS, use the combined APPLICATION AND CHEKLIST FOR SIGNS. FOR OFFICE USE ONLY BP# ARB# Fee Amount 'I�'-__ Date Paid �t By who? Receipt # * L3 h ck # ��� ! ' By_ ILA County of Albemarle Dept of Community Development, 401 McIntire Rd, Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 9724126 10,2015 Page I of 2 OVER — Part C: Description of Proposal Describe your proposal. Attach a separate sheet if necessary. The current roof color of the building is green and not compatible with Fulton Bank's corporate color. We propose to paint the existing roof the Fulton Blue corporate color, "Interstate Blue", see sample enclosed. j Part D: Applicant Agreement Applicant must read and sign • Each application package must contain (8) folded copies of all plans and documents being submitted. Only (1) set of building material samples is required. All submittal items, including building material samples, become the property of Albemarle County. Applicants are encouraged to maintain duplicate copies of all submittal items in their own files. • Only complete application packages will be scheduled for ARB review. The application package is not complete without the appropriate checklist, completed, signed, and included with the required submittal materials indicated on the checklist. I hereby certify that I own the subject property or have the legal power to act on behalf of the owner in filing this application. *See submittal requirements below. I also certify that the information provided on this application and accompanying information is accurate, true, and correct to the best of my knowledge, and that the attached plans contain all information required by the appropriate checklist. January 2, 2018 Sign ture ofo;AZe owner's rep tative Date oreoatr��iu�ha� Michael A Neff, Director of Production, NewGround 636-898-8132 Printed name, Title Daytime phone number of Signatory *Ownership Information: • If ownership of the property is in the name of any type of legal entity or organization including, but not limited to, the name of a corporation, partnership or association, or in the name of a trust, or in a fictitious name, a document acceptable to the County must be submitted certifying that the person signing above has the authority to do so. If the applicant is a contract purchaser, a document acceptable to the County must be submitted containing the owner's written consent to the application. 9 If the applicant is the agent of the owner, a document acceptable to the County must be submitted that is evidence of the existence and scone of the aeencv. Attach the owner's written consent. 11 /2010 Page 2 of 2 OVER NEWGROUND TRANSMITTAL TO Attn• RAc Mnranrnt r%A=Fc7a%niclri DATE County of Albemarle Department of Community Development 401 McIntire Road Charlottesville. VA 22902-4596 15450 South Outer Forty Drive Suite 300 Chesterfield, MO 63017 636-898-8100 636-898-8111Fax www.newground.com January 2. 2018 ARCHITECT Thomas D Auer, NCARB PROJECT Fulton Bank / Hollymead Branch LOCATION Charlottesville, VA PROJECT NO 29487 434-296-5832 Transmitted ® Herewith ❑ Under Separate Cover ❑ ASI ® Working Drawings ❑ Addendum ❑ Change Order ® Specifications ❑ RFI ❑ Shop Drawings Ship Via: ❑ Mail ❑ Courier Federal Express []Next morning ® Next day ❑ Express Saver (3 day) We are sending you: QTY DATED DESCRIPTION 2 sets November 30, 2017 Sheets AS & A6 (with roof paint note removed) — signed/sealed 1 ARB Application 1 ARB Checklist 8 ARB Submittal Documents 1 Fulton Blue "Interstate Blue" sample Comments: Margaret, please replace sheets AS & A6 with the enclosed sheets. The roof color will not change. Let me know if Any plan review comments, mneff@neweround.com , and I will get them addressed. I also enclosed the ARB information, please confirm it is acceptable and that we can be on the Feb 12 agenda. I will pay the fee Jan 3, after you process the application, let me know when I can pay online. cc: Cain, Sanford t- ,,''-' "ii By: Mike Neff Architectural Review Board Amendment to a Site Development Plan Submittal Requirements Checklist I Part ,A: Applicant - Con Lac I and Parcel Information :I Project name: Fulton Bank Tax map and parcel #: Physical street address (if assigned): 95 Community Street Location of property (landmarks, intersections, or other): Contact person: Michael Neff Business name: NewGround Address: 15450 South Outer Forty Drive Daytime phone: 636-898-8132 Fax: ARB # City: Chesterfield State: MO Zip: 63017 Email: mneff@newground.com loart B: Revisions to a CafA / Amendment to a SDP Requirismnnts Checklist Important Note: Submittal packages must contain (8) collated copies of all information unless otherwise indicated. A. Written description of the proposal ® Provide a description of the revised/amended proposal. Identify all proposed changes from the previously approved submittal. 0 Provide a revised materials list if any of the building materials or material color(s) have changed. B. Site plan showing the following (drawn to the scale of i"=20, clearly legible and folded): ❑ Show all proposed changes to the previously approved plan including site layout, landscaping, lighting, and all site features, with changed features clouded and clearly identified on the plan. ❑ Sheet number, total number of sheets, date of the drawing, date and description of the latest revision, and contact information for the firm preparing the drawings in the title block on all drawings. ❑ Provide the original plan and existing conditions. C. Appearance of the building(s) (architectural elevations, color perspective sketches, site sections): ® Dimensioned architectural elevations of the proposed building(s) showing all changes to the previously approved building(s) design. Elevations must be drawn to a minimum scale of 1/16"=V-0". A larger scale may be required. Include a building materials schedule and key on the elevation drawings. 0 One set of all building materials / colors if changed from the previously approved submittal. 1 Revised 7128/10 D. Additional material ❑ The applicant is welcome to submit any additional material that will make the revision to a certificate of appropriateness/amendment to a site development plan review more productive. Drawings or other submittal items that clarify topography, visibility, utilities, landscaping, or other unique or unusual conditions are welcome. Part Applieant Agreement Applicant must read and sign • Each application package must contain (8) folded copies of all plans and documents being submitted. Only (1) set of building material samples is required if the building materials have changed. All submittal items, including building material samples, become the property of Albemarle County. Applicants are encouraged to maintain duplicate copies of all submittal items in their own files. • All information in this checklist is required, unless specifically waived by the ARB, prior to processing a revision to a certificate of appropriateness / amendment to a site development plan review by the ARB. Additional submittal materials may be required, depending on the proposal. • Only complete application packages will be scheduled for ARB review. The application package is not complete without this checklist COMIDleted. signed, and included with the required submittal materials indicated on the checklist In representing the above referenced fine submitting this application for review, 1 hereby state that the information provided in this application, and all accompanying information, is accurate, true and correct to the best of my knowledge, and that the attached plans contain all information required by this checklist. Signattire of person completin I ckilst Michael A Neff/Director of Production/NewGroun Printed Name / Title January 2, 2018 Date 636-898-8132 Daytime phone number of Signatory County of Albemarle Department of Planning and Community Development 401 McIntire Road, Charlottesville, VA 22902-4596 (434) 296-5832 Tel, (434) 972-4126 Fax www.albemarle.or r: 2 Revised 7/28110