HomeMy WebLinkAboutWPO201700004 VSMP - SWPPP 2017-09-27 ecyoF A COUNTY OF ALBEMARLE
Department of Community Development
14,1111.111 : 401 McIntire Road,North Wing
Charlottesville,Virginia 22902-4596
TeL (434)296-5832 • Fax(434)972-4126
jRGtt�
Stormwater Pollution Prevention Plan (SWPPP)
For Construction Activities At:
Project Name: _Commonwealth Apartments
Address: Commonwealth Drive
_South of Trophy Chase Apartments
Prepared by:
Name: _Shimp Engineering P.C.
Prepared for:
Name: Positive LLC
SWPPP Preparation Date: 07/13/2017
(This document is to be made publicly available according to 9VAC25-880-70, Part II, section D)
APPROVED
by the Albemarle County
��`
=munity Development Department
File �,iPa 2p�-7 oaoo cs
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Albemarle County
CONTENTS: (from Albemarle County Code Sec. 17-405)
1. Registration statement
2. Notice of general permit coverage
3. Nature of activity
4. Erosion and Sediment Control Plan.
5. Stormwater Management Plan
6. Pollution Prevention Plan.
7. Discharges to impaired waters, surface waters within an applicable TMDL wasteload
allocation, and exceptional waters.
8. Qualified personnel
9. Signed Certification
10. Delegation of authority.
11. General permit copy
12. Inspection logs
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County
Section 1. Registration statement
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Albemarle County
Registration Statement
General VPDES Permit for Discharges of Stormwater from Construction Activities (VAR90)
(Please Type or Print All Information)
1. Construction Activity Operator: (General permit coverage will be issued to this operator. The Certification in Item#12 must be
signed by the appropriate person associated with this operator.)
Name: Seven_Dt.Ve.I (Y14dIA.t
Contact: 4.vV(1.ed Cla e.-12-11 ,-1)1A_ V 1 l
Mailing Address: 11 00 AV 111UFt1Y1 .B Iva( 3u_.tte A
City: Cnalt.(Q 1�I,�
SV ' ,,�.t State: VA Zip: 22MO Phone.6 4) 9(p Z— lyLq
e.
Email address(if available): ANUA. Seven dove I Upmgh.k. Co
Indicate if DEQ may transmit general permit correspondence electronically: Yes1X1 No n
2. Existing General Permit Registration Number(for renewals only):
3. Name and Location of the Construction Activity:
Name: CC(Y mtl`(\UJQs1*(\ kpetorne is
Address(if available):
City: State: v-A Zip:22 Q o
County(if not located within a City): Att f'(\CL(Lkk„
Latitude(decimal degrees):3g.010-7 ZU Longitude(decimal degrees):—7 S. 991123
Name and Location of all Off-site Support Activities to be covered under the general permit:
Name:
Address(if available):
City: State: Zip:
County(if not located within a City):
Latitude(decimal degrees): Longitude(decimal degrees):
4. Status of the Construction Activity(check only one): Federal[ Stater.]Public C Private E
5. Nature of the Construction Activity(e.g.,commercial,industrial,residential,agricultural,oil and gas,etc.):
'R9-S1 denhCtl
S. Name of the Receiving Water(s)and Hydrologic Unit Code(HUC):
Name:1Z1V0 \f I9-lVt .— (Led< Name:
HUC: 02.0g 0 z0L-(0L10l HUC:
7. If the discharge is through a Municipal Separate Storm Sewer System(MS4),the name of the MS4 operator:
8. Estimated Project Start and Completion Date:
Start Date(mm/dd/yyyy): I b/ I S/ 1 7 Completion Date(mm/dd/yyyy): 1 11115/ I
9. Total Land Area of Development(to the nearest one-hundredth acre): I . oL ij
Estimated Area to be Disturbed(to the nearest one-hundredth acre): I .17 (,l( jj
10. Is the area to be disturbed part of a larger common plan of development or sale? Yesa No El
11. A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the General
VPDES Permit for Discharges of Stormwater from Construction Activities prior to submitting this Registration Statement.
By signing this Registration Statement the operator is certifying that the SWPPP has been prepared.
12. Certification: "I certify under penalty of law that I have read and understand this Registration Statement and that this document
and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and
evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons
directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true,
accurate,and complete. I am aware that there are significant penalties for submitting false information including the possibility of
fine and imprisonment for knowing violations."
Printed Name: a /rd C Carrington VII Title: Manager
Signature: j / Date: 7/13/17
(Please sign in INK. Tly ertification must be signed by the appropriate person associated with the operator identified in
Item#1.)
07/2014
Page 1 of 1
Section 2. Notice of general permit coverage
(This notice is to be posted near the main entrance according to 9VAC25-880-70, Part II, section C.)
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County
Section 3. Nature of activity
This site is a wooded site within the county of Albemarle. The proposal is the construction of a 22-unit
apartment building with associated parking.
The total area of disturbance is 1.12 acres.
THE FOLLOWING ARE THE PROPOSED MANAGEMENT STRATEGIES AND DETAILED SEQUENCE
OF CONSTRUCTION:
PHASE 1
1. INSTALL CONSTRUCTION ENTRANCE.
2. INSTALL SAFETY FENCE AT THE LOCATION SHOWN ON THE EROSION & SEDIMENT
CONTROL PLAN.
3. CONSTRUCT THE SEDIMENT TRAP AND DIVERSIONS.
4. CONTACT THE ENGINEER AND ALBEMARLE COUNTY FOR INSPECTION AND APPROVAL
OF ALL E&S CONTROL MEASURES.
PHASE 2
1. UPON APPROVAL OF ALL E&S CONTROL MEASURES, BEGIN WHOLESALE CLEARING,
GRADING AND STOCKPILING.
2. PROTECT SOIL STOCKPILES WITH SILT FENCING AND TEMPORARY SEEDING AS
NECESSARY.
3. MAINTAIN ALL E&S CONTROL MEASURES.
4. CONSTRUCT SITE IMPROVEMENTS AS SHOWN ON THE PLAN.
PHASE 3
1. REMOVE SEDIMENT TRAP, INSTALL SILT FENCE, AND BEGIN GRADING SLOPES AT THE
NORTHWEST CORNER OF THE SITE.
2. ESTABLISH AND MAINTAIN PERMANENT STABILIZATION FEATURES, WHICH INCLUDES
THE ESTABLISHMENT OF A PERMANENT VEGETATIVE COVER OVER THE ENTIRE DISTURBED
AREA. UPON COMPLETION CALL FOR FINAL INSPECTIONS.
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County
Section 4. Erosion and Sediment Control Plan.
Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP)Albemarle County
C__.
^^>
lJ
n
L_
O O
C
FM
H-i <
H
O
O 0 0 0 0 0 0 Cl) , a ... 3 wy� -a
'� z
�! C) Ui .4=. W N) o D o a s n.
