Loading...
HomeMy WebLinkAboutSDP201800007 Review Comments Appeal to BOS 2018-04-16COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper. Virginia 22701 Stephen C. Brich, P.E. Commissioner April 12, 2018 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Christopher Perez Re: North Pointe Northwest -- Initial Site Plan SDP -2018-00007 Review #1 Rev. #1 Dear Mr. Perez: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Collins Engineering, dated 20 February 2018, and offers the following comments: I. Upon attempting to verify required licensure it seems that the firm Collin Engineering, Inc. is not registered appropriately with the APELSCIDLA Board. The plans will not be approved until this is resolved. 2. Please extend the median farther from Route 29 to close the gap. The existing access easement to parcel 32-22K1 does not meet corner clearance requirements along the proposed alignment of Lewis & Clark Drive; therefore, allowing a full access entrance for it is not a requirement. If discussions with the adjoining property owner occur, the Department's recommendation would be for them to connect somewhere through the proposed development where the parcel can have full access. 3. Additionally, regardless of the existing easement, installation of an entrance here will require review by VDOT and a permit (depending on the acceptance status of the roads). 4. The Route 29 Improvements Plan (SUB201600196) for the entrance of this site, which must be approved in conjunction with this plan, has not been approved. 5. The minimum horizontal radius in the GS -7 design standards is based on a super - elevation of the street. Is that the intent and, if so, is there enough distance to return to normal elevation before the Route 29 entrance? If the street is not super -elevated, the minimum radius is 335' per the GS-SSAR. 6. Sheet 6 has a callout for GR -2 flush with face of curb along Lewis & Clark Drive. Are guardrails warranted here? Also note that the guardrail at the Route 29 entrance crosses the sidewalk. 7. Why is there a break in the median between Route 29 and Aldrich Lane? 8. A temporary turnaround is required at the end of Lewis & Clark Drive. See Appendix F of the Road Design Manual for turnaround design standards, or acceptance will end at the Aldrich Terrace intersection. VirginiaDOT.org WE KEEP VIRGINIA MOVING April 12, 2018 Christopher Perez Page 2 9. Where transit buses will be present, the minimum bike lane width is S feet. 10. There is a curb inlet in the bus pullout that needs to be shifted to the curb. If further information is desired, please contact Justin Deel at 434-422-9894. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, OAX , q47'f."" Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING Stephen C. Brich, P.E. Commissioner COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper. Virginia 22701 March 30, 2018 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Christopher Perez Re: North Pointe Northwest — Initial Site Plan SDP -2018-00007 Review #1 Dear Mr. Perez: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Collins Engineering, dated 20 February 2018, and offers the following comments: 1. The Route 29 Improvements Plan (SUB201600196) for the entrance of this site, which must be approved in conjunction with this plan, has not been approved. 2. The minimum horizontal radius in the GS -7 design standards is based on a super - elevation of the street. Is that the intent and, if so, is there enough distance to return to normal elevation before the Route 29 entrance? If the street is not super -elevated, the minimum radius is 335' per the GS-SSAR. 3. Sheet 6 has a callout for GR -2 flush with face of curb along Lewis & Clark Drive. Are guardrails warranted here? Also note that the guardrail at the Route 29 entrance crosses the sidewalk. 4. Why is there a break in the median between Route 29 and Aldrich Lane? 5. A temporary turnaround is required at the end of Lewis & Clark Drive. See Appendix F of the Road Design Manual for turnaround design standards, or acceptance will end at the Aldrich Terrace intersection. 6. Where transit buses will be present, the minimum bike lane width is 5 feet. 7. There is a curb inlet in the bus pullout that needs to be shifted to the curb. If further information is desired, please contact Justin Deel at 434-422-9894. VirginiaDOT.org WE KEEP VIRGINIA MOVING March 34, 2018 Christopher Perez Page 2 A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, � ��.lvl!✓oL Ute" Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING Christopher Perez From: Richard Nelson <rnelson@serviceauthority.org> Sent: Thursday, March 15, 2018 4:00 PM To: Christopher Perez Cc: Alex Morrison Subject: SDP201800007 - North Pointe - Initial Chris, I recommend approval for SDP201800007 - North Pointe — Initial. Three (3) copies of the site plan will need to be submitted to ACSA for water and sewer construction review, as well as RWSA sewer capacity approval, prior to final site plan approval. Thanks, Richard Nelson Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434) 977-4511