Loading...
HomeMy WebLinkAboutWPO201700004 Application WPO VSMP 2017-07-28 Virginia Stormwater Manement Program (VSMP) Application for Albemarle County 744.4 Project Name: 1M T 4 Y Pte'* FtI' (The name should be the same as it appears on plans) Is this an amendment to an approved plan? Yes ❑ No ❑ Is this a revision or resubmission for review? Yes 6( No ❑ County File Number: (4/PV 2017 - q (to be provided by the County for new applications) The following are required elements of new applications[from code section 17-401]. For revisions or amendments,please indicate which items are being amended. Signatures must be provided for any submission. ❑ A. Signature of the Property Owner for each parcel: (Required with every submission or revision, NOT TO BE SIGNED BY AN AGENT OR CONSULTANT) By signing this application as the owner,I hereby certify that all requirements of these plans and permits will be complied with,and I have the authority to authorize the land disturbing activities and development on the subject property. I hereby grant the County of Albemarle the right to enter upon the property as required to ensure compliance with the approved plans and permits. OW." 03-14 Qb5tnv4_ ANACeva) Tax Map&Parcel Print Name of Property Owner Sign e of Owner Date Tax Map&Parcel Print Name of Property Owner Signature of Owner Date Tax Map&Parcel Print Name of Property Owner Signature of Owner Date Tax Map&Parcel Print Name of Property Owner Signature of Owner Date Contact Information for the Owner(s)to receive correspondence: Print Name fepsVn j4 tX C.�o &,W 1> C .(LINaVa1•-1 Address OOQ A l-1 tJ pjUJO S V erg_ I City C)k il..0'Ct 1 4 U. State J(� Zip 22103 Daytime Phone Hay) 962.- PM E-mail eltuiu'deS eve.ndeuaopMEit+. Co 7/1/14,Revised: 7/10/14, 1/7/14 Page 1 of 2 • ❑ B. All Fees [Code section 1708] For new or modified plans; Total acres proposed to be disturbed Acres to be Total Fee Fee Due with this Fee with Transfer or disturbed Application modification of permit Less than 1 $290 $20 Cl .n8 esst an5 , Ii 11 5 and less than 10 $3,400 '.1,71i $250 10 and less than 50 $4,500 $2,250 $300 50 and less than 100 $6,100 $3,050 $450 100 and more $9,600 $4,800 $700 For(minor)amendments to an approved plan;$200 per review Variances;$150(per request) Mitigation Plan;$150 ❑ C. Registration Statement on the official DEQ form. ❑ D. Erosion and Sediment Control Plan satisfying the requirements of code section 17-402. ❑ E. Stormwater Management Plan satisfying the requirements of code section 17-403. ❑ F. Pollution Prevention Plan satisfying the requirements of code section 17-404. ❑ G. Stormwater Pollution Prevention Plan satisfying the requirements of code section 17-405. ❑ H. Mitigation Plan satisfying the requirements of code section 17-406 for any proposed disturbance of stream buffers. ❑ I. Requested Variations or Exceptions as provided in code sections 17-407 and 408. ❑ J. Construction Record Drawings(as-builts) for any existing facilities in the proposal satisfying the requirements of code section 17-422. Provide 2 copies of all plans and any supporting documents. Professional seals must have original signatures. Additional information if not provided on plans and documents: Name of a Contact Person for correspondence(usually the plan preparer,consultant or agent) Print Name S Ae 6,1N ', - Ck c/a JJS-n S{MM2 Address 20 *.A.A-1 S'- City C*ite-t,pt v'U .- JOr- State V 1- Zip 721 0 2_ Daytime Phone 041% 22,F - 9/40 E-mail jinn N 6 sshmP—£NGtNECAPOG •coon *When applications and plans are reviewed,but not approved,and a response to comments is not received within 6 months from the date of county comments,the application will be deemed withdrawn. Applications without valid owner's signatures will not be considered valid. FOR OFFICE USE ONLY 2 '\,txhWPO# ci vU e o, CcMM,or ,CQ_F1,�,c171 1S' Fee Amoun 13SD Date Paid 1"'Jt iy who? 594Ut.,,Lae Receipt#1`OtO 3 Ck# `.2Z gy. 7/1/14,Revised: 7/10/14, 1/7/14 Page 2 of 2 - 1 �� ?