Loading...
HomeMy WebLinkAboutWPO201600005 Plan - Stormwater WPO VSMP 2016-02-09V5MF FLAN fOR RIVER51DE VILLAGE E3LOCK 5 Ilk VICINITY MAP SCALE: 1 "-1 ,000' OWNER / DEVELOPER ,� - Riverside Village Properties, Inc. A� rip r Garrett St, Suite 0 �_.. Charlattesville, VA 22902 m` Lic? N .45183 P. NMD —Nei hborhood Model Develo ment 4� raft EC — Entrance Corridor pOA� G Per Approved Application Plan. ZMA 2012-00002.S�ONAL E .. SITE IMAGE PROVIDED BY GOOGLE MAPS SHEET INDEX C I - EROSION * SEDIMENT CONTROL COVER S1-IEET C2 - EROSION * SEDIMENT CONTROL NARRATIVE C3 - FHA5E I ER05ION * SEDIMENT CONTROL PLAN C4 - PHA5E 2 ER05ION * SEDIMENT CONTROL FLAN C5 - ERO5ION * SEDIMENT CONTROL DETAILS SOURCE OF TITLE Tax Map 78, Parcel 58 DB 4.150 PG 20 BENCHMARK Datura for topography is NAVD88. SOU RCE OF BOUNDARY & TOPO Source of Boundary Survey: Roger W. Ray & Associates. Dated: 10/15/12. Source of Topography: Two (2) foot contours shown from an airborne survey under the supervision of James H. Bell, Jr. aerial topography from Louisa Aerial Surveys, Inc. Dated: 03/10/12. S TORMWATER MANAGEMENT Stcrmwater measures for this block approved under WPO 2014 00074. The final design shows a decrease in impervious area from the approved plan. �fA' �i�1 �i"� i.,��iN'IVEFt�b 1•i� ib: ff 1,qsi 7100, aTIA nfr X�' ?A 9 t f ar,T1au6 r�f, ��rx Qs -i' !{'.rJ A :. IMAGE PROVIDED BY GOOGLE MAPS SHEET INDEX C I - EROSION * SEDIMENT CONTROL COVER S1-IEET C2 - EROSION * SEDIMENT CONTROL NARRATIVE C3 - FHA5E I ER05ION * SEDIMENT CONTROL PLAN C4 - PHA5E 2 ER05ION * SEDIMENT CONTROL FLAN C5 - ERO5ION * SEDIMENT CONTROL DETAILS SOURCE OF TITLE Tax Map 78, Parcel 58 DB 4.150 PG 20 BENCHMARK Datura for topography is NAVD88. SOU RCE OF BOUNDARY & TOPO Source of Boundary Survey: Roger W. Ray & Associates. Dated: 10/15/12. Source of Topography: Two (2) foot contours shown from an airborne survey under the supervision of James H. Bell, Jr. aerial topography from Louisa Aerial Surveys, Inc. Dated: 03/10/12. S TORMWATER MANAGEMENT Stcrmwater measures for this block approved under WPO 2014 00074. The final design shows a decrease in impervious area from the approved plan. PROJECT DESCRIPTION, GENERAL NOTES, EROSION & SEDIMENT CONTROL NOTES, AND SEQUENCE OF CONSTRUCTION PERMANENT SEEDING SPECIFICATIONS (PS) February 16 through April 30: Kentucky 31 Fescue - 128 lbs/acre; Red Top Grass - 2 lbs/acre; Annual Rye - 20 lbs/acre. Add 20 lbs/acre of Crownvetch and reduce Kentucky 31 Fescue to 108 lbs/acre whein slopes are greater than 3:1. May 1 through August 15: Kentucky 31 Fescue - 128 lbs/acre; Red Top Grass - 2 lbs/acre; Foxtail Millet - 2.0 lbs/acre. Add 20 lbs/acre of Crownvetch and reduce Kentucky 31 Fescue to 108 lbs/acre whein slopes are greater than 3:1. August 16 through October 31: Kentucky 31 Fescue - 128 lbs/acre; Red Top Grass - 2 lbs/acre; Annual Rye - 20, lbs/acre. Add 20 lbs/acre of Crownvetch and reduce Kentucky 31 Fescue to 108 lbs/acre whein slopes are greater than 3:1. November 1 through February 15: Kentucky 31 Fescue - 128 lbs/acre; Red Top Gross - 2 lbs/acre; Winter Rye - 20 lbs/acre. Add 20 lbs/acre of Crownvetch and reduce Kentucky 31 Fescue to 108 lbs/acre whein slopes are greater than 3:1. MULCHING SPECIFICATIONS: Straw or hay at a rate of 2 tons/acre. Must be anchored. Spread with mulch blower or by hand. LIME AND FERTILIZER SPECIFICATIONS: Lime and fertilizer needs should be determined by soil tests. Soil tests may be preformed by the Cooperative Extension Service Soil Testing Laboratory at VPI&SU, or by a reputable commercial laboratory. Information