HomeMy WebLinkAboutWPO201700004 Review Comments WPO VSMP 2017-09-26Short Review Comments Report for: WPO201700004 SubApplication Type: Commonwealth Apartments Stormwater Management/BMP Plan Erosion and Sediment Control Plan Date Completed:03/01/2017 Reviewer:David James CDD Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:03/29/2017 Reviewer:David James CDD Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:05/22/2017 Reviewer:David James CDD Engineering Review Status:Requested Changes Reviews Comments:Emailed Justin Shimp 6/15/2017: The registration statement will need to be complete and added to the SWPPP. The project now has over an acre of land disturbance. Please have Mr. Bonner (operator) complete that part and pay associated fees. ... David James Division: Date Completed:09/06/2017 Reviewer:David James CDD Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:09/26/2017 Reviewer:David James CDD Engineering Review Status:Approved Reviews Comments:Please submit an additional (2) copies of the plans. Plans dated 1/17/17, last revised 9/11/17. Division: Page:1 of 1 County of Albemarle Printed On:April 04, 2018 SHIMpPROJECT MANAGEMENT 1 CIVIL ENGINEERING LAND PLANNING ENGI N EERI NGa September 11, 2017 David James County of Albemarle Department of Community Development 401 McIntire Road, North Wing Charlottesville, VA 22902 Regarding: RE: WPO201700004-Commonwealth Apartments Mr. James, Thank you for your review and feedback on the plans for Commonwealth Apartments. The following changes have been made in response to your comments: C. Stormwater Management Plan(SWMP) 1. Show the VRRM spreadsheet on the plan and state that the additional nutrient credits were purchased. The VRRM summary is provided on Sheet C6. The stormwater management summary section ^i'L on Sheet C2 states that the additional nutrient credits have been purchased. 5. Show pipe clearance/s in the storm profiles where they cross. The sewer location/elevations that Alex Morrison had sent us were not able to be built as shown. We have not received an updated design. I have updated the profile of the storm pipe to show the approximate location of crossing and have specified for the separation to exceed a 12"minimum. This is located on Sheet C5. 6. Show proof that the site will meet the 1% of total drainage area in your analysis. Show the site's DA and point of analysis. Name the downstream stormwater conveyance system, and its DA. WPO201400099 was previously approved showing that the site met 1% of the total drainage area. The downstream stormwater conveyance system and drainage area is now named in the stormwater narrative on Sheet C2. D. Erosion and Sediment Control Plan (ESCP) 4. Specify on plans an approved mix for graded slopes steeper than 3:1. Liriope spicata had been specified on the Site Plan Amendment, but not the VSMP. The VSMP is now updated with this specification, shown on Sheet C6. Thank you again for your time and please let us know if you have any additional questions about what is shown in this document. Best Regards, Kendrae 4s Shimp Engineering, P.C. 1 Phone (434) 296-5832 yOF A �h �'lRGSN�P COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 VSMP Permit plan review Project title: Commonwealth Apartments Project file number: WP0201700004 Plan preparer: Shimp Engineering PC Owner or rep.: Positive LLC Plan received date: January 18, 2017 March 20, 2017 July 26, 2017 Date of comments: March 1, 2017 (Rev. 1) March 29, 2017 (Rev.2) May 22, 2017 (Rev. 3) September 6, 2017 (Rev. 4) Reviewer: David James Fax (434) 972-4126 b ustin@shimp-engineering. com] [lanelbonner@gmail.com] County Code section 17-410 and Virginia Code § 62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESOP, (3) a SWMP, and (4) any TMDL measures necessary. (Rev. 1) Provide a SWPPP. Response: An updated SWPPP has been provided. This property is currently approved for grading under a different WPO plan. When the new owner beigns work on the amended plan, the SWPPP will be updated with certificaitons signed by new owner. (Rev.3) Complete the Registration Statement; Provide copy of DEQ permit when obtained; Fill out sections 8, 9 & 10. (Rev.4) Addressed. (Rev.3) Pay fee difference, see VSMP application form for fee info. (Rev.4) Addressed. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. (Rev. 1) Provide a PPP; include in SWPPP. Response: A PPP is included in the SWPPP. (Rev. 2) Acceptable. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. 