HomeMy WebLinkAboutWPO201300076 Application 2013-12-11 0pment
Albemarle Com y 401 IVl_.4 Community ei itire Road Charlottesville,e,VA 2D2902-4596
epartment
Planning Applicat1011 Voice:(434)296-5832 Fax:(434)972-4126
(PARCEL/OWNER INFORMATION
TMP 056A2-01-00-02000 Owner(s):
Application # WP0201300076 ALEXANDER, MICHAEL B
PROPERTY INFORMATION
Legal Description ACREAGE
Magisterial Dist. White Hall Land Use Primary Public
Current AFD Not in A/F District Current Zoning Primary Downtown Crozet District
APPLICATION INFORMATION
Street Address A 1205 CROZET AVE CROZET, 22932 Entered By
Application Type Water Protection Ordinances Todd Shifflett
12/11/2013
Project Downtown Crozet Streetscape Project- Phase 2
Received Date 12/09/13 Received Date Final Submittal Date Total Fees
Closing File Date Submittal Date Final Total Paid
Revision Number
Comments
NO FEES-COUNTY PROJECT
Legal Ad
SUB APPLICATION(s)
. Sub Applicati Corn ent;,,�. ,},
x*�.. 4y d �.-kr�m4�4 . ,e8��9'>Y.°.._ �? .. .;z R„ gsa....-ii •^4%
Erosion and Sediment Control Plan
Stormwa�ter Management/B11�1P Pia
-----4,,,,,IJw--'wp.4 w•---Y wr Y w,.y✓wwwww.:. -w«a , i
{ L n t
TdT -�
(APPLICANT/CONTACT INFORMATION
ContactType Name; a Address „Ci „tate f..6, Zip Phone PhoneCell
bwnu«»{Ap..►cn.t ; LEXANDERMSCHAEL.B «.»». 2109MO«RRIS«. AD » iCLTTESVLL..'~2 903 7
..»^� » .» «x« uu «» ».«w»««» :g. ' ,......,« « . .0»«« uau5.»« u ».:.0 u»»«»u ».,.0»,.,.,u«
»kuuuu
»vuuu»«„.. u«..««i»».««»k«ri«mary Contact FRANK PO«««, R. PROJECT MA-WAGER
x«
5.
u y
Signature of Contractor or Authorized Agent Date
A kation for Review of ` ""
Erosion & Sediment Controi'Plan & Stormwater Managemen3MP Plan &
Stream Buffer Mitigation Plan
AtErosion & Sediment Control Plan XStormwater Management/BMP Plan 0 Stream Buffer Mitigation Plan
❑ &S Plan Amendment 0 SWM Plan Amendment
(Previous Plan# ) (Previous Plan# )
❑ E&S Plan with Variance 0 Request for Exception
#of Variances 0 SWM Plan Resubmittal
❑ E&S Plan Resubmittal WPO Application#
WPO Application#
Submit 2 copies each of applicable plans/narrative/computations
*When a WPO plan is reviewed,but not approved,and a response to comments is not received within 6 months from the date of
county comments,the application will be deemed withdrawn.
Project Name: DOWNTOWN CROZET STREETSCAPE PROJECT- PHASE 2
Tax map and parcel: N/A Zoning: N/A
Amount of Land Disturbance: 1.5 Acres
Location of property(landmarks,intersections,or other): CROZET AVENUE BETWEEN TABOR STREET AND THE
SQUARE, CROZET, VIRGINIA
Contact Person(Who should we call/write concerning this project?): FRANK POHL, SR. PROJECT MANAGER (EXT. 7914)
Address OFFICE OF FACILITIES DEVELOPMENT City State Zip
Daytime Phone( ) Fax#( ) E-mail fpohl@albemarle.org
Owner of Record VDOT RIGHT-OF-WAY C/O TROY AUSTIN, P.E.
Address CULPEPPER DISTRICT City State Zip
Daytime Phone( 434-589-5871 Fax#( ) E-mail NATHRAN.AUSTIN@VDOT.VIRGINIA.GOV
Contractor LINGO, INC.
Address 7 ELLIS LANE City LYNDHURST State VA Zip 22952
Daytime Phone(540-949-0370 Fax#( ) E-mail LINCOINC@COMCAST.NET
Plan Preparer KIMLEY-HORN AND ASSOCIATES, INC. C/O BRIAN A. MCPETERS, P.E.