2 Dg ,S'0,.
aah . l O
M a� ' F. �4 /�
� om g= $ n ,� / t/ /
m m -o -um m m Meapa °an. x Q i i r. \ / �/ a
O > > > E 00 Z 55,,a m °` X� n --1Fri(i) q'°'�g� 4 �� .1,1Z
— mmM - - - C) • s i.„, -i5. -1 > —0
9° 73X7309° 93 $ , n I O
m000zmm ,,.0 / i 1 1:1 O f
0000000 a Ap m
zzz � � � 1 ,. n
7
Z
HHH
w ,. 3oM R �E C3x:. i_ m �� > —n R. � a b O
o
—ImmrMHH z� F f–Tl O 7J
73ZZZ 7 gl°
O H -1 -1000 •'N m° s`. a _—
D000 � zO ��
mzzzODO + O O 73
-1 --I -I -, Z %n <
D73737J 7Jm O --1
X000 -I �
-0 -0 -0 < I
rrr z
mm
zzz - ill
z
Ai -I
0 (.5)
z_
%y DD 6pN ° W �� N <T D O>jNN Otis
%�%� QmQ cm El NoT mmm m O 0 D ^'A dN �O 3 O m�>T> Oo��
H D >T = ri 30 it° <'�A 'II
!N N uFliil NT.M odIm
�.i !b 4, mvp, mp �Q gD _vm pm N E� v o� m ,',�8a N0 -g°,,
m mem O
£ o,, np ao s� ��,, = BO m g 0 5 �o�1- c� m Adam -
$" cc ,�'-�g 'cpi H m5a'7, Pzo no 0 3i o A�£= of << o m
3 22 N m v 7. 'ao z Z m �c . o,a cF) v} 9 XI
mm 5T 5T m8o oD -n g _ .. om u A
A 9 3 0
m_m_ N y D D = d I 0 .. �o R%
£ L1 GI D $ ri £ 'V.%
< A m G- Z
N y y .L s. T ] ' N m E £P_.
Pm ° p l' .55 " > qa
y V N m m ',;;c, y x O
> a°D
cc �' 8 0 - 0 "� 3
3 z a a
• A s aII t' g O
Nx ° Z
o D - m
p0 0
3
£
S 3 77
3
£ o
v
E. 1
Desorption
tY ,.
4ToVSMP PLAN FOR COVER SHEET r Z
SHIMP ENGINEERING P CS'
WIIIIJIOIVWEALTH14J°AI'?TAIENTS ftevp 0o,/z2,,, De
County CoTm�t e z
2 s .ENGINER/NG-LANDPLANNING-PROJECT MANAGEMENT'
�oTTe�t=
N -.1ALBEMARLE COUNTY, VIRGINIA PR v09 za• a M^N sr. SUrE °'
mAC NNti -N �A nr
-A�$> m til
tri
v_ismo''m'mFr`ImOAZvm� rN mZA y OD - r D g ^ mm �O ZmtiON010O 'Irm 0 >c Dm ��- OZ 2 OI/IggpmCO CZOD�aNrDAm ZZunA > p r F0 OAm0 A xA O O m m Z D ~O A m yA m O A n m>O m O O m y Z Z Z DA Z y m O p r0O �ZNO�mAmp<0V1$rAn<omSD?TON - O r �aA A Z'A,Ip As0 N m O Z O D> ; r^ E ", N U N m�i rNn ; gz N� 1an �svA Ao'"Inin A o "'> rn -cn >- r! A - m oNAonz y Km mxz '^ oN ?Z O O 0 mz r -0 � � < ZC� 7m�y 1 zzym gA . _A 'nA-z m ca$vyino;zyis"NpzoNib ao> o; z m '.ly N �'^ " r1H > oN ; A i1
s oo" or"z=Ai io z» ? ocA Azv"j ams �mnynzNF >A y^I;m-z o->amm iz rT,R1 zy N v po H
tri
5mv_.o � " $ omzo 1!1
m Av N� � ao3ln�nulrm V aiDyinommA$? �x y�zm >'^ >i o m rii
v � mA"3'IzovDzv�v'I�mDxarl m nm ➢ �oz v acv Am ovvo�a > m o z; I^i iymcl < r-I z im�uninA -� OSADAmO 00m x~Z�'m,INnQyO mDNCmmCVIUN m > �N o m n � A Anz �iI"IA�fi �anN' Nozvvo�oz$� A�omp N �n mp o FN /^'
mn Zm Z O mA • N OONCmOZ"IZSm 'f'ZDA R•r ;,,,F6',7_.,
g Am O NA -C
ypm mm z-91 Nil1o_^ N z on _ g-.no'o" 000 o0 yx�0omooxz ,y m sy i!'''
co
g n xo ; zz -z.'" g"'pm'^ ���> o� �nNo�mm�m A�z'"� z � <a �nn m� N ? t-4
' y z <D o m N g N O N g 0 S my m Z n0I O N Z g mO Z X_C N m C%.D D D D A N 0 Aison4�yo m N < -. mmrismozF y'�zmv� zozoo cDvi $ $ N mczmmhm Arng, O m� - Dvy ;DmO� 000r ACZr� ti- m 9 < 0
v<i m '� m O Z D y D mm D�r COmZ<<'>agD Amm r•IN Or ZrC�1� ~~y NAn C A� mADr''', pC mA
y A Z➢r mZm NAm SCOm - O O- x� �
PC mo, Tri<m r:,!'
; i z x z o �zm bilhprA.I Dip Npv-.o'x,I�oim omo2o y AIX g g g 'mna n n HH
mx D ,ml A $ S m m - m 8N :1�N Om<NmO;-' ��.y8 DFZDAy�r''' mNNUS D m� o o �Zm ;o v0i> O
D E',' Z O n Y N m N O O o A 2� m D m 9 O T � � g N m
AO N < O 0 r O_m> y moNm p 2 OC�m "r-:'
Om N D�
n i!'''
AN 0 'r-1
g g +� �O - jo gA2222 pms0 N $DDOyrm Om< g~ �1 �1 �yy rN �A �D
D V vmi Z p N n m a R' r O i m m > <m 0 r➢x O m C D C C x r'0^N y 0 m O Z ro ro L O m Cr^,)'
_ _ 2Zm Zm 2 N 2➢ 1`
pm OI� N N O 0 ~ 00�N m r$'
20<r �O m DZO R� D m F D 9 �O O
2 r^ ~ 00 A m m < A Z
9.