1. (Rev. 1) Contact Ana Kilmer about additional (+0.28 lb) nutrient credit purchasing. Response: We will follow up with Ms. Kilmer about the contract for approval. (Rev. 2) Contact Ana Kilmer about additional (+0.34 lb) nutrient credits. (Rev. 3) Acknowledged. (Rev.4) Show the VRRM spreadsheet on the plan and state that the additional nutrient credits were purchased on the plan. 2. (Rev. 1) Provide storm sewer design, including profiles, and computations. Show drainage area maps. (Rev. 2) Your design calculations (LD -229 worksheet) do not match what's shown for the storm sewer profile details on Sheet C5. Include note: Concrete inlet shaping (IS -1) shall be provided in any drainage structure with a 4' or greater drop. Show roof drains; where do they outfall? (Rev. 3) Addressed. 3. (Rev. 1) Provide calcs/estimate that any permanent ditches/channels will meet design flow & velocity requirements. Response: Stormpipe velocity calcs are included in the SWM packet. (Rev. 2) Addressed. 4. (Rev. 1) Provide Final stabilization/Landscaping plan. If any tree/forest space protection? Response: Stabilization includes permanent seeding and low maintenance ground cover, which is indicated by a dotted hatch on sheet C6. (Rev. 2) Addressed. 5. (Rev. 3) Show pipe clearance/s in the storm profiles where they cross. (Rev. 4) Not addressed, not shown. Per email from Alex Morrison they were to be provided to you. 6. (Rev. 3) Show proof that the site will meet the I% of total drainage area in your analysis. Show the site's DA, and point of analysis. Name the downstream stormwater conveyance system, and it's DA. (Rev. 4) Not addressed; Provide on plans in SWM narrative. D. Erosion and Sediment Control Plan (ESCP) Virginia Code § 62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. (Rev. 1) Show critical slopes waiver approval on title, or narrative sheet. Response: The critical slopes waiver approval is listed on the cover sheet, under zoning information. (Rev. 2) Addressed. 2. (Rev. 1) Provide/Show Existing site conditions sheet (utilities, off-site easements, demo plan). Response: An existing conditions sheet has been added. See sheet C3. (Rev. 2) Addressed. (Rev. 1) Add IP at these (3) inlet locations: Response: Inlet protection has been added to those three locations. (Rev. 2) Partially addressed. Remove IP from center left area above, add OP there. (Rev. 3) Addressed. 4. (Rev. 1) Provide low maintenance (not grass) ground cover for graded slopes steeper than 3:1. Response: Low maintenance ground cover has been specified for slopes steeper than 3:1. See dotted hatch on sheet C6. (Rev. 2) Partially addressed. Provide a standard/approved mix in landscaping plan. (Rev. 3) Partially addressed. Callout should be for >3:1 slope areas. Include in notes the use of low maintenance groundcover as part of final stabilization, and specify approved mix in ESC plan. (Rev. 4) Approved mix not provided in plans. (Rev. 1) Provide/Show paved construction entrance with wash rack (see detail, Design manual, sect. 3). Response: The plan now calls for a paved construction entrance with a wash rack. (Rev. 2) Addressed. 6. (Rev. 1) Provide retaining wall(s) and/or slope bench(es) for the proposed steep grades (18- 30.7.5). Response: There are now two separate sections of 2:1 preserved slopes, separated by at least 8 ft of 4:1 grading. Each section is less than 20 ft of elevation change. (Rev. 2) Addressed. 7. (Rev. 1) Show proposed grading missing adjacent to building along proposed storm line. Response: The grading has been updated along the proposed storm line. (Rev. 2) Addressed. (Rev. 2) Sheet C2—Provide proof of offsite location with `approved erosion and sediment control plan'. Owner to certify that the plan will be implemented in accordance with applicable VESCP regulations. (Sec. 17-304 D.) (Rev. 3) Not addressed. (Rev. 4) Addressed. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle.org/deptfonns.asp?department=cdenMo PROJECT MANAGEMENT sHimp k CIVIL ENGINEERING LAND PLANNING ENGINEERING April 27, 2017 David James County of Albemarle Department of Community Development 401 McIntire Road, North Wing Charlottesville,VA 22902 Regarding: RE: WPO201700004-Commonwealth Apartments-Minor Site Plan Amendment Mr. James, Thank you for your review and feedback on the plans for Commonwealth Apartments. The following changes have been made in response to your comments: 1. Now that all comments have been addressed, we will contact Ana Kilmer about the nutrient credit requirements. 