Stormwater Pollution Prevention Plan (SW PPP)
For Construction Activities At:
Project Name: Ivy Water Main Extension Project
Address: Lenvic, LLC
Tax Map# 58A2-14& 58A2-20
Joseph W. Richmond, Jr.
Tax Map# 58A2-20A
Roger L. Gibson
Tax Map# 58A2-21
Louis S. Eaton
Tax Map# 58A2-24
Prepared by:
Name: Whitman, Requardt&Associates, LLP
Prepared for:
Name: (Contractor to be determined)
SWPPP Preparation Date:
(This document is to be made publicly available according to 9VAC25-880-70,Part II, section D)
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County
CONTENTS: (from Albemarle County Code Sec. 17-405)
1. Registration statement
2. Notice of general permit coverage
3. Nature of activity
4. Erosion and Sediment Control Plan.
5. Stormwater Management Plan
6. Pollution Prevention Plan.
7. Discharges to impaired waters, surface waters within an applicable TMDL wasteload
allocation, and exceptional waters.
8. Qualified personnel
9. Signed Certification
10. Delegation of authority.
11. General permit copy
12. Inspection logs
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County
Section 1. Registration statement
(Provide a signed completed copy of the DEQ registration statement)
(To be inserted into SWPPP following final review and approval.)
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County
Section 2. Notice of general permit coverage
(This notice is to be posted near the main entrance according to 9VAC25-880-70, Part II, section C.)
(Provide a copy of the DEQ coverage letter when obtained)
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Albemarle County
Section 3. Nature of activity
(Provide a detailed narrative of the construction activities. Include or reference a construction schedule and
sequence. Include any phasing.)
Construction Activities
1. Clearing and grubbing along roadway or easement.
2. Furnish and install 18" steel casing pipe underneath CSX property.
3. Furnish and install 6", 4" DI water pipe.
4. Furnish and install 6"and 4"valves.
5. Furnish and install fire hydrants, blow-offs and boxes, water services, sampling stations, and
automatic flushing system.
6. Locate and connect to existing water main.
7. Abandon existing water main.
8. Restoration of all easements, yards, parking lot.
9. Place asphalt pavement according to VDOT specifications.
10. Testing of all water pipe and all appurtenances.
11. Disinfection of water main.
12. Any incidental work to complete project.
Anticipated Schedule
Start Construction: September 2016
End Construction: June 2017
Sequence of Construction
1. Notify the Albemarle County Service Authority (ACSA) inspector in writing seven days prior to
commencing construction of this project. The inspector will notify the City of Scottsville's (City)
Erosion and Sediment Control Regulatory Agency to arrange an on-site preconstruction meeting at
least 48 hours prior to the issuance of a Land Disturbance Permit.
2. Remove existing debris from drainage ditches and haul to an appropriate disposal site.
3. Install all erosion and sediment control measures.
4. Notify the ACSA and City inspectors when initial erosion control measures are in place.
5. Locate all existing utilities and construct all water main improvements and water service
connections. Place and compact approved backfill materials as trenching and installations proceed.
6. Test water mains, connect new water service connections, and overlay existing roads and gravel
drives.
7. No stockpile is anticipated for this project.
8. Upon completion of work, apply permanent seeding to all disturbed areas.
9. When disturbed area are stabilized to the satisfaction of the inspectors and the engineer, remove all
temporary erosion and sediment control devices.
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County
Section 4. Erosion and Sediment Control Plan.
(Provide a reduced, 1 1x17 copy of the latest Erosion and Sediment Control Plan. Do not reference only.)
(To be inserted into SWPPP following final review and approval.)
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County
Section 5. Stormwater Management Plan
(Provide a reduced 11x17 copy of the latest stormwater management plan. Do not reference only.)
(Not required.)
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Albemarle County
Section 6. Pollution Prevention Plan.
(reference County Code 17-404 and State Regulation 9VAC25-880-70 part II section A.4)
A. Plan showing pollution activities and prevention practices
(Provide a reduced 11x17 copy of a site plan on which all of the following activity locations are clearly marked.
Keep this plan up-to-date with ongoing site changes and inspections.)
(To be inserted into SWPPP following final review and approval.)
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County
B. Sources of Pollutants, locations,and prevention practices
Pollutant,or Pollutant Prevention Practices,
Location on site
Generating Activity Control Measures
No additional activities—N/A
C. Sources of Pollutants continued. Common activities and minimum control and prevention
practices
Pollutant,or PollutantPrevention Practices,
Location on site'
Generating Activity Control Measures
Follow Erosion and Sediment Control
Clearing,grading,excavating,and un- Land disturbance area Plan. Dispose of clearing debris at
stabilized areas acceptable disposal sites.Seed and mulch,
or sod within 7 days of land clearing
Cover storm drain inlets and use drip pans
Paving operations Roads and driveways and absorbent/oil dry for all paving
machines to limit leaks and spills
Direct concrete wash water into a leak-
Concrete washout and Current location and detail shown on proof container or leak-proof settling basin
cement waste plan that is designed so that no overflows can
occur
Enclose or cover material storage areas.
