HomeMy WebLinkAboutWPO201600048 Inspection 2018-03-26COUNTY OF ALBEMARLE
Department of Community Development
VSMPNESCP PERMIT SITE INSPECTION REPORT
Project Name:
r
U < JrR �,,�
(
Project/WPO Number:
},� PGA /).C(6 - t2ob i j
Project Address:
-1-
c' 03
DEQ Permit Number (if
applicable):
VAR �.�
Project Operator:
RL
Operator Telephone #:
00 j q41 i- 03 ? D
Project Contact:
}
Contact Telephone #:
6' _ 4 c/ _ 03 0
Contact E-Mail:
N
.n
Qualified Personnel (QP):
Inspector:
Weather (WetlDrylRain):
Disturbed Acreage:
Z
Inspection Date & Time:
�
ap,
Single -Family: ❑ Yes
No
Stage of Construction: LJ
Pre -Construction Meeting LJ Initial Clearing & Grading LJ
Rough Grading
❑ Building Construction
❑ Final Grading
❑ Construction of SWM Facilities
❑ Final Stabilization
❑ Notice of Termination
[� Other: (
° �� �4z
Re -Inspection:
❑ Yes No
COVERAGE & POSTING REQUIREMENTS
Yes
No
N/A
Reviewed during re -inspection? OYes$I�O
CommentsMescdptfon
9
Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A)
(9VAC25-870-310)(Alb. Co. Code §17-300, 17-302)
o�
2
A copy of the notice of coverage letter is posted conspicuously near the
main entrance of the construction activity? (CGP Part II.C)
Notice of the location of the SWPPP is posted near the site's entrance, if
3
applicable, and information for public access is provided? (9VAC25-870-
54.G)(CGP Part 11 D.2 & 3)
SWPPP AVAILABILITY AND CONTENTS
Yes
No
N/A
Reviewed during re -inspection? []Yes ETNo
Comments0escripfion
4
The SWPPP is on -site or made available during the inspection? (CGP
Part 11 D.1 & 2)(9VAC25-870-54.G)
5
The SWPPP contains a signed copy of the registration statement?
(CGP Part 11 A.1.a)
6
The SWPPP includes, upon receipt, a copy of the notice of coverage
letter and the CGP? (CGP Part 11 A.1.b & c)
The SWPPP includes a narrative description of the nature of the
7
construction activity, including the function of the project? (CGP Part II
A.1.d)
Page 1 of 7
The SWPPP includes a legible site plan identifying all appropriate
8
measures and that includes the locations of support activities and the
onsite rain gauge, when applicable? (CGP Part Il A.1.e(1-7))
9
The SWPPP contains the name, phone number and qualifications of
"Qualified Personnel" conducting inspections? (CGP Part II A.6)
10
The SWPPP contains an approved erosion and sediment control plan?
(9VAC25-870-54.B)(CGP Part II.A.2)
The SWPPP contains an approved stormwater management plan or an
11
existing construction site has a stormwater management plan that
ensures compliance with the water quality and quantity requirements?
(9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria 11.13 ❑ ILC ❑
72
The SWPPP contains an adequate pollution prevention plan? (9VAC25-
870-54.D)(CGP Part II.A.4)
The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of
-
13
concern, exceptional waters and the additional controls measures
applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a-b))
14
Delegation of Authority is provided and signed in accordance with Part III
K? (CGP Part II A.7)
15
The SWPPP is signed and dated in accordance with Part III K? (CGP Pa
I1 A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES Yes
No N/A
Reviewed during inspection? ❑Yes 2rNo
Comments0escripfion
Is
the SWPPP being amended whenever there is a change in the design,
nnntn irtinn nnPrntinn nr mninfononro thot hoc o cinnifironf nffaM nn +ha
e
ischarge of pollutants to surface waters? (CGP Part II B(1))(9VAC25-870-
as the SWPPP been amended if inspections or investigations by the
17
perator's qualified personnel, or by local, state or federal officials find that
xisting control measures are ineffective in minimizing pollutants in
ischarges? (CGP Part II B(2))(9VAC25-870-54.G)
18
ontractor(s) that will implement and maintain each control measure are
dentified? (CGP Part II B(3))(9VAC25-870-54.G)
-lave there been updates to the SWPPP when any modifications to its
mplementation have occurred, including a record of dates when major
19
rading activities occur, construction activities temporarily or permanently
;ease on a portion of the site or stabilization measures are initiated? (CGP
art 11 B.4(a))(9VAC25-870-54.G)
20
Is there documentation in the SWPPP of replaced or modified controls?
