HomeMy WebLinkAboutWPO201600011 Inspection 2018-03-15COUNTY OF ALBEMARLE
Department of Community Development
VSMPNESCP PERMIT SITE INSPECTION REPORT
Project Name:
/�717 0 n - 1�.�'�
ProjectlWPO Number:
4J �U � def (� • ��
Project Address:,/�
-&.7eAC_ttR1 b r. (
DEQ Permit Number (if
applicable):
VAR
Project Operator:
_,� t(
Operator Telephone #:
b V
Project Contact:
_i<s i
Contact Telephone #:
_ 7-0_ 373
Contact E -Mail:
Qualified Personnel (QP):
�� fJre►�
Inspector:
�,_Ac�
Weather (Wet/Dry/Rain):
Disturbed Acreage:
--2-,-5 -5
Inspection Date & Time:
Single -Family: ❑ Yes DINo
Stage of Construction: LJ Pre -Construction Meeting LJ Initial Clearing & Grading LJ
❑ Building Construction ❑ Final Grading ❑ Construction of SWM Facilities
❑ Notice of Termination ❑ Other:
Rough Grading
[�Jal Stabilization
Re -Inspection:
❑ Yes la
Page 1 of 7
COVERAGE & POSTING REQUIREMENTS
Yes
No
N/A
Reviewed during re -inspection? ❑YesEINvo
Comments/Descrip6on
1
Construction site has permit coverage? (Va. Code §82.1- 44.15:34.A)
(9VAC25-870-310)(Alb. Co. Code §17-300, 17-302)
2
A copy of the notice of coverage letter is posted conspicuously near the
f
main entrance of the construction activity? (CGP Part II.C)
Notice of the location of the SWPPP is posted near the site's entrance, if
/
3
applicable, and information for public access is provided? (9VAC25-870-
54.G)(CGP Part II D.2 & 3)
SWPPP AVAILABILITY AND CONTENTS
Yes
No
N/A
Reviewed during re -inspection? ❑Ye§,0lo
Comments/Description
4
The SWPPP is on-site or made available during the inspection? (CGP
Part 11 D.1 & 2)(9VAC25-870-54.G)
5
The SWPPP contains a signed copy of the registration statement?
/
(CGP Part II A. 1.a)
6
The SWPPP includes, upon receipt, a copy of the notice of coverage
letter and the CGP? (CGP Part 11 A. 1.b & c)
The SWPPP includes a narrative description of the nature of the
7
construction activity, including the function of the project? (CGP Part 11
A.1.d)
Page 1 of 7
___---- _r r.___-" ------ —....-..-._..._..-1.-..--
11 existing construction site has a stormwater management plan that
ensures compliance with the water quality and quantity requirements?
(9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria 11.113 ❑ ILC ❑
12 The SWPPP contains an adequate pollution prevention plan? (9VAC25-
870-54.D)(CGP Part II.A.4)
The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of
13 concern, exceptional waters and the additional controls measures
applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a -b))
14 Delegation of Authority is provided and signed in accordance with Part iIi
K? (CGP Part II A.7)
15 The SWPPP is signed and dated in accordance with Part iII K? (CGP Pa
II A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES IYed No IN/AI Reviewed during inspection? []Yes "01
Is the SWPPP being amended whenever there is a change in the design,
16 nstruction, operation, or maintenance that has a significant effect on the
ischarge of pollutants to surface waters? (CGP Part II B(1))(9VAC25-870-
The SWPPP includes a legible site plan identifying all appropriate
1)peratol's
qualified personnel, or by local, state or federal officials find that
8
measures and that includes the locations of support activities and the
ischarges? (CGP Part iI B(2))(9VAC25-870-54.G)
18
onsite rain gauge, when applicable? (CGP Part II A.1.e(1-7))
dentified? (CGP Part II B(3))(9VAC25-870-54.G)
9
The SWPPP contains the name, phone number and qualifications of
implementation have occurred, including a record of dates when major
19
"Qualified Personnel" conducting inspections? (CGP Part II A.6)
ase on a portion of the site or stabilization measures are initiated? (CGP
10
The SWPPP contains an approved erosion and sediment control plan?
20
Is there documentation in the SWPPP of replaced or modified controls?
