Loading...
HomeMy WebLinkAboutARB201700015 Study 2018-03-01COLLINS 3ARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 NORTHTOWN CENTER- PHASE IIB ARB NARRATIVE 434.293.3719 PH 434.293.2813 FX www.coIJins-engineering.com The proposed Northtown project (Phase IIB) includes (3) commercial/retail buildings on the existing Northtown property where Union Bank and Gander Mountain reside. The total proposed commercial/retail space is approximately 39,000 SF. The (3) buildings located adjacent to Gander Mountain have been modified from the original concept plans to provide a more attractive and pedestrian oriented area (see attached Architectural analysis). Additional parking areas, landscaping, sidewalks and screened dumpster pads are proposed with this development. A brick enclosure matching the building's brick facade, with (2) two wooden board -on- board swinging gates, will enclose and screen the trash container areas from public view. Rooftop mechanical equipment will also be screened with the building's cornice. Ample landscaping is proposed to soften the site improvements and provide tree cover. This landscaping supports the existing landscaping currently located within the large, bordering stormwater management facility to the south. Improvements to the utility infrastructure are not required since they currently exist onsite or within adjacent public right-of-way, however connections will be required to serve the proposed building. The project will connect to an existing waterline within Gander Drive, existing sanitary sewer located onsite and gas and power lines located within route 29's public right of way. Proposed storm sewer will channel the run-off to the existing and proposed stormwater management facilities. See the attached plan for location of the utilities and swm features. The attached pictures represent current conditions taken from the entrance corridor, viewing the area proposed to be development with this plan. Also attached are the narratives and diagrams provided by the Architect for additional details on the site, buildings, and proposed materials. A site plan is included with the submission as well for additional details on the site design. Picture facing south along northbound lanes of the Entrance Corridor, showing Stellar One Bank Biofilter Picture taken from the Entrance Corridor, facing south, showing the site_ I EM q ` •� � 1� t #'}mot ��ti �i s r � Picture facing south towards the site, from southhound lanes on the other side of the Entrance Corridor Gander Mountain (sits South of the project site)