Loading...
HomeMy WebLinkAboutARB201700112 Review Comments Architectural Review Board Approval 2018-02-06COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: Heather McMahon DATE: PROJECT NAME: ARB-2017-112: Riverside Village Submittal Type Requiring Revisions O indicates submittal Code County Project Number # Copies Erosion & Sediment Control Plan (E&S) Mitigation Plan (MP) Waiver Request (WR) Stormwater Management Plan (SWMP) Road Plan (RP) Private Road Request, with private/public comparison (PRR) Private Road Request — Development Area (PRR-DA) Preliminary Site Plan (PSP) Final Site Plan (or amendment) (FSP) Final Plat FP Preliminary Plat (PP) Easement Plat (EP) Boundary Adjustment Plat (BAP) Rezoning Plan (REZ) Special Use Permit Concept Plan (SP-CP) Reduced Concept Plan (R-CP) Proffers (P) Bond Estimate Request (BER Draft Groundwater Management Plan (D-GWMP) Final Groundwater Management Plan (F-GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB201700112 Z Other: Please explain (For staff use only) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB 2 Heather McMahon PROJECT MH,VAGEMENT SHIMCIVIL ENGINEERING LAND PLANNING ENGINEERINr" C -'> February 61h, 2018 Heather McMahon, Senior Planner County of Albemarle Planning Division RE: SDP 201700062 Riverside Village Block I — Final Site Development Plan - ARB Ms. McMahon, Thank you for your review of the Final Site Development Plan for Riverside Village Block 1. We have reviewed and revised the plan per your most recent comments dated November 30th, 2017. Below is a detailed response to each of your comments. 1. Vary the tree and shrubs species throughout the entirety of the site. Landscape Plan has been updated, by Water Street Studios, with varied species throughout entire site. 2. Illustrate the number of benches in each of the plazas. Ensure that each plaza holds a minimum of two benches and that one plaza holds at least four benches. Approximate location of benches have been added to the plan 3. Provide a roof plan and elevations that show roof -mounted mechanical equipment locations and sizes. Show how visibility of all equipment will be eliminated. Noted by architect 4. Correct the standard mechanical equipment note on the architectural drawings. Noted by architect Ensure that the kelvins emitted by all light fixtures are consistent throughout the site. Kelvins emitted by fixtures is now consistent across all fixtures. 6. Choose either black or bronze for the Model B bollard lighting and specify choice on the lighting plan. Black has been chosen for the Model B bollard lighting, and is noted at the bottom of the specification. Bollard fixture has changed and numbers have been reduced across the site. 7. Consider adding ornamentals between the large shade trees (London Plane trees) proposed for the EC frontage. Street frontage trees will now be the preserved existing, which is a mix of large shade trees and ornamentals. 8. Retaining walls six feet and higher must be terraced and planted. Specify retaininq wall material. Note specifying retaining wall height has been altered to reflect accurate wall height. Masonry retaining wall around dumpster will act as screening, while lower 5' stack block wall beside parking does not trigger terrace requirement. No retaining walls across site trigger terrace requirement. 9. Clarify the wall-like element on Sheet C4, which is near the curved monument sign/wall in the southeast corner of the block, near the throat of Trailside Drive. Due to an oversight, the wall-like element is from a previous sign design and has since been deleted. 10. Show adequate tree protection for any existing trees to remain on the site during construction. Tree protection and conservation checklist have been provided. 11. Add all drawing and revision dates as well as correct sheet numbers to the site plan set and to the architectural drawings. Correct Sheet C11 title "Existing Landscape Plan," to "Landscape & Lighting Plan Details." All sheet numbers and dates have been revised. If you have any questions or concerns about these revisions please feel free to email me at Peter@shimp- engineering.com or you may contact Justin Shimp at Justin @shimp-enineering.com or call us at (434) 227- 5140. Best Regards, Peter Russell Shimp Engineering, P.C. 2