Loading...
HomeMy WebLinkAboutWPO201400092 Permit WPO VSMP 2017-01-25 fc , 1 ,r COMMONWEALTH of VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY Street address:629 East Main Street,Richmond,Virginia 23219 Molly Joseph Ward Mailing address:P.O.Box 1105,Richmond,Virginia 23218 David K.Paylor Secretary of Natural Resources www.deq.virginia.gov Director (804)698-4000 1-800-592-5482 January 25, 2017 Foothills Crossing Inc 455 Second St SE Ste 400 Charlottesville,VA 22902 alan@riverbenddev.com RE: Coverage under the VPDES Construction General Permit(VAR10) General Permit No.VAR10J190 Foothill Crossing II Residential Albemarle Dear Permittee: DEQ has reviewed your Registration Statement received on November 11, 2014 and determined that the proposed land-disturbing activity is covered under the General VPDES Permit for Discharges of Stormwater from Construction Activities (VAR10). The effective date of your coverage under this general permit is July 1, 2014 or the date of this letter, whichever is later. A copy of the general permit can be obtained from DEQ's webpage at the following location: http://www.deq.virginia.gov/Portals/O/DEQ/Water/Publications/CGP2014.pdf. The general permit contains the applicable Stormwater Pollution Prevention Plan (SWPPP) requirements and other conditions of coverage. Please print the general permit and read it carefully as you will be responsible for compliance with all permit conditions. DEQ staff has determined that the proposed land-disturbing activity will discharge to a surface water identified as impaired or for which a TMDL wasteload allocation has been established and approved prior to the term of the general permit for (i) sediment or a sediment-related parameter or (ii) nutrients. Therefore, the following general permit(Part 1.13.4)and SWPPP requirements(Part II.A.5) must be implemented for the land-disturbing activity: • Permanent or temporary soil stabilization shall be applied to denuded areas within seven (7) days after final grade is reached on any portion of the site; • Nutrients (e.g., fertilizers) shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events; • Inspections shall be conducted at a frequency of (i) at least once every four (4) business days or (ii) at least once every(5) business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day; and • Representative inspections used by utility line installation, pipeline construction, or other similar linear construction activities shall inspect all outfalls. The general permit will expire on June 30, 2019. The conditions of the general permit require that you submit a new registration statement at least 90 days prior to that date if you wish to continue coverage under the general `rr permit, unless permission for a later date has been granted by the Board. Permission cannot be granted to submit the registration statement after the expiration date of the general permit. If you have any questions about this permit, please contact the DEQ Office of Stormwater Management at ConstructionGP@deq.virginia.gov. Sincerely, Frederick K. Cunningham, Director Office of Water Permits 2 *Sri t*swiro° oy ALkta RGIN�' COUNTY OF ALBEMARLE Community Development 401 McIntire Road Charlottesville,Vriginia 22902-4596 (434)296-5832 EROSION CONTROL PERMIT Date of Application: 11/11/2014 Permit Effective Date: 01/25/2017 Number: WPO-2014-00092 LANDOWNER: Foothill Crossing,Inc. Phone: 4342454970 455 Second ST SE Suite 400 Charlottesville,VA22902 CONTRACTOR: Contour Construction LLC Phone: (434)244-0001 1713 Allied Street Charlottesville,VA22902 REPONSIBLE LAND Contour Construction LLC Phone: (434)244-0001 DISTURBER: 1713 Allied Street Charlottesville,VA22902 Certification/License#: 34036 Type: Responsible Land Disturber Plans Prepared By: Collins Engineering Plans Dated: 11/07/2014 Last Revised: 06/29/2016 Plans Entitled: Foothill Crossing II WPO Plan Location: Dist. 30.05 Acreage: Tax Map: 05600-00-00-05700 Hydrological JR02 056A2-01-00-06200 Unit: Issued By:Kenny Thacker Title:Erosion Control Officer Signature Date