Loading...
HomeMy WebLinkAboutARB201700115 Review Comments Architectural Review Board Approval 2018-03-08COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 March 8, 2018 Kevin Schafer Design Develop LLC 418 East Main Street Charlottesville, VA 22902 RE: ARB-2017-115: Sapon & Swisher Dental, Major Amendment Dear Kevin, I have reviewed the plan with revision date of 2/27/2018 and the following revisions are requested to make the proposal consistent with the ARB's conditions of approval and with the Entrance Corridor Design Guidelines. 1. Correct the plant schedule to correspond with the number of plants shown on the landscape plan (C105 of the site plan set). This condition has not been met. Please revise the Landscape Plan (C105) to address the following: a. There are 24 Rhus aromatica `Gro-Low' (RA) illustrated and called out on the plan yet the plant schedule on C105 lists the quantity as 22. Rectify the error. 2. Reduce and limit the number of proposed plants for any one species to 25% of the total for that plant type by adding more variety. This condition has not been met. Please revise the Landscape Plan (C105) to address the following: a. The total number of overall site shrubs proposed is 192; one -quarter of 192 is 48. With quantities of 57 and 67 respectively, AM (Aroma melanocarpa `Autumn Magic') and HG (Itea virginica `Henry's Garnet') are over the 25% threshold. Reduce the quantity of HG (Itea virginica `Henry's Garnet') and AM (Aroma melanocarpa `Autumn Magic') to less than 25% of the total of overall site shrubs. 3. Please specify the color choice for Model C light fixture in the manufacturer's specifications. Approved colors for lighting fixtures visible from the Entrance Corridor are brown, black or dark bronze (dark gray is also acceptable) . This condition has not been met. Please revise the manufacturer's specifications on C 108 to reflect a chosen finish color for the Model C lighting fixture proposed. 4. Revise the landscape plan to verify that the proposed trees on the west side of the property will not conflict with existing utilities. The applicant's response letter states: "We also took the opportunity to forward the plan to both Century Link (Devin Sampleswright, devin.sampleswrightna,centurylink.com) and the City of Charlottesville Gas Department (Christian Chirico, chiricocna,charlottesville.org) for review of the Landscape Plan. Both contacts provided minimal feedback that we addressed with the revised plan." Please provide copies of that communication for staff review. Please provide: 1. Two full sets of revised drawings addressing each of these conditions. Include updated ARB revision dates on each drawing. 2. A memo including detailed responses indicating how each condition has been satisfied. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staff s review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, -�6" pd'A� Heather McMahon, Senior Planner 434.296.5832 x 3278 hmcmahon(cer�,albemarle. org cc: Drs. Mark Sapon and Brad Swisher 259 Hydraulic Ridge Rd, Ste. 203 Charlottesville, Va. 22901 File ARB-2017-115 COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking and distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO PROJECT NAME: ARB-2017-115: Sapon & Swisher Dental DATE: Submittal Type Requiring Revisions () indicates submittal code County Project Number # Copies Erosion & Sediment Control Plan (E&S) Mitigation Plan (MP) Waiver Request (WR) Stormwater Management Plan (SWMP) Road Plan (RP) Private Road Request, with private/public comparison (PRR) Private Road Request — Development Area (PRR-DA) Preliminary Site Plan (PSP) Final Site Plan (or amendment) (FSP) Final Plat (FP) Preliminary Plat (PP) Easement Plat (EP) Boundary Adjustment Plat (BAP) Rezoning Plan (REZ) Special Use Permit Concept Plan (SP-CP) Reduced Concept Plan (R-CP) Proffers (P) Bond Estimate Request (BER) Draft Groundwater Management Plan (D-GWMP) Final Groundwater Management Plan (F-GWMP) Aquifer Testing Work Plan (ATWP) Groundwater Assessment Report (GWAR) Architectural Review Board (ARB) ARB201700115 Other: Please explain (For staff use only) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB 2 Heather McMahon