Loading...
HomeMy WebLinkAboutWPO201600075 Inspection 2018-03-15COUNTY OF ALBEMARLE Department of Community Development VSMP/VESCP PERMIT SITE INSPECTION REPORT Project Name: S 1 ProjectlWPO Number: (%%PD - 000,, Sr Project Address: I h'M uJNod DEQ Permit Number (if applicable): VAR i WC 6 ! A Project Operator: 4' of/t Operator Telephone #: ko _ Project Contact: Contact Telephone #: _ Y31 Contact E-Mall: c Qualified Personnel (QP): G 4 13rVA&f Inspector: Weather (Wet/Dry/Rain): Disturbed Acreage: 'Z.0 Inspection Date &Time: ; y Single -Family: ❑ Yes 290 Stage of Construction: H Pre -Construction Meeting Initial Clearing & Grading ough Grading ❑ Building Construction ❑ Final Grading ❑ Construction of SWM Facilities ❑ Final Stabilization ❑ Notice of Termination ❑ Other. Re -Inspection: ❑ Yes o OWPoo COVERAGE & POSTING REQUIREMENTS Ye No N/A ,�+ Reviewed during re -inspection? L0'es []No Comments/Description Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A) / 1 (9VAC25-870-310)(Alb. Co. Code §17-300, 17-302) 1/ A copy of the notice of coverage letter is posted conspicuously near the 2 main entrance of the construction activity'? (CGP Part I I.C) Notice of the location of the SWPPP is posted near the site's entrance, if 3 applicable, and information for public access is provided? (9VAC25-870- 54.GxCGP Part II D.2 & 3) sopiap SWPPP AVAILABILITY AND CONTENTS Yes No N/A Reviewed during re -inspection? ees ❑No Comments/Descrfptlon 4 The SWPPP is on -site or made available during the inspection? (CGP / v Part II D.1 & 2)(gVAC25-870-54.G) 5 The SWPPP contains a signed copy of the registration statement? (CGP Part II A.1.a) 6 The SWPPP includes, upon receipt, a copy of the notice of coverage letter and the CGP? (CGP Part II A.1.b & c) The SWPPP includes a narrative description of the nature of the 7 construction activity, including the function of the project? (CGP Part II A.1.d) Page 1 of 7 The SWPPP includes a legible site plan identifying all appropriate 8 measures and that includes the locations of support activities and the onsite rain gauge, when applicable? (CGP Part It A.1.e(1-7)) 9 The SWPPP contains the name, phone number and qualifications of "Qualified Personnel" conducting inspections? (CGP Part 11 A.6) 10 The SWPPP contains an approved erosion and sediment control plan? (9VAC25-870-54.B)(CGP Part II.A.2) The SWPPP contains an approved stormwater management plan or an 11 existing construction site has a stormwater management plan that ensures compliance with the water quality and quantity requirements? (9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria 11.13 ❑ 11.0 ❑ 12 The SWPPP contains an adequate pollution prevention plan? (9VAC25- i 870-54.DXCGP Part II.A.4) The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of 13 concern, exceptional waters and the additional controls measures applicable? (9VAC 25-870-54,E)(CGP Part IIA.5 (a-b)) 14 Delegation of Authority is provided and signed in accordance with Part lit / K? (CGP Part It A.7) 15 The SWPPP is signed and dated in accordance with Part III K? (CGP Pare / V II A.8) SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES Yes No N/A Reviewed during inspection? Wyles ❑No Comments/Descripfiort Is the SWPPP being amended whenever there is a change in the design, 16 iconstruction, operation, or maintenance that has a significant effect on the charge of pollutants to surface waters? (CGP Part II B(1)X9VAC25-870- Pis.G) Has the SWPPP been amended if inspections or investigations by the t� r,�r •Je e (cl� v�P p(c' 17 operators qualified personnel, or by local, state or federal officials find that f existing control measures are ineffective in minimizing pollutants in ✓ ,discharges? (CGP Part Il B(2))(9VAC25-870-54.G) 18 that will implement and maintain each control measure are ; J�ontractor(s) entified? (CGP Part II B(3))(9VAC25-870-54.G) Have there been updates to the SWPPP when any modifications to its limplementation have occurred, including a record of dates when major / I 19 rading activities occur, construction activities temporarily or permanently �/ I ease on a portion of the site or stabilization measures are initiated? (CGP