Loading...
HomeMy WebLinkAboutARB201600127 Action Letter 2018-03-14COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 November 11, 2016 Katurah Roell/Piedmont Delvelopment Group 2811 Hydraulic Road Charlottesville Va 22901 RE: ARB-2016-127: Fifth Street Commercial Dear Mr. Roell, Fax (434) 972-4126 At its meeting on Monday, November 7, 2016, the Albemarle County Architectural Review Board, by a vote of 3:0 voted to forward the following recommendations on the above -noted Initial Site Development Plan to the agent for the Site Review Committee: • Regarding requirements to satisfy the design guidelines as per § 18-30.6.4c (2), (3) and (5): • Clearly show all existing and proposed utilities and easements on the landscape plan. Increase planting area to avoid planting and utility conflicts without reducing the amount of landscaping proposed. • Regarding recommendations on the plan as it relates to the guidelines: None. • Regarding recommended conditions of initial plan approval: Prior to Initial Plan Approval: • Clearly show all existing and proposed utilities and easements on the landscape plan. Increase planting area to avoid planting and utility conflicts without reducing the amount of landscaping proposed. Prior to Final Site Plan to Final Site Plan Approval: A Certificate of Appropriateness is required. The following items shall be addressed in final plan submittal: 1. Provide material and color samples for review. 2. Revise the raised parapets to be four-sided with roofs to improve building cohesiveness and provide depth to these features. 3. Provide specs on the proposed window glass for Building A confirming that visible light transmittance shall not drop below 40% and visible light reflectance shall not exceed 30%. 4. Provide a dumpster screen detail in the plan with the fence height, sufficient to screen the dumpster, indicated. 5. Show equipment locations and heights on the elevation drawings. All equipment (rooftop and ground -mounted) must be positioned to not be visible from the EC. This should not result in a parapet that looks over -scaled. Provide site sections and/or perspective views to clarify visibility of rooftop equipment from 164. 6. Provide complete lighting information for review. 7. Clearly show all existing and proposed utilities and easements on the landscape plan. Increase planting area to avoid planting and utility conflicts without reducing the amount of landscaping proposed. 8. Provide more variety to the shrub species proposed so that the number of proposed shrubs for any one species is limited to 25% of the total number of shrubs proposed. 9. Add medium trees along internal pedestrian ways at 25' spacing and 2 '/z caliper. 10. Coordinate the plant schedule and the plan regarding the number of Inkberry Holly shown. 11. Clarify on the plans the wooded area to remain and show tree protection fencing. 12. Submit a comprehensive sign plan and design criteria with the next ARB submittal. Comprehensive sign criteria will need to be approved before final ARB approval is given for the building and site. 13. Provide a rear elevation of Building C. • Regarding conditions to be satisfied prior to issuance of a grading permit: ■ Clarify on the plans the wooded area to remain and show tree protection fencing. You may submit your application for continued ARB review at your earliest convenience. Application forms, checklists and schedules are available on-line at www.albemarle.org/ARB. Please be certain that your ARB submittal addresses the above -noted issues. If you have any quegs ions-ee cerning any of the above, please feel free to call me. RoWald Higgins, AICP Chief of Zoning Cc: Scott Collins/Collins-Engineering 200 Garrett St, Ste. K Charlottesville, Va. 22902 Ftv Investments Lie 943 Glenwood Station Ln Suite 10I Charlottesville Va 22901 File