Loading...
HomeMy WebLinkAboutARB201800061 Action Letter 2018-05-09501 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 May 9, 2018 Scott Collins c/o Collins Engineering 200 Garrett Street, Suite K Charlottesville, VA 22902 RE: ARB201800061 Martha Jefferson Hospital Apartments Dear Mr. Collins, At its meeting on Monday, May 7, 2018, the Albemarle County Architectural Review Board unanimously voted to forward the following recommendations on the above -noted Initial Site Development Plan to the agent for the Site Review Committee: • Regarding requirements to satisfy the design guidelines as per § 18-30.6.4c(2), (3) and (5) and recommended conditions of initial plan approval: None. • Regarding recommendations on the plan as it relates to the guidelines: None. • Regarding conditions to be satisfied prior to issuance of a grading permit: 1. Clearly identify on the plan all tree preservation areas. Show how these areas will be protected. • Regarding the final site plan submittal: 1. Provide architectural plans with the Final Site Plan submittal. Consider building materials with natural earth tones to integrate the development with the surroundings. 2. Identify on the plan locations of all mechanical equipment. Show how visibility of equipment will be eliminated from the EC. 3. Add the standard mechanical equipment note to the plan: "Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated." 4. Indicate on the plan the block color proposed for the retaining walls at the stormwater management facility located at the south end of the site. A color that blends with the natural surroundings would be appropriate. 5. Provide a complete lighting plan with the final site plan submittal. 6. Provide trees, 40' on center, 2'/2" caliper at planting, along the full frontage of Peter Jefferson Parkway and along the west side of the western internal road. 7. Add a mix of trees in an irregular pattern in the open areas around the proposed trail. 8. Provide 2 additional interior parking trees at 2'/z" caliper. 9. Align all parking area perimeters with Iarge trees, 2%z" caliper at planting, 40' on center. 10. Add a mix of trees in an informal arrangement south of Building 6. 11.Provide a complete landscape plan with plant schedule in the final site plan. 19., Add the standard plant health note to the plan. "All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant." 13. C1earIy identify on the plan all tree preservation areas. Show how these areas will be protected. You may submit your application for continued ARB review at your earliest convenience. Application forms, checklists and schedules are available on-line at www.albemarle.org/ARB. Please be certain that your ARB submittal addresses the above -noted issues. If you have any questions concerning any of the above, please feel free to contact me. Sincerely, Margaret Maliszewski Chief of Planning/Resource Management cc: Riverbend Development 455 Second St. Se, Suite 400 Charlottesville, Va 22902 Martha Jefferson Hospital Attn: Tax Department 6015 Poplar Hall Drive Ste 214 Norfolk Va 23502