(CGP Part 11 B.4(b))(9VAC25-870-54.G)
21
Is the SWPPP updated to indicate areas that have reached final
tabilization? (CGP Part 11 B.4(c))(9VAC25-870-54.G)
Is the SWPPP updated to indicate properties that are no longer under the
22 egal control of the operator and the dates on which the operator no longer
Pad legal control over each property? (CGP Part II B.4(d))(9VAC25-870-
oes the SWPPP identify the date of any prohibited discharges, the
23 olume released, actions taken to minimize the impact of the release and
measures taken to prevent the recurrence of any prohibited discharge?
CGP Part II B.4(e-0) (9VAC25-870-54.G)
24 mendments, modifications, or updates to the SWPPP are signed in
ccordance with Part III K? (CGP Part II B(5))(9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS
Inspections required by the SWPPP are conducted at the required
25 frequency, including a modified frequency for impaired water(s), approved
TMD!_(s), and exceptional waters when applicable? (CGP Part II F (2))
(CGP Part Il A.5.b.3)
No !N/A Reviewed during inspection? []Yes Eill'o
Page 2 of 7
26 Inspection reports are completed and signed in accordance with CGP
Part II F (3-4)? (CGP Part II F (3-4))
27 Corrective actions are taken consistent with the requirements of the
CGP? (CGP Part II G(1-2))
ESC AND SWM PLAN IMPLEMENTATION
No
Reviewed during inspection?Yes []No
28 Have scream buffers and steep slopes been protected as shown on the
plan?
Sequencing of the project is implemented in accordance with the
29 approved erosion and sediment control plan and stormwater managemen
plans? (9VAC25-870-54.8 and C)
Have all denuded areas requiring temporary or permanent stabilization
been stabilized, and have stabilization requirements for impaired waters,
k Gti cc. � ( CLZALLt�
30 approved TMDL(s), pollutants of concern and exceptional waters, when
applicable, been met? (9VAC 25-840-401.1) (9VAC25-870-54.B) (9VAC25-
cvecks
880-60) (CGP Part I F.1(a)) (CGP Part 11 A.5.b(1)) (CGP Part II A.2.c (8))
(CGP II E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected
IO;aI tf 5 F 0'rb, �C)
31 with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part Il
5��� 'P ,
A.2(c)) (9VAC25-870-54.B)
A permanent vegetative cover has been established that is uniform,
32 mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3)
(CGP Part it A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.8)
Have sediment trapping facilities been constructed as the first step in land
33 disturbance activities? (9VAC 25-840-40.4) (CGP Part II A.2(c)) (CGP II
E(1-2)) (9VAC25-870-54.B)
Have earthen structures been stabilized immediately after installation?
34 (9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Are sediment traps and basins installed in accordance with MS-6 and the
35 approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part II
A.2(c)) (CGP it E(1-2)) (9VAC25-870-54.B)
Are finished cut and fill slopes adequately stabilized to prevent or correct
36 excessive erosion? (9VAC 25-840-40.7) (CGP Part It A.2(c)) (CGP II E(1-
2)) (9VAC25-870-54.13)
Is concentrated runoff down cut or fill slopes contained in an adequate
37 permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part II
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Is adequate drainage or other protection provided for water seeps?
38 (9VAC 25-840-40.9) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
Do all operational storm sewer inlets have adequate inlet protection?
