HomeMy WebLinkAboutSUB201700199 Review Comments Road Plan and Comps. 2018-05-04COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
Road and Drainage Plan Review
Project title: Foothill Crossing Connector Road
Project file number: SUB-2017-00199
Plan preparer:
Collins Engineering [scott@collins-engineering.com]
Owner or rep.:
Foothill Crossing, Inc.
Plan received date:
16 November 2017
(Rev. 1)
6 March 2018
Date of comments:
11 January 2018
(Rev. 1)
4 May 2018
Reviewers:
Matt Wentland
Scott,
We have reviewed the plans and have the following comments:
Engineering
1. The WPO submittal will need to be approved prior to road plan approval.
Planning — Rachel Falkenstein
1. [ZMA2016-05] Street trees should be located between the sidewalk and roadway
2. [ZMA2016-05] Provide a more legible detail showing the greenway tunnel specifications.
Tunnel specifications need to be approved by Parks & Rec staff prior to road plan
approval.
Fire Rescue — Shawn Maddox
1. Fire Rescue has no objections to the plans as submitted. Please provide fire flow test results prior
to final acceptance. Thank you for addressing previous comments.
Comments have not yet been received from the ACSA or VDOT. E911 had no objection.
File: SUB201700199 Foothill Crossing Connector Road Review Comments revl 05-04-18.doc