concerning the State Soil Testing Laboratory is available from County Extension Agents. Under unusual conditions where it is not possible to obtain a soil test, the following soil amendments will be applied: For Permanent Seeding: Seeded areas shall be limed at a rate of 2 tons per acre, sand fertilized at a rate of 1,000 lbs. per acre of 10-20-10 (23 lbs. per 1,000 square fefet) or equivalent. For Temporary Seeding: Seeded areas shall be limed at a rate of 2 tons per acre, aind fertilized at a rate of 600 lbs. per acre of 10-20-10 (14 lbs. per 1,000 square feet;) or equivalent. Permanent Seeding W Not To Scale TABLE 3.31-B 1. ACCEPTABLE TEMPORARY SEEDING PLANT MATERIALS ALBEMARLE, ZONED NMD. THE PROPOSAL IS THE CONSTRUCTION OF NEW "QUICK REFERENCE FOR ALL REGIONS" THE INFORMATION AND DATA SHOWN OR INDICATED WITH RESPECT TO THE CONDOMINIUM BUILDING WITH ASSOCIATED ROADS AND UTILITIES. Rate Planting Dates Species (tbs./acre) Sept. 1 - Feb. 15 50/50 Mix of BASED ON INFORMATIDN AND DATA FURNISHED TO THE OWNER AND Annual Ryegrass (Lolium multi-florum) & 50- 100 Cereal (Winter) Rye (Secale cereale) Feb. 16 - Apr. 30 Annual Ryegrass 60-100 (Lolium multi-florum) May 1 - Aug 31 Gelman Millet 50 (Setaria italica) COORDINATION OF THE WORK WITH OWNERS OF SUCH UNDERGROUND Source: Va. DSWC 2 Temporary Seeding TS C2 Not To Scale GENERAL NOTES PROJECT DESCRIPTION THIS SITE IS A CLEARED AND PREPARED SITE WITHIN THE COUNTY OF 1. ALL ELEVATIONS INDICATED REFER TO SITE DATUM OF NAVD88. ALBEMARLE, ZONED NMD. THE PROPOSAL IS THE CONSTRUCTION OF NEW 2. THE INFORMATION AND DATA SHOWN OR INDICATED WITH RESPECT TO THE CONDOMINIUM BUILDING WITH ASSOCIATED ROADS AND UTILITIES. EXISTING UNDERGROUND UTILITIES AT OR CONTIGUOUS TO THE SITE ARE BASED ON INFORMATIDN AND DATA FURNISHED TO THE OWNER AND THE TOTAL AREA OF DISTURBANCE IS 1.13 ACRES ENGINEER BY THE OVIVNERS OF SUCH UNDERGROUND FACILITIES OR OTHERS. THE OWNER OR ENGINEER SHALL NOT BE RESPONSIBLE FOR THE THE PROJECT INVOLVES THE FOLLOWING WORK ACTIVITIES: ACCURACY OR COMPLETENESS OF SUCH INFORMATION OR DATA. THE CONTRACTOR SHALL HAVE FULL RESPONSIBILITY FOR CONFIRMING THE 1. THE CONTRACTOR SHALL OBTAIN ALL LOCAL AND STATE EROSION AND ACCURACY OF THE DATA, FOR LOCATING ALL UNDERGROUND UTILITIES, FOR SEDIMENT PERMITTING REQUIREMENTS AND MAINTAIN ALL EROSION AND COORDINATION OF THE WORK WITH OWNERS OF SUCH UNDERGROUND SEDIMENT CONTROLS IN ACCORDANCE WITH THE PERMIT REQUIREMENTS. UTILITIES DURING CONSTRUCTION, FOR THE SAFETY AND PROTECTION 2. INSTALLATION OF TEMPORARY AND PERMANENT EROSION AND SEDIMENT THEREOF AND REPAIRING ANY DAMAGE THERETO RESULTING FROM THE CONTROL MEASURES AS SHOWN ON THE PLAN AND DETAILS. WORK. ALL OF THESE CONDITIONS SHALL BE MET AT NO ADDITIONAL 3. INSTALLATION OF STORM SEWER FOR SITE DRAINAGE. COST TO THE OWNER_ THE CONTRACTOR SHALL CONTACT "MISS UTILITIES" 4. CONSTRUCTION OF STRUCTURES AND PARKING AREAS SHOWN ON THE SITE OF VIRGINIA AT 1-80)0-552-7001 PRIOR TO THE START OF WORK. DEVELOPMENT PLAN. 3. WHEN WORKING ADJACENT TO EXISTING STRUCTURES, POLES, ETC., THE CONTRACTOR SHALL USE WHATEVER METHODS THAT ARE NECESSARY TO PROTECT STRUCTURES FROM DAMAGE. REPLACEMENT OF DAMAGED EXISTING SITE CONDITIONS STRUCTURES SHALL BE AT THE CONTRACTOR'S EXPENSE. PRIOR TO INITIAL GRADING THE SITE WAS FORESTED. MASS GRADING ACTIVITIES 4. THE CONTRACTOR 'SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING SINCE JULY OF 2014 HAVE CLEARED THE SITE AND MASS GRADED THE SITE, AS SITE STRUCTURES FROM DAMAGE AND COORDINATING WORK SO THAT THE SHOWN IN THE CURRENT FIELD SURVEY IN THIS PLAN. OWNER CAN MAKE