OPmm AZrN0ix0000 OpmO�Iu A0N00 yOC>l0 C>I mDX2 Dm0 • 0 N DmCO ym
Unum m mgomg gmm $ m zv Ao _ hl;
0 5 �p :.amm ,A-Dim�N2�
0 xA0 OCC xY� OZmONAp�$ 2OmnNVIm NZ ymZ timNZ yx Ox'nar CgrP,33timAOr 'xlp
rg
Zr0n D V01Dymti mO�NN sSQANgnA<gC�� D >$NDDaA rmnOnI !L ! OZOD IAiID'8 mmmN O'Nrl-IgA0 0°.-i'-I' P r
A..'t.INmmSrpA pA�01�0>~ yA�A OJACymrD COy <pmZZ21 mZO 010 ODNy AZi L,9g1PtimyAN_DD<ON
$ O AF>OD OODNN O C ZOA 000 O $Avy >ZD x "IZyO V)
c�A<x<vA $In oN � A "F ~mNCNni omoAzoAOA<-zv� `01,,,I.
ozA - 1,.1
1,1 aN rz�C1rlNgcziNAz m LOQ
0 n ti C C C-i A y N O O 9
� � ocixm om>moxax o czio.N� �$mv x v�Ax x -Na��A. �o o miP�
2433E~OmrpADD i#,zyD s�Ap'x„InA�An`o % xaozm oz m`N"a >➢ A �omDz
A >FF N .I � �ymr zA !,,p,,,,
g � `'..5.2.'!
^;off No'^r "Sa N $NyNmAA o N
>ZN� Nr Cr mZ N r>IA'N,IAg'x,IO �OOyCZ yC �O AO ZgOAm C DA�m;
NNN �o. NmC om $$o io�pm;0mNm2^�io -Fn<><:m gOm E7,''.' ;zg� m� o ra; �gXm�^'$INmm'> LTJ
'0.12�� '?,IAx �; Y _I O`%',IDi0 �m0 0 r FTi ro CD 'kik;
OC_ iC1S ND'n i EUSz'AO~2 y -^
OO g124 0 < 5,=IICD;m -:A 0 %1 ZyD 22r-`'d
gm • gOC ODAO SrOCDm Dg_Oti<ONpDA g o
yy Tann m�^OZO Zr� IA/1> �A A � ODOy<tix OA N200_ 9 , "%''
Zm yrm Z DjArN
'-' "� TA �< - n �� m� i<1^v:g g� roFulami �oN v-' zNzm�ozm Ao x�m$omFcmi �
on�m Dy �A s ODpyADNC m-'zcc„!:1 o m A`-g"' pc `^Nr' c crI^m� 0Tr - z
manmm m O NO�Aigz on NDo Nmox➢�>Z mr oz mnx `^ n i m�omv�r
mono x NpA .o mo ;?ynl�om> moAo mA zzxmcA r^ - m io IAiry n Niom A ->.>con`^`^A -m z
>A- �Dv zzp$ o . ;fcoir ppm 0 z',71: ;rl "! n C
ro mmAm O� �> AmmNL Om 0r0r/IOA xmAON O_ - ;IN O C; >D OrZC �ZO�'�.IZCNOx m �/�
(nfA ZOOM CO C< rir� y y0 n>0cnDfA N aonom2O nnOO < 0? r�>OZ ZwOA S N ti 0 DOUR Vj
Dy <NN< Z OAA o;oo'0n O mDOr- yZ'< FP1 �m0- >O'^rx'Ir'rnOAZ- A _
N$'O,D fDlpQAp� 41- Or 0A OyAxixCAOmOmNO<yZOCti CZ mOAL AOZr AD O>'m0 �'•<Dmm O O
morn ra -lZo 9 nzo !1: 1<iAny oo m➢- A ov nm -1001 mo mai' zo00o n
~'OAn AF NiCOOmti in > gmm - _ inF22 2-i ;al"!
040]00 !!Ali:'21
00 AC< OFC�] 9OImOnZr0C00N� ny 00Zp> DOS ZZ5yUpOOIr0 2>ria C I^nOoO msOmTmoF,nZAmO?vp ;?r O_A �Ng ooi 0 OtCitirormnmi /]�I�20�n pmi h',"
;'ZnImiI00000n0A>Ar ^I 4; Nm C m>mC CmOmCO l�AC55 OmDm JACVIOAC m O mOC ODZXO m D_ pr^Z (�r\/��0 :4,;,,--8
m Y N ,;51 -r 0 m N-� C I m A A D D y r Z iii
O m A 0 0 m m V!
�aDO � � Am rCCr NA OOfml OA yO� AnNti ➢ 0 y � 0mm AC.
� m m � Op: CyCrOrr-s Z x Zm0vv Am�voA >5yc�- y�:gzoN�m vOD8 pm o'm g a<z y foo mA o
gr �'Zn A 0`+I 00 Or' y <m m m AO 3?'OIO 02> >0 r1� D ➢Z N `" fNnj
i' 0v r::
'" vi
'z,IZ `" z p� '-4a
m� 8r"
v� aim z mm io Ni yi_ z i m y i o
po y o <o $ '`~"z ='o g o m " o o g o 1—I
2
aD_I- y0 m2A yx DO NCD Cmm= ANOo� mD 0� D�O�m 0-i9D -
m �D Z UOi rOn xlm AA mDr Zy IOn 10/Im 'SrIA00 C OA'n S Zmir ^
iNNz '"�� gpnzo 4zi mnti ogig amFoo P$ NN sooma �ii,1 l 1
==mz oror nV v !oc ?aaD oz$ o 4zinN'z '4;mm : O
_ai g< igF $ 0 00 on ii > oD DN->i
�NrIF Nov �momp ;> mmA v >?; 334x' ms icvzlA oN�� s
i'"I O D O D A A Z 2�m O O A m -11.'
m O O ti m 5 0 0 m 2
rOZA OIAiI N40]0 ti 22m Nn NN ~
Ir!,!.-
N v Z 5$a �m >N>m nyv -•o Ii!!
>99N
�zg mmz v �sp cumin -oil''''
v rg�ia �� �rCI ntiz'c voNc /`i
!In
v' l i>i�mz aAo girzn 0000Pam p F ?a >05 z O m nz i
b.,!,
oo Nom m m aS PS oaA� ZQo1"'
l Z urmi. mvi> iil
" >�goz `;"i po 0in am ..��h� �z aa�A A: c�i No 4zim ~"z'o� i'nsN OINO b ^OID>5 iNDNn rsnoOlm> yl D m''mFm D4»g
;-Og zpp r �Z$ Oi O �xm0 g>DR mzmv m -mo mmn !rhos Am !cl
omgz nm`''g A DOp vii' ��arvi � D AOAo >umvi o_� (/�
m N , r41'0
N i S ?y o D O y N;- 0 m g A 0 O N g 0 2
ammr <m�'4 o res- 'i'-6<'i
< ,,.i.-;-%-
zcos $ m 9,-,i.,-,i,
o'Arz,I i>a-
ram oz r41'0 3 Pm^ Aoi 781:?)--'''
i�nmi o m 21> ozoov
N= `> ��N Nog
pA i o >o a mDo v � mzO �
mzz �^ res m o o n a azzv vino
np Nzm z % il4. i n z I V.J
»gym 0 Oa El
0--10 - D'NA,IZ ..
