Loading...
HomeMy WebLinkAboutSUB201700199 Review Comments Road Plan and Comps. 2018-05-04COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Road and Drainage Plan Review Project title: Foothill Crossing Connector Road Project file number: SUB-2017-00199 Plan preparer: Collins Engineering [scott@collins-engineering.com] Owner or rep.: Foothill Crossing, Inc. Plan received date: 16 November 2017 (Rev. 1) 6 March 2018 Date of comments: 11 January 2018 (Rev. 1) 4 May 2018 Reviewers: Matt Wentland Scott, We have reviewed the plans and have the following comments: Engineering 1. The WPO submittal will need to be approved prior to road plan approval. Planning — Rachel Falkenstein 1. [ZMA2016-05] Street trees should be located between the sidewalk and roadway 2. [ZMA2016-05] Provide a more legible detail showing the greenway tunnel specifications. Tunnel specifications need to be approved by Parks & Rec staff prior to road plan approval. Fire Rescue — Shawn Maddox 1. Fire Rescue has no objections to the plans as submitted. Please provide fire flow test results prior to final acceptance. Thank you for addressing previous comments. Comments have not yet been received from the ACSA or VDOT. E911 had no objection. File: SUB201700199 Foothill Crossing Connector Road Review Comments revl 05-04-18.doc