Loading...
HomeMy WebLinkAboutWPO201600040 Plan - Stormwater WPO VSMP 2014-10-01 COUNTY OF ALBEMARLE ^tion Department of Community Development 401 McIntire Road,North Wing ® e- i21 Charlottesville,Virginia 22902-4596 4111 ? Tel.(434)296-5832• Fax(434)972-4126 Stormwater Pollution Prevention Plan (SW PPP) For Construction Activities At: Project Name: Ivy Water Main Extension Project Address: Lenvic, LLC Tax Map# 58A2-14& 58A2-20 Joseph W. Richmond, Jr. Tax Map# 58A2-20A Roger L. Gibson Tax Map# 58A2-21 Louis S. Eaton Tax Map# 58A2-24 Prepared by: Name: Whitman, Requardt&Associates, LLP Prepared for: Name: (Contractor to be determined) SWPPP Preparation Date: (This document is to be made publicly available according to 9VAC25-880-70,Part II, section D) Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County CONTENTS: (from Albemarle County Code Sec. 17-405) 1. Registration statement 2. Notice of general permit coverage 3. Nature of activity 4. Erosion and Sediment Control Plan. 5. Stormwater Management Plan 6. Pollution Prevention Plan. 7. Discharges to impaired waters, surface waters within an applicable TMDL wasteload allocation, and exceptional waters. 8. Qualified personnel 9. Signed Certification 10. Delegation of authority. 11. General permit copy 12. Inspection logs Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County Section 1. Registration statement (Provide a signed completed copy of the DEQ registration statement) (To be inserted into SWPPP following final review and approval.) Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County Section 2. Notice of general permit coverage (This notice is to be posted near the main entrance according to 9VAC25-880-70, Part II, section C.) (Provide a copy of the DEQ coverage letter when obtained) Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Albemarle County Section 3. Nature of activity (Provide a detailed narrative of the construction activities. Include or reference a construction schedule and sequence. Include any phasing.) Construction Activities 1. Clearing and grubbing along roadway or easement. 2. Furnish and install 18" steel casing pipe underneath CSX property. 3. Furnish and install 6", 4" DI water pipe. 4. Furnish and install 6"and 4"valves. 5. Furnish and install fire hydrants, blow-offs and boxes, water services, sampling stations, and automatic flushing system. 6. Locate and connect to existing water main. 7. Abandon existing water main. 8. Restoration of all easements, yards, parking lot. 9. Place asphalt pavement according to VDOT specifications. 10. Testing of all water pipe and all appurtenances. 11. Disinfection of water main. 12. Any incidental work to complete project. Anticipated Schedule Start Construction: September 2016 End Construction: June 2017 Sequence of Construction 1. Notify the Albemarle County Service Authority (ACSA) inspector in writing seven days prior to commencing construction of this project. The inspector will notify the City of Scottsville's (City) Erosion and Sediment Control Regulatory Agency to arrange an on-site preconstruction meeting at least 48 hours prior to the issuance of a Land Disturbance Permit. 2. Remove existing debris from drainage ditches and haul to an appropriate disposal site. 3. Install all erosion and sediment control measures. 4. Notify the ACSA and City inspectors when initial erosion control measures are in place. 5. Locate all existing utilities and construct all water main improvements and water service connections. Place and compact approved backfill materials as trenching and installations proceed. 6. Test water mains, connect new water service connections, and overlay existing roads and gravel drives. 7. No stockpile is anticipated for this project. 8. Upon completion of work, apply permanent seeding to all disturbed areas. 9. When disturbed area are stabilized to the satisfaction of the inspectors and the engineer, remove all temporary erosion and sediment control devices. Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County Section 4. Erosion and Sediment Control Plan. (Provide a reduced, 1 1x17 copy of the latest Erosion and Sediment Control Plan. Do not reference only.) (To be inserted into SWPPP following final review and approval.) Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County Section 5. Stormwater Management Plan (Provide a reduced 11x17 copy of the latest stormwater management plan. Do not reference only.) (Not required.) Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Albemarle County Section 6. Pollution Prevention Plan. (reference County Code 17-404 and State Regulation 9VAC25-880-70 part II section A.4) A. Plan showing pollution activities and prevention practices (Provide a reduced 11x17 copy of a site plan on which all of the following activity locations are clearly marked. Keep this plan up-to-date with ongoing site changes and inspections.) (To be inserted into SWPPP following final review and approval.) Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County B. Sources of Pollutants, locations,and prevention practices Pollutant,or Pollutant Prevention Practices, Location on site Generating Activity Control Measures No additional activities—N/A C. Sources of Pollutants continued. Common activities and minimum control and prevention practices Pollutant,or PollutantPrevention Practices, Location on site' Generating Activity Control Measures Follow Erosion and Sediment Control Clearing,grading,excavating,and un- Land disturbance area Plan. Dispose of clearing debris at stabilized areas acceptable disposal sites.Seed and mulch, or sod within 7 days of land clearing Cover storm drain inlets and use drip pans Paving operations Roads and driveways and absorbent/oil dry for all paving machines to limit leaks and spills Direct concrete wash water into a leak- Concrete washout and Current location and detail shown on proof container or leak-proof settling basin cement waste plan that is designed so that no overflows can occur Enclose or cover material storage areas. Mix paint indoors in a containment area or Structure construction,stucco, Structures in a flat unpaved area.Prevent the painting, and cleaning discharge of soaps,solvents,detergents and wash water,paint,form release oils and curing compounds. Water shall be filtered,settled or similarly Dewatering operations Dewatering sites shown on plan treated prior to discharge as shown on plan. Designated areas for material delivery and storage. Placed near construction Material delivery and storage Designated area shown on plan entrances,away from waterways and drainage paths Material use during building process Building areas Follow manufacturer's instructions. MSDS's attached. Waste collection area will not receive a substantial amount of runoff from upland areas and does not drain directly to a Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County Pollutant,or Pollutant Prevention Practices, Generating Activity Location on site Control Measures Current designated container areas on waterway. Containers have lids covered Solid waste disposal plan before periods of rain,or are in a covered area. Scheduled collection to prevent overfilling.MATERIALS NOT TO BE BURIED ON-SITE Convenient and well-maintained portable sanitary facilities will be provided,and Sanitary waste Current locations shown on plan located away from waterways or inlets. Such facilities shall be regularly maintained. Apply fertilizers in accordance with Landscaping operations Landscape areas shown on plan manufacturer's recommendations and not during rainfall events To be treated in a sediment basin or better Wash Waters Wash areas shown on plan control as specified on plan.Minimize the discharge of pollutants from equipment and vehicle washing Vehicle and equipment washing Designated areas and details shown on Provide containment and filtering for all plan wash waters per the plan Minimization of exposure to precipitation and stormwater.Minimize the exposure of building materials,building products, construction wastes,trash,landscape materials,fertilizers,pesticides,herbicides,detergents,sanitary waste,and other materials present on the site to precipitation and to stormwater. (Identify all non-stormwater discharges to occur on your site. Keep this plan up-to-date with ongoing site changes and inspections. See CGP, 9VAC25-880-70 section E for examples of non-stormwater discharges.) D. Non-stormwater discharges Discharge Pollutants or Pollutant Location on Site Constituents None anticipated N/A N/A Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County E. Persons responsible for pollution prevention practices (Provide the names and contact information for all persons responsible for prevention practices as listed above.) (To be provided by contractor.) F. Response and reporting practices Minimize discharges from spills and leaks.Minimize the discharge of pollutants from spills and leaks and implement chemical spill and leak prevention and response procedures as follows. Respond to all spills,leaks and discharges as follows; Report all spills,leaks and discharges as follows; (Provide detailed response and reporting practices according to 9VAC25-880-70, Part II, section A.4.e.) (To be provided by contractor.) G. Pollution Prevention Awareness (Describe training and procedures to provide awareness and compliance for all measures in this document; waste management, wash waters, prevention measures, etc.) (To be provided by contractor.) Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County Section 7. Discharges to impaired waters, surface waters within an applicable TMDL wasteload allocation, and exceptional waters. (Provide detailed measures for any applicable TMDL) (Not required—N/A) Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County Section 8. Qualified personnel The following personnel are responsible for inspections; (Provide the name,telephone number, and qualifications of the qualified personnel conducting inspections.) (To be provided by contractor.) Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County Section 9. Signed Certification (Provide certification according to 9VAC25-870-370. For purposes of plan review and approvals, this certification should be the owner of the property, the same signature as appears on the bonds and applications. Another operator can be designated on the delegation of authority form to follow.) CERTIFICATION "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Owner/Operator Name: Company: Title: Signature: Date: Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County Section 10. Delegation of authority. (Provide the persons or positions with authority to sign inspection reports or to modify the stormwater pollution prevention plan. A formal, signed delegation of authority is needed.) Delegation of Authority (name), hereby designate the person or specifically described position below to be a duly authorized representative for the purpose of overseeing compliance with environmental requirements, including the Construction General Permit, at the construction site. The designee is authorized to sign any reports, stormwater pollution prevention plans and all other documents required by the permit. (name of person or position) (company) (address) (city, state, zip) (phone) By signing this authorization, I confirm that I meet the requirements to make such a designation as set forth in the Construction General Permit (CGP), and that the designee above meets the definition of a "duly authorized representative". Operator Name: Company: Title: Signature: Date: (To be provided by contractor.) Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County Section 11. General permit copy (Provide a copy of the construction general permit, 9VAC25-880) (To be inserted upon receipt.) Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County Section 12. Inspection logs (Provide templates for your inspections. Requirements are listed in 9VAC25-880-70, Part II, section B and F.) (To be provided by contractor.) Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County