(9VAC25-870-54.B)(CGP Part II.A.2)
21
Is the SWPPP updated to indicate areas that have reached final
Part II B.4(c))(9VAC25-870-54.G)
ThP SWPPP rnntninc nn nnnrnvarf ctnrmwafer mnnanamonf nlan nr nn
___---- _r r.___-" ------ —....-..-._..._..-1.-..--
11 existing construction site has a stormwater management plan that
ensures compliance with the water quality and quantity requirements?
(9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria 11.113 ❑ ILC ❑
12 The SWPPP contains an adequate pollution prevention plan? (9VAC25-
870-54.D)(CGP Part II.A.4)
The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of
13 concern, exceptional waters and the additional controls measures
applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a -b))
14 Delegation of Authority is provided and signed in accordance with Part iIi
K? (CGP Part II A.7)
15 The SWPPP is signed and dated in accordance with Part iII K? (CGP Pa
II A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES IYed No IN/AI Reviewed during inspection? []Yes "01
Is the SWPPP being amended whenever there is a change in the design,
16 nstruction, operation, or maintenance that has a significant effect on the
ischarge of pollutants to surface waters? (CGP Part II B(1))(9VAC25-870-
Does the SWPPP identify the date of any prohibited discharges, the
23 volume released, actions taken to minimize the impact of the release and
measures taken to prevent the recurrence of any prohibited discharge?
(CGP Part II B.4(e-f)) (9VAC25-870-54.G)
24 Amendments, modifications, or updates to the SWPPP are signed in
�ccordance with Part III K? (CGP Part II B(5))(9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS lYesl No +N/A+ Reviewed during inspection? [:]Yes No
Inspections required by the SWPPP are conducted at the required
25 frequency, including a modified frequency for impaired water(s), approved
TMDL(s), and exceptional waters when applicable? (CGP Part II F (2))
(CGP Part II A.5.b.3)
Page 2 of 7
Has the SWPPP been amended if inspections or investigations by the
1)peratol's
qualified personnel, or by local, state or federal officials find that
xisting control measures are ineffective in minimizing pollutants in
ischarges? (CGP Part iI B(2))(9VAC25-870-54.G)
18
Contractor(s) that will implement and maintain each control measure are
dentified? (CGP Part II B(3))(9VAC25-870-54.G)
Have there been updates to the SWPPP when any modifications to its
implementation have occurred, including a record of dates when major
19
grading activities occur, construction activities temporarily or permanently
ase on a portion of the site or stabilization measures are initiated? (CGP
Part II B.4(a))(9VAC25-870-54.G)
20
Is there documentation in the SWPPP of replaced or modified controls?
(CGP Part II B.4(b))(9VAC25-870-54.G)
21
Is the SWPPP updated to indicate areas that have reached final
Part II B.4(c))(9VAC25-870-54.G)
stabilization? (CGP
Is the SWPPP updated to indicate properties that are no longer under the
22
legal control of the operator and the dates on which the operator no longer
had legal control over each property? (CGP Part II B.4(d))(9VAC25-870-
Does the SWPPP identify the date of any prohibited discharges, the
23 volume released, actions taken to minimize the impact of the release and
measures taken to prevent the recurrence of any prohibited discharge?
(CGP Part II B.4(e-f)) (9VAC25-870-54.G)
24 Amendments, modifications, or updates to the SWPPP are signed in
�ccordance with Part III K? (CGP Part II B(5))(9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS lYesl No +N/A+ Reviewed during inspection? [:]Yes No
Inspections required by the SWPPP are conducted at the required
25 frequency, including a modified frequency for impaired water(s), approved
TMDL(s), and exceptional waters when applicable? (CGP Part II F (2))
(CGP Part II A.5.b.3)
Page 2 of 7
26
Inspection reports are completed and signed in accordance with CGP
Part it F (3-4)? (CGP Part II F (3-4))
27
Corrective actions are taken consistent with the requirements of the
CGP? (CGP Part II G(1-2))
ESC AND SWM PLAN IMPLEMENTATION
Yes No N/A Reviewed during inspection? es ❑No
Comments/Descripflon
28
Have stream buffers and steep slopes been protected as shown on the
plan?