Part 11 B.4(a))(9VAC25-870-54.G) 20 Is there documentation in the SWPPP of replaced or modified controls? CGP Part II B.4(b))(9VAC25-870-54.G) { 21 Is the SWPPP updated to indicate areas that have reached final / t'P-•w� r(r ^7 c�,.t r stabilization? (CGP Part II B.4(c)X9VAC25-870-54.G) Is the SWPPP updated to indicate properties that are no longer under the r 22 legal control of the operator and the dates on which the operator no longer had legal control over each property? (CGP Part II B.4(d)X9VAC25-870- G) 23 Does the SWPPP identify the date of any prohibited discharges, the volume released, actions taken to minimize the impact of the release and measures taken to prevent the recurrence of any prohibited discharge? CGP Part 11 B.4(e-f)) (9VAC25-870-54.G) 24 mendments, modifications, or updates to the SWPPP are signed in ccordance with Part III K? (CGP Part II B(5))(9VAC25-870-54.G) V INSPECTIONS AND CORRECTIVE ACTIONS Yes No N/A� i Reviewed during inspection? 0es ❑No Comments/Description Inspections required by the SWPPP are conducted at the required frequency, including a modified frequency for impaired water(s), approved / 25 I TMDL(s), and exceptional waters when applicable? (CGP Part 11 1= (2)) V/ (CGP Part 11 A.5.b.3) Page 2 of 7 26 Inspection reports are completed and signed in accordance with CGP vf Part II F (3-4)? (CGP Part II F (3-4)) Corrective actions are taken consistent with the requirements of the ✓ 27 CGP? (CGP Part II G(1-2)) ESC AND SWM PLAN IMPLEMENTATION Yes No N/A Reviewed during inspection? ❑Yes []No CommentsVescripdon 28 Have stream buffers and steep slopes been protected as shown on the / V . plan Sequencing of the project is implemented in accordance with the 29 approved erosion and sediment control plan and stormwater management plans? (9VAC25-870-54.B and C) Have all denuded areas requiring temporary or permanent stabilization been stabilized, and have stabilization requirements for impaired waters, 30 approved TMDL(s), pollutants of concern and exceptional waters, when applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC2 880-60) (CGP Part I F.1(a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8)) (CGP II E(1-2)) Are soil stockpiles adequately stabilized with seeding and/or protected 31 with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part 11 A.2(c)) (9VAC25-870-54.8) A permanent vegetative cover has been established that is uniform, kA to 32 mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3) (CGP Part II A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-54.B) Have sediment trapping facilities been constructed as the first step in land 33 disturbance activities? (9VAC 25-840-40.4) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Have earthen structures been stabilized immediately after installation? / 34 (9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870- 54_B) Are sediment traps and basins installed in accordance with MS-6 and the / 35 approved plan? (9VAC 25-840-40.6) (CGP Part 11 A.2.c (9)) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.6) Are finished cut and fill slopes adequately stabilized to prevent or correct / 36 excessive erosion? (9VAC 25-840-40.7) (CGP Part II A.2(c)) (CGP I1 E(1- ✓ 2)) (9VAC25-870-54.B) 37 Is concentrated runoff down cut or fill slopes contained in an adequate or temporary structure? (9VAC 25-840-40.8) (CGP Part II permanent A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Is adequate drainage or other protection provided for water seeps? 38 (9VAC 25-840-40.9) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870- 54.13) Do all operational storm sewer inlets have adequate inlet protection? 