Loading...
HomeMy WebLinkAboutSDP201800014 Review Comments Initial Site Plan 2018-04-27COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper. Virginia 22701 Stephen C. Brich, P.E. Commissioner April 27, 2018 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Cameron Langille Re: Brookhill Section 1 Block 4B — Initial Site Plan SDP-2018-00014 Review #1 Dear Mr. Langille: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Bohler Engineering, dated 5 March 2018, and offers the following comments: I . The entrance on Stella Lane does not quite meet the minimum spacing requirements to the roundabout (225') 2. The final site plan must also show conformance with the VDOT Road Design Manual Appendices B(1) and F, as well as any other applicable standards, regulations or other requirements. If further information is desired, please contact Justin Dee] at 434-422-9894. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING