Loading...
HomeMy WebLinkAboutARB201600151 Correspondence 2018-03-01Margaret Maliszewski From: Craig Kotarski <Craig.Kotarski@timmons.com> Sent: Tuesday, November 22, 2016 9:16 PM To: Margaret Maliszewski Subject: RE: LIDL Margaret, There were some small horizontal shifts, but the plans primarily have remained the same. A summary of the surface level changes are as follows: * Shifted building, retaining walls parking lot, monument sign (Rt 250) and entrance (route 250) approximately 8' to the west (this was primarily done so that the wall would be constructable without an offsite easement) • Walls on eastern portion of the site (adjacent to the ford dealership) were shifted to be closer to the building. • Configuration of the walls on the western side of the site changed. This was due to the 8' shift mentioned above, and coordinating the walls with the storm piping location and its constructability. ■ Change to the alignment of the road up from Rt 20. The entrance location has not changed. • Stormwater management facility has gotten slightly larger. However the top elevation of the facility hasn't changed. The information presented in the cross sections remains valid. The 8' shift mentioned above lowered the FFE of the building, by about 1'. This had a trickle effect through the rest of the site from a grading perspective. Reactionary changes to the landscape plan based on the changes above. Items were primarily unchanged, with slight shifts. Best, Craig Craig Kotarski, P.E., LEED AP Sr. Project Manager TIMMONS GROUP I www.timmons.com 608 Preston Avenue, Suite 200 1 Charlottesville, VA 22903 Office: 434.327.16881 Fax: 434.295.8317 Mobile: 434.964.7148 1 crai .kotarski timmons.com Your Vision Achieved Through Ours To send me files greater than 20MB click here. From: Margaret Maliszewski[mailto:MMaliszewski@albemarle.org] Sent. Tuesday, November 22, 2016 1:08 PM To: Craig Kotarski Subject: LIDL Craig, The Initial Site Plan recently received for the LIDL grocery store has a drawing date of 11/21/2016. The drawings submitted for ARB review on December 5 have a drawing date of 10/24/16. Can you indicate what additional changes were made? Can you provide a marked -up copy? Thanks. Margaret Margaret Maliszewski, Principal Planner Albemarle County Department of Community Development 401 McIntire Road Charlottesville, VA 22902 434-296-5832 x3276 rnmaliszewskig?albernarle.org