NECESSARY ARRANGEMENTS TO MODIFY/PROTECT EXISTING STRUCTURES FROM DAMAGES. ADJACENT PROPERTIES 5. THE CONTRACTOR 'SHALL BE RESPONSIBLE FOR NOTIFYING ALL UTILITY THIS PROPERTY IS BORDERED TO THE NORTH AND EAST BY SINGLE-FAMILY OWNERS, ADJACENT LAND OWNERS WHOSE PROPERTY MAY BE IMPACTED AND ATTACHED LOTS, AND TO THE SOUTH AND WEST BY FORESTED PARK LAND. THE VIRGINIA DEPARTMENT OF TRANSPORTATION PRIOR TO COMPLETING ANY OFF-SITE WORK. OFF-SITE AREAS 6. CONTRACTOR SHALL NOTIFY AND COORDINATE ALL WORK INVOLVING NO OFF-SITE (OUTSIDE OF PROJECT LIMITS) LAND DISTURBING ACTIVITIES WILL EXISTING UTILITIES WITH UTILITY OWNERS, AT LEAST 72 HOURS PRIOR TO THE TAKE PLACE IN THE COURSE OF THIS PROJECT. START OF CONSTRUCTION. 7. CONTRACTOR SHALL IMMEDIATELY REPORT ANY DISCREPANCIES BETWEEN SOILS EXISTING CONDITIONS AND CONTRACT DOCUMENTS TO THE OWNER AND REFER TO PREVIOUSLY APPROVED MASS GRADING PLAN, WPO 2014-21, FOR ENGINEER. LOCATIONS AND DESCRIPTIONS OF IN SITU SOILS. 8. CONTRACTOR SHALL SUBMIT FOR THE APPROVAL OF THE OWNER SUBMITTALS OF ALL SPECIFIED MATERIALS LISTED IN THE PLANS, TO CRITICAL EROSION AREAS INCLUDE SHOP DRAWINGS, MANUFACTURER'S SPECIFICATIONS AND THERE ARE NO AREAS ON THIS SITE WITH CRITICAL EROSION CONCERNS. LABORATORY REPORTS. THE OWNER'S APPROVAL OF SUBMITTALS WILL BE PERMANENT STABILIZATION GENERAL AND WILL NOT RELIEVE THE THE CONTRACTOR FROM THE THOSE AREAS OF THE SITE WHICH WILL NOT BE ULTIMATELY PAVED WILL HAVE RESPONSIBILITY OF ADHERENCE TO THE CONTRACT AND FOR ANY ERROR THAT MAY EXIST. PERMANENT SEEDING ESTABLISHED, AS WELL AS TREES AND SHRUBS. STORM WATER MANAGEMENT: STORM WATER MANAGEMENT IS ADDRESSED BY AN INFILTRATION TANK, AS SHOWN IN APPROVED WPO 2014 00074. EROSION & SEDIMENT CONTROLS 1. SAFETY FENCE: A PROTECTIVE BARRIER INSTALLED TO PROHIBIT UNDESIRABLE USE OF AN EROSION CONTROL MEASURE. STD. AND SPEC. 3.01. 2. CONSTRUCTION ENTRANCE: INSTALL AND MAINTAIN A CONSTRUCTION ENTRANCE, AS NECESSARY, THAT MEETS THE REQUIREMENTS OF STD. AND SPEC. 3.02 AND CONFORMS WITH THE REQUIREMENTS OF THE EROSION & SEDIMENT CONTROL PLAN. THE EXISTING ENTRANCE IS A STONE CONSTRUCTION ENTRANCE AS APPROVED ON THE MASS GRADING PLANS. THIS ENTRANCE MAY REMAIN IN PLACE PROVIDED THAT THE CONTRACTOR KEEPS MUD AND DIRT OFF OF THE PUBLIC STREET. IF TRACKING OF MUD ONTO ROADWAYS OCCURS THE COUNTY INSPECTOR MAY REQUIRE CONSTRUCTION OF A PAVED CONSTRUCTION ENTRANCE. 3. CONSTRUCTION ROAD STABILIZATION: TEMPORARY STABILIZATION WITH STONE OF ACCESS ROADS, SUBDIVISION STREETS, PARKING AREAS, AND OTHER TRAFFIC AREAS IMMEDIATELY AFTER GRADING TO REDUCE EROSION CAUSED BY VEHICLES DURING WET WEATHER, AND TO PREVENT HAVING TO REGRADE PERMANENT ROADBEDS BETWEEN INITIAL GRADING AND FINAL STABILIZATION. STD. AND SPEC. 3.03. 4. SILT FENCE: INSTALL AND MAINTAIN SILT FENCE THAT MEETS THE REQUIREMENTS OF STD. AND SPEC. 3.05. THIS SILT FENCE SHALL BE INSTALLED AS SHOWN ON THE EROSION & SEDIMENT CONTROL PLAN AND ACCOMPANYING DETAILS FOR THE PURPOSE OF INTERCEPTING SILT -LADEN RUNOFF BEFORE IT IS DISCHARGED FROM THE SITE. THE SILT FENCE SHALL BE INSPECTED AND MAINTAINED TO ENSURE CONTINUED PERFORMANCE. 5. STORM DRAIN INLET PROTECTION: THE INSTALLATION OF VARIOUS KINDS OF SEDIMENT TRAPPING MEASURES AROUND DROP INLETS OR CURB INLET STRUCTURES PRIOR TO PERMANENT STABILIZATION OF THE DISTURBED AREA; LIMITED TO DRAINAGE AREAS NOT EXCEEDING ONE ACRE, AND NOT INTENDED TO CONTROL LARGE, CONCENTRATED STORMWATER FLOWS. STD. AND SPEC. 3.07. 