oy m m � n� R• '^
ian5g o� fi Eo n mz r o zoz yo b lit
f:1253_,11,1 .gas^e: o 'I > i� 03°- 0 �' �n in "E i� _.E_ _ ¢ in -�3 _^ in tiEVN z A
n as la
WO
oq Vii,', =_°s.�g Cz ^nv ' o a3�A ¢3�on �^➢� ��r� ,"--t c'''')
- E�-_^3>; 3�s - Ni 1;11-11
- a; 03»�m !ii'llq
_a3� m a.s`'°3nn ^$ _ ^ 3a3 9� 24g- 33- -3x -gym 3^»i ^i '3oi _ _ aaEa> -o< v3a - 3aCoA .-aD = _ .«3.EZ - D Ea ism o3nv ��^3v3'z" -es o3o3iE,a-a-anon ns^O - _ �y _cO �OaD - - 040 ^3m -9 g" i 00 -- =AE.]".O 4. ei)11
3R3= a`'S9 m� - cg _ 3 ° ¢v o¢z '�C °3° ",* _ m oll "i^_ ��o -^nv 'z a3'r� _4z a3= !a n
°3� ill mo `^ 'a'� a n a0 -°E- c A a _N ,.33N No !'d'H- - m »o _ »°;o
i.
nEn �3a - - _ _'- ac = _ - "; 3°-0°0 - _ _ =gay =_a�N 3 _ -
i3w- aaR= o� _ --¢3"r� = 7 e Pi
y ^h� 'girl
_ o'� ___ Fc - _2. 0.13^ Sam-� u.,IP)�
�, G - o33i li g _ _ - P.l`. iO3E I`Ir - _v> 3, c3N o3a - _ ao ! - - - +J
,¢,'So 333"-�a = _- _ _ __ -°z - - _"o `^ _ 11:11-,?;
s:o- _ oho 1,2:;!:4
_ ^
¢s "; a ^o Dov 3X30 :14 141;"'
,il . ¢3m " - - =^o vn _ - l 1
i=Ez n$ 3 3� - - "' ^ - "7?- ° _ _ 30� _ - - �A .c-3 a'o._ _ �n
_ ;,.1,1,i1-c "3°313^ _ _ - i - -z - - ^3 -i-'r3' =0 - - l ally 1;;;i1,,'
- >D O
hil
o3N - - - - - _ 3° -`C= = »o^ Sin -flita _ _ c33o ;;;Iit
E°3 U1
oa3 _ "o _ - g3^ 3 3 = °3" o _ gg - 30 _ 3.-n 3S,°', _rq 33`-
1 ii
go
1:-:.
¢ 3¢ p3r a3°= - 3° - _3 ,1 _ ira'lk - ilit a� aiP it
- - 2,:
^.3" »n' - = a' _ _ _ '3 --�3 mhow.3� 0^
Ono3a da - ^ - _" - 23° 0- l
03 Ili
iONEo nC = ^ s 3 _ ^3N ' a-- -- e. X.a..'.^ o3a._ _
=_,030` _ - _ 3 - 3 a$ _ 3^ - E^3 _X30 " - __ _ `�i C
.'a 3c 3 '_ 0 = E - _ ,°l - ^>0 z - _ - 119,:5: os O
=ili 03 oh a_ _ - - - �3a 3 i - - �3 3�Ea ^ 3�0 3Ft ?4 on _ " - og¢ ^ w3
Da 01yM
o N _ VSMP PLAN FOR ER
OL
SEDIMENT y� r N� SHIMP�NGINE�RING,P.C.
^ o CONTROL NARRATIVE $ o z r
p� O \ CO�YI�IO�Y �ALrtigil �TH�NTS Rev g
Dot Description �� S'
1 oa/n/17 county comments m2 g ENGINEER/NG-LANDPLANA NG-PROJECT MANAGEMENT
O 9, z V 2 4 27 17 County Comments Gj `' `C
N J D v ALBEMARLE COUNTY, VIRGINIA aFFR vi vi, 2a1 E TE N E: t,3„227-3„a
CI-IARI iTIES VI��E. VA 22so2 �ti5 TIN 651i1wIP-ENGIN EERIN a.coM
N�O ;� -\ A.QD"i'5'11_4i9'2:_!-°'
\ IOn�� o3n
//I/!/,/J1/,_/ //{ jam' / �;
v t 1;1l)'lf/� °r ill z'jt I /• ,.v
/
786.;
z + •
m u, anD�m \ D=� SCA 7 , _ • �'--- J,Q,
C F n_,.x n/ raSF • • �r^ —
o •A <79� H
A m
z 0 •
> i I
, ____._
. ,.. ..,
m ,..._.)._,
�� m92
m
r7 O,,,rO tn. \ \
Rlal °m I �I \
> U) < O U) `e \ \ N
00 o O u \
m
� (D p• K � :y \ V 1
N )
o •
� �_ Z .TJ f • \ `, co
03 * 0 a o ~\� \�� \ � — --Z— fes mo: o,
"ss lee
C,. I) �N auk„ow,/111. T t o "d
ti Y v
-O `ZM mif• t
D- 4
0
,
m
! \ m D-n gym-[7• f /
/ / «►, o — FP,12
_ ,
ado �' am • t 1
41 4,III
i N N ----- "dr' t, i
;%1
on �R —_.'✓ • \ �m�h II r y may. — _ _
7:2:,
3R1 , �� saa•rZ 9
VlGNOJ0 )�' IExl cG-2 `�an_iii
i )0.
0 0 oi: a
T£ C � � l_______.,,,,_____________i\
OOnry ( _"�\ E%1$i1NG PgRKINC AREA FOR iROPNY Cf1 SA`E APARIAIENTSm
O m co"OO .,/ , m
iI vi
N == ul q 9 N
u O-._.
/! I 'n p W a/ O f
/ ,DQE.'.T�
Ii/
of �/ li
si / I/ O3 N
/1
i5
)
a CO,y
Z2
a VS AP PLAN FOR EXISTING CONDITIONS& $y,oe ry M � SNMIENGINEERING,P.C.
r,�
n _ oDEMOLITION a z • ,COiliiJiOiVIVEALlilAAPAATIENTS R
ev t Date Description
y 3
oa/ti/t� County Comments ern x ENGINEERING-L9NDPLANNAV-PROJECTMANAGEMNT
, -^ II' 2 4/27/17 County Comments
`ni ^x
o `I o `-,1ALBEMARLE COUNTY, VIRGINIA \,,,,ew� �`P
N - tlIK�� c.a.7 z -
a
1
- I 1n
(Tri W CO
It:r,o I o C
0
O
Z
u w w u w w uZ QO
m W N V N NI O 0 rn
m
v) 0
-13 x E C m 2 -i F n 3
0
N g x -0 53 ,.-7,
m
0 _, s:), 0 K m -, < Z
0 0 0 -Q o z c m -I
o Z y A < < y m n Z
occ x, - N 0 Z o m = 0
A m 0 m G _ Z -
' , 0 rn z m Z
c oz A rr*1 z m -I
Z A z o A Z
Z A Z O
A0 n r
n , m N
0
0 3
z W
O
r
N
SC)0C)G(Dernx
v c
m o
IN'vs-inE
\ 2 c m �
\ \2,12-ET- F
\N Ae o m
0 3^.3 9 m
N/ w m
N
n A
ioot
I \ .331 1 l�.i/ �Ir t„ € ,i. 1JI to
\� \\ & {r r Frey' '`
... �'w' O LI
OFB�-• i[ RBANCE
�• �
Z tf� •
.. Z
m
y p,n \ x11) /1/ '''
r f APP.*for
, • _• -�
CF I g5 51nx A ' • ,-;:;?5,!,,,
'cn F �, _�
y s o • 1 is, r k N v
m •••••••••••••••••••• ••• r -••_ � •
2 YY����tt���•e•••r••••opa* I' \ 0 • IP
el) t \ 41 ' 1111W-11110 I ,_
N.