Sequencing of the project is implemented in accordance with the
29
approved erosion and sediment control plan and stormwater managemen
plans? (9VAC25-870-54.B and C)
Have all denuded areas requiring temporary or permanent stabilization
been stabilized, and have stabilization requirements for impaired waters,
30
approved TMDL(s), pollutants of concern and exceptional waters, when
applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25-
880-60) (CGP Part I F.1 (a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8))
(CGP II E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected
31
with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part II
A.2(c)) (9VAC25-870-54.B)
A permanent vegetative cover has been established that is uniform,
32
mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3)
(CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Have sediment trapping facilities been constructed as the first step in land
33
disturbance activities? (9VAC 25-840-40.4) (CGP Part II A.2(c)) (CGP 11
E(1-2)) (9VAC25-870-54.B)
r
Have earthen structures been stabilized immediately after installation?
34
(9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54. B)
Are sediment traps and basins installed in accordance with MS -6 and the
35
approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part 11
A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-54.B)
Are finished cut and fill slopes adequately stabilized to prevent or correct
36
excessive erosion? (9VAC 25-840-40.7) (CGP Part II A.2(c)) (CGP 11 E(1- �!
2)) (9VAC25-870-54.B) t
Is concentrated runoff down cut or fill slopes contained in an adequate
37
permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part II
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Is adequate drainage or other protection provided for water seeps?
38
(9VAC 25-840-40.9) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54. B)
Do all operational storm sewer inlets have adequate inlet protection?
t%i�2esf ✓ n;cx i
39
(9VAC 25-840-40.10) (CGP Part I1 A.2(c)) (CGP II E(1-2)) (9VAC25-870-
Are stormwater conveyance channels adequately stabilized with channel
40
lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part 11 A.2(c))
(CGP II E(1-2)) (9VAC25-870-54.B)
Is in -stream construction conducted using measures to minimize channel
41 damage? (9VAC 25-840-40.12) (CGP Part 11 A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B)
Are temporary stream crossings of non -erodible material installed where
42 applicable? (9VAC 25-840-40.13) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B)
43 Is necessary restabilization of in -stream construction complete? (9VAC
25-840-40.15) (CGP II E(1-2)) (9VAC25-870-54.B)
Are utility trench operations conducted and stabilized in accordance with
44 MS -16? (9VAC 25-840-40.16) (CGP Part 11 A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B)
Are soil and mud kept off paved or public roads to minimize the transport
45 of sediment? (9VAC 25-840-40.17) (CGP Part 11 A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B)
Page 3 of 7
Have all temporary control structures that are no longer needed been
46 removed and disturbed soil resulting from their removal permanently
stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP 11 E(1-2))
(9VAC25-870-54. B)
Are properties and waterways downstream from development adequately
47 protected from erosion, sediment and damage in accordance with the
standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25 -840-
40.19(a -n))
48 Permanent control measures included in the SWPPP are in place?
(9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a))
POLLUTION PREVENTION PLAN IMPLEMENTATION Yes No N/A Reviewed during inspection? ❑Yes0
Comments/Descrfptfon
Practices are in place to prevent and respond to leaks, spills, and other
releases including (i) procedures for expeditiously stopping, containing,
49 and cleaning up spills, leaks, and other releases; and (ii) procedures for
reporting leaks, spills, and other releases in accordance with Part III G?
(CGP Part 11 A.4.e(1))(9VAC25-870-56)
Practices are in place to prevent the discharge of spilled and leaked fuels
50 and chemicals from vehicle fueling and maintenance activities? (CGP Part II
A.4.e (2))(9VAC25-870-56)
Practices are in place to prevent the discharge of soaps, solvents,
51 detergents, and wash water from construction materials, including the
clean-up of stucco, paint, form release oils, and curing compounds? (CGP
Part it A.4.e(3))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from vehicle
52 and equipment washing, wheel wash water, and other types of washing?
(CGP Part II A.4.e(4))(9VAC25-870-56)
53 Concrete wash water is directed into a leak -proof container or leak -proof
settling basin? (CGP Part 11 A.4.e(5))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from
54 storage, handling, and disposal of construction products, materials, and
wastes? (CGP Part 11 A.4.e(6))(9VAC25-870-56)
Practices are in place to prevent the discharge of fuels, oils, and other
55 petroleum products, hazardous or toxic wastes, and sanitary wastes?
(CGP Part 11 A.4.e(7)(9VAC25-870-56)
Practices are in place to minimize any other discharge from the potential
56 pollutant -generating activities not addressed above, when applicable?
