Loading...
HomeMy WebLinkAboutWPO201600064 Review Comments WPO VSMP 2017-02-24 Williams``literprises Incorporated Land Development Design TO: Albemarle County Department of Community Development amis. FROM: Robert Williams SUBJECT: Response to Comments SDP-2016-00064 Canaan Christian Church DATE: February 24, 2017 Plat Changes: 1.6dd a SWM definition: SWM = Stormwater Management V Response: The definition was added as note#15 on sheet 1 2.Add the following note: "The SWM Forest and Open Space Easement is subject to the guidance set forth by DEQ in the Virginia Stormwater Management Program. The areas will remain undisturbed in a natural, vegetated state, except for activities as approved by the local program authority, such as forest management, control of invasive species, replanting and revegetating, passive recreation (e.g., trails), and limited bush hogging to maintain desired vegetative �mmunity (but no more than four times a year)." esponse: The note was added as note#14 on sheet 1. 3.Hatch the SWM forest & open space easement area. Remove note that says "hereby dedicated to Albemarle County" ,Response: The SWM Forest& Open Space Easement area was hatched t/ and "hereby dedicated to Albemarle County" was removed from the easement label. See sheet 2. 4.Show a SWM facility easement around the two SWM facilities. Remove the SWM access easement. Response: The SWM Access Easement was removed and its description V-removed from the Owner's Consent. A SWM easement was added around the two SWM facilities and its description added to the Owner's Consent. See sheets 1 and 2. P.O. Box 67 Ruby, Virginia 22545 (540)226-1203 we . inc (a� live . corn SDP-2016-00064 '`4400. Canaan Christian Church February 24, 2017 Page 2 of 2 Plan Changes: 1.Add the following note: "The SWM Forest and Open Space Easement is subject to the guidance set forth by DEQ in the Virginia Stormwater Management Program. The areas will remain undisturbed in a natural, vegetated state, except for activities as approved by the local program authority, such as forest management, control of invasive species, replanting and revegetating, passive recreation (e.g., trails), and limited bush hogging to maintain desired vegetative pommunity (but no more than four times a year)." V Response: The note was added as note#7 on sheet 4. 2.SFjow & hatch the SWM forest & open space easement. ,/Response: The SWM Forest& Open Space Easement area was hatched and labeled on sheet 4. 3.Show a SWM facility easement around the two SWM facilities. Remove the SWM access easement. /Response: The SWM Access Easement was removed and a SWM easement was added around the two SWM facilities. See sheet 4. 4.Provide 4 copies of the plan. `/Response: 4 copies of the VSMP plans and the plat have been provided. P.O. Box 67 Ruby, Virginia 22545 (540)226-1203 we . incRlive . corn COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP Permit plan review Project title: Canaan Christian Center Project file number: WP0201600064 Plan preparer: Williams Enterprises, Inc. Owner or rep.: Canaan Christian Church Plan received date: 18 Oct 2016 Rev. 1 received date: 22 Dec 2016 Date of comments: 15 Nov 2016 Rev. 1 comments: 01 Feb 2017 Reviewers: Emily Cox County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Please provide a signed copy of the certification (Section 9). Rev. 1. Comment addressed. 2. Please note that the notice of general permit coverage (Section 2) and the general permit copy (Section 11) must be inserted. Rev. 1. Comment addressed. 3. Update any plans sheets which are revised in the next submission. Rev. 1 Comment addressed. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. Approved, but update plan sheet with any E&S revisions. Rev. 1 Comment addressed. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. 1. Please combine the SWMP & ESCP into one plan set. It should be called VSMP Submittal and have the WPO number (201600064) on it. Rev. 1 Comment addressed. 2. Provide calculations for the sizing of the 8" roof drain as well as permanent outlet protection to prevent erosion. Rev. 1 Comment Addressed. 3. The forest/open space used for VRRM calculations will need to be platted before this plan can be Engineering Review Comments Page 2 of 3 approved. Please note that the County Attorney is currently working on a template for a deed to go with this plat. Rev. 1 Required deed and agreement are provided with this letter. The forest and open space should be labeled as "SWM forest & open space easement". 4. Please clarify the total areas and types of cover within the drainage divides. The charts on sheets 6, 7 and 9 all have different numbers. Rev. 1 Comment Addressed. 5. There are sheet flow labels on Sheet 8 that don't appear to be pointing towards any Tc path. Please remove or clarify. Also, there are no Tc paths shown for Drainage Area A. Please provide. Rev. 1 Comment Addressed. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. The diversion dike on the western end of the site may be changed to silt fence. All diversion dikes need to be directed to sediment traps or basins. There is not much drainage on this end of the site and in this case a trap or basin is not necessary. Silt fence will be sufficient. This silt fence should be included in Phases I and II. 2. Please show silt fence on the eastern end of the site adjacent to the staging and stockpile areas. This silt fence should be included in Phases I and II. 3. Please show silt fence as well as tree protection on the southern perimeter of the site in Phase II. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the Engineering Review Comments Page 3 of 3 application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle. org/deptforms.asp?department=cdengwno 1/441101 **440, ,z�III4 8F"�®G COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,Room 227 Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 VSMP Permit plan review Project title: Canaan Christian Center Project file number: WPO201600064 Plan preparer: Williams Enterprises,Inc. Owner or rep.: Canaan Christian Church Plan received date: 18 Oct 2016 Date of comments: 15 Nov 2016 Reviewers: Emily Cox County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain(1)a PPP, (2)an ESCP, (3)a SWMP, and(4)any TMDL measures necessary. 1. Please provide a signed copy of the certification(Section 9). 2. Please note that the notice of general permit coverage(Section 2)and the general permit copy (Section 11)must be inserted. 3. Update any plans sheets which are revised in the next submission. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. Approved, but update plan sheet with any E&S revisions. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. 1. Please combine the SWMP&ESCP into one plan set. It should be called VSMP Submittal and have the WPO number(201600064)on it. 2. Provide calculations for the sizing of the 8"roof drain as well as permanent outlet protection to prevent erosion. 3. The forest/open space used for VRRM calculations will need to be platted before this plan can be approved. Please note that the County Attorney is currently working on a template for a deed to go with this plat. Engineering Review Comments Page 2 of 3 4. Please clarify the total areas and types of cover within the drainage divides. The charts on sheets 6, 7 and 9 all have different numbers. 5. There are sheet flow labels on Sheet 8 that don't appear to be pointing towards any Tc path. Please remove or clarify. Also, there are no Tc paths shown for Drainage Area A. Please provide. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. The diversion dike on the western end of the site may be changed to silt fence. All diversion dikes need to be directed to sediment traps or basins. There is not much drainage on this end of the site and in this case a trap or basin is not necessary. Silt fence will be sufficient. This silt fence should be included in Phases I and II. 2. Please show silt fence on the eastern end of the site adjacent to the staging and stockpile areas. This silt fence should be included in Phases I and II. 3. Please show silt fence as well as tree protection on the southern perimeter of the site in Phase II. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re-submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval,plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms,which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing,this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application,they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued,via the coverage letter,the County can hold a pre-construction conference. Applicants will need to complete the request for a pre-construction conference form, and pay the remainder Sod Engineering Review Comments Page 3 of 3 of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre-construction conference will be scheduled with the County inspector. At the pre-construction conference, should everything proceed satisfactorily,a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle.org/deptforms.asp?department=cdengwpo Williams terprises Incorporated Land Development Design TO: Albemarle County Department of Community Development Engineering Attn: Emily Cox FROM: Robert Williams SUBJECT: Response to Comments SDP-2016-00064 Canaan Christian Church DATE: December 12, 2016 Requirements: A.Stormwater Pollution Prevention Plan(SWPPP) The SWPPP content requirements can be found in County Code section 17-405.A SWPPP must contain(1)a PPP,(2)an ESCP,(3)a SWMP,and(4)any TMDL measures necessary. 1.Please provide a signed copy of the certification(Section 9). VResponse: A signed copy of the certification has been added to the SWPPP. See section 9. 2.Please note that the notice of general permit coverage(Section 2)and the general permit copy (Section 11)must be inserted. /Response: The County's notice of general permit was added to the V SWPPP. See section 2. A copy of the approved general permit issued for the site will be inserted once received. See section 11. 3.0 to any plans sheets which are revised in the next submission. esponse: Any revised plan sheets will be updated in the SWPPP. B.Pollution Prevention Plan(PPP) The PP content requirements can be found in County Code section 17-404. .Approved,but update plan sheet with any E&S revisions. Response: The PPP has been updated with the E&S revisions. C.Stormwater Management Plan(SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved,and the reasons are provided in the comments below.The stormwater management plan content requirements can be found in County Code section 17-403. 1.Please combine the SWMP&ESCP into one plan set.It should be called VSMP Submittal and have the WPO number(201600064)on it. Rsponse: The two plan sets were combined to create the VSMP mittal plan set. The plan number WPO-2016-00064 was added to sheet 1. P.O. Box 67 Ruby, Virginia 22545 (540)226-1203 we inclive . corn SDP-2016-00064 *41001sold • Canaan Christian Church December 12, 2016 Page 2 of 3 2.Provide calculations for the sizing of the 8"roof drain as well as permanent outlet protection to prevent erosion. . response: Pipe capacity computations for the roof drain have been V provided on sheet 6. Outlet protection was added for the roof drain with the computations provided on sheet 4. 3.The forest/open space used for VRRM calculations will need to be platted before this plan can be approved.Please note that the County Attorney is currently working on a template for a deed to go with this plat. Response: A plat was prepared to delineate the forest/open space used 0 for the VRRM calculations. The plat is included with the plan sets. A preliminary copy of the deed document has been completed and provided with the plat. 4.Please clarify the total areas and types of cover within the drainage divides. The charts on sheets 6, 7 and 9 all have different numbers. / Co.Ce 7 Sl{e al-P--et- Response: . -&Response: The VRRM spreadsheet on sheet 7 evaluates the water quality requirements for the site. Therefore, only the on-site areas are included. The proposed drainage divides tabulation on sheet 9 lists the proposed drainage areas which include drainage from Hacktown Road that flows y/ on-site. Therefore, the drainage from the off-site areas is included for / water quantity evaluation purposes. The tabulation on sheet 6 lists the ��V subareas within the overall drainage in order to evaluate each segment of L the drainage path. The roof drainage area is shown to evaluate the roof drain, the upstream area of the driveway culvert is shown to evaluate it and the total area to each level spreader is shown on sheet 6. The computations use the rational method and profiles/sections are shown on sheet 5. Please note that the area breakdown and total for each level spreader(LS#1 and LS#2) on sheet 6 is the same as DA B1 and DA B2 on sheet 9. 5.There are sheet flow labels on Sheet 8 that don't appear to be pointing towards any Tc path. Please remove or clarify. Also,there are no Tc paths shown for Drainage Area A.Please provide. Response: The erroneous text was deleted. The Tc for Drainage Area 'A' / in both the pre and post condition was determined to be sheet flow with IL less than the minimum of 0.1 hr or 6 min. Therefore, the Tc path was not shown. The Tc is listed in the Drainage Area tabulation for both the existing and proposed drainage divides. See sheets 8 and 9. P.O. Box 67 Ruby, Virginia 22545 (540)226-1203 weinc (a� live . com SDP-2016-00064 `0 '‘..0/ ' Canaan Christian Church December 12, 2016 Page 3 of 3 D.Erosion and Sediment Control Plan(ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved,and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. I.The diversion dike on the western end of the site may be changed to silt fence.All diversion dikes need to be directed to sediment traps or basins. There is not much drainage on this end of the site and in this case a trap or basin is not necessary. Silt fence will be sufficient.This silt fence should be included in Phases I and II. Response: The diversion dike was replaced with silt fence and the silt trap was deleted. The silt trap computation was deleted. The silt fence is shown in both Phase I and Phase II. References to the diversion dike and silt trap were deleted from the Erosion and Sediment Control Legend for Phase I and Phase II. See sheets 16 and 17. The silt trap and diversion dike details were deleted from the Erosion and Sediment Control Details. 0 See sheet 19. Reference of the diversion dike and silt trap were deleted from the list of structural practices on the Erosion and Sediment Control Notes. The Erosion and Sediment Control Escrow estimate was updated to include the additional silt fence, tree protection, outlet protection and delete the diversion dike and silt trap. See sheet 18. 2.Please show silt fence on the eastern end of the site adjacent to the staging and stockpile areas. This silt fence should be included in Phases I and H. Response: Silt fence was added along the eastern portion of the development area adjacent to the staging area and stockpile in both Phase I and Phase II. See sheets 16 and 17. 3.Please show silt fence as well as tree protection on the southern perimeter of the site in Phase H. V Response: Silt fence and tree protection are shown along the southern perimeter of the development area in both Phase I and Phase II. See sheets 16 and 17. r P.O. Box 67 Ruby, Virginia 22545 (540)226-1203 we . Inc(c� irve . com