Loading...
HomeMy WebLinkAboutWPO201700023 Preconstruction Form 2017-06-28 PC n c 1-C � 2 a 7 - Atli/At-teat, Request for Pre-construction Meeting and Grading Permit from Albemarle County '" tti.: I1 k.A Approved Plan Number: WPO-2017-23 Approved Plan Name: Oakleigh (Plans must be approved prior to a pre-construction meeting.) Bond approved date: June 28,2017 (Bonds must be approved and posted prior to a pre-construction meeting or permit.) Responsible Land Disturber: Print Name: Wagner Excavation, contact-Tom Sinclair or Mark Wagner State Certification Number:RLD 42116 Address 208 South Bayard Avenue City Waynesboro State VA Zip 22980 Daytime Phone(434) 531-2488 E-mail tsinclair@wagnerexcavation.com Primary Contractor: Print Name Clark Construction/EBM Group, LLC,A Joint Venture Address 1615 Apache Drive City McComb State MS Zip 39648 Daytime Phone(251 ) 979-9990 E-mail joe.y@ebmgroupllc.com Permit Issuance and First Year Maintenance Fees: (Request must include payment) Total acres proposed to be disturbed is contained on the approved plan and application: VSMP: Acres to be disturbed Fee Due at Grading Permit Less than 1 $63.80 1 and less than 5 $594.00 5 and less than 10 $748.00 10 and less than 50 $990.00 50 and less than 100 $1,342.00 100 and more $2,112.00 For plans exempt from VSMP,VESCP fees were paid with the application. 7/1/14,Revised: 8/29/14 Page 1 of 3 Person(s)to attend the Pre-construction Meeting: Names(type or print) Firm Contact Number or email Tom Sinclair,Wagner Excavation 434-531-2488 tsinclair@wagnerexcavation.com Steve Edwards, Edwards designStudio 434-531-7507 steve@edwardsdesignstudio.com Alan Franklin 434-531-5544 alan@alanfranklinpe.com George Ray, Oakleigh Albemarle, LLC georgerayjr@gmail.com Jeremy Lynn,ACSA 434-977-4511, x114 jlynn@serviceauthority.org Victoria Fort, RWSA 434-977-2970,x205 vfort@rivanna.org Joe Yarborough, EBM Group, LLC 251-979-9990 joe.y@ebmgrouplic.com jy• ger - 5i6'y ,loon ar M . orf 60664 Roby JoCZ 93ti 2A 6 •5 32, &4. 3gcg .4 , 11 ,0,0.d e. 0/S The second part of the application fee is required to be paid with this request. This fee amount is; FOR OFFICE USE ONLY Permit Issued Date By who? ` . 0 .1ZtJ 7/1/14,Revised: 8/29/14 Page 2 of 3