Loading...
HomeMy WebLinkAboutZMA201800003 Review Comments Zoning Map Amendment 2018-03-30Megan Nedostup From: Richard Nelson <rnelson@serviceauthority.org> Sent: Friday, March 30, 2018 3:04 PM To: Megan Nedostup Cc: Alex Morrison Subject: ZMA201800003 Southwood Phase 1 Attachments: Southwood_WaterandSewer_Capacity_03292018.pdf Megan, I recommend approval for ZMA201800003 Southwood Phase 1. Below are comments that will need to be addressed before final site plan approval for each phase. • Water and Sewer Construction Plan Review will be required at the final site plan stage. • RWSA Capacity Certification may be required. • Southwood existing public water/sewer connection abandonment and relocation tracking will be required with each site plan. • A memorandum of understanding for tracking existing water/sewer capacity to be used in the redevelopment will be required. Attached is a draft memo regarding Southwood. Thanks, Richard Nelson Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434) 977-4511 1