6. TEMPORARY DIVERSION DIKE: A RIDGE OF COMPACTED SOIL CONSTRUCTED AT THE TOP OR BASE OF A SLOPING DISTURBED AREA WHICH DIVERTS OFF-SITE RUNOFF AWAY FROM, UNPROTECTED SLOPES AND TO A STABILIZED OUTLET, OR TO DIVERT SEDIMENT -LADEN RUNOFF TO A SEDIMENT TRAPPING STRUCTURE. MAXIMUM EFFECTIVE LIFE IS 18 MONTHS. STD. AND SPEC. 3.09. 7. TEMPORARY SEDIMENT BASIN: A TEMPORARY BARRIER OR DAM WITH CONTROLLED STORMWATER RELEASE STRUCTURE WHICH IS FORMED BY CONSTRUCTING AN EMBANKMENT OF COMPACTED SOIL ACCROSS A DRAINAGEWAY. IT IS USED TO DETAIN SEDIMENT -LADEN RUNOFF FROM DRAINAGE AREAS 3 ACRES OR GREATER FOR ENOUGH TIME TO ALLOW MOST OF THE SUSPENDED SOLIDS TO SETTLE OUT. IT CAN BE CONSTRUCTED ONLY WHERE THERE IS SUFFICIENT SPACE AND APPROPRIATE TOPOGRAPHY. MAXIMUM EFFECTIVE LIFE IS 18 MONTHS UNLESS DESIGNED AS A PERMANENT POND BY A QUALIFIED PROFESSIONAL. STD. AND SPEC. 3.14. 8. TEMPORARY SEDIMENT TRAP: A TEMPORARY EXCAVATED TRAP TO CAPTURE SEDIMENT LADEN RUNOFF FROM DRAINAGE AREA'S OF LESS THAN 3.0 ACRES. TWO SEDIMENT TRAPS ARE PROVIDED ON THE PLANS ADJACENT TO THE PROPOSED CULVERT EXTENSION ON ROUTE 20. THE TRAPS SHALL BE CONSTRUCTED PER THE DETAILS ON THIS PLAN AND PER STD. AND SPEC. 3.13. 9. OUTLET PROTECTION: THE INSTALLATION OF RIPRAP CHANNEL SECTIONS AND/OR STILLING BASINS BELOW STORM DRAIN OUTLETS TO REDUCE EROSION AND UNDER -CUTTING FROM SCOURING AT OUTLETS AND TO REDUCE FLOW VELOCITIES BEFORE STORMWATER ENTERS RECEIVING CHANNELS BELOW THESE OUTLETS. STD. AND SPEC. 3.18, 10. TEMPORARY SEEDING: TEMPORARY SEEDING SHALL BE APPLIED TO ALL DENUDED AREAS WITHIN SEVEN (7) DAYS TO DENUDED AREAS THAT MAY OR MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN 30 DAYS. TEMPORARY SEEDING SHALL BE APPLIED IN CONFORMANCE WITH STD. AND SPEC. 3.31. 11. PERMANENT SEEDING: ALL DITCHES AND ADJACENT AREAS WITHIN 15 FT OF THE EDGE OF THE DITCHES SHALL BE SEEDED IN CONFORMANCE WITH STD. AND SPEC. 3.32. PERMANENT SEEDING SHALL BE APPLIED TO AREAS DELINEATED ON THESE PLANS WITHIN SEVEN (7) DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. PERMANENT SEEDING STABILIZES DISTURBED AREAS AND ENHANCES THE BEAUTY OF THE SITE. 12. MULCHING: APPLICATION OF PLANT RESIDUES OR OTHER SUITABLE MATERIALS TO THE SOIL SURFACE TO PREVENT EROSION AND FOSTER THE GROWTH OF VEGETATION. ORGANIC MULCHES (STRAW) HAVE BEEN FOUND TO BE THE MOST EFFECTIVE. 13. DUST CONTROL: CONDUCT DUST CONTROL OPERATIONS NECESSARY TO MET THE REQUIREMENTS OF STD. & SPEC. 3.39 AS REQUIRED TO CONTROL SURFACE AND AIRBORNE MOVEMENT OF DUST. GENERAL EROSION AND SEDIMENT CONTROL NOTES: 1. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 6251-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. 3. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 4. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF-SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 5. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 6. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 7. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 8. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 9. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. 10. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS. 11. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING ORDINANCE SECTION 5.1.28. 12. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OIF THE CODE OF ALBEMARLE. 13. BORROW, FILL OR VNASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7:OOAM TO 9:OOPM. 14. BORROW, FILL OR VNASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAN MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE 0 SLIDES, SINKING, OR COLLAPSE. 15. THE DEVELOPER SH! ALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES WHERE APPLICABLE ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR OTHER PORTION OF THE PROPERTY. 16. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 840LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 17. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH). AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90LBS/1000SF, INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER SHALL BE APPLIED AT 1000LBS/ACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 18OLBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL RYEEGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS TO BE APPLIED AT 8OLB`:S/100SF. ALTERNATIVES ARE SUBJECT TO APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 18. MAINTENANCE: ALL tMEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIR IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIATELY, 19. ALL TEMPORARY ERCOSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED WITHIN 30 IDAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. 20, THIS PIAN SHALL B3E VOID IF THE OWNER DOES NOT OBTAIN A PERMIT WITHIN 1 YEAR OF THE DATE OF APPROVAL. (WATER PROTECTION ORDINANCE SECTION 17-204G.) 21. PERMANENT VEGETATFION SHALL BE INSTALLED ON ALL DENUDED AREAS WITHIN NINE (9) MONITHS AFTER THE DATE THE LAND DISTURBING ACTIVITY COMMENCED. (WATER PROTECTION ORDINANCE SECTION 17-207B) MANAGEMENT STRATEGY AND SEQUENCE OF CONSTRUCTION THE FOLLOWING ARE THE PROPOSED MANAGEMENT STRATEGIES AND DETAILED SEQUENCE OF CONSTRUCTION: PHASE 1 (MEASURES ALLREADY COMPLETED WITH MASS GRADING) 1. INSTALL CONSTRUCTION ENTRANCE. 2. INSTALL SILT FENCE, TREE PROTECTION FENCE, AND SAFETY FENCE AT THE LOCATIONS SHOWN ON THE EROSION & SEDIMENT CONTROL PLAN. 3. CONSTRUCT SEDIMENT TRAP. 4. CONTACT THE ENGINEER AND ALBEMARLE COUNTY FOR INSPECTION AND APPROVAL OF ALL E&S CONTROL MEASURES. PHASE 2 1. UPON APPROVAL OF E&S CONTROL MEASURES, BEGIN CLEARING AND GRADING OF THE SITE, BEGIN CONSTRUCTION OF STRUCTURES AND PARKING AS SHOWN ON THE SITE DEVELOPMENT PLAN. 2. MAINTAIN ALL E&S CONTROL MEASURES. PHASE 3 1. STABILIZE PARKING AND PAD SITE. 2. ALL PERIMETER SILT FENCE AND STABILIZATION MEASURES SHALL REMAIN IN PLACE UNTIL THE SITE IS DEEMED STABILIZED BY THE PLAN REVIEWING AUTHORITY. 3. AFTER THE SITE IS STABILIZED, REMOVE SEDIMENT TRAP. CONSTRUCTION MAINTENANCE THE FOLLOWING CONSTRUCTION MAINTENANCE PRACTICES SHALL BE FOLLOWED AT THE SITE. 1. ALL E&S CONTROL MEASURES WILL BE CHECKED DAILY AND AFTER EACH SIGNIFICANT RAIN EVENT. ALL DEFICIENCIES IDENTIFIED DURING THESE INSPECTIONS SHALL BE CORRECTED AS SOON AS PRACTICABLE. 2. THE SILT FENCE BARRIER SHALL BE REGULARLY CHECKED FOR UNDERMINING, DETERIORATION OR SIGNIFICANT EROSION. SEDIMENT SHALL BE REMOVED AFTER EACH STORM EVENT AND WHEN THE LEVEL OF SEDIMENT DEPOSITION REACHES HALF THE HEIGHT OF THE CONTROL. 3, THE CONTRACTOR IS RESPONSIBLE FOR ADHERING TO ALL MAINTENANCE REQUIREMENTS SET FORTH IN THE CURRENT EDITION OF THE VIRGINIA SEDIMENT AND EROSION CONTROL MANUAL, OTHER APPLICABLE COMMONWEALTH OF VIRGINIA REGULATIONS AND THE PROJECT SPECIFICATIONS. 4. ALL SEEDED AREAS WILL BE REGULARLY CHECKED TO ENSURE THAT A GOOD STAND OF GRASS IS MAINTAINED, 5. AREAS WITH RIP -RAP SHOULD BE REGULARLY INSPECTED TO DETERMINE IF HIGH FLOWS HAVE DAMAGED THESE CONTROLS OR CAUSED EXCESSIVE SEDIMENT DEPOSITION. ALL AREAS SHALL BE MAINTAINED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS E&S CONTROL PLAN. ENVIRONMENTAL CONTROLS 1. CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL ENVIRONMENTAL CONTROL MEASURES SO AS TO COMPLY WITH LOCAL ORDINANCES, STATE AND FEDERAL_ LAWS AND REGULATIONS APPLICABLE TO WATER POLLUTION IN WATERS OF THE STATE AND IN INTERSTATE WATERS. 