°t7"ta�"�E � � r Community Development Department Nor4(31 P ire Road Charlottesville,VA22902-4596 i vie:(434}296-6832 Fax:(434)972-4126 ,., r.). Planning Application PARCEL OWNER INFORMATION TMP 061W0-03-00-01400 Owner(s): POSITIVE LLC Application# WP02O 17©0004 [PROPERTY INFORMATION Legal Description I ACREAGE Magisterial Dist. Jack Jouett 1.1 Land Use Primer; Open Current AFD Not in A/F District I Current Zoning Primar, R15 Residential ] APPLICATION INFORMATION Street Address Entered By Application Type Water Protection Ordinances Jennifer Smith: 11/20/2017 Project Commonwealth Apartments Received Date 01/18/17 71 Recei•:ed Date Final Submittal Date Total Fees 200 Closing File Date Submittal Date Final Total Paid, 200 Revision Number Comments Legal Ad SUB APPLICATION(s) Type i Sub Applicatio Comment Stormwater Management/BMP Plan 01/20/17 Erosion and Sediment Control Plan 01/20/17 APPLICANT / CONTACT INFORMATION ContactType Name ,address CityState I Zip 1 Phone PhoneCell 0,,,, ^';.=,-t POSITP,`E LLC 620 PLANTATION COURT CHARLOTTES''aILL 22903 —e- - L= IE BOrIHEF. 620 PLANTATION COURT CHARLOTTESOLL 22903 4342966518 Signature of Contractororr,uthorized Aaent Date a ate. Virginia Stormwater Management Program(VSMP) — + �:l�. Application for Albemarle County •111.1W Project Name: Commonwealth Apartments (The name should be the same as it appears on plans) Is this an amendment to an approved plan? Yes® No❑ Is this a revision or resubmission for review? Yes❑ No El County File Number: WP0201400099 (to be provided by the County for new applications) The following are required elements of new applications[from code section 17-4011. For revisions or amendments,please indicate which items are being amended. Signatures must be provided for any submission. 0 A. Signature of the Property Owner for each parcel: (Required with every submission or revision,NOT TO BE SIGNED BY AN AGENT OR CONSULTANT) By signing this application as the owner,I hereby certify that all requirements of these plans and permits will be complied with,and I have the authority to authorize the land disturbing activities and development on the subject property. I hereby grant the County of Albemarle the right to enter upon the property as required to ensure compliance with the approved plans and permits. (� /� 4/47 61W-03-4* Iri P05-4 'F LLC 1aP Conner l/r/4na.S/i_ Tax Map&Parcel Print Name of Property Owner Signature of Owner Date Tax Map&Parcel Print Name of Property Owner Signature of Owner Date Tax Map&Parcel Print Name of Property Owner Signature of Owner Date Tax Map&Parcel Print Name of Property Owner Signature of Owner Date Contact Information for the Owner(s)to receive correspondence: Print Name 4 a,! QD✓1/t e — Address /162,UP/r�� �. �n C _ City C/PC 1/) /kr-.. de State l/iYi. Zip 22 1 0.) Daytime Phone(43G) f a 6s-- / _ E-mail /01/1 / bvd„to/ /}I re'. 1 .Ggyrr+ Revised:7/10/14,1/7/14 Page 1 of 2 NEI PROJECT MA'KIAGEMENT sHimpCIVIL ENGINEERING LAND PLANNING ENGINEERINGa . January 18, 2017 Regarding: Commonwealth Apartments WPO201400099 Stormwater Management Mr. Wentland, The siteplan amendment for Commonwealth Apartments, TMP 61W-03-14 increases impervious area on the site, resulting in an increase in phosphorus loads to be removed. Nutrient credits were purchased with the previously approved plan, in the amount of 0.80 lbs. The Virginia Runoff Reduction Method (VRRM) spreadsheet calls for 1.08 lbs phosphorus to be removed with the current plan. Therefore, an additional 0.28 lbs of nutrient credits will be purchased. The channel protection and detention requirements were met with the previous plan by analysis showing adequate preceding channels for channel protection and capacity to the 1% drainage area limit of analysis. As the site area has