HomeMy WebLinkAboutWPO201700058 Permit 2018-03-13COUNTY OF ALBEMARLE
Community Development
401 McIntire Road
Charlottesville, Vriginia 22902-4596
(434)296-5832
EROSION CONTROL PERMIT
Date of Application: 07/21/2017
Permit Effective Date:
03/13/2018
Number:
WPO -2017-00058
LANDOWNER:
HERRING, JUDITH S
Phone:
4348235223
5444 BROWNSVILLE ROAD
CHARLOTTESVILLE VA22903
CONTRACTOR:
ADELAIDE CVILLE LLC - KYLE REDINGER
Phone:
(434) 409-1929
250 W MAIN STREET, STE 201
CHARLOTTESVILLE VA22902
REPONSIBLE LAND
GOODMAN EXCAVATING, LLC - WILLIAM
Phone:
(540) 872-5105
DISTURBER:
GOODMAN
2978 DIGGSTOWN ROAD
BUMPASS VA23024
Certification/License #:
RLD08453
Type:
Responsible Land Disturber
Plans Prepared By:
Shimp Engineering, P.C.
Plans Dated:
07/19/2017
Last Revised:
01/31/20I8
Plans Entitled:
VSMP PLAN FOR SPARROW HILL
Location:
Dist.
14.92
Acreage:
Tax Map:
05600-00-00-026A2
Hydrological
JR02
05600-00-00-108AO
Unit:
Additional Information: Annual Maintenance Fees [Sections 17-207 & 208 of the Albemarle County Code] — Annual maintenance
fees will be assessed in March of every year this permit is active. Fees cannot be prorated after the first year
of permit issuance,
Issued By: Kenny Thacker Title: Erosion Control Officer
-�3
Si tore Date
COMMONWEALTH of VIRGINIA
DEPARTMENT OF ENVIRONMENTAL QUALITY
Street address: 629 East Main Street, Richmond, Virginia 23219
Molly Joseph ward Mailing address: P.O. Box 1105, Richmond, Virginia 23218 David K. Paylor
Secretary of Natural Resources www.deq.virginia.gov Director
(804)698-4000
1-800-592-5482
March 13, 2018
Adelaide CVille LLC
205 W Main St Ste 201
Charltotesville, VA 22902
kyle.redinger@gmail.com
RE: Coverage under the VPDES Construction General Permit (VAR10)
General Permit No. VARlOK846
Sparrow Hill
Residential
Albemarle
Dear Permittee
DEQ has reviewed your Registration Statement received on July 25, 2017 and determined that the proposed
land -disturbing activity is covered under the General VPDES Permit for Discharges of Stormwater from
Construction Activities (VAR10). The effective date of your coverage under this general permit is July 1, 2014 or
the date of this letter, whichever is later.
A copy of the general permit can be obtained from DEQ's webpage at the following location:
http://www.deg.virginia.gov/Portals/0/DEQ/Water/Publications/CGP2014.pdf.
The general permit contains the applicable Stormwater Pollution Prevention Plan (SWPPP) requirements and
other conditions of coverage. Please print the general permit and read it carefully as you will be responsible for
compliance with all permit conditions.
DEQ staff has determined that the proposed land -disturbing activity will discharge to a surface water identified
as impaired or for which a TMDL wasteload allocation has been established and approved prior to the term of the
general permit for (i) sediment or a sediment -related parameter or (ii) nutrients. Therefore, the following general
permit (Part 1.B.4) and SWPPP requirements (Part II.A.5) must be implemented for the land -disturbing activity:
• Permanent or temporary soil stabilization shall be applied to denuded areas within seven (7) days after
final grade is reached on any portion of the site;
• Nutrients (e.g., fertilizers) shall be applied in accordance with manufacturer's recommendations or an
approved nutrient management plan and shall not be applied during rainfall events;
• Inspections shall be conducted at a frequency of (i) at least once every four (4) business days or (ii) at
least once every (5) business days and no later than 48 hours following a measurable storm event. In the
event that a measurable storm event occurs when there are more than 48 hours between business days,
the inspection shall be conducted on the next business day; and
• Representative inspections used by utility line installation, pipeline construction, or other similar linear
construction activities shall inspect all outfalls.
The general permit will expire on June 30, 2019. The conditions of the general permit require that you submit
a new registration statement at least 90 days prior to that date if you wish to continue coverage under the general
permit, unless permission for a later date has been granted by the Board. Permission cannot be granted to
submit the registration statement after the expiration date of the general permit.
If you have any questions about this permit, please contact the DEQ Office of Stormwater Management at
ConstructionGP(a deq.virginia.gov.
Sincerely,
Frederick K. Cunningham, Director
Office of Water Permits
2