Loading...
HomeMy WebLinkAboutSDP201700080 Correspondence 2018-02-12Tim Padalino From: Sent: To: Cc: Subject: Follow Up Flag: Flag Status: Tim, Jonathan Ritchie <jritchie@bohlereng.com> Wednesday, February 21, 2018 4:42 PM Tim Padalino; mfontaine@renaudconsulting.net Heather McMahon; Margaret Maliszewski; Lawrence Osborne III; V162083 @nf.bohlereng.com RE: Initial Site Plan SDP201700080 Follow up Flagged Per our conversation please use this email as a formal request to defer action on the ISP SDP201700080 until we are able to obtain ARB approval. As discussed once we obtain ARB approval we will proceed to the Final Site Plan submission and will not require an additional ISP submission. Thanks again for the help. Jonathan Ritchie, P.E. BOHLER F N G T X F F R T N G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 M: 540-326-6539 1 jritchie@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Tim Padalino [mailto:tpadalino@albemarle.org] Sent: Tuesday, February 20, 2018 9:58 AM To: Jonathan Ritchie <jritchie@bohlereng.com>; mfontaine@renaudconsulting.net Cc: Heather McMahon <hmcmahon@albemarle.org>; Margaret Maliszewski <MMaliszewski@albemarle.org>; Lawrence Osborne III <losborne@bohlereng.com>; V162083@nf.bohlereng.com Subject: RE: Initial Site Plan SDP201700080 Hi Jonathan, You're welcome — and thank you for the update. I'll communicate with Heather and Margaret to get an updated sense of where things are headed, per your recent conversation with Heather. As a quick reminder, I'll need to take action on the Initial Site Plan relatively soon (as we only have a total of 60 days to "take action" — i.e. either approve with conditions, or deny — and the SRC meeting last Thursday was day 45). The only other option in this situation would be for the applicant to request for a deferral, which freezes the 60-day review period and allows for much more time (up to six months) to work on possible revisions to the site layout and other details. Regardless, I will follow up with you if I have any questions or information to share, after I connect with our ARB planners. And I'll stay posted for any updates from your end. Thanks very much - - - Tim Padalino, AICP Albemarle County I Community Development Dept. (434)-296-5832 x. 3088 From: Jonathan Ritchie [mailto:iritchie@bohlereng.com] Sent: Monday, February 19, 2018 12:43 PM To: Tim Padalino <tpadalino@albemarle.org>; mfontaine@renaudconsulting.net Cc: Heather McMahon <hmcmahon@albemarle.org>; Margaret Maliszewski <MMaliszewski@albemarle.org>; Lawrence Osborne III <losborne@bohlereng.com>; V162083@nf.bohlereng.com Subject: RE: Initial Site Plan SDP201700080 Thanks Tim. Lawrence Osborne from our office spoke with Heather regarding the ARB meeting and we have an understanding of what we need to do. We will keep you posted on the progress with the ARB. Thanks again and nice meeting you last week. Jonathan Ritchie, P.E. BOHLER F N I: 1 N F. F R i N (. 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 M:540-326-65391 Iritchie@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Tim Padalino[mailto:tpadalino@albemarle.org] Sent: Thursday, February 15, 2018 11:05 AM To: Jonathan Ritchie <iritchie@bohlereng.com>; mfontaine@renaudconsulting.net Cc: Heather McMahon <hmcmahon@albemarle.org>; Margaret Maliszewski <MMaliszewski@albemarle.o Subject: Initial Site Plan SDP201700080 Hello Jonathan and Mark, Thanks for attending the SRC meeting this morning; it was nice to meet both of you. (And I apologize for the error in the SRC memo that incorrectly specified Room 235.) I'm writing to provide you with a copy of the "action memo" from the 2/12 ARB meeting (attached), which contains the ARB review comments. The Wawa review is item d. (beginning on page 4). Per our discussion during the SRC meeting, it sounds like there may be some decision -making to do regarding next steps, including the possibility of requesting a deferral of the Initial Site Plan review to allow more time to address the issues identified by the ARB. And it also sounds like you intend to coordinate further with ARB staff with regards to scheduling a return to the ARB; to that end, I've copied Margaret Maliszewski and Heather McMahon on this message in case that helps to expedite your coordination. In the meantime, we will be working to synchronize and clarify the two different sets of review comments (Planning and ARB) that pertain to the landscaping requirements for this project at this location. Thanks again; and please let me know if you have any questions or requests for assistance at any time. Tim Padalino, AICP Senior Planner I Community Development Department County of Albemarle, Virginia https://www.albemarle.org/department.asp?department=cdd (434)-296-5832 x. 3088