(CGP Part 11 A.4.e(8))(9VAC25-870-56)
hspectorSignature:�C_"_./Date: res 4
Page 4 of 7
COUNTY OF ALBEMARLE
Department of Community Development
VSMPNESCP PERMIT SITE INSPECTION REPORT
Project Name:
COVERAGE & POSTING REQUIREMENTS
yes
No
NIA
ProjectNIP0 Number:
UPC 9, O 1 b • b c
Project Address:DEQ
�Z
LwLMfe
Comments0escription
Permit Number (if
applicable):
VAR
Project Operator:
1
Operator Telephone #:
Project Contact:5
A copy of the notice of coverage letter is posted conspicuously near the
Contact Telephone #:
$4io - 7� - 3l
Contact E -Mail:
2
main entrance of the construction activity? (CGP Part I LC)
Qualified Personnel (QP):
Inspector:
Notice of the location of the SWPPP is posted near the site's entrance, if
Weather (Wet/Dry/Raln):r
Disturbed Acreage:
applicable, and information for public access is provided? (9VAC25-870-
'Z o
Inspectlon Date & Time:
Single -Family- ❑ YesNo
Stage of Construction: LJ
❑ Building Construction
❑ Notice of Termination
Pre -Construction Meeting LJ Initial Clearing & Grading LJ Rough Grading
❑ Final Grading ❑ Construction of SWM Facilities Z�-�nal Stabilization
El Other:
Re4nspectlon:
❑ Yes eCINo
N/A
Reviewed during re -inspection? []Yes []No
Page 1 of 7
COVERAGE & POSTING REQUIREMENTS
yes
No
NIA
Reviewed during re -inspection? []Yes [:]No
Comments0escription
Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A)
1
(9VAC25-870-310)(Alb. Co. Code §17-300, 17-302)
A copy of the notice of coverage letter is posted conspicuously near the
2
main entrance of the construction activity? (CGP Part I LC)
Notice of the location of the SWPPP is posted near the site's entrance, if
3
applicable, and information for public access is provided? (9VAC25-870-
54.GXCGP Part II D.2 & 3)
SWPPP AVAILABILITY AND CONTENTS
yeS
No
N/A
Reviewed during re -inspection? []Yes []No
COMM -
The SWPPP is on-site or made available during the inspection? (CGP
4
Part II D.1 & 2X9VAC25-870-54.G)
The SWPPP contains a signed copy of the registration statement?
5
(CGP Part II A.t.a)
The SWPPP includes, upon receipt, a copy of the notice of coverage
6
letter and the CGP? (CGP Part II A.1.b & c)
The SWPPP Includes a narrative description of the nature of the
7
construction activity, including the function of the project? (CGP Part II
A.1.d)
Page 1 of 7
The SWPPP includes a legible site plan identifying all appropriate
8
measures and that includes the locations of support activities and the
onsite rain gauge, when applicable? (CGP Part II A.1.e(1-7))
9
The SWPPP contains the name, phone number and qualifications of
"Qualified Personnel" conducting inspections? (CGP Part II A.6)
10
The SWPPP contains an approved erosion and sediment control plan?
(9VAC25-870-54.B)(CGP Part II.A.2)
The SWPPP contains an approved stormwater management plan or an
11
existing construction site has a stormwater management plan that
ensures compliance with the water quality and quantity requirements?
(9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria 111.113 ❑ ILC ❑
12
The SWPPP contains an adequate pollution prevention plan? (9VAC25-
870-54.D)(CGP Part II.A.4)
The SWPPP identifies impaired water(s), approved TMDL, pollutants) of
13
concern, exceptional waters and the additional controls measures
applicable? (9VAC 25-870-54.EXCGP Part IIA.S (a -b))
14
Delegation of Authority is provided and signed in accordance with Part 111
K? (CGP Part II A.7)
15
The SWPPP is signed and dated in accordance with Part III K? (CGP Part
11 A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES Yes No WA
Reviewed during inspection? []Yes []No
Comm ents(Description
Is the SWPPP being amended whenever there is a change in the design,
16
construction, operation, or maintenance that has a significant effect on the
discharge of pollutants to surface waters? (CGP Part II B(1))(9VAC25-870-
4.G)
Has the SWPPP been amended if inspections or investigations by the
17
qualified personnel, or by local, state or federal officials find that
�perator's
xisting control measures are ineffective in minimizing pollutants in
ischarges? (CGP Part it B(2))(9VAC25-870-54.G)
18
ontractor(s) that will implement and maintain each control measure are
dentified? (CGP Part II B(3)X9VAC25-870-54.G)
ave there been updates to the SWPPP when any modifications to its
mplementation have occurred, including a record of dates when major
19
3rading activities occur, construction activities temporarily or permanently
ease on a portion of the site or stabilization measures are initiated? (CGP
Part II B.4(a))(9VAC25-870-54.G)
20
Is there documentation in the SWPPP of replaced or modified controls?
