Loading...
HomeMy WebLinkAboutFDP201800006 Plan - Approved Floodplain Development Permit 2018-05-02LEGEND EMERGENCY SPILLWAY IBM OF GRADING (ALSOOEXTENT & SCOPE ��• �•� DUE TO LEAK IN DAM, BENTONITE COULD BE TILLED INTO UPSTREAM FACE OF DAM \ WIRE SILT FENCE SUPPORTSD S X X X SII.T FENCE SF x x x OUTLET PROTECTIONOP _ Q) Er W PPSOILING ST SEEDING HULCENG TO & PS & TOP OF DAM TREE PROTECTION[ GENERAL EROSION AND SEDIMENT CONTROL NOTES 1. OULE MTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN 6" SOLID P.V.C. PIPE (TYP.) THE QUANTITIES OF MATERIAL WILL BE ESTIMATED ON THE GIVEN DIMENTIONS. THE FINAL COST WILL BE BASED ON THE ACTUAL QUANTITIES USED. 3. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 4. ALL DISTURBING AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 5. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 6. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF - PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 7. THIS PLAN IS PROVIDED FOR THE IMPLEMENTATION OF EROSION AND SEDIMENT CONTROL MEASURES. WATER SURFACE ELEV. CROSS-SECTION d I' —1 430 428 426 424 422 420 418 416 14 REVISIONS W-11fo-Inka mil PROPOSED" NEW HEADWALL WITH PLASH PAD AND PRESSURE TREATED BOLLARDS SPACED WITH OPENINGS LESS THAN PIPE DIAMETERS. PROPOSED ANTI -SEEP WALL AT MID PIPE JOINTS OLD PIPES TO BE REPLACED WIHT 2 - 40.0 FT. N-12 SMOOTH WALL PIPES OF EQUIVALENT DIAMETER PIPES 436 434 32 PROPOSED NEW ENDHEADWALL NOTE: IN ORDER TO MONITOR THE SEEPAGE AT THE BASE OF THE DAM IN THE — — — 412 CIRCLE AREA, CLEARING SHALL BE 410 DONE DURING CONTRUCTION TO DETERMINE 408 TP THE SOURCE AND A REMEDY PROVIDED. 06 WILL BEENT DETERMIN DTHE ANDS AT THATETIME�UTION 6" PERFORATED P.V.C. PIPE (TYP.) 02 TP 4 TP NOTE: & PS & 3 OR 4 TREES TO BE REMOVED IN THIS AREA NOTE: THIS AREA WILL BE ALLOWED TO DRY OUT AND SLIGHTLY FILLED .,. TO DO AWAY WITH MOSQUITO BREEDING GROUND. IN ORDER TO MONITOR THE EFFLUENT, TP REA WILL BE SEEDED AND MAINTAINED. INSTALL A TYPICAL 2'X4' DISTRIBUTION BOX ON LINE. PAINT INSIDE OF BOX WHITE. x x__,,._x�_X X@X X—.x__ SF S X --�—X--"_x FRENCH DRAIN BLANKET ( SEE DETAIL) 6" OF TOPSOIL OVERLAY ( GRASS SEEDED) DISTRIBUTION BOX PLAN N.T.S. EDGE IVY CREEK LENGTH VARIES WITH PLAN VIEW 6.0" TOPSOIL SHALL BE PLACED ON TOP OF FILTER AND SEEDED 2" OF SAND OR B STONE ENCASES THE GOEOTECH MATERIAL, STONE, AND PVC PIPING ALL AROUND 57 AGGREGATE STONE WITH P.V.C. PIPING INSIDE STONE IS ENTIRELY ENCASED WITHIN GEOTECH MATERIAL p' DRAINAGE DISCHARGE TO SMALL DITCH .... TOWARD IVY CREEK \ / / 6" SOLID P.V.C. PIPE (TYP.) 6" PERFORATED P.V.C. PIPE (TYP.) DETAIL- FRENCH DRAIN BLANKET N.T.S. APPROVED y the Al arie county C (M 51 'u' �* P 0 ki p rm n t 0 �jm e nt DATE APRIL 16, 2018 PLOT SCALE ONLY 1 "=30' NiAn 'p U WU III. QDEC M Lic. No. 045649 ��I�NAL DWG. NAME 1800400 BLANKET DRAIN.DWGi Q C 4 `�" / / SHEET