39 (9VAC 25-840-40.10) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870- ✓ 54.B) Are stormwater conveyance channels adequately stabilized with channel Part II A.2(c)) J 40 lining and/or outlet protection? (9VAC 25-840-40.11) (CGP (CGP II E(1-2)) (9VAC25-870-54.8) Is in -stream construction conducted using measures to minimize channel / 41 damage? (9VAC 25-840-40.12) (CGP Part it A.2(c)) (CGP II E(1-2)) V (9VAC25-870-54.B) Are temporary stream crossings of non -erodible material installed where 42 applicable? (9VAC 25-840-40.13) (CGP Part II A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-54.8) 43 Is necessary restabilization of in -stream construction complete? (9VAC / 25-M-40.15) (CGP 11 E(1-2)) (9VAC25-870-54.B) V Are utility trench operations conducted and stabilized in accordance with / 44 MS-16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP II E(1-2)) J (9VAC25-870-54. B) Are soil and mud kept off paved or public roads to minimize the transport 7J 45 of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP II E(1-2)) v (9VAC25-870-54. B) Page 3 of 7 Have all temporary control structures that are no longer needed been 46 removed and disturbed soil resulting from their removal permanently stabilized? (9VAC 25-840-40.18) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Are properties and waterways downstream from development adequately 47 protected from erosion, sediment and damage in accordance with the standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840- 40.19(a-n)) 48 Permanent control measures included in the SWPPP are in place? (9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a)) POLLUTION PREVENTION PLAN IMPLEMENTATION Yes No N/A Reviewed during inspection?�es []No Comments/Description Practices are in place to prevent and respond to leaks, spills, and other releases including (i) procedures for expeditiously stopping, containing, f 49 and cleaning up spills, leaks, and other releases; and (ii) procedures for reporting leaks, spills, and other releases in accordance with Part III G? (CGP Part II A.4.e(1)X9VAC25-870-56) Practices are in place to prevent the discharge of spilled and leaked fuels 50 and chemicals from vehicle fueling and maintenance activities? (CGP Part I I A.4.e(2 )}(9VAC25-870-56) Practices are in place to prevent the discharge of soaps, solvents, 51 detergents, and wash water from construction materials, including the clean-up of stucco, paint, form release oils, and curing compounds? (CGP Part II A.4.e(3)X9VAC25-870-56) Practices are in place to minimize the discharge of pollutants from vehicle 52 and equipment washing, wheel wash water, and other types of washing? (CGP Part II A.4.e(4)X9VAC25-870-56) 53 Concrete wash water is directed into a leak -proof container or leak -proof / settling basin? (CGP Part II A.4.e(5))(9VAC25-870-56) V Practices are in place to minimize the discharge of pollutants from w/ Ca u V 54 storage, handling, and disposal of construction products, materials, and wastes? (CGP Part II A.4.e(6)X9VAC25-870-56) Practices are in place to prevent the discharge of fuels, oils, and other as S% t 55 petroleum products, hazardous or toxic wastes, and sanitary wastes? V (CGP Part II A.4.e(7)(9VAC25-870-56) Practices are in place to minimize any other discharge from the potential / 56 pollutant -generating activities not addressed above, when applicable? (CGP Part II A.4.e(8))(9VAC25-870-56) Inspector Signatur Date: 3 1 5/18 Page 4 of 7 Notes: CONSTRUCTION GENERAL PERMIT SITE INSPECTION REPORT REQUEST FOR CORRECTIVE ACTION Project Name: Permit Number (if applicable): Date: Regulatorr y Observation/Recommended Corrective Action Checklist # Citation/LegatOccurrence requirement' Observation: Recommended Corrective Action: Observation: Recommended Corrective Action: Observation: Recommended Corrective Action: Observation: Recommended Corrective Action., Observation: Recommended Corrective Action: ' Refers to applicable regulation found In the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and Sediment Control Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for Discharges of Stormwater from Construction Activities (9VAC25-880). Page 5 of 7 Recommended Corrective Action Deadline: Targeted Re -Inspection Date: Comments: The recommended corrective action deadline date applies to all conditions noted on this report unless otherwise noted. If listed condition(s) currently constitute non-compliance and/or corrective actions are not completed by the deadline, other enforcement actions may be issued to the entity responsible for ensuring compliance on the above project. Inspector Signature: __ _ Date: Page 6 of 7