HomeMy WebLinkAboutWPO201400074 Review Comments WPO VSMP 2018-03-29COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
VSMP Permit plan review
Project title: Riverside Village WPO Amendment 1
Project file number: WP0201400074 — WPO1
Plan preparer:
Justin Shimp, Shimp Engineering [Justin@shimp-engineering.com]
Owner or rep.:
Chris Henry [chenry@stonypointdb.com]
Plan received date:
Rev 1 — Feb 6", 2018
Rev 2 — March 1st, 2018
Rev 3 — March 23rd, 2018
Date of comments:
Rev 1 — Feb 2711, 2018
Rev 2 — March 20t", 2018
Rev 3 — March 29t", 2018
Reviewers:
Rev 1 & Rev 2 & Rev 3 - Bobby Jocz
County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to
act on any VSMP permit by issuing a project approval or denial. This project is Approved
pending purchase of nutrient credits. The application may be resubmitted for approval if all of
the items below are satisfactorily addressed. The VSMP application content requirements can be
found in County Code section 17-401.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must
contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
Include WPO number [WP0201400074] and project description [WPO Amendment 1] on the title
page, calculations booklets and SWM plan.
Rev 2 — Partially addressed. Include WPO Amendment 1 in title on cover sheet.
Rev 3 - Addressed
PE seal and signature should be provided on calculations booklets and SWM plan.
Rev 2 — Addressed
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17-404.
No objection
Engineering Review Comments
Page 2 of 4
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is Approved pending purchase of nutrient credits, and the reasons are
provided in the comments below. The stormwater management plan content requirements can be
found in County Code section 17-403.
This project does not qualify under Part 11 C [9VAC25-870-96] as indicated on sheet C6. Note that
per grandfathering regulations [9VAC25-870-48], "if the plan for the grandfathered project is
modified after approval, there can be no increase in the volume rate of runoff above that in the
previously approved plan". Please ensure compliance under part I113 requirements [9VAC25-870-
63].
Rev 2 — Addressed
Drainage area map and VRRM spreadsheet identify different impervious and total project
acreages. The VRRM spreadsheet states the project limits are 2.14 acres with impervious area of
1.3 acres, whereas the water quality map provides a total project limit of 2.41 acres and an
impervious area of 1.47. Please correct
Rev 2 - Addressed
3. Purchase of nutrient credits must occur prior to final approval.
Rev 2 — Acknowledged, 2.63 lbs of credit must be purchased prior to final approval.
4. Catchment area identified for catchment A4 is inconsistent between calculations packet, drainage
map, and LD-204 spreadsheet. Please correct.
Rev 2 — Not addressed, inconsistent values for the curb opening length, catchment area, and
runoff coefficient for structure A4 still presented. Please correct.
Rev 3 — Addressed
5. Provide throat lengths for all inlet structures on stormsewer profiles.
Rev 2 - Addressed
6. Structure A9 is indicated as existing on the stormsewer profiles, but is called out as currently a
MH structure in the current conditions. Please clarify.
Rev 2 — Addressed
7. Provide analysis proving post development l0yr 24hr storm is confined within the conveyance
system. The LD-347 shows that the 10yr-24h storm is contained within the stormsewer pipe
network, but does not prove containment within SSC-Al.
Rev 2 — partially addressed. Cross section presenting ditch depths not provided as discussed
via email 2/28.
Rev 3 — Addressed
Additional Rev 2 Comments
1. [Sheet C5] Correct channel geometry presented in ditch section detail. The depth identified
is not possible with the side slope and width identified.
Rev 3 — Addressed
2. [Calculations packet and sheet C6] For ditch design table provide context for the number
presented (3.246) to the right of the 2-year flow for ditch Al.
Rev 3 — Addressed
3. Discharge into reach A4-A4A does not include flow from BMPC/underground detention.
Please correct.
Rev 3 — Addressed
4. Provide inlet calculations for structure All.
Rev 3 — Addressed
Engineering Review Comments
Page 3 of 4
D. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is Approved pending purchase of nutrient credits. The erosion control plan content
requirements can be found in County Code section 17-402.
1. The north diversion dike takes too sharp of curve towards the sediment trap and may result in
overtopping of diversion. Please soften the curve.
Rev 2 — Addressed.
2. The temporary culvert discharges too close to the outlet of the sediment trap causing short
circuiting of the trap. In addition the pipes proximity to the outfall may cause structural issues.
Confirm outlet elevation of the pipe to evaluate potential conflict with existing 18" HDPE
stormsewer pipe.
Rev 2 — Addressed.
3. Ensure existing biofilter adjacent to project site will not be contaminated from construction
activities related to block 1.
Rev 2 — Addressed
4. For E&S Phase II, silt fence should be provided below 2:1 slope on the east side of the property
until final stabilization can occur.
Rev 2 — Addressed.
5. Provide engineering detail for temporary diversion.
Rev 2 — Addressed.
Additional Rev 2 Comments
1. [Sheet C4] Construction entrance is listed twice in the key, should be replaced with dust
control.
Rev 3 - Addressed
2. Provide measures to ensure construction traffic only utilizes construction entrance for site
nevecc_
Rev 3 — Addressed
Once credits are purchased, please provide 2 additional copies of the plans for approval.
Process;
After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate
request form and fee to the Department of Community Development. One of the plan reviewers will
prepare estimates and check parcel and easement information based on the approved plans. The County's
Management Analyst will prepare bond agreement forms, which will need to be completed by the owner
and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need
to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to
obtain all the correct signatures and forms.
Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded.
The County's Management Analyst or other staff will prepare the forms and check for ownership and
signature information. The completed forms will need to be submitted along with court recording fees.
After bonding and agreements are complete, county staff will need to enter project information in a DEQ
database for state application processing. DEQ will review the application information based on local
Engineering Review Comments
Page 4 of 4
VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid
directly to the state. For fastest processing, this is done electronically with the emails provided on the
application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the
application, they will issue a permit coverage letter. This should be copied to the county.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference.
Applicants will need to complete the request for a pre -construction conference form, and pay the remainder
of the application fee. The form identifies the contractor and responsible land disturber, and the fee
remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction
conference will be scheduled with the County inspector. At the pre -construction conference, should
everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that
work may begin.
County forms can be found on the county website forms center under engineering;
http://www.albemarle.or /g deptforms.asp?department=cdengnoo
Bobby Jocz
Albemarle County
Community Development — Engineering
rjocz@albemarle.org
(434) 296-5832 ext. 3283