HomeMy WebLinkAboutARB201700015 Application 2018-03-01Albemarle CounX-
Planning Application
Community Development Department
401W, *ire Road Charlottesville, VA22S'02-45025
(434) 296-5032 Fax : (434) 972-4126
TMPF—CMOD-00-GG-11000 Owner(s). FIRST GOLD LEAF LAND TRUST WENDELL W WOOD, TRUSTEE
Application #I AIZ820170001 5
PROPERTY INFORMATION
Legal Description ACREMM PARCEL C
I -
Magisterial Dist. Rio Land Use Primary Unassigned
Current AFD Not linA/FDistrict Current Zoning Primary Highway Commercial
JAPPLICATION INFORMATION
Street Address Entered By
Application Type Architectural Revi - ew Board Jennifer Pntcl�
2,'22!1017
Project ENorthtown Phase 11B
Received Data 02/21117 Received Date Final Submittal Date 02/21/17 Total Fees 1075
Closing File Date Submittal Date Final Total Paid 1 10751
Revision Number
Comments
Legal Ad
SUB APPLICATION(s)
TYPE afic)
Final Site Development Plan 02/21/17
APPLICANT CONTACT INFORMATION
ContactType Marne Address CiK'S—tate zip I Phow I Phonecel)
3wrtWAp0;c&—'.
= FIRST GOLD LEAF LAND TRUST WENDELL
PO BOX 55413
CHARLOTTES471-L
22905
.......
1200 GARRETT ST
CHARLOTTES\ICL
22902
@ 4-3-*42-'
933719
Signature of Contractor or Authorized Agent Crate
Architectural Review Board Application T_
Part A: Applicant, Contact and Parcel Information
Project Name:++r�
Tax map and parcel(s): "��� _ Physical Street Address:
6&"V4:.L 4e'f
Contact Person:d %` 4u1 s
Business Name: 4U. --J "k
Address ? .!A4J6_ 5Z City C wtwc
Daytime Phone C_) 2/ j' 3 71 Fax # U E-mail
State _L-0 zip 21yo 2
Owner of Record: &s% 46 Ljji4f 4t—o 7As
AddressCity C{Aft/i
Daytime Phone C__)Wj- 133y Fax # E-mail
State E44 ,zip2-2ys
Part B: Review Type and Fee
Select review type
Review by the Architectural Review Board
Conceptual Plan/Advisory Review (for a Special Use Permit or a No Fee
Rezoning)
Preliminary/Initial Review of a Site Development Plan No Fee
Final Review of a Site Development Plan $1075.00
Amendment to an approved Certificate of Appropriateness $ 242.00
Building Permit Review $ 634.00
County -wide Certificate of Appropriateness
Structures 750' or more from the EC, no taller than 5 stories No Fee
Structures located behind a structure that fronts the EC No Fee
Personal wireless service facilities No Fee
Fencing or Equipment or Lighting No Fee
Additions to ARB-approved buildings No Fee
Minor amendments to site or architectural plans No Fee
Building permits where the change is 50% or less of the altered elevation No Fee
NOTE: For SIGNS, use the combined APPLICATION AND CHEKLIST FOR SIGNS.
FOR OFFICE USE ONLY BP# ARB# ! - 1 S
Fee Amount $ 10715 • C:0 Date Paid By who? Receipt # 10 lCheck #1 L By
County of Albemarle Dept of Community Development, 401 McIntire Rd, Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 9724126
1012015 Page 1 d2
OVER
I Part C: Description of Proposal
IDescribe your proposal. Attach a separate sheet if necessary. l
Part D: Applicant Agreement
Applicant must read and sign
• Each application package must contain (8) folded copies of all plans and documents being submitted.
Only (1) set of building material samples is required. All submittal items, including building material
samples, become the property of Albemarle County. Applicants are encouraged to maintain duplicate
copies of all submittal items in their own files.
• Only complete application packages will be scheduled for ARB review. The application package is not
complete without the appropriate checklist, completed, signed, and included with the required submittal
materials indicated on the checklist.
I hereby certify that I own the subject property or have the legal power to act on behalf of the owner in filing this
application. *See submittal requirements below. I also certify that the information provided on this application
and accompanying information is accurate, true, and correct to the best of my knowledge, and that the attached
plans contain all information required by the appropriate checklist.
Z Z/-/7
Signat e o er, owner's representative Date
or contract purchaser
"f- (l'G.) -4f ' i 1.37
Printed name, Title Daytime phone number of Signatory
*Ownership Information:
• If ownership of the property is in the name of any type of legal entity or organization including, but not
limited to, the name of a corporation, partnership or association, or in the name of a trust, or in a fictitious
name, a document acceptable to the County must be submitted certifying that the person signing above has
the authority to do so.
If the applicant is a contract purchaser, a document acceptable to the County must be submitted containing
the owner's written consent to the application.
If the applicant is the agent of the owner, a document acceptable to the County must be submitted that is
evidence of the existence and scope of the agency. Attach the owner's written consent.
11/2010 Page 2 of 2
OVER
Architectural Review Board
Final Review of a Site Development Plan
Submittal Requirements Checklist
I Part A: Applicant, Contact and Parcel Information I
Project Name: W O WA/N
Tax map and parcel(s): L J — irfjD<. Physical street address: 674,-,24- /34*.4
Contact Person:
S r 4L44.