2. CONTRACTOR SHALL MINIMIZE THE POTENTIAL FOR AIR POLLUTION BY THE USE OF EMISSION CONTROL EQUIPMENT ON CONTRACTOR OPERATED EQUIPMENT, SHUT -DOWN OF MOTORIZED EQUIPMENT WHEN NOT IN USE, AND ACTIVELY CONTROLLING DUST EMISSIONS THROUGHOUT THE PROJECT. 3. ANY WASTE DISCOVERED DURING THE PROJECT SHALL NOT BE MOVED WITH OUT PRIOR AUTHORIZATION OF THE OWNER AND BE DIIRECT-LOADED INTO COVERED ROLL -OFF CONTAINERS FOR TEMPORARY STORAGE PRIOR TO DISPOSAL IN A PERMITTED LANDFILL. EROSION & SEDIMENT CONTROL PERMITTING 1. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL LOCAL AND STATE EROSION AND SEDIMENT CONTROL PERMITS AND MAINITAINING ALL EROSION AND SEDIMENT CONTROLS IN ACCORDANCE WITH THE FPERMIT REQUIREMENTS, MINIMUM STANDARDS (MS): All applicable Virginia Erosion and Sediment Control Regulations and Minimum Standards shall be adhered to during all phases of construction. These include, but are not limited to the following: 1. STABLIZATION OF DENUDED AREAS: Permanent or temporary soil stabilization shall be applied to bare areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade, but will remain dormant or undisturbed for longer than 30 days. Permanent stabilization shall be applied at areas that are to be left dormant for more than 1 year. 2. STABILIZATION OF SOIL STOCKPILES: During construction of the project, soil stockpiles shall be stabilized or protected with sediment trapping measures. The applicant is responsible for temporary protection and permanent stabilization of all soil stockpiles on site as well as soil intentionally transported from the project site. 3. PERMANENT VEGETATIVE COVER A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieve that, in the opinion of the county Inspector, is uniform and mature enough to survive to inhibit erosion. 4. TIMING & STABILIZATION OF SILT TRAPPING MEASURES: Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land disturbing activity and shall be made functional before upslope land disturbance takes place. 5. STABILIZATION OF EARTHEN STRUCTURES: Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. 6. SEDIMENT TRAPS AND BASINS: A sediment basin shall control surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three acres. The sediment basin shall be designed and constructed to accommodate the anticipated sediment loading for the land disturbing activity. The outfall device or system device shall take into account the total drainage area flowing through the disturbed area to be served by the basin. 7. CUT AND FILL SLOPES: Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. & CONCENTRATED RUN-OFF DOWN CUT OR FILL SLOPES: Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent channel, flume, or slope drain stru ctu re. 9. WATER SEEPS FROM A SLOPE FACE: Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. 10. STORM SEWER INLET PROTECTION: All storm sewer inlets that are made operable during construction shall be protected so that sediment -laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. 11. STABILIZATION OF OUTLETS: Before newly constructed stormwater conveyance channels are made operational, adequate outlet protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel. 12. WORK IN LIVE WATERCOURSES: When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover materials. 13. CROSSING A LIVE WATERCOURSE: When a live watercourse must be crossed by construction vehicles more than twice in any six month period, a temporary stream crossing constructed of nonerodible materials shall be provided. 