sa
m rl:a
n..li a m •
3-. \\ I
mZ
— �o
DCn < O (n • \ `\\
O O
M m 2.I F i \\\ \\\\ I co 3n
O S C O \ \ /' ..co ,
JJ CITI s1 /�• _:yam=o
Z '-' CLD -
rr ' • v Q� Offw
\
21'
CP
_7 o • r3 o NJ 1c - -
^ ----
1O .1
I
oix F. I-(/)
•1 ��.--
rb
/ •. / 7 r 7 I \ rn\ m m Z iE' _Dc8i mgt I i_ -
rn
----.:- 6 '
4 1
11e-AA
•,..z.-w.,•_--- • • • _•
// --T-- -- 1
j :t - -
:
-
LIMITS OF DI A'6ANcE s4--.3,9c.....E - /.tt\ ti _t_
\
Ex"BG 2� � A1%
/
1
2 - -I-- - EXISTING PARKING AREA FOR TROPHY CWASE APARTMENTS
m
N
^m A Oot
� V
,1 a
os& ,5.0,,,,4,6
VSMP PLAN FOR PHASEI EROSION& e t-y ''&
o _ . o SEDIMENT CONTROL PLAN y r
SHIMPENGINEERING, P,Ce
o _ COMAIONWEALTHgASTIENTS SEDIMENT
Date Description U_ = ENGINEERING-LANDPLANNING-PROJECTMANAGEME,NT
1 07/17/17 Cau De roteon N
O� II J 2 4/27/17 Canty Comments m2 m�
4, o ALBEMARLE COUNTY, VIRGINIA c F W.i �`°
N v - B VIN`S
___ cHAR�o.res���c. �A aasoa ��sPH.sw�Mo-eNe,Neeawe.coX,
I
rq of
�� I;Ir�L:6 9,00 1 -0
2. i 1 ,
.-\ '� -
/C6 En Z
o p
II c I m
n 73
o m m - I 0
N my:.. —6 H 2l" O N
�' N..HH
II`'.t.1 ( TOP 494.37
a.MI p
r
0
nl Z
z''ti
1 u o, u u w w c., w u u u
xJo
�Z —{ — _ _ _ Z QS
O N m Co CN N OJ U N O O
.� N
P m
r� r_i O
C r O m
-,°, -1 in -1 o ; v r U v A m
i u c. In o = D O , O O K J1 y < Z
o z .Ti 77 A m T9 m
O n o z z D V > D o z c m "'I
'-'3 n Z 0 z o z .Z7 0 A o o z
O o -� y -< O -< -< > m O n
Z O
o A coA or m m m g z m - Z
>, n m mI o o Z r
_ ,zn„ o A rr*I Z m . 1
cz czi z z a >
! ‘8
� z v D p
A o n r
/I------'1 il---- ------------:::------ -----:-----1--------'-'':::-----:::----- -..__.._
D m m N
�C
� 3
Z O
N'�CJ <999‘71-1..,,,,
:�' Srn 11 7136 p
�a4
raP548a r
o o U 6 6 a
� c c�i1 N � � � O � r^ � <
5
m o
N O n
\ ] mFN�
\ am
,,. ,\I'-',..,04_,_,-,,,,,
A��Ort I
Ua°I
\\ 0 3 N 3�m
9
ii\:
swami Zkm. .151.
;'�� LIT<1(TS OF DIS I I r // �'
�► ��i.■ T DANCE /% 41_-0-___I--__-----.,:--__-_-_,-.,
1,1,nol
neva ��' �� � I � \
'All _ I - �i� ��_: in.
� e 1 \,_�---
,zO� t�/t���i.��.•.•.�q/gq.gOgq
m D o 'Al ����tt!"q...iii0_.q��S0i< ��®_- �
D
:.)r''
m Z in'
S `.
I�il O9. '��
D
m L — I� iii I� I. \ \1 � ! _-_=' _
'HilNI ■ 'itl ` ii .t VA. �c8?fA:Ayz0 1y I ' 1 �Z Nu)J 2 IDZ ,-;Sir r t GNN�Or \
_ , a
a � �7 ■ Iii ' , ���fY►ejl � —--
I!9V
— t
__—_--—------ 'Ll
* le , , ., ION ro,f
ei
�F° r jg
MP.
i 0
•
N •
I:
/7///:''
://'///////'/:/:///://////1://
/ill;
o a�
I
- LIMITS,OF DIS U':'� —
: 'ap
EXIST.CG-2'
l:\
/ I
/ — it �\
/ F.r- - EXISTING PARKING AREA FOR iROPNY GWA E�APARIMENIS
0
N^m ATOQ
gcu
m Aa ,o m
,..23).°„f
1 / // o a O N e a 4
I,, Ir ;,1,,,::;(
N N
1 u
oma coyo
VSMP PLAN FOR PHASE 2 EROSION& y�>, ry "� SHIMP ENGINEERING, P.C.
