HomeMy WebLinkAboutSDP201800014 Review Comments Initial Site Plan 2018-05-08Markup Summary
Architect (1)
Subject: Architect
Page Label: 1
Author: mwentland
Date: 5/3/2018 4:06:47 PM
Color: ■
Engineer (8)
AN
Subject: Engineer
Page Label: 1
1. WPO Plan must be approved before final site
L
rs,
Author: mwentland
plan can be approved.
T
Date: 5/8/2018 10:02:46 AM
2. Road Plan must be approved before final site
Color: ■
plan can be approved. Road plan must include all
roads encompassed by this site plan.
3. VDOT approval is necessary before final site
plan can be approved.
4. Ensure the correct proffers are shown on the
plan and that all elements of the plan comply with
the Code of Development as approved with ZMA
2015-007.
5. Ensure all critical slopes, buffers, etc. are
shown as approved on ZMA 2015-007.
6. Recommend additional spot elevations for
grading in the parking areas.
7. Required easements must be recorded, prior to
WPO Plan approval.
---------------------------------------------------------------------------------------------------------------------
Subject: Engineer
Page Label: 14
With final site plan, provide pavement design
° fire
Author: mwentland
based on ADT, based on VDOT pavement design
P.P. '""
No,
Date: 5/8/2018 9:02:06 AM
guide (Stella Lane /Road A)
®
Color: ■
---------------------------------------------------------------------------------------------------------------------
Subject: Engineer
\ Page Label: 10 Retaining wall height needs to follow Code of
Author: mwentland Development. COD limits appear to range 6' -8'.
Date: 5/8/2018 9:31:32 AM
!,?
Color: ■
---------------------------------------------------------------------------------------------------------------------
Subject: Engineer
Page Label: 8 Show and label preserved and managed steep
Sh—an°label pres d Author: mwentland slopes.
an° manage° sleep slopes.
Date: 5/8/2018 9:33:07 AM
Color: ■
---------------------------------------------------------------------------------------------------------------------
Subject: Engineer Page Label: 11 With final site plan, provide drainage computations
��p�atl« le.ol�a,
Author: mwentland for pipes and structures using VDOT methodology.
pn Date: 5/8/2018 9:36:32 AM
h w L Color: ■
---------------------------------------------------------------------------------------------------------------------
Subject: Engineer
labelwalkway wl°'ns, Page Label: 9 label walkway widths, since variable width
sitla°altle wi°ln sidewalks
walks
Author: mwentland
Date: 5/8/2018 9:38:38 AM
Color: 0
---------------------------------------------------------------------------------------------------------------------
Subject: Engineer
Page Label: 9 Ref. Albemarle County Design Standards Manual
T Author: mwentland (ACDSM; 27-Apr 2015), p. 17, for allowable walk
i Date: 5/8/2018 9:43:02 AM /parking space design configurations.
Color: ■
---------------------------------------------------------------------------------------------------------------------
Subject: Engineer Ensure that residential and commercial lots and
Page Label: 8
Author: mwentland associated streets resulting from subdivision of the
Date: 5/8/2018 9:43:42 AM property, with the exception of stream crossings,
Color: ■ shall be located outside of the 100' stream buffer
(SP-2015-00025, Brookhill Conditions, #2).