2. Thank you for catching that mistake, I have now updated the LD-229 table to match the storm pipe profile. The note has been included on the profile. Roof drains are now shown on the plans (C4), and the pipe calculations have been updated to include the runoff from the entire building in the second pipe. D. Erosion and Sediment Control Plan (ESCP) 3. The location you have mentioned is an inlet. The pipe is extremely deep and flows from north to south. 4. We have now called for Liriope spicata to be planted as low maintenance ground cover. 8. The location has not yet been decided. Thank you again for your time and please let us know if you have any additional questions about what is shown in this document. Best Regards, 449-kdLN9v2/90,4_ •C4 Kendra Patrick Shimp Engineering, P.C. 1 Phone (434) 296-5832 yOF A �h �'lRGSN�P COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 VSMP Permit plan review Project title: Commonwealth Apartments Project file number: WP0201700004 Plan preparer: Owner or rep.: Plan received date: Date of comments: Reviewer: Shimp Engineering PC Positive LLC January 18, 2017 March 20, 2017 March 1, 2017 (Rev. 1) March 29, 2017 (Rev.2) May 22, 2017 (Rev. 3) David James Fax(434)972-4126 b ustin@shimp-engineering. com] [lanelbonner@gmail.com] County Code section 17-410 and Virginia Code § 62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESOP, (3) a SWMP, and (4) any TMDL measures necessary. (Rev. 1) Provide a SWPPP. Response: An updated SWPPP has been provided. This property is currently approved for grading under a different WPO plan. When the new owner beigns work on the amended plan, the SWPPP will be updated with certificaitons signed by new owner. (Rev.3) Complete the Registration Statement; Provide copy of DEQ permit when obtained; Fill out sections 8, 9 & 10. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. (Rev. 1) Provide a PPP; include in SWPPP. Response: A PPP is included in the SWPPP. (Rev. 2) Acceptable. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. 1. (Rev. 1) Contact Ana Kilmer about additional (+0.28 lb) nutrient credit purchasing. Response: We will follow up with Ms. Kilmer about the contract for approval. (Rev. 2) Contact Ana Kilmer about additional (+0.34 lb) nutrient credits. (Rev. 3) Acknowledged. 2. (Rev. 1) Provide storm sewer design, including profiles, and computations. Show drainage area maps. (Rev. 2) Your design calculations (LD -229 worksheet) do not match what's shown for the storm sewer profile details on Sheet C5. Include note: Concrete inlet shaping (IS -1) shall be provided in any drainage structure with a 4' or greater drop. Show roof drains; where do they outfall? (Rev. 3) Addressed. 3. (Rev. 1) Provide calcs/estimate that any permanent ditches/channels will meet design flow & velocity requirements. Response: Stormpipe velocity calcs are included in the SWM packet. (Rev. 2) Addressed. 4. (Rev. 1) Provide Final stabilization/Landscaping plan. If any tree/forest space protection? Response: Stabilization includes permanent seeding and low maintenance ground cover, which is indicated by a dotted hatch on sheet C6. (Rev. 2) Addressed. 5. (Rev. 3) Show pipe clearance/s in the storm profiles where they cross. 6. (Rev. 3) Show proof that the site will meet the 1% of total drainage area in your analysis. Show the site's DA, and point of analysis. Name the downstream stormwater conveyance system, and it's DA. D. Erosion and Sediment Control Plan (ESOP) Virginia Code § 62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. (Rev. 1) Show critical slopes waiver approval on title, or narrative sheet. Response: The critical slopes waiver approval is listed on the cover sheet, under zoning information. (Rev. 2) Addressed. 2. (Rev. 1) Provide/Show Existing site conditions sheet (utilities, off-site easements, demo plan). Response: An existing conditions sheet has been added. See sheet C3. (Rev. 2) Addressed. 3. (Rev. 1) Add IP at these (3) inlet locations: Response: Inlet protection has been added to those three locations. (Rev. 2) Partially addressed. Remove IP from center left area above, add OP there. (Rev. 3) Addressed. 4. (Rev. 1) Provide low maintenance (not grass) ground cover for graded slopes steeper than 3:1. Response: Low maintenance ground cover has been specified for slopes steeper than 3:1. See dotted hatch on sheet C6. (Rev. 2) Partially addressed. Provide a standard/approved mix in landscaping plan. (Rev. 3) Partially addressed. Callout should be for >3:1 slope areas. Include in notes the use of low maintenance groundcover as part of final stabilization, and specify approved mix in ESC plan. (Rev. 1) Provide/Show paved construction entrance with wash rack (see detail, Design manual, sect. 3). Response: The plan now calls for a paved construction entrance with a wash rack. (Rev. 2) Addressed. 