Loading...
HomeMy WebLinkAboutWPO201700034 Checklist - Project Closeout (Administrative) 2017-10-19 WATER PROTECTION (REVIEW) FILE CLOSEOUT AT TIME OF ENGINEERING APPROVAL/DENIAL IMAGING CENTER INSTRUCTIONS CHECKLIST The Lead Engineer is to complete this form within 30 days of final action of WPO plan; place the completed form in the WPO folder and forward to the Imaging Center for digital closeout into LaserFiche. Once items have been placed in LaserFiche,Imaging Center staff will ��forward _back to the Engineering Department.WPO# O� fl (OOO3L—� V e \ `' i (JO (J�V�IM 0( 1 UQPROJECT TITLE 1 AM( `�, hot' / f ev4 ioo-c weal FULL NAME OF ENGINEER �n'1 L l 0 X FINAL wt ACTION DATE: �l CutntyView — EDI Limits of Disturbance Area(Ac)updated g-3 • B L Status/Status Date updated Hardcopy— File Folder Closeout: All items listed should be placed in project folder,in reverse chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file, place an"N/A" next to the check box. The Lead Reviewer/Engineer has the discretion to include any item deemed necessary to provide clarity to the file,please indicate that item on the"Other" lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or, if the document is already in digital format,can be saved to LaserFiche. Please provide the digital location (path/name)of the document in the space provided. .'Applicati•n(signature copy) 1 Scan ❑ Saved location a Approved E&S Plan and/or SWM Plan and/or SWPPP(stamped"Approved") .1Er Scan ❑ Saved location pproved Mitigation Plan(stamped"Approved") r Fr Scan ❑ Saved location L n p\a v "SWM Maintenance Agreement(executed and recorded) ❑ Scan ❑ Saved location NrSWM De d/Easement Plat(recorded) Scan 2 Saved location c) L(� 2/ 1" 0\6S-QS &Nutrient Credit Agreement(recorded) ❑ Scan ❑ Saved location Calculations stamped"Approved" El Scan ❑ Saved location Bond Estimate ❑ Scan ❑ Saved location `V` ho ri * k ACOE/ACSA/VDOT Approval Letter(s) ❑ Scan ❑ Saved location 0 Other(Please explain) ?)C -e aScan ❑ Saved location ❑ At the Engineer's discretion, copies of unapproved plans/plats may be placed in the file if they lend clarity to the review at a later date. If such plans are included, they should be clearly marked as unapproved and contain a note clarifying why it was included. ❑ Scan ❑ Saved location