HomeMy WebLinkAboutZMA201800003 Review Comments Zoning Map Amendment 2018-03-30Megan Nedostup
From: Richard Nelson <rnelson@serviceauthority.org>
Sent: Friday, March 30, 2018 3:04 PM
To: Megan Nedostup
Cc: Alex Morrison
Subject: ZMA201800003 Southwood Phase 1
Attachments: Southwood_WaterandSewer_Capacity_03292018.pdf
Megan,
I recommend approval for ZMA201800003 Southwood Phase 1. Below are comments that will need to be addressed
before final site plan approval for each phase.
• Water and Sewer Construction Plan Review will be required at the final site plan stage.
• RWSA Capacity Certification may be required.
• Southwood existing public water/sewer connection abandonment and relocation tracking will be required with
each site plan.
• A memorandum of understanding for tracking existing water/sewer capacity to be used in the redevelopment
will be required.
Attached is a draft memo regarding Southwood.
Thanks,
Richard Nelson
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(434) 977-4511
1