Loading...
HomeMy WebLinkAboutWPO201600008 Preconstruction Form WPO VSMP 2016-11-28 C511-1 Zk ' ib *14111e .j<(). of Request for Pre-construction Meeting and Grading Permit ' from Albemarle County -!‘;.,Tont;: Approved Plan Number: WPO- 201 " V 0 00% Approved Plan Name: t y&ort, 2C -1 ` ?h45L (Plans must be approved prior to a pre-construction meeting.) Bond approved date: (Bonds must be approved and posted prior to a pre-construction meeting or permit.) Responsible Land Disturber: Print Name: W��I I4Yh 7, 'oed w►cr State Certification Number: 161:43 Address ql k pi +OWb L'a II City ButiAp.,05 State VA Zip 250 2L1 Daytime Phone(910) 112_ 5105 E-mail r01MAH 4.044/4 4'7 11 C�i�� et l 1, OM Primary Contractor: (/ (� Print Name pmi, Address 214g �taa.s�tw�rH R sa City 90 IM<DRS S State Vit Zip 14°141 Daytime Phone 514 0) 51 °C E-mail apo juvat<..e,XC4vA IA t� i ra,.(•C� Permit Issuance and First Year Maintenance Fees: (Request must include payment) Total acres proposed to be disturbed is contained on the approved plan and application: VSMP: Acres to be disturbed Fee Due at Grading Permit Less than 1 $63.80 1 and less than 5 $594.00 5 and less than 10 $748.00 10 and less than 50 $990.00 50 and less than 100 $1,342.00 100 and more $2,112.00 For plans exempt from VSMP,VESCP fees were paid with the application. 7/1/14,Revised: 8/29/14 Page 1 of3 /1 , Person(s)to attend the Pre-construction Meeting: Names(type or print) Firm Contact Number or email Te C5 Atl .Le.S. Ded'tIry T-)„,dzlq .. .zjess0 fidd 4dw• c,w.. DM Ganedw••►.. alb A444., rt4v4.6.1 Ljo•awu►ukr-coishI 1kQ,r t1,cow, Thew., vg,„„ alvvtorc- 40A Gt'/AA/A-P.1/e4I(.Cet►+. 4/S .N,.-1C Co. s3Ysci• 9 -S` y "TD,.h 0 G, - en "ft (sz1D) WV-33 y z The second part of the application fee is required to be paid with this request. This fee amount is; FOR OFFICE USE ONLY Permit Issued Date By who? 7/1/14,Revised: 8/29/14 Page 2 of 3