Address 1700 WILLOW LAWN DR., SUITE 200 City RICHMOND State VA Zip 23230
Daytime Phone( 804-673-3882 Fax#( 804-673-3980 E-mail BRIAN.MCPETERS@KIMLEY-HORN.COM
Owner/Applicant Must Read and Sign
By signing this application as owner,I hereby certify that all requirements of the approved Erosion Control Plan,Stormwater
Management/BMP Plan,and/o/Mitigation Plan will be complied with and I have the authority to authorize the land disturbing activities and
devK.
elop ent on the subject pr!�erty. I hereb grant the County of Albemarle the right to enter upon the property as required to ensure
com l " ce with tiLelitAh a r e% p a /
11 3
Sin urof '
Sign e Owner, t P chaser � Date
,....,0444... �,Contra
Print Name Daytime phone number of Signatory
FOR OFFICE USE ONLY WPO#
Fee Amount$ Date Paid By who? Receipt# Ck# By:
Revised November 14,2011 Page 1 of 3
EROSION CONTROL PLAN: (SMVIIT 2 COPIES) `400
Land disturbing activity pertaining to single family dwelling unit:
1. Plan Review $150 per review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
2 Permit and First Year Inspection Fees $150
(TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION
CONTROL PERMIT)
3. Annual Permit Renewal and Inspection Fees $150
(TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED
PLAN REQUIREMENTS)
4. Each reinspection $150
(REINSPECTION FEES ARE INVOICED TO THE LANDOWNER)
Land disturbing activity pertaining to non-exempt agricultural land:
5. Plan Review $150 per review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
6. Permit and First Year Inspection Fees $150
(TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION
CONTROL PERMIT)
7. Annual Permit Renewal and Inspection Fees $150
(TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED
PLAN REQUIREMENTS)
8. Each reinspection $150
(REINSPECTION FEES ARE INVOICED TO THE LANDOWNER)
All other land disturbing activity:
9. Plan Review,Disturbed Area Less Than One Acre $150 per review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
10. Permit and First Year Inspection Fees, Disturbed Area Less Than One Acre $200
(TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION
CONTROL PERMIT)
11. Annual Permit Renewal and Inspection Fees,Disturbed Area Less Than One Acre $200
(TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED
PLAN REQUIREMENTS)
12. Plan Review,Disturbed Area One Acre or Larger p39D per review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
13. Permit and First Year Inspection Fees, Disturbed Area One Acre or Larger $100/per disturbed acre
(TO BE PAID PRIOR TO SCHEDULING PRECONSTRUCTION CONFERENCE FOR EROSION
CONTROL PERMIT)
14. Annual Permit Renewal and Inspection Fees,Disturbed Area One Acre or Larger $100/per disturbed acre
(TO BE PAID ANNUALLY,STARTING WITH SECOND YEAR,UNTIL COMPLETION OF APPROVED
PLAN REQUIREMENTS)
15. Each reinspection $250
(REINSPECTION FEES ARE INVOICED TO THE LANDOWNER)
16. Amendment to Approved Plan $180/per plan review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
17. Variances $150/per request
(TO BE PAID AT TIME OF APPLICATION)
18. SUBTOTAL EROSION CONTROL PLAN $
Revised November 14,2011 Page 2 of 3
Sore .**asel
STORMWATER MANAGEMENT/BMP PLAN & MITIGATION PLAN: (SUBMIT 2 COPIES)
19. Stormwater Management/BMP Plan.
... '''o"'`rer plan review N U
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
20. Major Amendment of Plan $180/per plan review
(TO BE PAID AT TIME OF APPLICATION AND EACH SUBMITTAL THEREAFTER UNTIL APPROVAL)
21. Request for exception $240
(TO BE PAID AT TIME OF APPLICATION)
22. Request for development in a stream buffer or for reduction or modification of stream
buffer and mitigation plan(if not part of another document)—Single family dwelling unit
or accessory structure $85
(TO BE PAID AT TIME OF APPLICATION)
23. Each inspection or reinspection $60
(INSPECTION/REINSPECTION FEES ARE INVOICED TO THE LANDOWNER)
24. Mitigation Plan $150
(TO BE PAID AT TIME OF APPLICATION) 7
M 44.7—°25. SUBTOTAL SWM/BP PLAN $ C/
(.4Q
TOTAL APPLICATION FEE: (Add lines 18 and 25) $
THE OWNER SHALL BE RESPONSIBLE FOR ALL REINSPECTION AND/OR ANNUAL RENEWAL
FEES WHICH MAY BE CHARGED TO THIS PROJECT.
