HomeMy WebLinkAboutWPO201700076 Review Comments 2018-03-15Dewberry
March 14, 2018
Dewberry Engineers Inc. 804.290.7957
4805 Lake Brook Drive, Suite 200 804.290.7928 fax
Glen Allen, VA 23060 www.dewberry.com
County of Albemarle, Department of Community Development
Attn: David James, VSMP Reviewer
401 McIntire Road, Room 227
Charlottesville, VA 22902-4596
RE: UVAF Temporary Golf Course Connector Road
3rd Submission — Including Responses from 2nd Submission
Project File Number: WPO201700076
Dear Mr. David James,
On behalf of the University of Virginia Foundation, Dewberry Engineers Inc. is pleased to submit for your
review and approval the final plans for the UVAF Temporary Golf Course Connector Road. A copy of the
Final Design (loo%) plans signed March 14, 2018 are being submitted electronically for your review.
Below are the comments along with responses that were received from your review dated March 9th, 2018.
A. Stormwater Pollution Prevention Plan (SWPPP)
1. (Rev. 1) Please add WPO number (WPO2o17o0076) to SWPPP cover sheet.
(Rev. 2) Provide copy for review.
(Rev. 1) Dewberry Response: The WPO number has been added to the SWPPP cover sheet.
(Rev. 2) Dewberry Response: A copy of the updated SWPPP has been included
with this submission.
(Rev. 2) Provide (2) copies of the SWPPP. Please have engineer seal, sign and
date each.
(Rev. 2) Dewberry Response: Acknowledged. The SWPPP is included in this
electronic submission. 2 hardcopies of the signed and seal SWPPP will be
delivered with the approval submission.
B. Pollution Prevention Plan (PPP)
1. (Rev. 1) Show proposed construction entrance, staging, stockpile, borrow, fueling, waste
disposal, concrete washout areas on the PPP.
(Rev. 2) Please submit for review. Insert PPP `exhibit sheet' into SWPPP book.
(Rev. 1) Dewberry Response: The PPP has been updated to include the above areas.
(Rev. 2) Dewberry Response: The PPP exhibit has been included in the SWPPP
book in Section 6. The SWPPP book has been included with this submission.
C. Stormwater Management Plan (SWMP)
4. C9.o3 Bioretention Facility (VADEQ SW Design Spec 9) -
a. (Rev. 1) Provide testing of underlying soils -1 per i000 sf of filter surface (Section 6.2).
(Rev 2) Acknowledged, comment still valid.
(Rev 1) Dewberry Response: Test holes are currently being scheduled and will be
completed prior to construction. Results will be submitted to the County and should any
changes be necessary they will be made under separate cover.
(Rev 2) Dewberry Response: Test holes are currently being performed and
will be completed prior to construction. Results will be submitted to the
County and should any changes be necessary they will be made under
separate cover.
Page 1 of 2
Mr. James
UVA Foundation — Temporary Golf Course Connector Road
W P0201700076
March 14, 2018
8. (Rev. 1) Submit an Easement Plat and Deed of Dedication and Easement for the SWM
facilities & access.
(Rev. 2) This must be submitted, reviewed, approved, and recorded prior to
VSMP plan approval.
(Rev. 1) Dewberry Response: Easement Plats and Deed of Dedication and Easement for the
SWM facilities will be completed and submitted under separate cover.
(Rev. 2) Dewberry Response: Acknowledged. The Easement Plats and the Deed
of Dedication and Easement for the SWM facilities has been reviewed, approved,
and recorded. The receipt * is 2oi8-02i66i and is dated 03/09/2oi8.
D. Erosion and Sediment Control Plan (ESCP)
1. (Rev. 1) Please show the steep slopes. Show all existing easements with deed book references,
locations, and dims.
(Rev. 2) Not addressed. Show steep slopes along Golf Course Dr.
(Rev.l) Dewberry Response: See sheet C8.oi and C8.02 for the existing steep slopes and
easements.
(Rev. 2) Dewberry Response: Steep slopes have been added to sheets C8.oi-
C8. 04.
2. (Rev. 1) Provide E&SC details sheet (Paved CE, CD, IP, OP, etc)
(Rev.2 ) Mostly addressed; Include paved wash rack detail below:
(Rev. 1) Dewberry Response: E&S details for E&S measures used on this project have been
added to sheet C8.o6.
(Rev. 2) Dewberry Response: The paved wash rack detail has been added to
sheet C8.o6.
This letter is provided as part of the resubmittal process and addresses all of the comments above. If you
have any questions or require clarification, please call (804)-205-3340, or email by
mthomaWdewberry.com.
Sincerely,
Matt C. Thomas, P.E.
Project Manager
''•'' Dewberry
Page 2of2