CGP Part II B.4(b))(9VAC25-870-5.4.G)
21
Is the SWPPP updated to indicate areas that have reached final
stabilization? (CGP Part It B.4(c))(9VAC25-870-54.13)
Is the SWPPP updated to indicate properties that are no longer under the
22
legal control of the operator and the dates on which the operator no longer
had legal control over each property? (CGP Part 11 B.4(d)x9VAC25-870-
4 .G)
Does the SWPPP identify the date of any prohibited discharges, the
23
volume released, actions taken to minimize the impact of the release and
measures taken to prevent the recurrence of any prohibited discharge?
CGP Part 11 13.4(e -f)) (9VAC25-870-54.G)
24
Amendments, modifications, or updates to the SWPPP are signed in
ccordance with Part III K? (CGP Part II B(5))(9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS Yes No N/A
Reviewed during inspection? []Yes []No
CommentsJDescription
Inspections required by the SWPPP are conducted at the required
25
frequency, including a modified frequency for impaired water(s), approved
TMDL(s), and exceptional waters when applicable? (CGP Part 11 F (2))
(CGP Part II A.5.b.3)
Page 2 of 7
rage 3 m i
Inspection repQrts are completed and signed in accordance with CGP
26
Part II F (3-4)? (CGP Part II F (3-4))
27
Corrective actions are taken consistent with the requirements of the
CGP? (CGP Part II G(1-2))
ESC AND SWM PLAN IMPLEMENTATIONY
No
WA
Reviewed during inspection? []Yes[]NoCommenta/Dascrtptlon
Have stream buffers and steep slopes been protected as shown on the
_
28
plan .
V/
Sequencing of the project is implemented in accordance with the
29
approved erosion and sediment control plan and stormwater managemen
plans? (9VAC25-870-54.B and C)
Have all denuded areas requiring temporary or permanent stabilization
been stabilized, and have stabilization requirements for impaired waters,
30
approved TMDL(s), pollutants of concern and exceptional waters, when
applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC2
880-60) (CGP Part I 17.1(a)) (CGP Part II A.5.15(1)) (CGP Part II A.2.c (8))
(CGP 11 E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected
31
with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part II
A.2(c)) (9VAC25-870-64.13)
A permanent vegetative cover has been established that is uniform,
32
mature enough to survive and will Inhibit erosion? (9VAC 25-840-40.3)
(CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.6)
Have sediment trapping facilities been constricted as the first step in land
33
disturbance activities? (9VAC 25-840-40.4) (CGP Part II A.2(c)) (CGP 11
E(1-2)) (9VAC25-870-54.13)
Have earthen structures been stabilized immediately after installation?
ti's
34
(9VAC 25-840-40.5) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-670-
54.13)
Are sediment traps and basins installed in accordance with MS-6 and the
35
approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part II
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.6)
Are finished cut and fill slopes adequately stabilized to prevent or correct
36
excessive erosion? (9VAC 25-840-40.7) (CGP Part II A.2(c)) (CGP 11 E(1-
2)) (9VAC25-870-54.8)
Is concentrated runoff down cut or fill slopes contained in an adequate
37
permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part II
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.13)
Is adequate drainage or other protection provided for water seeps?
38
(9VAC 25-840-40.9) (CGP Part it A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.6)
Do all operational storm sewer inlets have adequate inlet protection?
