HomeMy WebLinkAboutWPO201600034 Correspondence WPO VSMP 2016-06-07 Matthew Wentland To: Graham Murray Subject: RE:Greenloft Farm VSMP Graham, You can convert the flow coming from the pipe into sheet flow with a level spreader, but you'd have to do it away from the existing swale since it would just re-channelize the runoff and still direct it onto the neighbor's property. If you want to leave the design as it stands,the Energy Balance Equation would have to be applied to the swale to show that it's adequate. For the easements, it's fine knowing they will show up on the plat. I was looking for an easement onto the neighbor's property below the Pipe 4 outfall and then to the limits of analysis (from 9VAC25-870-66.4), but if you apply energy balance to that swale and it's adequate, it won't be necessary.The ESC plan is acceptable. Let me know if you have any other questions. Thanks, Matt From: Graham Murray [mailto:graham@collins-engineering.com] Sent:Tuesday,June 07, 2016 9:47 AM To: Matthew Wentland<mwentland@albemarle.org> Subject: RE:Greenloft Farm VSMP Good morning Matt, I'd like to follow up with you on your comments below&attached. I have 3 questions for you: • (SWM Comment#2)Can you please confirm a level spreader with its(and the proposed swale's)design&calculations will suffice for addressing this comment? I'm pretty sure it will based off the way I read your comment letter, but I wanted to confirm this. • (SWM Comment#3) I believe all of the easements are already shown,though admittedly they are difficult to see on sheet 9. Knowing these easements appear in detail on the plat, is there something more or specific you are looking for with the revised plans?I will be glad to oblige to this request, but if you could provide me with a little more detail/information with what you want to see that would be helpful. • The April 29th plans included an ESC submittal . Can I assume these plans are acceptable since we did not receive comments? Thanks, Graham From: Scott Collins Sent: Wednesday, May 25, 2016 4:41 PM To: Graham Murray Subject: FW: Greenloft Farm VSMP From: Matthew Wentland [mailto:mwentland@albemarle.org] Sent:Wednesday, May 25, 2016 3:01 PM To:Scott Collins Subject:Greenloft Farm VSMP Scott, 1 Here are the comments for the Greenloftaarm VSMP application. Let me know if yogve any questions. Thank you, Matt Wentland, P.E. Civil Engineer II 2 COLLINS /200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 �/` 434.293.3719 PH 434.293.2813 FX �www.coIlins-engineering.com TRANSMITTAL ❑ FAX ❑ MAIL X DELIVERY TO: MATT WENTLAND,PE FROM:GRAHAM MURRAY,PE COMPANY: COMMUNITY DEVELOPMENT DATE: 10/24/16 FAX: TOTAL NO.OF PAGES INCLUDING COVER: PHONE NUMBER: SENDER'S PHONE NUMBER: PROJECT/SUBJECT: GREENLOFT FARM VSMP PLANS-WPO 201600034 PLEASE FIND ENCLOSED: NO.COPIES DATE DESCRIPTION 4 10/24/16 PLANS FOR SIGNATURES 1 10/24/16 SWM CALCULATIONS PACKET 1 10/24/16 COMMENT RESPONSE LETTER NOTES/COMMENTS: THE ATTACHED PLANS ADDRESS THE 3 REMAINING SWM COMMENTS IN YOUR 5/25/16 COMMENT LETTER. ADDITIONALLY,IN AN E-MAIL DATED 6/10/16 BETWEEN MR.WENTLAND AND MR. MURRAY IT WAS CONFIRMED THE PREVIOUSLY SUBMITTED ESC PLANS WERE ACCEPTABLE.AND LASTLY,THE APPLICANT IS CONCURRENTLY WORKING TOWARDS OBTAINING THE REQUIRED SIGNATURES FROM THE OWNER ON THE SWPPP.THE APPLICANT KINDLY REQUESTS THIS BE A CONDITION OF APPROVAL IN THE EVENT THIS LAST ADMINISTRATIVE ITEM HAS NOT BEEN COMPLETED AT THE TIME OF ENGINEERING'S REVIEW/APPROVAL OF THIS PLAN. ALSO,TO PROVIDE FULL DISCLOSURE,PLEASE BE AWARE THE PRIVATE ROAD WAS MODIFIED SLIGHTLY STARTING AT STATION 34+00 IN THE REAR NEAR THE CUL-DE-SAC.BECAUSE THE SWM AND ESC MEASURES ARE PLACED AT THE PERIMETER,ONLY MINOR CHANGES WERE REQUIRED TO THE ATTACHED PLANS,THOUGH ALL UPDATES WERE PERFORMED TO ASSIST WITH THIS APPROVAL. SHOULD YOU HAVE ANY QUESTIONS CONCERNING YOUR APPROVAL OF THESE PLANS,PLEASE CONTACT ME AT GRAHAM@COLLINS-ENGINEERING.COM OR AT(434)566-3011. KINDLY, GRAHAM RECEIVED BY: SIGNATURE DATE Matthew Wentland From: Graham Murray <graham@collins-engineering.com> Sent: Thursday, November 10, 2016 4:49 PM To: Frank Pohl; Matthew Wentland Cc: Scott Collins Subject: RE:Greenloft Farm VSMP Thank you Frank for your help and agreement on this. Enjoy your day off. Graham From: Frank Pohl [mailto:fpohl@albemarle.org] Sent:Thursday, November 10,2016 4:47 PM To:Graham Murray<graham@collins-engineering.com>; Matthew Wentland <mwentland@albemarle.org> Subject: RE:Greenloft Farm VSMP Thanks for the information Graham. I was hoping we could avoid including it in the bond but it looks like that is not possible. With that, I agree with what you propose to include 10 lbs/yr nutrient credits in the bond at$15k each. Once the plat is recorded,the owner can request a reduction to have this removed if he wishes. Thanks and have a great weekend (we are off tomorrow), Frank Frank V. Pohl, PE County Engineer County of Albemarle (434) 296-5832 Ext. 7914 From:Graham Murray [mailto:graham@collins-engineering.com] Sent:Thursday, November 10, 2016 4:44 PM To: Frank Pohl<fpohlPalbemarle.org>; Matthew Wentland<mwentland@albemarle.org> Subject: RE:Greenloft Farm VSMP Frank, Thanks for the e-mail. Unfortunately the WPO is a priority.The developer wants to break ground by December 15t,which will be here before we know it with Veteran's Day and Thanksgiving upcoming. Also, Brian Ray with Roger W. Ray&Associates has informed me he has made great strides with the plat but its approval is still a little ways out. Thanks, Graham From: Frank Pohl [mailto:fpohl@albemarle.org] Sent:Thursday, November 10, 2016 4:38 PM 1 To:Graham Murray<graham@collins-eneering.corn>; Matthew Wentland <mwend@albemarle.org> Subject: RE: Greenloft Farm VSMP Graham, When do you anticipate the final plat will be recorded? I am just trying to figure out if we can hold off approving the WPO until such time, or if it the WPO is a priority. Thanks, Frank Frank V. Pohl, PE County Engineer County of Albemarle (434) 296-5832 Ext. 7914 From:Graham Murray [mailto:graham@collins-engineering.com] Sent:Thursday, November 10, 2016 2:39 PM To: Frank Pohl<fpohl@albemarle.org>; Matthew Wentland<mwentland@albemarle.org> Subject: RE:Greenloft Farm VSMP Frank, I would like, if you and Matt agree,to limit the bond amount for the conserved open spaces to 10 lbs/yr,which is equivalent to$150,000 when Matt's suggested figure of$15K per pound is applied to it.This 10 lbs/yr is consistent with VA DEQ's maximum amount of phosphorous credits available for purchase. This$150,000 would be in addition to the calculated $352,680 ESC bond and the$203,550 SWM bond.The end result would be a total VSMP bond amount of$706,230. Thanks, Graham From: Frank Pohl [mailto:fpohl@albemarle.org] Sent:Thursday, November 10,2016 2:27 PM To:Graham Murray<graham@collins-engineering.com>; Matthew Wentland<mwentland@albemarle.org> Subject: RE:Greenloft Farm VSMP Graham, How do you propose we handle this situation? Frank Frank V. Pohl, PE County Engineer County of Albemarle (434) 296-5832 Ext. 7914 2 From:Graham Murray [mailto:graham@collins-engineering.com] Sent:Thursday, November 10, 2016 8:39 AM To: Frank Pohl<fpohl@albemarle.org>; Matthew Wentland<mwentland@albemarle.org> Cc:Scott Collins<scott@collins-engineering.com> Subject: RE:Greenloft Farm VSMP Good morning Frank, You are correct,we are achieving Part IIB water quality compliance through the conserved open spaces shown in the approved VSMP plans.An easement is shown on the plans outside the limits of the proposed development preserving this area.This same easement is shown on the yet-to-be approved subdivision plat,though I believe a revised plat was sent to the County showing this 2 or 3 weeks ago by Roger W. Ray&Associates.Also,the vast majority of the conserved area receives runoff via sheet flow in the northern section of TMP 89-25 where upland development is very limited and measures are in place. Thanks, Graham From: Frank Pohl [mailto:fpohl@albemarle.orq] Sent: Wednesday, November 09, 2016 5:59 PM To: Graham Murray; Matthew Wentland Cc: Scott Collins Subject: RE: Greenloft Farm VSMP Graham, Are you meeting all requirements of Design Specification No. 2 to achieve this credit? Frank Frank V. Pohl, PE County Engineer County of Albemarle (434) 296-5832 Ext. 7914 From:Graham Murray [mailto:graham@collins-engineering.com] Sent:Wednesday, November 09, 2016 3:07 PM To: Matthew Wentland <mwentland@albemarle.org>; Frank Pohl<fpohl@albemarle.org> Cc:Scott Collins<scott@collins-engineering.com> Subject: RE:Greenloft Farm VSMP Good afternoon Matt and Frank, Attached are the SWM and ESC bond estimates for Greenloft Farm. Also, I'd like to discuss our options concerning the bonding of phosphorous credits. I think bonding the preservation areas at$15,000 per pound sounds good in theory given the going rates. However for an atypical development like Greenloft Farm it doesn't relate properly since the development is not seeking to purchase credits and its preservation area is in excess of 45 acres. I think because this development is preserving such significant areas it is making this bond amount impractical.When I remove the approved 45.48 acres of preserved open space and allocate it as managed turf it changes the required removal rate from-0.06 lbs/yr to 17.57 lbs/yr. This would equate to a bond amount of$263,550. I think we can all agree this seems excessive. In light of this,would you be willing to make an exception for this atypical project?Perhaps capping the nutrient credit at 10 lbs/yr would be an acceptable solution since this is the maximum VA DEQ allows.This would reduce the bond amount to$150,000 for the areas until the easement plat is approved. 3 (111100 Thanks, Graham From: Matthew Wentland [mailto:mwentland©albemarle.orq] Sent: Monday, November 07, 2016 3:26 PM To: Scott Collins Cc: Graham Murray; Frank Pohl Subject: RE: Greenloft Farm VSMP Scott, That would be great. For the Forested Area credits, we'll need a VRRM worksheet showing how many credits you would otherwise need and those will be bonded at$15,000 per pound. Thanks, Matt From:Scott Collins [mailto:scott@collins-engineering.com] Sent: Monday, November 07,2016 10:09 AM To: Matthew Wentland <mwentland@albemarle.org>; Graham Murray<graham@collins-engineering.com> Subject: Re: Greenloft Farm VSMP Matt- Let me know if you want us to put together the bond estimates for the wpo on green loft farm, if that will help you out. Thx. Scott On Nov 4,2016, at 3:10 PM, Scott Collins<scott@collins-engineering.com>wrote: Matt- Thanks again for the help. Attached is the final SWPP signed page as requested. The owner is wanted to get started on the E&S controls and grading on the site, so I think we want to move forward with the approval of the VSMP plan. Let me know if you need anything else from us for this approval. We will drop off the (4) copies of the plans this afternoon as well. Also, let me know if everything is good for us to start the bonding process with Ana. We will also have to bond the undisturbed area credits, until the plat is recorded. Thanks! Scott From: Matthew Wentland [mailto:mwentland@albemarle.org] Sent:Thursday, November 03,2016 2:56 PM To:Graham Murray Cc:Scott Collins Subject: RE:Greenloft Farm VSMP Graham, That should take care of all the plan changes, but you might want to wait to resubmit to make sure there are no comments from the road plans that would cause changes on the VSMP plans. Thanks, Matt 4 From:Graham Murray [m�to:graham@collins-engineering.com] Sent:Thursday, November 03, 2016 2:23 PM To: Matthew Wentland<mwentland@albemarle.org> Cc:Scott Collins<scott@collins-engineering.com> Subject: RE: Greenloft Farm VSMP Good afternoon Matt, After reviewing/addressing your VSMP comments for Greenloft Farm,the only change required to the construction plans was to add an inlet protection to the second inlet at the entrance.Can you please informally confirm, prior to our official submittal for signatures,the attached sheet 6 addresses your last remaining comment on the construction plans? Thanks, Graham P.S. I realize the easement plat, deeded language and the SWPPP's certification letter will need to be accepted before final VSMP approval.These are all administrative items though that do not require changes to the VSMP plans. From: Matthew Wentland [mailto:mwentland@albemarle.orq] Sent: Monday, October 31, 2016 12:15 PM To: Graham Murray Subject: Greenloft Farm VSMP Graham, Here are the comments for the Greenloft Farm VSMP submittal. Let me know if you have any questions. Thank you, Matt Wentland, P.E. • Civil Engineer II <S KM_C 224e 16110316460.pdf 5 v � H