Tim,
Jonathan Ritchie <jritchie@bohlereng.com>
Wednesday, February 21, 2018 4:42 PM
Tim Padalino; mfontaine@renaudconsulting.net
Heather McMahon; Margaret Maliszewski; Lawrence Osborne III; V162083
@nf.bohlereng.com
RE: Initial Site Plan SDP201700080
Follow up
Flagged
Per our conversation please use this email as a formal request to defer action on the ISP SDP201700080 until we are
able to obtain ARB approval. As discussed once we obtain ARB approval we will proceed to the Final Site Plan submission
and will not require an additional ISP submission. Thanks again for the help.
Jonathan Ritchie, P.E.
BOHLER
F N G T X F F R T N G
28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186
P: 540-349-4500 1 M: 540-326-6539 1 jritchie@bohlereng.com
www.BohlerEngineering.com
Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients,
which information may also be privileged. If the reader of this e-mail is not the intended recipient the document has been received in error and any
use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please
notify the sender via reply e-mail and immediately delete this e-mail from your system.
From: Tim Padalino [mailto:tpadalino@albemarle.org]
Sent: Tuesday, February 20, 2018 9:58 AM
To: Jonathan Ritchie <jritchie@bohlereng.com>; mfontaine@renaudconsulting.net
Cc: Heather McMahon <hmcmahon@albemarle.org>; Margaret Maliszewski <MMaliszewski@albemarle.org>; Lawrence
Osborne III <losborne@bohlereng.com>; V162083@nf.bohlereng.com
Subject: RE: Initial Site Plan SDP201700080
Hi Jonathan,
You're welcome — and thank you for the update.
I'll communicate with Heather and Margaret to get an updated sense of where things are headed, per your recent
conversation with Heather.
As a quick reminder, I'll need to take action on the Initial Site Plan relatively soon (as we only have a total of 60 days to
"take action" — i.e. either approve with conditions, or deny — and the SRC meeting last Thursday was day 45). The only
other option in this situation would be for the applicant to request for a deferral, which freezes the 60-day review period
and allows for much more time (up to six months) to work on possible revisions to the site layout and other details.
Regardless, I will follow up with you if I have any questions or information to share, after I connect with our ARB
planners. And I'll stay posted for any updates from your end.
Thanks very much - - -
Tim Padalino, AICP
Albemarle County I Community Development Dept.
(434)-296-5832 x. 3088
From: Jonathan Ritchie [mailto:iritchie@bohlereng.com]
Sent: Monday, February 19, 2018 12:43 PM
To: Tim Padalino <tpadalino@albemarle.org>; mfontaine@renaudconsulting.net
Cc: Heather McMahon <hmcmahon@albemarle.org>; Margaret Maliszewski <MMaliszewski@albemarle.org>; Lawrence
Osborne III <losborne@bohlereng.com>; V162083@nf.bohlereng.com
Subject: RE: Initial Site Plan SDP201700080
Thanks Tim. Lawrence Osborne from our office spoke with Heather regarding the ARB meeting and we have an
understanding of what we need to do. We will keep you posted on the progress with the ARB. Thanks again and nice
meeting you last week.
Jonathan Ritchie, P.E.
BOHLER
F N I: 1 N F. F R i N (.
28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186
P: 540-349-4500 1 M:540-326-65391 Iritchie@bohlereng.com
www.BohlerEngineering.com
Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients,
which information may also be privileged. If the reader of this e-mail is not the intended recipient the document has been received in error and any
use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please
notify the sender via reply e-mail and immediately delete this e-mail from your system.
From: Tim Padalino[mailto:tpadalino@albemarle.org]
Sent: Thursday, February 15, 2018 11:05 AM
To: Jonathan Ritchie <iritchie@bohlereng.com>; mfontaine@renaudconsulting.net
Cc: Heather McMahon <hmcmahon@albemarle.org>; Margaret Maliszewski <MMaliszewski@albemarle.o
Subject: Initial Site Plan SDP201700080
Hello Jonathan and Mark,
Thanks for attending the SRC meeting this morning; it was nice to meet both of you. (And I apologize for the error in
the SRC memo that incorrectly specified Room 235.)
I'm writing to provide you with a copy of the "action memo" from the 2/12 ARB meeting (attached), which contains the
ARB review comments. The Wawa review is item d. (beginning on page 4).
Per our discussion during the SRC meeting, it sounds like there may be some decision -making to do regarding next
steps, including the possibility of requesting a deferral of the Initial Site Plan review to allow more time to address the
issues identified by the ARB. And it also sounds like you intend to coordinate further with ARB staff with regards to
scheduling a return to the ARB; to that end, I've copied Margaret Maliszewski and Heather McMahon on this message
in case that helps to expedite your coordination.
In the meantime, we will be working to synchronize and clarify the two different sets of review comments (Planning and
ARB) that pertain to the landscaping requirements for this project at this location.
Thanks again; and please let me know if you have any questions or requests for assistance at any time.
Tim Padalino, AICP
Senior Planner I Community Development Department
County of Albemarle, Virginia
https://www.albemarle.org/department.asp?department=cdd
(434)-296-5832 x. 3088