From: Craig Kotarski <Craig.Kotarski@timmons.com>
Sent: Tuesday, November 22, 2016 9:16 PM
To: Margaret Maliszewski
Subject: RE: LIDL
Margaret,
There were some small horizontal shifts, but the plans primarily have remained the same. A summary of the surface
level changes are as follows:
* Shifted building, retaining walls parking lot, monument sign (Rt 250) and entrance (route 250) approximately 8'
to the west (this was primarily done so that the wall would be constructable without an offsite easement)
• Walls on eastern portion of the site (adjacent to the ford dealership) were shifted to be closer to the building.
• Configuration of the walls on the western side of the site changed. This was due to the 8' shift mentioned above,
and coordinating the walls with the storm piping location and its constructability.
■ Change to the alignment of the road up from Rt 20. The entrance location has not changed.
• Stormwater management facility has gotten slightly larger. However the top elevation of the facility hasn't
changed. The information presented in the cross sections remains valid.
The 8' shift mentioned above lowered the FFE of the building, by about 1'. This had a trickle effect through the
rest of the site from a grading perspective.
Reactionary changes to the landscape plan based on the changes above. Items were primarily unchanged, with
slight shifts.
Best,
Craig
Craig Kotarski, P.E., LEED AP
Sr. Project Manager
TIMMONS GROUP I www.timmons.com
608 Preston Avenue, Suite 200 1 Charlottesville, VA 22903
Office: 434.327.16881 Fax: 434.295.8317
Mobile: 434.964.7148 1 crai .kotarski timmons.com
Your Vision Achieved Through Ours
To send me files greater than 20MB click here.
From: Margaret Maliszewski[mailto:MMaliszewski@albemarle.org]
Sent. Tuesday, November 22, 2016 1:08 PM
To: Craig Kotarski
Subject: LIDL
Craig,
The Initial Site Plan recently received for the LIDL grocery store has a drawing date of 11/21/2016. The drawings
submitted for ARB review on December 5 have a drawing date of 10/24/16. Can you indicate what additional changes
were made? Can you provide a marked -up copy?
Thanks.
Margaret
Margaret Maliszewski, Principal Planner
Albemarle County Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 x3276
rnmaliszewskig?albernarle.org