not changed, the prior analysis covers the amended plan. If you have any questions about this amendment please feel free to contact me by email at kendra(a)shimp-engineering.com. Best, Kendra Patrick Shimp Engineering, P.C. � data input cellsProject Name: Commonwealth Apartments CLEAR Date: 11-Jan-17 -- _ _ .: constant values BMP Design Specifications Lot. 2013 Draft Stds&Specs calculation cells Site Information final results Post-Development Project(Treatment Volume and Loads) Land Cover (acres) A Soils B Soils C Soils D Soils Totals Forest/Open Space(acres)--undisturbed, protected forest/open space or reforested land 0.00 Managed Turf(acres)--disturbed,graded for lyards or other turf to be mowed/managed 0.46 0.09 0.55 ,Impervious Cover(acres) 0.35 0 25 0.59 1.15 I :Constants Runoff Coefficients(Rv) (Annual Rainfall(inches) 43 A Soils B Soils C Soils D Soils Target Rainfall Event(inches) 1.00 Forest/Open Space 0.02 0.03 0.04 0.05 Total Phosphorus(TP)EMC(mg/L) 0.26 Managed Turf 0.15 0.20 0.22 0.25 Total Nitrogen(TN)EMC(mg/L) 1.86 Impervious Cover 0.95 0.95 0.95 0.95 Target TP Load(lb/acre/yr) 0.41 Pj(unitless correction factor) 0.90 Post-Development Requirement for Site Area TP Load Reduction Required(lb/yr) 1.08 LAND COVER SUMMARY-POST DEVELOPMENT Land Cover Summary Treatment Volume and Nutrient Loads Treatment Volume Forest/Open Space Cover(acres) 0.00 (acre-ft) 0.0567 Weighted Rv(forest) 0.00 Treatment Volume(cubic feet) 2,470 %Forest 0% TP Load(lb/yr) 1.55 TN Load(lb/yr) Managed Turf Cover(acres) 0.55 (Informational Purposes Only) 11.10 Weighted Rv(turf) 0.21 %Managed Turf 48% Impervious Cover(acres) 0.59 Rv(impervious) 0.95 %Impervious 52% Site Area(acres) 1.15 Site Rv 0.59 t I NW"' vilif Site Results(Water Quality Compliance) Area Checks D.A.A D.A.B D.A.C D.A.D D.A.E AREA CHECK FOREST/OPEN SPACE(ac) 0.00 0.00 0.00 0.00 0.00 OK. IMPERVIOUS COVER(ac) 0.00 0.00 0.00 0.00 0,00 OK. IMPERVIOUS COVER TREATED(ac) 0.00 0.00 0.00 0.00 0.00 OK. MANAGED TURF AREA lac) 0.00 0.00 0.00 0.00 0.00 OK. MANAGED TURF AREA TREATED(ac) 0.00 0.00 0.00 0.00 0.00 OK. AREA CHECK I OK. II OK. II OK. II OK. II_ OK. Site Treatment Volume(ft3) 0 Runoff Reduction Volume and TP By Drainage Area' I D.A.A II D.A.B II D.A.C II D.A.D II D.A.E II TOTAL RUNOFF REDUCTION VOLUME ACHIEVED(ft') 0 0 0 0 0 0 TP LOAD AVAILABLE FOR REMOVAL(Ib/yr) 0.00 0.00 0.00 0.00 0.00 0.00 TP LOAD REDUCTION ACHIEVED(Ib/yr) 0.00 0.00 0.00 0.00 0.00 0.00 TP LOAD REMAINING(Ib/yr)[ 0.00 II 0.00 II 0.00 II 0.00 II 0.00 II 0.00 NITROGEN LOAD REDUCTION ACHIEVED(Ib/yr)I 0.00 II 0.00 II 0.00 II 0.00 II 0.00 II 0.00 Total Phosphorus FINAL POST-DEVELOPMENT TP LOAD(Ib/yr) 1.55 TP LOAD REDUCTION REQUIRED(Ib/yr) 1.08 TP LOAD REDUCTION ACHIEVED(Ib/yr) 0.00 TP LOAD REMAINING(Ib/yr):J 1.55 t REMAINING TP LOAD REDUCTION REQUIRED(lb/yr): 1.08 Total Nitrogen(For Information Purposes)! • POST-DEVELOPMENT LOAD(Ib/yr) i NITROGEN LOAD REDUCTION ACHIEVED(Ib/yr) 0.00 REMAINING POST-DEVELOPMENT NITROGEN LOAD(Ib/yr)®i Virginia Runoff Reduction Method Worksheet vow DEQ Virginia Runoff Reduction Method New Development Compliance Spreadsheet -Version 3.0 BMP Design Specifications List: 2013 Draft Stds&Specs Site Summary Total Rainfall= 43 inches Site Land Cover Summary A soils B Soils C Soils D Soils Totals %of Total Forest/Open(acres) 0.00 0.00 0.00 0.00 0.00 0 Managed Turf(acres) 0.00 0.46 0.00 0.09 0.55 48 Impervious Cover(acres) 0.00 0.35 0.00 0.25 0.59 52 1.15 100 Site Tv and Land Cover Nutrient Loads Site Rv 0.59 Treatment Volume(ft3) 2,470 TP Load(lb/yr) 1.55 TN Load(Ib/yr) 11.10 Total TP Load Reduction Required(Ib/yr) 1.08 Site Compliance Summary Total Runoff Volume Reduction(ft3) 0 Total TP Load Reduction Achieved(Ib/yr) 0.00 Total TN Load Reduction Achieved(Ib/yr) 0.00 Remaining Post Development TP Load 1.55 (Ib/yr) Remaining TP Load Reduction(Ib/yr) Required 1.08 Summary Print