Business Name: ALL(-J 4:4
Address ?-%W City C 'jq'f'4 State LA zip 22 7-z-
Daytime Phone ( ) Z 91- ?712 _ _ Fax # L_)
Part B: Submittal Requirements
E-mail _ _
I m portant: Submittal packages must contain 8 collated copies of all information unless otherwise indicated.
A. Written description of the proposal
Provide a description of the proposal. Identify changes from the preliminary submittal. Indicate
specifically how each ARB comment from the preliminary review has been addressed. If there are no
changes proposed, then explain why.
' Explain how the proposal is compatible with the surrounding area and the Entrance Corridor.
B. Site plan showing the following (drawn to the scale of 1 "=20 ; clearly legible and folded):
Location(s) of proposed building(s) on the site.
Location of proposed parking, travelways, walkways and other improvements.
Mechanical equipment, trash containers, loading and service areas, other similar features and
improvements, and associated screening.
Existing and proposed topography drawn with contour intervals of 5-feet or less, and with sufficient
off -site topography to describe prominent and pertinent off -site features and physical characteristics,
but in no case less than 50-feet outside of the site.
Location and size of existing and proposed utilities and easements. Identify type of utility and extent
of easement.
Stormwater management plan.
Location of retaining walls indicating top and bottom elevations, maximum wall height, and proposed
materials, with material and color samples.
Sheet number, total number of sheets, date of the drawing, date and description of the latest revision, and
/ contact information for the firm preparing the drawings in the title block on all drawings. For revised
drawings, clearly identify revisions made.
1
OVER —.
C. Landscape plan showing the following (drawn to the scale of f' —20' orlarger, clearly legible and folded):
Proposed landscaping that meets or exceeds the requirements outlined in the ARB guidelines.
Existing landscaping to be removed. Include the location, size, and species.
Landscape key including all landscape symbols and a description of what they represent.
Location of existing and proposed tree lines and tree save areas.
Location of existing natural features_
Location of individual trees of 6-inch caliper or greater and all significant groups of trees indicated by
botanical name and caliper.
Location and height of above -ground utilities and associated easements, and location of below -
ground utilities and associated easements.
f Stormwater facilities.
® Provide a signed, tree conservation checklist with all checklist items drawn on the landscape plans.
® Include tree protection fencing and limits of work on the landscape, grading and E&S plans.
D. Lighting plan showing the following (drawn to the scale of 1 "=20' or larger, clearly legible and fielded):
Location of all proposed building and site lighting.
® Lighting schedule identifying all proposed light fixtures, poles and brackets.
lc Manufacturer's cut sheets illustrating proposed lighting fixtures and information on illumination type,
intensity, style, shielding, color, finish, and installation height.
Photometric plan addressing all fixtures and indicating that lighting does meet the requirements of
Section 4.17 of the Zoning Ordinance.
Coordination of lighting with landscaping and other site elements.
E. Appearance of the building(s) (architectural elevations, color perspective sketches, site sections):
Dimensioned architectural elevations of the proposed building(s). Elevations must be drawn to the
scale of 118"=1'-0". Include a building materials schedule and key on the elevation drawings.
Submittal of elevations that are not visible from the Entrance Corridor may be required to clarify the
overall building design.
Site sections that clarify proposed changes in topography and illustrate the visibility of the proposed
development from the Entrance Corridor. Site sections shall indicate the finish floor elevation(s) and
roof height(s) relative to the natural elevations along the Entrance Corridor.
One set of all building materials / colors.
A floor plan adequate to show exterior walls, windows and doors.
F. Additional material
Provide labeled, color, 8 '/" x 11" photographs of the site as seen from both directions on the
Entrance Corridor.
Color perspective images (for example: sketches, renderings, photosimulations, etc.) that show the
proposed development as seen from the Entrance Corridor are often useful for gaining a clear
understanding of the proposal. The ARB may require such images in certain cases when other
submitted documents do not answer all questions of building form, building details, materials, context,
topography, and/or visibility.
Any additional material that is necessary to address comments made by the ARB at the preliminary
review with a memo itemizing how each of the preliminary comments have been addressed.
❑ The applicant is welcome to submit any additional material that will make the final site development
review more productive. Drawings or other submittal items that clarify topography, visibility, utilities,
landscaping, or other unique or unusual conditions are welcome.
2
OVER ->
Part C: Applicant Agreement
Applicant must read and sign
Each application package must contain (8) folded copies of all plans and documents being submitted.
Only (1) set of building material samples is required. All submittal items, including building material
samples, become the property of Albemarle County. Applicants are encouraged to maintain
duplicate copies of all submittal items in their own files.
• All information in this checklist is required, unless specifically waived by the ARB, prior to processing
a final site development plan review by the ARB. Additional submittal materials may be required,
depending on the proposal.
• Only complete application packages will be scheduled for ARB review. The application package is not
complete without this checklist, completed, signed, and included with the required submittal materials
indicated on the checklist.
In representing the above referenced firm submitting this application for review, l hereby state that the
information provided in this application, and all accompanying information, is accurate, true and correct to
the best of y knowledge, and that the attached plans contain all information required by this checklist.
Z^Zf'/7
Signature of person completing checklist Date
5 i 44"( r
243-1111
Printed Name / Title Daytime phone number of Signatory
County of Albemarle Department of Planning and Community Development
401 McIntire Road, Charlottesville, VA 22902-4596
(434) 296-5832 Tel www.albemarle.org revised 10/24/2014
3
OVER y