Revised November 14,2011 Page 3 of 3
*Is "vet4,0v A(g�ty
r�Rc;tN�r
Erosion & Sediment Control
Preconstruction Conference Checklist
bio zSPef �, Z
Name of Plan: j
Plan No.: 2 13-a 76
Date: 2.5- r /y
1) Copies of approved plan given to: Owner or Authorized Agent Contractor
2) Have all the conditions been met?
3) Responsible Land Disturber: 6y
Cert./Lic.No.: 7/ / Type: R(0
Address/ Phone/ Mobil Phone: 7 C7/15 z n^Q, 1�✓c,, 740,6a,t,, (,/A -z)... gv
�y0 9q 03
1,
4) Name of Prime Contractor: L-'^'i C
Address/ Phone/Mobil Phone: .5 ,/v►e As''Qve
Name of Subcontractor:
5) Persons in Attendance:
Name Firm
inaid 1491b y
C``y W1/( � L y°AGv
(6) Date Permit Issued: S ��
(7) Notification has been given that the wner/contactor is responsible for obtaining a VSMP permit
from DCR. DCR has requested the County to check for the site posting.
(8) Article II, section 17-207
B. Each permit shall also be subject to the following:
1. The permitted land disturbing activity shall be deemed to have commenced on the
date the permit was issued, provided that the program authority may establish another date of commencement
I of2
Revised 11/29/2011
� t
based on dmentation submitted by the owner that rly demonstrates that the land
disturbing activity commenced on'that date.
2. Permanent vegetation shall be installed on all denuded areas within nine (9)
months after the date the land disturbing activity commenced, except for areas that the program authority
finds are necessary parts of the construction that are subject to an active building permit and areas where
erosion is prevented by a non-erosive surface. For the purposes of this section, a "non-erosive surface"
includes, but is not limited to, roadways and sidewalks covered by gravel, asphalt pavement, or concrete;
trails or paths covered by gravel, stone dust, or mulch; buildings and other permanent structures; and such
other surfaces that the program authority determines would adequately provide a permanent barrier to erosion.
3. The time limit for installing permanent vegetation as required by paragraph (B)(2) may
be extended by either the program authority or the board of supervisors, or both, as follows:
a. The program authority may extend the time limit for installing permanent
vegetation up to an additional six (6) months, provided the owner submits a written request to the program
authority no less than one (1) month prior to the deadline for installing the permanent vegetation. The program
authority may grant the extension if it finds that: (i) the additional time is necessary due to factors beyond the
control of the owner; (ii) the owner had made good faith efforts to comply with the time limit; and (iii) the owner
has effectively controlled erosion and sedimentation on the property during the land disturbing activity. In
granting an extension, the program authority may impose reasonable conditions.
b. The board of supervisors may extend the time limit for installing permanent
vegetation for duration it determines to be appropriate, provided the owner submits a written request to the
clerk of the board of supervisors no less than two (2) months prior to the deadline for installing the permanent
vegetation. The program authority shall provide its opinion to the board as to the condition of the property with
respect to compliance with this chapter and an estimate of the minimum time needed to complete grading and
install permanent vegetation for the land disturbance covered by this permit. The board may grant the
extension if it finds that: (i) the additional time is necessary due to factors beyond the control of the owner; (ii)
the owner had made good faith efforts to comply with the time limit; and (iii) the owner has plans to effectively
control or has effectively controlled erosion and sedimentation on the property during the land disturbing
activity. In granting an extension, the board shall set a time limit and may impose other reasonable conditions.
«.
Notes: _ 1 I
2 oft
Revised 11/29/2011
I:\DEPT\Community Development\Forms\Inspections\Erosion Preconstruction Conf Checklist 1129 201 I.doc