Loading...
HomeMy WebLinkAboutWPO201600024 Correspondence WPO VSMP 2016-05-06 Matthew Wentland From: Matthew Wentland Sent: Thursday, May 05, 2016 11:55 AM To: 'Andre Pimentel' Subject: RE:Texas Roadhouse -Albemarle County Andre, 1. It should be okay without a silt trap. I saw the other day that VDOT is currently installing that underground system and it doesn't look like there would be room for the trap anyways. Inlet Protection is good for up to one acre and you have two you can direct the runoff to.The Inspector will also work with the contractor to fix any problems that come up in the field. 2. TRH can be the signing party since they will have a lease agreement. 3. The SWM report can be a separate doc. 4. Nothing additional is required. You just need to list the impaired water in the SWPPP and include the info in 9VAC25-880-70, Part II(A)(5): (1) Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; (2) Nutrients shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events; and (3) A modified inspection schedule shall be implemented in accordance with Part I B 4 or Part IB 5. Let me know if you have any other questions. My number is 434-296-5832 ext. 3458. Thank you, Matt From:Andre Pimentel [mailto:apimentel@greenbergfarrow.com] Sent:Wednesday, May 04, 2016 4:57 PM To: Matthew Wentland<mwentland@albemarle.org> Subject: RE:Texas Roadhouse-Albemarle County Matt I wanted to clarify a few points with you on our erosion control plan and SWPPP. 1.The way I am reading the std spec 3.05 for Silt fence we may not have the need to do a sediment trap. We have 290' of silt fence and 0.6 disturbed acres tributary to it,that less that the 0.25 acres/100'silt fence recommended for the practice. We also have 2 existing protected inlets that would further reduce the load on the Silt fence w/o having to be fully constructed traps. I am bringing this up because my designer is out was re-evaluating the current sediment trap design to address your comments. 2.This issue is related to the SWPPP. Texas Roadhouse (TRH) will be leasing the land from the land owner. A lease agreement will be in place prior to construction. Can TRH be the signing party for the registration statement, and certify the SWPPP,or would this have to be done by the current land owner? The last 2 project I did for this client in VA,TRH was purchasing and developing the land;TRH signed the registration and certification and delegates authority to GC,who will have day to day control over the construction site. 3. Our VA SWPPP includes erosion control and PPP in same document. SWM report is a separate doc.Would this be OK in Albemarle County? 1 Finally, our research indicates that the south fork of Rivanna River is impaired and under VA 303(d) list for not meeting general standards for Benthics(Benthic-Macroinvertebrate Bio assessments/4A).The impairment sources are listed as unknown, non-point source, municipal (urbanized high density area) stormwater. Not specific TMDL were found. As project meeting all current VA WQ,channel protection and flood protection, are we required to anything in regards to discharging to an impaired waterway. PIs feel free to give me a call if you prefer to discuss it further. I would have called but don't have your number. Andre M.Pimentel Civil Project Manager 153 Cordaville Road,Suite 210,Southborough,MA 01772 D 857.305.0597 T 508.229.0032 x8412 C 774.766.2856 �❑ Confidentiality Notice:This email may contain confidential and/or private information.If you received this email in error please delete and notify sender. From: Matthew Wentland [mailto:mwentland@albemarle.org] Sent:Wednesday,April 27,2016 11:24 AM To:Andre Pimentel<apimentel@greenbergfarrow.com> Subject: RE:Texas Roadhouse-Albemarle County Andre, Those forms look good.The certification in the SWPPP will also need to be signed. When the plan is resubmitted, make sure that whoever accepts the plan knows this is a resubmittal with the correct form and no additional fee is required. Thank you, Matt From:Andre Pimentel [mailto:apimentel@greenbergfarrow.com] Sent:Wednesday,April 27,2016 11:17 AM To: Matthew Wentland<mwentland@albemarle.org> Cc: lim@dumbartonproperties.com Subject: RE:Texas Roadhouse-Albemarle County Matt Received your comments on our initial submission for this project. I am working on the additional information requested and revisions required for VSMP,VESCP and SWMP permit approvals. From the additional information requested we identified 2 forms that require signatures. The registration form and the VSMP application. I have attached the forms for your verification prior to requesting signature from the applicable responsible parties. Can you please verify that the forms attached are the required forms and that they contain the required information. Andre M.Pimentel Civil Project Manager 153 Cordaville Road,Suite 210,Southborough,MA 01772 D 857.305.0597 T 508.229.0032 x8412 C 774.766.2856 2 21 South Evergreen Avenue Suite 200 Arlington Heights, IL 60005 t: 847 788 9200 ATLANTA LOS ANGELES NEW JERSEY CHICAGO NEW YORK GreenbergFarrow DALLAS COLUMBUS WISCONSIN BENTONVILLE PHILADELPHIA FRESNO MEMPHIS SHANGHAI MEXICO CITY Letter of Transmittal August 15,2016 To Matt Wentland Project Texas Roadhouse Albemarle Square Charlottesville,VA Albemarle County Administration Center Room 227 Project# 20140710.0 401 McIntire Road From Brandon Goldberg Charlottesville,VA 22902 Tel 434.296.5832 x3458 We are sending you the following enclosures via Air Express-Priority for your approval: Copies Date Description Two(2)sets 7/26/16 Civil Plan Sets C0.0-A2;as prepared by GreenbergFarrow Two(2) 8/10/16 VSMP Review Comments-Applicant Response;as prepared by GreenbergFarrow Two(2)sets 7/26/16 SWPPP;as prepared by GreenbergFarrow Two(2) 7/26/16 VSMP Application for Albemarle County;as prepared by Owner and GreenbergFarrow .............................................................................................................................................. Two(2) 8/15/16 Purchase Agreement for Nutrient Credit;as prepared by Owner and Texas Roadhouse Message Mr.Wentland, Enclosed,for your review and approval,you will find the following VSMP resubmittal items for the proposed Texas Roadhouse at 455 Albemarle Square.As a side note,Texas Roadhouse has signed the Purchase and Sale Agreement with the Chesapeake Bay Nutrient Land Trust and the transaction is pending payment.Should you have any questions or need additional information,please don't hesitate to contact Paula Hubert via phone,224-310-5072,or email, phubert(agreenbergfarrow.com. Thank You, Brandon Goldberg If endosures are not as noted,please contact sender Copies Paula Hubert,GreenbergFarrow