14. APPLICABLE REGULATIONS: All applicable federal, state and local regulations pertaining to working in or crossing live watercourses shall be met. 15. STABILIZATION OF BED AND BANKS The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed. 16. UNDERGROUND UTILITIES: Underground utilities shall be installed in accordance with the following standards in addition to other criteria: a.No more than 500 linear feet of trench may be opened at one time. b.Excavated material shall be placed on the uphill side of trenches c.Effluent for dewatering operations shall be filtered or passed through approved sediment trapping device, or both, and discharged in a manner that does not adversely affect flowing streams or offsite property. d.Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization. e. Restabilization shall be accomplished in accordance with these regulations. f. Applicable safety regulations shall be complied with. 17. CONSTRUCTION ACCESS ROUTES: Where construction vehicle access routes intersect paved public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto paved surfaces. Where sediment is transported on to a public road surface, the road shall be cleaned thoroughly at the end of each day. Sediment shall be removed by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual lots as well as to larger land disturbing activities. 18. TEMPORARY E&S CONTROL MEASURE REMOVAL: All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after temporary measures are no longer needed, unless otherwise authorized by the local program authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sediment. 19. ADEQUACY OF RECEIVING CHANNELS: Properties and waterways downstream from the development site shall be protected from sediment deposition, erosion and damage, due to increases in volume, velocity and peak flow rates of stormwater runoff for the stated frequency storm of 24-hour duration. J STIN M. SHIMP l Lic/No/45183 ��5O TOP OF BERM =345.0 I I I I I I 12 13 14 15 i I I I I s 11�.1 I I I I uw rc rrutcnu�c a�uu \sr.4 SO EROSION &SEDIMENT CONTROL SYMBOLS Ln � BOX./^"" "`, •• / . ✓, f, �oG�lO� �.:$ SYMBOL N0. TITLE KEY 30.0'Ar \ 'DOGW00(y''` 340 \ ° .... 3.01 SAFETY FENCE SAF 34,3. /s soR' a DA=0.67 AC. D I . ,. "e . / ,-:�•.��= • � ! •§, 3.02 CONSTRUCTION ENTRANCE CE _ SA OSF 4 —X44— PS 3.03 CONSTRUCTION ROAD STABILIZATION / J eWe —�=� �� — — So' s �� X X —x 3.05 SILT FENCE SF CWD 342 7 J �j 3.07 INLET PROTECTION IP ,• W Q ¢0— AM 00 i 1 P 3.13 TEMPORARY SEDIMENT TRAP ST ! [[DRAWN TO SCALE] O �.. is3 O pr 3.31 TEMPORARY SEEDING TS m 000, PS 3.32 PERMANENT SEEDING PS m Ill j�j 3.35 MULCH MU m > / = 3.38 TREE PROTECTION FENCE TP i Iw \\ — LIMITS OF DISTURBANCE EXISTING CONTOUR w cpl �A - PROPOSED CONTOUR 20 0 20 40 60 .. .Y PROPOSED CONTOUR Scale: 1 "=20' O JUSTIN M. SHINIP Lic. No. 45183 O Al' L."Tip U JUSTIN A SHIMP> Lic. N 4518' ,,,6 -toN SNOW FEN BOARD FE' -NCE CORRECT TRUNK ARMORING 00 TRIANGULAR BOARD FENCE ('1�Tree Protection Fence TP) C5 Not To Scale -----i-- ORIGINAL GROUND ELEV. EL=A Area 2 DRY STORAGE D2 67 CU. YD./ACRE `v EL=B Area 1 WET STORAGE 67 CU. YD./ACRE D1 �. (EXCAVATED) FILTER CLOTH GROUNDL EL=C ELEV. * SEE PLATE 3.13-1 COARSE AGGREGATE CLASS I RIPRAP CROSS SECTION OF OUTLET CLASS I RIPRAP LENGTH (IN FEET) = 2' (INXAC )AINAGE AREA DIVERSION �—��� DIKE _ fir, .: r��s– ; .