_ o SEDIMENT CONTROL PLAN 5 z y
o CD�YI�IO�ALTI�ApA1eT �NTs Rey I Dote Description N ENGINEERII,G-LANDPLANNING-PROJECTMANAGEME'NT
Q1 O f 1 03/17(17 County Comments mS
'T J 2 4/27(17 County Comments �2c
N' J ALBEMARLE COUNTY, VIRGINIA %FR wdIN�9�`C PHONE <434, 2
1
N
N
i)e, ),cia.e# ' I _,0 O
F- r
- I M
O
N
O
Z
u (, w CA w u LA w CA _ Qp
CO N N - 0) 0 CR N -` P y
m
N m.G
- X K O C m m 0 U) N Cl m
r z 3
`a =' N r A -0 '- O z m
p z o = D A m K m -4 m
c o
z A
ooo O 0 o z U A o o o z
o z o m =
o Jo m o m M 0 z Z
n m m Z r
m Z z o m z m '�
L7 C) Z A X)
13 D O
0 n r
m m N
1
o g
z 03
O
r
N
®®®@ ® ®®®®
vc
i90
rv' ooR%'
sm
'oho U1
3 --
/
V •//////;////''� '//////// ///
o
® I I q ‘ , , , , // „ " 1 ,
.,,„,...,_A,..� M1TS OF DISTURBANCEI' �.'�'� - -7L---------------=----_
• „— _
���'
C, • V RAI Ao • a.- • •,. , ,may 4 I A --_
oma„ r. E L \ -'
ail
z �1y s. ,i7,,,,,,,„,„,,, l` .,•• `�, • e ` CP-
-517,,,p
? -�
c c Lam," <s I aa••af a•a•••a li a•ig•••1 I t' �! \,,.„7,•:\
a \
azar rt•eali•a•••**••••••••• t
m n o ,,,4:4_, w,p •ti„eimi••ia_a_/••••!.-01 ` , \ .`�` -r '• x Ari �^p
0 Apmtp, ,,sto \ t. ,epi-, , j \a-
o L Nil �� I ,.,., III 1 �`� \\ 1` ,, - �j ' \
- , , i '
n OCD O D I ■ oilL
I \ Z+ - _- _
J v„iii f4 /1 � "O' o \r'. uci p. r - ---s _-✓1 r�\� �,\_''.. I L1Ask �y� �° I mN°'uc \ m'n+i_ °'on / co 3 ,\
23
O _. _• m 0 Z fI • �`4 ms, o \ oN�IN11 \ NiO 2TaOS1 I�� �`a`\ v�i°� unto _Ihi!it±-
Ffl
XI fix; �;�' •I — "g. i / I 1 . �'lil o .. i 11 7J `I .i.; 11 m o
CP 211111.1111:1111 410.2
/ Ill
MI CNU _ - a
1 -
I Fr �{
•
4.1
II , .
j ws., r,
-
. .., ,
‘,,,,. .
\ 1 • +�/` _
i. l I.... �
NiiiL_ L --
C L ��-- �l
LIMITS OF DIDI—S}MB �
EX I ST CC-2
A
O
I "s\
C / i- -- EXISTING PARKING AREA FOR iROPNY LWASE APARIIAENTS
' r i
,
/ r
/ j g A',i' "',-7,V
n?.m
'/ / Uo O
I, %/ /
69,-O aD?�.�.AF
_ N'4°1 W
t / 3 v ,,,
tr v
as Coy
VSMP PLAN FOR PHASE 3 EROSION& e t-y °ti'-
gINEERING, Pa COiJik/OiVIVE4L11/APAk'1k/RiVIS
Rey P Date Description 3
03/17/17 County comments n m ENGINEER/NG-LANDPTANNING-PROJECT MANAGEMENT
ch T' --i
2 4/27/17 County Comments 2 °Ox
o J N ALBEMARLE COUNTY, VIRGINIA c�`�F W� �°
N `? ',I
B tlINX9 ONE: c93+, 227-3140 CHARLOTTESVILLE, VA 22902 JUSTIN•SNIMP-ENGINEERING.COM
fA k-,,, . 7- \ trtt1411, lil: !. `. Ra:i
•,,,___, p ---= r t m A 1 , :. Ja
t v •—-/\ i( 1,iff
1, CDIt ':
AY4411
_':+ y, _ —
•
,,...
110 ..,... ,,
m �, �;: 'Z7 zl> fet v �r Fe
m
ti 2
—..i ^ m T / \ *Aff,;00 VW' (-) @ L'.'4 '.= 1 . .... v
i ^ c \ ((((((((((��/,'�kyr Z
'1,1111. . r71- "' _ fi
r t. w 1 1111 /((II((����� 113 S i1d���`I,�. I_ �, %3 o E. � g. r
itrAVAI
--iS r; 1 OINIVIPO 4- 1. it P.Ir z ,0,
, ...... :.:....0: )\ ((77,„, , ,„1 tA
"' (((((((((((((( I , ft m p ulrf
ao; o
VIII IIII o `� mi. �p t-;20N a 1 c�
IIIIII
IDIIIIILI' :t 4D .
Iq\
F
I m€ II�,\��11 rA
s moo III p
r.
II 11111 S ' g rl i s y Ao F n W�l�' 14< ) �7
ii
llllf - m A m VIII A. 1111--- 'g Eat p =1T 6' e ►��il% 1 n
110=- - i 11111 - 1II,\�\� I V 1z_ mFs _ dol I1l� �►1..„414Sr'II, to
n �
VIII gg G pf II. '.-o �,y p j.6.61* 4 T�Ri
z s s F "am > '..."€la�yr�r .�i .►i, y�
11111 1=1111. =s ' . - j c z e 111111• ID \.u�. ;�1n�y�1.�
IIIIII
11111 so a•�•h�ri �'NQw��i 21h
1VILV1111 � — � 1 Y
_I � G m^ ii`i � l `�%%� � y11M-e.111111 A� m 1 \ f -- : 4 - r��w,�y'._ 1111111- g. v I 1 a s chi 11m� 8A\ .. \ N o= IIII-� _ m A \\
1111111=11111 MP, AT - 111 p 1 VV y
R —17i
ea
• -W = o T
04 s m F. n P 3
=fig,% Ed VIfi 1(1 f4ji n ,.„2 A' ,k^ g1 9 sq= ,,2 ao 1' �6,n F.n E 3 0
�AASta @ ,� •i 1 I m al!.4 u n_o 3 u 3 �D n v c r S n
•Oo �15-u, If
5 2S e o s 04'0 0-- i asem.. '5- :-
_ _ s,`. m ,z C 6' 'O 'v .6.
- a fi ee11 E 6664 gg = N71�_ R,� �"; ‹i7>
n �„? .' 93 r
,m 8�2g P P P If P: cn _ 3n - ng i – m kFL n ^._+ o a . o. $-°.•a:+I f a n
2 41515
il.g P t , r ; b Z" -o n9 - !,39oa \ ,N \U c, ^la .3
ffS
'all
ti _ n . m - or a
g . . . 'fie - -- Q H n = n i. TI e 3 C N U P o e y7V�
_ h ,,,,,c..-
3 3.P 3 N 3 0 ,$ O o y a ,, : . ' P O
ki
. . 3-. " N Pe. .3 wq�E e. a+f cEe—n ^aip .�:piA .p
-2:v.151?..^I $� _ n. .1Ek '>=.e a' i6'.°^ vee iI CP
. a _ 6OY
3q 33 vp '.bF -._. . =. 9'9 aS a
tl. Irl ti to j : 9 y -
ai !I$ . ii 9S. f
IEC 1 ra
IN
CD
a a d as EAsvi} ► tt •••••••••••
'� o?_ 5' x s°o n 4IDrm 1 ra••••••••
................
:;i: j• !/jam .•.•.•••••• I I t l
m o ,�to ..R1 nW. N N •}-•.ti_.ai}S.S. �/ ,iiii•.i.i.i.i.i. 1 ■ I 1 1
2 RE .5- 5 '.............. #11311 WeloW*Wee ttiiriti CID ..„ 1 .0 f..?,
z 5 ' i > 't %:::::::::::::$:;::::) i i.•.•.*:: 7 NEN= o o I
-e O m< 1•••••••••• z
z r.....••... A ,I
o C m< t:i:••yy} -a i•::::••••••••:• K,j '
n a a g � S3l. 1 �.M1 m ••.......e.• • f•. ■ �. F1=0
111
O g33 g:8q :. 11.1 :::::•iii•: ■1111.11- 0 -��i ����\\\�\\\\\
: MI MERIN
A •
n if;o a s q 3 w{S ,�oi,t m •�• •:•i OMEN 6 .
lioldtat
,,,,,,73-,--„,..