39 (9VAC 25-840-40.10) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54. B)
Are storrnwater conveyance channels adequately stabilized with channel
40 lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part It A.2(c))
(CGP II E(1-2)) (9VAC25-870-54.8)
Is in -stream construction conducted using measures to minimize channel
41 damage? (9VAC 25-840-40.12) (CGP Part II A.2(c)) (CGP II E(1-2)) I X
Are temporary stream crossings of non -erodible material installed where
42 applicable? (9VAC 25-840-40.13) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B)
Is necessary restabilization of in -stream construction complete? (9VAC
43 25-840-40.15) (CGP II E(1-2)) (9VAC25-870-54.B)
Are utility trench operations conducted and stabilized in accordance with
44 MS-16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP tl E(1-2))
(9VAC25-870-54. B)
Are soil and mud kept off paved or public roads to minimize the transport
45 of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP 11 E(1-2))
(9VAC25-870-54. B)
Have all temporary control structures that are no longer needed been
46
removed and disturbed soil resulting from their removal permanently
stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B)
Are properties and waterways downstream from development adequately
47
protected from erosion, sediment and damage in accordance with the
standards and criteria specified by 9VAC25-840. 1 9(a-n)? (9VAC 25-840-
40.19(a-n))
48
Permanent control measures included in the SWPPP are in place?
b
(9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a))
POLLUTION PREVENTION PLAN IMPLEMENTATION
Yes No N/A Reviewed during inspection? []Yes No
Comments0escrip(ton
Practices are in place to prevent and respond to leaks, spills, and other
releases including (i) procedures for expeditiously stopping, containing,
49
and cleaning up spills, leaks, and other releases; and (ii) procedures for
reporting leaks, spills, and other releases in accordance with Part III G?
(CGP Part II A.4.e(1))(9VAC25-870-56)
Practices are in place to prevent the discharge of spilled and leaked fuels
g
50
and chemicals from vehicle fueling and maintenance activities? (CGP Part II
A.4.e (2))(9VAC25-870-56)
Practices are in place to prevent the discharge of soaps, solvents,
51
detergents, and wash water from construction materials, including the
clean-up of stucco, paint, form release oils, and curing compounds? (CGP
Part 11 A.4.e(3))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from vehicle
52
and equipment washing, wheel wash water, and other types of washing?
(CGP Part li A.4.e(4))(9VAC25-870-56)
53
Concrete wash water is directed into a leak -proof container or leak -proof
basin? Part II A.4.e(5))(9VAC25-870-56)
settling (CGP
Practices are in place to minimize the discharge of pollutants from
54 storage, handling, and disposal of construction products, materials, and
wastes? (CGP Part II A.4.e(6))(9VAC25-870-56)
Practices are in place to prevent the discharge of fuels, oils, and other
55 petroleum products, hazardous or toxic wastes, and sanitary wastes?
(CGP Part 11 A.4.e(7)(9VAC25-870-56)
Practices are in place to minimize any other discharge from the potential
56 pollutant -generating activities not addressed above, when applicable?
(CGP Part II A.4.e(8))(9VAC25-870-56)
r
hspec tor Signature: L ��A� ) � Date: 3/2_6 /f �
Page 4 of 7
Notes:
CONSTRUCTION GENERAL PERMIT SITE INSPECTION REPORT
REQUEST FOR CORRECTIVE ACTION
Project Name: A/0 1-k Pcy)4 Sc-A E " " 7 Permit Number (if applicable): 14PO 2,ol&•Q? Date: S &- Ilk
Regulatory
tort'
Checklist # Citation/Legal
Occurrence Observation/Recommended Corrective Action
requiremen-V
-Str
Observation:
Recommended Corrective Action:
Observation:
m t ock
-�
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
Recommended Correcdve Ac on:
1 Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and
Sediment Control Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for
Discharges of Stormwater from Construction Activities (9VAC25-880).
Page 5 of 7