► _ ����'as �+bio _ - �_ �1 1 Sediment Trap Design Dataa No. A B C H (ft.) Z (ft.) Weir Length DA Wet Vol. D1 Wet Vol. Dry Vol. D2 Dry Vol. matter. Must be anchored. tons for Spread with mulch blower or (fit.) (Acs.) (Req.) (ft.) Cy (Prov.) (Req.) (ft.) Cy (Prov.) 1 343.5 342 340 2 2.0 4 0.67 44.9 2 49 44.9 1.5 57 MAX. SLOPE 2: SEDIMENT–LADEEN�RUNOFF R E'QUtR E STORM WATER WITH LARGER PARTICLES REMOVED DRAIN INLET FLOW FLOW r � FLOW \ FLOW DEPTH BELOW TOP OF INLET: MIN. 1'– MAX. 2' III -1 d d ° WEEP HOLES FOR ° DEWATERING a SPECIFIC APPLICATION LARGER PARTICLES SETTLE OUT THIS METHOD OF INLET PROTECTION 1S APPLICABLE WHERE HEAVY FLOWS ARE EXPECTED AND WHERE AN OVERFLOW CAPABILITY AND EASE OF MAINTENANCE ARE DESIRABLE. ri`\Excavated Droe Inlet Sediment Tr(in C5) Not To Scale 710- ;.`iii_.:-._._.��--._..:...............�,.. 5 .l ri4..il vt, ...Vi:'� v.1IVI.N. i.� S,}'.S r – L X IS I G P t t PROEI LE rf CC ,S 2 _.__... 'i t f } I P0NA' F +MLI [XT_'J FULL 611_! € A �� r0 7c I. �I Irl P AN,, 1_3R_..-3 PL6' I 2117 a Nk sMF',vITJ Tia St IMI NT I -I_ i F. SECTION —. A laid niaaai w atef tali of I it'ich mist be ift,4afferl with a 111iiiinium 1 fileli b allcod", hoto l' aloe supplying, a wa-,41 hose with a +,liaalaieter caf 1.5 inclie's iter of lequate Constant pre, slue. Water aaaaast be c:aaaiecl a��a'r � ialaa tlae �iltirai�- fica -air apps wecl settliaa`f area to remove se(li iienL All sedj etit shall be pa -eves ted froia elitedlig s tonil clraiais, ditches rar Watercourses, PAVED WASH PACK NO 7_`CkLE Paved Construction Entrance W/'Wash Rack (CE Not To Scale ORGANIC MULCH MATERIALS AND APPLICATION RATES RATES: MULCHES: NOTES: Per Acre Per 1000 sq. ft. Straw or Hay 12 - 2 tons 70 - 90 lbs. Free from weeds and coarse (Minimum 2 matter. Must be anchored. tons for Spread with mulch blower or winter cover) by hand. Fiber Mulch Minimum 35 lbs. Do not use as mulch for 1500 lbs. winter cover or during hot, dry periods.* Apply as slurry. Corn Stalks 4 - 6 tons 185 - 275 lbs. Cut or shredded in 4-6" lengths. Air-dried. Do not use in fine turf aeras. Apply with mulch blower or by hand. Wood Chips 4 - 6 tons 185 - 275 lbs. Free of coarse matter. Air- dried. Treat with 12 lbs nitrogen per ton. Do not use in fine turf areas. Apply with mulch blower, chip handler, or by hand. Bark Chips 50 - 70 cu. 1-2 cu. yds. Free of coarse matter. Air - or yds. dried. Do not use in fine Shredded turf areas. Apply with Bark mulch blower, chip handler, or by hand. When fiber mulch is the only available mulch during periods when straw should be used, apply at a minimum rate of 2000 lbs./ac. or 451bs./1000 sq. ft. Source: Va. DWSC 3 Mu_ (chin _MU C5 Not To Scale SAFETY FENCE PERSPECTIVE VIEW PERSPECTIVE VIEW PLASTIC FENCE SAFETY FENCE ( SAF Not To Scale PERSPECTIVE VIEW METAL FENCE CONSTRUCTION OF A SILT PENCE (WITHOUT WIRE S UPPOR T) 1. SET THE STAKES. 2. EXCAVATE A 4"X 4" TRENCH UPSLOPE ALONG THE I INE OF STAKES. 6'MAX. 3. STAPLE FILTER MATERIAL TO STAKES AND EXTEND IT INTO THE TRENCH. 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. SHEET FLOW INSTALLATION (PERSPECTIVE VIEW) 4" POINTS A SHOULD BE HIGHER THAN POINT B. DRAINAGEWAY INSTALLATION (FRONT ELEVATION) 4 Silt Fence Without Wire Su ort C5 Not To Scale WIRE SCREEN RUNOFF OVERFLOW WATER WITH SEDIMENT SEDIMENT 611 CONCRETE BLOCK GRAVEL FILTER WIRE SCREEN J 2" X 4" WOOD STUD FILTERED WATER SPECIAL APPLICATION THIS METHOD OF INLET PROTECTION IS APPLICABLE AT CURB INLETS WHERE AN OVERFLOW CAPABILITY IS NECESSARY TO PREVENT EXCESSIVE PONDING IN FRONT OF THE STRUCTURE. * GRAVEL SHALL BE VDOT #3, #357 OR #5 COARSE AGGREGATE g Dro Inlet Protection IP C5 Not To Scale (0 g 00 0 O 0 CO I z O T N W W z r) 0 I z v W r 0 I T 0-00 N O rn � N N W Q > > W J V) J Z W Q � o W J Q o T N 0 115-1�� ® JUSTIN M. SKIMP > Llc./No. 45183 O Sheet No. C5 OF 5 File No. 12.009