Mix paint indoors in a containment area or
Structure construction,stucco, Structures in a flat unpaved area.Prevent the
painting, and cleaning discharge of soaps,solvents,detergents
and wash water,paint,form release oils
and curing compounds.
Water shall be filtered,settled or similarly
Dewatering operations Dewatering sites shown on plan treated prior to discharge as shown on
plan.
Designated areas for material delivery and
storage. Placed near construction
Material delivery and storage Designated area shown on plan
entrances,away from waterways and
drainage paths
Material use during building process Building areas Follow manufacturer's instructions.
MSDS's attached.
Waste collection area will not receive a
substantial amount of runoff from upland
areas and does not drain directly to a
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County
Pollutant,or Pollutant Prevention Practices,
Generating Activity Location on site Control Measures
Current designated container areas on waterway. Containers have lids covered
Solid waste disposal plan before periods of rain,or are in a covered
area. Scheduled collection to prevent
overfilling.MATERIALS NOT TO BE
BURIED ON-SITE
Convenient and well-maintained portable
sanitary facilities will be provided,and
Sanitary waste Current locations shown on plan located away from waterways or inlets.
Such facilities shall be regularly
maintained.
Apply fertilizers in accordance with
Landscaping operations Landscape areas shown on plan manufacturer's recommendations and not
during rainfall events
To be treated in a sediment basin or better
Wash Waters Wash areas shown on plan control as specified on plan.Minimize
the discharge of pollutants from
equipment and vehicle washing
Vehicle and equipment washing Designated areas and details shown on Provide containment and filtering for all
plan wash waters per the plan
Minimization of exposure to precipitation and stormwater.Minimize the exposure of building materials,building products,
construction wastes,trash,landscape materials,fertilizers,pesticides,herbicides,detergents,sanitary waste,and other materials
present on the site to precipitation and to stormwater.
(Identify all non-stormwater discharges to occur on your site. Keep this plan up-to-date with ongoing site
changes and inspections. See CGP, 9VAC25-880-70 section E for examples of non-stormwater discharges.)
D. Non-stormwater discharges
Discharge Pollutants or Pollutant Location on Site
Constituents
None anticipated N/A N/A
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County
E. Persons responsible for pollution prevention practices
(Provide the names and contact information for all persons responsible for prevention practices as listed above.)
(To be provided by contractor.)
F. Response and reporting practices
Minimize discharges from spills and leaks.Minimize the discharge of pollutants from spills and leaks and implement chemical spill
and leak prevention and response procedures as follows.
Respond to all spills,leaks and discharges as follows;
Report all spills,leaks and discharges as follows;
(Provide detailed response and reporting practices according to 9VAC25-880-70, Part II, section A.4.e.)
(To be provided by contractor.)
G. Pollution Prevention Awareness
(Describe training and procedures to provide awareness and compliance for all measures in this document;
waste management, wash waters, prevention measures, etc.)
(To be provided by contractor.)
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County
Section 7. Discharges to impaired waters, surface waters within an applicable TMDL
wasteload allocation, and exceptional waters.
(Provide detailed measures for any applicable TMDL)
(Not required—N/A)
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County
Section 8. Qualified personnel
The following personnel are responsible for inspections;
(Provide the name,telephone number, and qualifications of the qualified personnel conducting inspections.)
(To be provided by contractor.)
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County
Section 9. Signed Certification
(Provide certification according to 9VAC25-870-370. For purposes of plan review and approvals, this
certification should be the owner of the property, the same signature as appears on the bonds and
applications. Another operator can be designated on the delegation of authority form to follow.)
CERTIFICATION
"I certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gather and
evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my
knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for
submitting false information, including the possibility of fine and imprisonment for knowing violations."
Owner/Operator Name:
Company:
Title:
Signature:
Date:
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County
Section 10. Delegation of authority.
(Provide the persons or positions with authority to sign inspection reports or to modify the stormwater pollution
prevention plan. A formal, signed delegation of authority is needed.)
Delegation of Authority
(name), hereby designate the person or specifically described position below to be a
duly authorized representative for the purpose of overseeing compliance with environmental requirements,
including the Construction General Permit, at the construction site. The
designee is authorized to sign any reports, stormwater pollution prevention plans and all other documents
required by the permit.
(name of person or position)
(company)
(address)
(city, state, zip)
(phone)
By signing this authorization, I confirm that I meet the requirements to make such a designation as set forth in
the Construction General Permit (CGP), and that the designee above meets the definition of a "duly
authorized representative".
Operator Name:
Company:
Title:
Signature:
Date:
(To be provided by contractor.)
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County
Section 11. General permit copy
(Provide a copy of the construction general permit, 9VAC25-880)
(To be inserted upon receipt.)
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County
Section 12. Inspection logs
(Provide templates for your inspections. Requirements are listed in 9VAC25-880-70, Part II, section B and F.)
(To be provided by contractor.)