S
39
(9VAC 25-840-40.10) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Are stormwater conveyance channels adequately stabilized with channel
40
lining and/or outlet protection? (9VAC 25-84D-40.11) (CGP Part II A.2(c))
(CGP it E(1-2)) (9VAC25-870-54.B)
Is in-stream construction conducted using measures to minimize channel
II E(1-2))
/
41
damage? (9VAC 25-840-40.12) (CGP Part II A.2(c)) (CGP
(9VAC25-870-54.5)
Are temporary stream crossings of non-erodible material installed where
42
applicable? (9VAC 25-840-40.13) (CGP Part 11 A.2(c)) (CGP II E(1-2))
(9VAC25-870-54.B)
43
Is necessary restabilization of in-stream constriction complete? (9VAC
25-840-40.15) (CGP II E(1-2)) (9VAC25-870-54.B)
Are utility trench operations conducted and stabilized in accordance with
44
MS-16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP 11 E(1-2))
(9VAC25-870-54.B)
Are soil and mud kept off paved or public roads to minimize the transport
45
of sediment? (9VAC 25-840-40.17) (CGP Part 11 A.2(c)) (CGP II E(1-2))
(9VAC25-870-54.13)
rage 3 m i
�A
Inspector Signature: Date: r i /
Page 4 of 7
Have all temporary control structures that are no longer needed been
46
removed and disturbed soil resulting from their removal permanently
stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54.6)
Are properties and waterways downstream from development adequately
47
protected from erosion, sediment and damage in accordance with the
standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25 -840-
40.19(a -n))
48
Permanent control measures included in the SWPPP are in place?
(9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a))
POLLUTION PREVENTION PLAN IMPLEMENTATION
Yes No N/A
Reviewed during inspection? []Yes []No
Comments/Descrlp8on
Practices are in place to prevent and respond to leaks, spills, and other
releases including (i) procedures for expeditiously stopping, containing,
49
and cleaning up spills, leaks, and other releases; and (ii) procedures for
reporting leaks, spills, and other releases in accordance with Part 111 G?
(CGP Part II A.4.e(1)X9VAC25-870-56)
Practices are in place to prevent the discharge of spilled and leaked fuels
50
and chemicals from vehicle fueling and maintenance activities? (CGP Part 11
A.4.e(2))(9VAC25-870-56)
Practices are in place to prevent the discharge of soaps, solvents,
51
detergents, and wash water from construction materials, including the
clean-up of stucco, paint, form release oils, and curing compounds? (CGP
Part 11 A.4.e(3))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from vehicle
52
and equipment washing, wheel wash water, and other types of washing?
(CGP Part II A.4.e(4))(9VAC25-870-56)
53
Concrete wash water is directed into a leak -proof container or leak -proof
settling basin? (CGP Part 11 A.4.e(5))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from
54
storage, handling, and disposal of construction products, materials, and
wastes? (CGP Part 11 A.4.e(6)X9VAC25-870-56)
Practices are in place to prevent the discharge of fuels, oils, and other
f
55
petroleum products, hazardous or toxic wastes, and sanitary wastes?
./
(CGP fart 11 A.4.e(7X9VAC25-870-56)
Practices are in place to minimize any other discharge from the potential
56
pollutant -generating activities not addressed above, when applicable?
(CGP Part 11 A.4.e(8)X9VAC25-870-56)
�A
Inspector Signature: Date: r i /
Page 4 of 7
Notes:
CONSTRUCTION GENERAL PERMIT SITE INSPECTION REPORT
REQUEST FOR CORRECTIVE ACTION
Project Name: Permit Number (if applicable): Date:
' Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and
Sediment Control Regulations (6VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-670), or the General Permit for
Discharges of Stormwater from Construction Activities (OVAC25-860).
Page 5 of 7
Regulator y
Checklist #
Citation/LegaOccurrence Observatlon/Recommended Corrective Action
requirement'
Observation:
Begommended CorrecOve AcLton:
Observation:
Recommended Corrective Acdon:
Observation:
Recommended Corrective Action:
Observation:
Recommended CorrectiveActbn:
Observation:
Recommended Corrective Action:
' Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and
Sediment Control Regulations (6VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-670), or the General Permit for
Discharges of Stormwater from Construction Activities (OVAC25-860).
Page 5 of 7
Recommended Corrective Action Deadlines
Targeted Re -inspection Date:
Comments:
The recommended corrective action deadline date applies to all conditions noted on this report unless otherwise noted. If listed condition(s) currently
constitute non-compliance and/or corrective actions are not completed by the deadline, other enforcement actions may be issued to the entity responsible for
ensuring compliance on the above project.
Inspector Signature:
Page 6 of 7
Date: