Loading...
HomeMy WebLinkAboutWPO201700015 Permit 2017-03-30 pF Al I�li IE.jjf COUNTY OF ALBEMARLE Community Development 401 McIntire Road Charlottesville,Vriginia 22902-4596 (434)296-5832 EROSION CONTROL PERMIT Date of Application: 02/13/2017 Permit Effective Date: 03/30/2017 Number: WPO-2017-00015 LANDOWNER: David or Melissa Slutzky Phone: 4349895888 1705 Lambs Road Charlottesville,VA22901 CONTRACTOR: River Works,Inc. Phone: (919)582-3574 6105 Chapel Hill Rd. Raleigh,NC27607 REPONSIBLE LAND Bill Wright Phone: (336)279-1002 DISTURBER: 4117 Pleasant Garden Rd. Greensboro,NC27406 Certification/License#: 39197 Type: Responsible Land Disturber Plans Prepared By: Ecosystem Services Plans Dated: 03/14/2017 Last Revised: 03/14/2017 Plans Entitled: Ivy Creek Nutrient Bank Stream Restoration Phase 1 Location: Dist. 2.3 Acreage: Tax Map: 04400-00-00-034C0 Hydrological JR07 Unit: Issued By:Kenny Thacker Title:Erosion Control Officer 3-So -/7 Signature Date Registration Statement General VPDES Permit for Discharges of Stormwater from Construction Activities (VAR10) (Please Type or Print All Information) 1. Construction Activity Operator: (General permit coverage will be issued to this operator. The Certification in Item#12 must be signed by the appropriate person associated with this operator.) Name: River Works, Inc. Contact:Wade Smith Mailing Address:6105 Chapel Hill Road City:Raleigh State: NC Zip:27607 Phone:919-815-0370 Email address(if available): Indicate if DEQ may transmit general permit correspondence electronically: Yes Ei No❑ 2. Existing General Permit Registration Number(for renewals only): 3. Name and Location of the Construction Activity: Name: Ivy Creek Nutrient Bank Stream Restoration - Phase I Address(if available): 1705 Lambs Road City:Charlottesville State:VA Zip:22902 County(if not located within a City):Albemarle Latitude(decimal degrees): 38.081353 Longitude(decimal degrees): 78.511756 Name and Location of all Off-site Support Activities to be covered under the general permit: Name: Ivy Creek Nutrient Bank Stream Restoration - Phase I Address(if available): 1705 Lambs Road City:Charlottesville State:VA Zip:22902 County(if not located within a City):Albemarle Latitude(decimal degrees): 38.081353 Longitude(decimal degrees): 78.511756 4. Status of the Construction Activity(check only one): Federal❑ State El Public❑ Private 5. Nature of the Construction Activity(e.g., commercial, industrial, residential,agricultural,oil and gas,etc.): Stream Restoration and Planting 6. Name of the Receiving Water(s)and Hydrologic Unit Code(HUC): Name: Ivy Creek-South Fork Rivann River Reservoir Name: HUC:02080204 HUC: 7. If the discharge is through a Municipal Separate Storm Sewer System(MS4),the name of the MS4 operator: 8. Estimated Project Start and Completion Date: Start Date(mm/dd/yyyy):4/3/17 Completion Date(mm/dd/yyyy):6/1/17 9. Total Land Area of Development(to the nearest one-hundredth acre):2.44 Estimated Area to be Disturbed(to the nearest one-hundredth acre):2.44 10. Is the area to be disturbed part of a larger common plan of development or sale? Yes El No Q 11. A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the General VPDES Permit for Discharges of Stormwater from Construction Activities prior to submitting this Registration Statement. By signing this Registration Statement the operator is certifying that the SWPPP has been prepared. 12. Certification: "I certify under penalty of law that I have read and understand this Registration Statement and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." Printed Name:Wade Smith Title:Site Superintendent Signature: (21.09pre- _ Date:3/30/17 (Please sign in INK. This Certification must be signed by the appropriate person associated with the operator identified in Item#1.) 07/2014 Page 1 of 1 Instructions for Completing the Registration Statement 400 General VPDES Permit for Discharges of Stormwater from Construction Activities (VAR10) .. GENERAL The entities that are considered operators will commonly consist of the owner or developer of a project(the party with control of project plans A.Coverage Under this General Permit. and specifications)or the general contractor(the party with day to day operational control of the activities at the project site which are Any operator applying for coverage under this general permit who is necessary to ensure compliance with the general permit). required to submit a Registration Statement (see Section B below) must submit a complete Registration Statement to the Department. Provide the legal name(do not use a colloquial name),contact,mailing The Registration Statement serves as a Notice of Intent for coverage address, telephone number, and email address (if available) of the under the General VPDES Permit for Discharges of Stormwater from construction activity operator;general permit coverage will be issued to Construction Activities(VAR10). this operator. Indicate if the Department may transmit general permit correspondence electronically. B.Single-family Detached Residential Structures. Item 2:Existing General Permit Registration Number. Operators with an existing stormwater discharge or proposing a new stormwater discharge associated with the construction of a single- For reapplications only, provide the existing general permit registration family detached residential structure are not required to submit a number for the construction activity. This item does not need to be Registration Statement or the Department of Environmental Quality completed for new construction activities applying for general permit (DEQ)portion of the general permit fee. coverage. Operators of these types of discharges are authorized to discharge Item 3: Name and Location of the Construction Activity under this general permit immediately upon the general permit's Information. effective date of July 1,2014. Provide the official name,street address(if available),city or county(if C.To Apply for Permit Coverage. not located within a City)of the construction activity. Also, provide the latitude and longitude in decimal degrees of the approximate center of 1. New Construction Activities. Any operator proposing a new the construction activity(e.g.,N 37.5000,W 77.5000). stormwater discharge from construction activities shall submit a complete Registration Statement to the Department prior to the Name and Location of Off-site Support Activity Information. commencement of land disturbance, unless exempted by Section B above. Any operator proposing a new stormwater discharge from This general permit also authorizes stormwater discharges from construction activities in response to a public emergency where the support activities (e.g., concrete or asphalt batch plants, equipment related work requires immediate authorization to avoid imminent staging yards, material storage areas, excavated material disposal endangerment to human health or the environment is immediately areas, borrow areas) located on-site or off-site provided that (i) the authorized to discharge under this general permit and must submit a support activity is directly related to a construction activity that is complete Registration Statement to the Department no later than 30 required to have general permit coverage;(ii)the support activity is not days after commencing land disturbance; documentation to a commercial operation, nor does it serve multiple unrelated substantiate the occurrence of the public emergency must construction activities by different operators; (iii) the support activity accompany the Registration Statement. does not operate beyond the completion of the construction activity it supports; (iv) the support activity is identified in the registration 2. Existing Construction Activities. Any operator that was statement at the time of general permit coverage; (v) appropriate authorized to discharge under the general permit issued in 2009, control measures are identified in a SWPPP and implemented to and who intends to continue coverage under this general permit, address the discharges from the support activity areas; and (vi) all shall submit a complete Registration Statement to the Department applicable state, federal, and local approvals are obtained for the on or before June 1,2014, unless exempted by Section B above. support activity. D.Where to Submit Registration Statements. Provide the official name,street address(if available), City and County (if not located within a City) of all off-site support activities to be All Registration Statements should be submitted to: covered under this general permit. Also, provide the latitude and longitude in decimal degrees of the approximate center of the off-site Department of Environmental Quality support activities (e.g., N 37.5000, W 77.5000). Also, if an off-site Office of Stormwater Management,10th Floor support activity is going to be covered under this general permit the P.O.Box 1105 total land area of the off-site support activity and the estimated area to Richmond,VA 23218 be disturbed by the off-site support activity need to be included in Item #9. LINE-BY-LINE INSTRUCTIONS Item 4:Status of the Construction Activity. Item 1:Construction Activity Operator Information. Indicate the appropriate status (Federal, State, Public, or Private) of "Operator" means the owner or operator of any facility or activity the construction activity. subject to the Stormwater Management Act and regulations. In the context of stormwater associated with a large or small construction Item 5:Nature of the Construction Activity. activity, operator means any person associated with a construction project that meets either of the following two criteria: (i)the person has Provide a brief description of the construction activity, such as direct operational control over construction plans and specifications, commercial, residential, agricultural, oil and gas, etc.This list is not all including the ability to make modifications to those plans and inclusive. specifications or (ii) the person has day-to-day operational control of those activities at a project that are necessary to ensure compliance Item 6:Receiving Waters(s)and HUC Information. with a stormwater pollution prevention plan for the site or other state permit or VSMP authority permit conditions(i.e.,they are authorized to Provide the name of the receiving water(s)and corresponding HUC for direct workers at a site to carry out activities required by the all stormwater discharges including any stormwater discharges from stormwater pollution prevention plan or comply with other permit off-site support activities to be covered under this general permit. conditions). Hydrologic Unit Code or HUC is a watershed unit established in the most recent version of Virginia's 61°order national watershed boundary dataset. 07/2014 Page 1 of 2 • assigned or delegated to the manager in accordance with dem 7:M34 Information. corporate procedures. If stormwater is discharged through a municipal separate storm sewer b. For a partnership or sole proprietorship: by a general partner or system(MS4),provide the name of the MS4 operator.The name of the the proprietor,respectively. MS4 operator is generally the Town, City, County, Institute or Federal facility where the construction activity is located. c. For a municipality,state, federal, or other public agency: by either a principal executive officer or ranking elected official. For purposes Item 8: Construction Activity Start and Completion Date of this part,a principal executive officer of a public agency includes: Information. (i)The chief executive officer of the agency,or Provide the estimated start date (month/day/year) of the construction activity. Provide the estimated completion date (month/day/year) of (ii)A senior executive officer having responsibility for the overall the construction activity. operations of a principal geographic unit of the agency. Item 9:Construction Activity Area Information. Provide the total area (to the nearest one-hundredth acre) of the development (i.e.., the total acreage of the larger common plan of development or sale). Include the total acreage of any off-site support activity to be covered under this general permit. Provide the estimated area (to the nearest one-hundredth acre)to be disturbed by the construction activity. Include the estimated area of land disturbance that will occur at any off-site support activity to be covered under this general permit. Item 10:Common Plan of Development or Sale Information. Indicate if the area to be disturbed by the construction activity is part of a larger common plan of development or sale. Larger common plan of development or sale is defined as a contiguous area where separate and distinct construction may be taking place at different times on different schedules. Plan is broadly defined as any announcement or documentation, including a sign, public notice or hearing, sales pitch, advertisement, drawing, permit application, zoning request, etc., or physical demarcation such as boundary signs, lot stakes, or surveyor markings indicating that construction activities may occur. Item 11:Storrnwater Pollution Prevention Plan(SWPPP). A Stormwater Pollution Prevention Plan(SWPPP)must be prepared in accordance with the requirements of the General VPDES Permit for Discharges of Stormwater from Construction Activities(VAR10)prior to submitting this Registration Statement. By signing this Registration Statement the operator is certifying that the SWPPP has been prepared. Item 12:Certification. A properly authorized individual associated with the operator identified in Item 1 of the Registration Statement is responsible for certifying and signing the Registration Statement. Please sign the Registration Statement in INK. State statutes provide for severe penalties for submitting false information on the Registration Statement. State regulations require that the Registration Statement be signed as follows: a. For a corporation: by a responsible corporate officer. For the purpose of this part,a responsible corporate officer means: (i) A president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy-making or decision-making functions for the corporation,or (ii) the manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long-tem, compliance with environmental laws and regulations;the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been 07/2014 Page 2 of 2 $NT Op Dill' I fxA<o��. Br4TLS of Western Virginia Regulatory Section NAO 2017-00253 David Slutzky 1705 Lambs Road Charlottesville, Virginia 22901 Dear Mr. Slutzky DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS NORFOLK DISTRICT FORT NORFOLK 803 FRONT STREET NORFOLK VA 23510-1011 February 22, 2017 This is in regard to your Department of the Army permit application number NAO-2017-0253 to do stream restoration in unnamed tributaries to Ivy Creek. Work will be completed as per plans on file at this office. Work will occur on your property, Albemarle County, Virginia. Your proposed work as outlined above satisfies the criteria contained in the Corps Nationwide Permit(s) (27) attached. The Corps Nationwide Permits were published in the February 21, 2012 Federal Register notice (77 FR 10184) and the regulations governing their use can be found in 33 CFR 330 published in Volume 56, Number 226 of the Federal Register dated November 22, 1991. Provided the project specific conditions (above) and the Nationwide Permit General Conditions (enclosed) are met, an individual Department of the Army Permit will not be required. In addition, the Virginia Department of Environmental Quality has provided an unconditional §401 Water Quality Certification for Nationwide Permit Number(s) 27. A permit may be required from the Virginia Marine Resources Commission and/or your local wetlands board, and this verification is not valid until you obtain their approval, if necessary. This authorization does not relieve your responsibility to comply with local requirements pursuant to the Chesapeake Bay Preservation Act (CBPA), nor does it supersede local government authority and responsibilities pursuant to the Act. You should contact your local government before you begin work to find out how the CBPA applies to your project. Enclosed is a "compliance certification" form, which must be signed and returned within 30 days of completion of the project, including any required mitigation. Your signature on this form certifies that you have completed the work in accordance with the nationwide permit terms and conditions. SPECIAL CONDITIONS 1. Take pre and post construction photos of the stream enhancement work. 2. Monitor the stream enhancement work for 2 years to ensure work and stream is stable. This can be done through visual observations and photos submitted to this office once per year unless there are issues. This verification is valid until the NWP is modified, reissued, or revoked. All of the existing NWPs are scheduled to be modified, reissued, or revoked prior to March 18, 2017. It is incumbent upon you to remain informed of changes to the NWPs. We will issue a public notice when the NWPs are reissued. Furthermore, if you commence or are under contract to commence this activity before the date that the relevant nationwide permit is modified or revoked, you will have twelve (12) months from the date of the modification or revocation of the NWP to complete the activity under the present terms and conditions of this nationwide permit unless discretionary authority has been exercised on a case- by-case basis to modify, suspend, or revoke the authorization in accordance with 33 CFR 330.4(e) and 33 CFR 330.5 (c) or (d). Project specific conditions listed in this letter continue to remain in effect after the NWP verification expires, unless the district engineer removes those conditions. Activities completed under the authorization of an NWP which was in effect at the time the activity was completed continue to be authorized by that NWP. If you have any questions, please contact me at (434) 973-0568 or Vincent.d.pero@usace.army.mil Sincerely, PEROMINCENT.D.127077 DDNially sgedc=USlo=USbGoverrnme t,ou=DoDoou$PKI, 8255 ou=USA, cn=PERO.VI NCENT.D.1270778255 Date: 2017.02.22 13:52:29 -05'00' Vincent D. Pero Western Virginia Regulatory Section