• - 400.161%-1,4%.
..•j• •.• ••y I r• • iiac , . i l• ; v„ •
1
n m • m i• ii •* : • i • •.• • . .+ g i��it.ttl i. •o o Z' D Nm I . �iiiiiiii�: 1ii •• • I�' r= n 1'S a `< ,. v m—1 :• :• — r
1 ?).A
o
as •
coyM
VSML
P PAN FOR EROSION&SEDIMENT y4, �.
V
2
g SHIMPENGINEERING, P.C.COJViJIOiVWBj4ITliiT � C Rev g
o CaONTROL DETAILS
2 4/27/17 Description
cWntrconments
County Comments p y x
My �x
, '' C ENGNEERING-L9NDPL9NNING-PROJECT MANAGEMENT
Mill
o JZALBEMARLE COUNTY, VIRGINIA 44 vi \ PHONE. 1.3„ 227-5110
0 n --.1
CHARLOTTESVILLE. VA 22903 VSTIN•SNIMP-ENOINEEHINO
COM
Section 5. Stormwater Management Plan
Water quality standards set forth by 9VAC-25-870-65 will be addressed through the purchase of nutrient credits. The
Virginia Runoff Reduction Method spreadsheet was used to determine that this site is in need of 1.14 lbs phosphorus
removal. 0.80 lbs of nutrient credits were purchased for a previously approved plan that was not built; therefore 0.34 lbs will
be purchased with this plan.
This site is not subject to energy balance analysis, as it is less than 1%of the total watershed area, as per 9VAC25-870-66
subsection B(4).
Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP)Albemarle County
Section 6. Pollution Prevention Plan.
(reference County Code 17-404 and State Regulation 9VAC25-880-70 part II section A.4)
A. Plan showing pollution activities and prevention practices
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County
ft x G ■
O
W I
� m ❑ x �o0 I
v
en
c 1 L(7
31„1S10 IL S11WIl
,....,., i
08
__
41)
- $111,11 it
4)— ..-, . 4
„ -
I
III
fi
740
. i!t) is 11111- --"'"2" /P ,111111111” ,
go
I .1 ,_
z __ \ \
, 0 es
„_ N \
, _ N \ _ , .
le% _
__ , _ N
,_
, ,_
id AN- -_ __ ,,„. 2,,N 11 0 oe
"1 it 0 2(1%if - _ _,
, \ , EU 4) ,_
__,_"1" ___ __ _ \. ,or, -- 1
-- \ mu
\\ u.NW; 4p1
______ _ __...
_ .0o ___ _ ____ ___ __ ,,
N ,
1
_ ,... N
\ g
____
i 1/4 _ \ 1 1 . 1
10
.._-:- ' ___0431 -N in N, \ \ 1 1 11.�
\\ \ \\ \ \ I I I �;,.
__`` -\\ \\\ \ \ \ \ \ I I 1 1:
— , \ \\ \
•, - imm.,-_,____--=---------- 11,„ N \ \ ‘ lir 0' i 7 , I
I , , , -.-- I I I 4)
0 --
__1 I tilt
i.i.,+‘ i)m\ \\, lillik,), i 1 1 kr .:,
��4..�� �a .) x I '\ 107 , I !: :; ss :
lk •
, .......... —� At.•t..dl_•t.•tt.t!
1 1
1 mn.,.r r�,`,r. l I I, I I I I /��,1/ I
(a_ ,,%
_
Q 11
..11(7:: dm Aik,
_ _;- a
://///////////:////1/1/11
\-1
"'�►..��.� �6�III--- , ////// III A I'``r`r"'' airR
.7.. ..-::-_:-. - � :
_—___----- i, / I I ////11.:161;717-----1/
I Im, 7-
-—— /�'�/ 1 I I 1 1 111 I /
30Nb8�10 a �0 S11WIl�
_ �- — �'/ I \ I /Ill 1l / �l/Ill�I1Il/1 {
t / \ / ////�///l/////l/I//iii// \
/ \ ) / ///////I //// // // / � I I
//'/ // I //i�// // // ////////////41
// // / // //// ��//�/��///////��/l/ vv
/ / �/////// // / // //// / \ � I
/ / / / / ' L
///, \
B. Sources of Pollutants, locations, and prevention practices
Pollutantor Pollutant Prevention Practices,
Location on site
Generating Activity Control Measures
C. Sources of Pollutants continued. Common activities and minimum control and prevention
practices
Pollutant,or PollutantPrevention Practices,
Lo ,cation.on site'
Generating Activity Control Measures
Follow Erosion and Sediment Control
Clearing,grading,excavating,and un- Land disturbance area Plan. Dispose of clearing debris at
stabilized areas acceptable disposal sites. Seed and mulch,
or sod within 7 days of land clearing
Cover storm drain inlets and use drip pans
Paving operations Roads and driveways and absorbent/oil dry for all paving
machines to limit leaks and spills
Direct concrete wash water into a leak-
Concrete washout and Current location and detail shown on proof container or leak-proof settling basin
cement waste plan that is designed so that no overflows can
occur
Enclose or cover material storage areas.
Mix paint indoors in a containment area or
Structure construction,stucco, Structures in a flat unpaved area.Prevent the
painting, and cleaning discharge of soaps,solvents,detergents
and wash water,paint,form release oils
and curing compounds.
Water shall be filtered,settled or similarly
Dewatering operations Dewatering sites shown on plan treated prior to discharge as shown on
plan.
Designated areas for material delivery and
Material delivery and storage Designated area shown on plan storage. Placed near construction
entrances,away from waterways and
drainage paths
Material use during building process Building areas Follow manufacturer's instructions.
Waste collection area will not receive a
substantial amount of runoff from upland
areas and does not drain directly to a
Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Pollutant,or PollutantPrevention Practices,
Iocatidn ori"site
Generating Activity Control Nl<easures
Current designated container areas on waterway. Containers have lids covered
Solid waste disposal plan before periods of rain,or are in a covered
area. Scheduled collection to prevent
overfilling.MATERIALS NOT TO BE
BURIED ON-SITE
Convenient and well-maintained portable
sanitary facilities will be provided,and
Sanitary waste Current locations shown on plan located away from waterways or inlets.
Such facilities shall be regularly
maintained.
