HomeMy WebLinkAboutARB201700137 Review Comments Architectural Review Board Approval 2018-05-02 (2)Margaret Maliszewski
From:
Sent:
To:
Subject:
Attachments:
Good afternoon, Luke.
Margaret Maliszewski
Wednesday, May 02, 2018 2:30 PM
'Luke Waldron'
North Pointe landscaping
resubmittal sheet.docx
I've reviewed North Pointe landscape plan sheets L1.00 and L1.01 revised 4/18/18. Revisions in these drawings resolve
the issues outlined in my April 2, 2018 email, with the following exceptions:
1. I've noted a few discrepancies between plant labels and numbers in red in the two screen shots copied below.
These items should be resolved, and the plant schedule updated accordingly. (I apologize if I've miscounted or if
I'm just not seeing all the plant symbols. Just let me know if that's the case.)
2. I said that I would get back to you and Brian regarding the level of detail needed for the landscaping along the full
length of the frontage. We will need sufficient detail to show that the proffer is being met — that there is a 40'
buffer with existing trees/shrubs. It will need to include enough detail for the ARB to see that the quantity, size,
and character of the existing wooded area establishes an appropriate buffer for the corridor. Depending on what is
existing, this may not require identification of every tree, but it will require identification of some — or many —
trees. I'll repeat this information in an email to Brian and I'll copy you on it.
Please provide one set of revised drawings addressing comment #1. A "Revised Application Submittal" form is attached.
Thanks.
Margaret
�131 JV —
24rV
f ii; GY
1
26W 39iR
"*-*r.renrrirs
Y.
WORTH POINTE
- PtAN'T 5CHEQUcE
i
of r
i
wi
r.27
�•� .y"� �� - Ill G{:
1
Margaret Maliszewski, Chief of Planning/Resource Management
Albemarle County Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 x3276
mmaliszewski@albemarle.org