6. (Rev. 1) Provide retaining wall(s) and/or slope bench(es) for the proposed steep grades (18- 30.7.5). Response: There are now two separate sections of 2:1 preserved slopes, separated by at least 8 ft of 4:1 grading. Each section is less than 20 ft of elevation change. (Rev. 2) Addressed. 7. (Rev. 1) Show proposed grading missing adjacent to building along proposed storm line. Response: The grading has been updated along the proposed storm line. (Rev. 2) Addressed. 8. (Rev. 2) Sheet C2—Provide proof of offsite location with `approved erosion and sediment control plan'. Owner to certify that the plan will be implemented in accordance with applicable VESCP regulations. (Sec. 17-304 D.) (Rev. 3) Not addressed. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle.org/deptfon-ns.asp?department=cdengmTo Phone (434) 296-5832 yOF A �'lR�SN�P COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 VSMP Permit plan review Project title: Commonwealth Apartments Project file number: WP0201700004 Plan preparer: Owner or rep.: Plan received date: Date of comments: Reviewer: Shimp Engineering PC Positive LLC January 18, 2017 March 20, 2017 March 1, 2017 (Rev. 1) March 29, 2017 (Rev.2) David James Fax (434) 972-4126 U ustin@shimp-engineering. com] [lanelbonner@gmail.com] County Code section 17-410 and Virginia Code § 62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. (Rev. 1) Provide a SWPPP. Response: An updated SWPPP has been provided. This property is currently approved for grading under a different WPO plan. When the new owner beigns work on the amended plan, the SWPPP will be updated with certificaitons signed by new owner. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. (Rev. 1) Provide a PPP; include in SWPPP. Response: A PPP is included in the SWPPP. (Rev. 2) Acceptable. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. 1. (Rev. 1) Contact Ana Kilmer about additional (+0.28 lb) nutrient credit purchasing. Response: We will follow up with Ms. Kilmer about the contract for approval. (Rev. 2) Contact Ana Kilmer about additional (+0.34 lb) nutrient credits. 2. (Rev. 1) Provide storm sewer design, including profiles, and computations. Show drainage area maps. Response: A stormpipe profile is now included in the VSMP on sheet C4. Calcs and drainage area maps are included in the SWM packet. (Rev. 2) Your design calculations (LD -229 worksheet) do not match what's shown for the storm sewer profile details on Sheet C5. Include note: Concrete inlet shaping (IS -1) shall be provided in any drainage structure with a 4' or greater drop. Show roof drains; where do they outfall? 3. (Rev. 1) Provide calcs/estimate that any permanent ditches/channels will meet design flow & velocity requirements. Response: Stormpipe velocity calcs are included in the SWM packet. (Rev. 2) Addressed. 4. (Rev. 1) Provide Final stabilization/Landscaping plan. If any tree/forest space protection? Response: Stabilization includes permanent seeding and low maintenance ground cover, which is indicated by a dotted hatch on sheet C6. (Rev. 2) Addressed. D. Erosion and Sediment Control Plan (ESCP) Virginia Code § 62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. (Rev. 1) Show critical slopes waiver approval on title, or narrative sheet. Response: The critical slopes waiver approval is listed on the cover sheet, under zoning information. (Rev. 2) Addressed. 2. (Rev. 1) Provide/Show Existing site conditions sheet (utilities, off-site easements, demo plan). Response: An existing conditions sheet has been added. See sheet C3. (Rev. 2) Addressed. 3. (Rev. 1) Add IP at these (3) inlet locations: Response: Inlet protection has been added to those three locations. (Rev. 2) Partially addressed. Remove IP from center left area above, add OP there. 4. (Rev. 1) Provide low maintenance (not grass) ground cover for graded slopes steeper than 3:1. Response: Low maintenance ground cover has been specified for slopes steeper than 3:1. See dotted hatch on sheet C6. (Rev. 2) Partially addressed. Provide a standard/approved mix in landscaping plan. 5. (Rev. 1) Provide/Show paved construction entrance with wash rack (see detail, Design manual, sect. 3). Response: The plan now calls for a paved construction entrance with a wash rack. (Rev. 2) Addressed. 6. (Rev. 1) Provide retaining wall(s) and/or slope bench(es) for the proposed steep grades (18- 30.7.5). Response: There are now two separate sections of 2:1 preserved slopes, separated by at least 8 ft of 4:1 grading. Each section is less than 20 ft of elevation change. (Rev. 2) Addressed. 7. (Rev. 1) Show proposed grading missing adjacent to building along proposed storm line. Response: The grading has been updated along the proposed storm line. (Rev. 2) Addressed. 8. (Rev. 2) Sheet C2—Provide proof of offsite location with `approved erosion and sediment control plan'. Owner to certify that the plan will be implemented in accordance with applicable VESCP regulations. (Sec. 17-304 D.) The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle.or /g deptforms.asp?department=cdeng"oo PROJECT MANAGEMENT sHimp k CIVIL ENGINEERING 111 LAND PLANNING ENGINEERINGa March 17,2017 David James County of Albemarle Department of Community Development 401 McIntire Road, North Wing Charlottesville, VA 22902 Regarding: RE: WP0201700004-Commonwealth Apartments-Minor Site Plan Amendment Mr. James, Thank you for your review and feedback on the plans for Commonwealth Apartments. The following changes have been made in response to your comments: A. Stormwater Pollution Prevention Plan (SWPPP) 1. An updated SWPPP has been provided. This property is currently approved for grading under a different WPO plan. When the new owner begins work on the amended plan, the SWPPP will be updated with certifications signed by the new owner. B. Pollution Prevention Plan (PPP) 1.A PPP is included in the SWPPP. C. Stormwater Management Plan(SWMP) 1. We will follow up with Ms. Kilmer about the contract for approval. 2. A stormpipe profile is now included in the VSMP on sheet C4. Calculations and drainage area maps are included in the SWM packet. 3. Stormpipe velocity calculations are included in the SWM packet. 4. Stabilization includes permanent seeding and low maintenance ground cover, which is indicated by a dotted hatch on sheet C6. D. Erosion and Sediment Control Plan (ESCP) 1. The critical slopes waiver approval is listed on the cover sheet, under zoning information. 2.An existing conditions sheet has been added. See sheet C3. 3. Inlet protection has been added to those three locations. 4. Low maintenance ground cover has been specified for slopes steeper than 3:1. See dotted hatch on sheet C6. 5. The plan now calls for a paved construction entrance with a wash rack. 6. There are now two separate sections of 2:1 preserved slopes, separated by at least 8 ft of 4:1 grading. Each section is less than 20 ft of elevation change. 7. The grading has been updated along the proposed storm line. Thank you again for your time and please let us know if you have any additional questions about what is shown in this document. Best Regards, Kendra Patrick Shimp Engineering, P.C. 1 Phone (434) 296-5832 yOF A �'lR�SN�P COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 VSMP Permit plan review Project title: Commonwealth Apartments Project file number: WP0201700004 Plan preparer: Owner or rep.: Plan received date: Date of comments: Reviewer: Shimp Engineering PC Positive LLC January 18, 2017 March 1, 2017 David James Fax (434) 972-4126 U ustin@shimp-engineering. com] [lanelbonner@gmail.com] County Code section 17-410 and Virginia Code § 62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Provide a SWPPP. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. Provide a PPP; include in SWPPP. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. 1. Contact Ana Kilmer about additional (+0.28 lb) nutrient credit purchasing. 2. Provide storm sewer design, including profiles, and computations. Show drainage area maps. 3. Provide calcs/estimate that any permanent ditches/channels will meet design flow & velocity requirements. 4. Provide Final stabilization/Landscaping plan. If any tree/forest space protection? D. Erosion and Sediment Control Plan (ESCP) Virginia Code § 62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. Show critical slopes waiver approval on title, or narrative sheet. 2. Provide/Show Existing site conditions sheet (utilities, off-site easements, demo plan). 3. Add IP at these (3) inlet locations: 4. 5. 6. 7. Provide low maintenance (not grass) ground cover for graded slopes steeper than 3:1. Provide/Show paved construction entrance with wash rack (see detail, Design manual, sect. 3). Provide retaining wall(s) and/or slope bench(es) for the proposed steep grades (18-30.7.5). Show proposed grading missing adjacent to building along proposed storm line. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; hllp://www.albemarle.orWdeptfon-ns.asp?department=cdengmTo