Apply fertilizers in accordance with
Landscaping operations Landscape areas shown on plan manufacturer's recommendations and not
during rainfall events
To be treated in a sediment basin or better
Wash Waters Wash areas shown on plan control as specified on plan.Minimize
the discharge of pollutants from
equipment and vehicle washing
Vehicle and equipment washing Designated areas and details shown on Provide containment and filtering for all
plan wash waters per the plan
Minimization of exposure to precipitation and stormwater.Minimize the exposure of building materials,building products,
construction wastes,trash,landscape materials,fertilizers,pesticides,herbicides,detergents,sanitary waste,and other materials
present on the site to precipitation and to stormwater.
(Identify all non-stormwater discharges to occur on your site. Keep this plan up-to-date with ongoing site
changes and inspections. See CGP, 9VAC25-880-70 section E for examples of non-stormwater discharges.)
D. Non-stormwater discharges
Discharge Pollutants or Pollutant Location on Site
Constituents
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Albemarle County
E. Persons responsible for pollution prevention practices
F. Response and reporting practices
Minimize discharges from spills and leaks. Minimize the discharge of pollutants from spills and leaks and
implement chemical spill and leak prevention and response procedures as follows. To the extent practical, do
not store oils, chemicals, or other potential contaminants on site. When storage of potential contaminants is
required,provide secondary containment, such as spill berms or spill containment pallets. These should be
located within the drainage areas to a sediment trap or sediment basin. Direct concrete wash water into a settling
basin, dispose of hardened concrete with other construction waste debris to an appropriate waste facility.
Respond to all spills, leaks and discharges as follows. Spills of oil, petroleum products, sanitary wastes, and
substances listed under 40 CFR parts 110, 117, and 302 should be cleaned up as soon as possible while
protecting worker safety. Construct an earthen dike around any spills on dirt to prevent spreading. If a spill
occurs during rainfall, cover it with a tarp or another impermeable cover to prevent contaminating runoff. Do
not bury any spills or wash them with water. Maintain a spill kits in a readily accessible location. A spill kit
shall consist of a lined drum with bags of universal sorbents in the bottom, accessible without tipping the drum,
sorbent socks above the bags, and personal protective equipment on the top. All materials used to remove the
contaminants, including any water used to rinse equipment, and all dirt removed must be treated as
contaminated. Textiles, such as from coveralls, may be sent to a certified laundry facility. Waste must be
disposed of according to the standards of Albemarle County and the Commonwealth of Virginia. Store
hazardous materials and wastes in covered containers.
Report all spills, leaks and discharges as follows: All spills, leaks, and discharges shall be recorded in the
inspection logs. If construction activity results in a discharge of contaminants that may be reasonably expected
to enter surface waters, the operator shall notify the Department of Environmental Quality immediately or
within 24 hours, and shall submit a written report within five days. For significant spills that cannot be
controlled by personnel in the immediate vicinity, notify the local emergency response by dialing 911.
Albemarle County must also be notified, and potentially some of the following agencies: the Fire Department,
the Public Works Department, the Coast Guard, the Highway Patrol, the County Police Department,
Department of Toxic Substances, OSHA, etc. For spills of federal reportable quantities, in conformance with
the requirements in 40 CFR parts 110, 119, and 302, the contractor should notify the National Response Center
at(800) 424-8802.
G. Pollution Prevention Awareness
The engineer,project superintendent, and contractor shall have weekly meetings to review on-site conditions
and advise contractor of potential risks that should be addressed. Contractor will be responsible for following
procedures on a daily basis and applying appropriate waste management and prevention practices to be in
compliance with the conditions of the general permit. Employees shall be informed of the danger to nature and
to human health of various chemical spills.
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County
Section 7. Discharges to impaired waters, surface waters within an applicable TMDL
wasteload allocation, and exceptional waters.
The site discharges to an impaired water, Meadow Creek, located in Albemarle County and the City of
Charlottesville. The causes of impairment are Benthic-Macroinvertebrate Bioassessments and Escherichia coli.
Site work shall be in compliance with the following requirements:
1. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after
final grade is reached on any portion of the site;
2. Nutrients shall be applied in accordance with manufacturer's recommendations or an approved
nutrient management plan and shall not be applied during rainfall events; and
3. In accordance with Part I B 4 and Part I B 5, inspections shall be conducted as follows:
I. Inspections shall be conducted at a frequency of(i) at least once every four business days or(ii) at
least once every five business days and no later than 48 hours following a measurable storm
event. In the event that a measurable storm event occurs when there are more than 48 hours
between business days, the inspection shall be conducted on the next business day; and
II. Representative inspections used by utility line installation, pipeline construction, or other similar
linear construction activities shall inspect all outfalls discharging to exceptional waters.
Section 8. Qualified personnel
The following personnel are responsible for inspections;
To be determined
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County
Section 9. Signed Certification
CERTIFICATION
"I certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gather and
evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my
knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for
submitting false information, including the possibility of fine and imprisonment for knowing violations."
Owner/Operator Name: Edward C. Carrington VII
Company: Seven Development, LLC
Title: Manager
Signature:
Date: 7/13
Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 10. Delegation of authority.
Delegation of Authority
(name), hereby designate the person or specifically described position below to be a
duly authorized representative for the purpose of overseeing compliance with environmental requirements,
including the Construction General Permit, at the construction site. The
designee is authorized to sign any reports, stormwater pollution prevention plans and all other documents
required by the permit.
(name of person or position)
(company)
(address)
(city, state,zip)
(phone)
By signing this authorization, I confirm that I meet the requirements to make such a designation as set forth in
the Construction General Permit (CGP), and that the designee above meets the definition of a "duly
authorized representative".
Operator Name:
Company:
Title:
Signature:
Date:
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County
Section 11. General permit copy
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Albemarle County
Section 12. Inspection logs
Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Albemarle County
Commonwealth Office SWPPP Inspection Log
Inspection: Last Rainfall:
Date Time Date Rainfall Amount
Summary:
Locations of:
• Prohibited discharges
• Controls needing maintenance
• Failed controls:
• Evidence per Part II F 3 a(7):
(see back of sheet for details)
• Additional measures needed:
Corrective actions required:
Unimplemented corrective actions from previous inspection:
Inspector Signature Date Operator Signature Date
Part IIF3a (7)
(a) Concentrated flows of stormwater in conveyances such as rills, rivulets or channels that have not
been filtered, settled, or similarly treated prior to discharge, or evidence thereof;
(b) Sediment laden or turbid flows of stormwater that have not been filtered or settled to remove
sediments prior to discharge;
(c) Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that
discharge to surface waters. Inlets and catch basins with failing sediments controls due to improper
installation, lack of maintenance, or inadequate design are considered unprotected;
(d) Sediment deposition on any property (including public and private streets) outside of the
construction activity covered by this general permit;
(e) Required stabilization has not been initiated or completed on portions of the site;
(f) Sediment basins without adequate wet or dry storage volume or sediment basins that allow the
discharge of stormwater from below the surface of the wet storage portion of the basin;
(g) Sediment traps without adequate wet or dry storage or sediment traps that allow the discharge of
stormwater from below the surface of the wet storage portion of the trap; and
(h) Land disturbance outside of the approved area to be disturbed;