HomeMy WebLinkAboutWPO201800007 Approval - County 2018-05-09COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP Permit plan review Project title: Rivanna Village — Amendment 1 and Phase H Project file number: WP0201800007 Plan preparer: Scott Blossom [Scott@blossomconsulting.net] Owner or rep.: Tim Culpepper[tulpepper@robinsondevelopment.com] Plan received date: Rev 1 — December 8", 2017 Rev 2 — March 9u', 2018 Rev 3 — April 16'', 2018 Date of comments: Rev 1 — January 17`h, 2018 Rev 2 — March 27u', 2018 Rev 3 — May 9"', 2018 Reviewers: Rev 1 & Rev 2 — Bobby Jocz Rev 3 — Matt Wentland County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is approved. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Amend project title to state: "Rivanna Village — Amendment 1 and Phase H". Rev 2 — Addressed 2. Amend title sheets to state: "WPO/Stormwater Plans", "WPO/Erosion and Sediment Control Plans" and "WPO /Buffer Mitigation Plan". Rev 2 - Addressed 3. krg16L1UUUH 6LULU rrent project name should be updated to be "Rivanna Village: Phase H" Rev 2 — Addressed 4. Provide date for sourced topography. Topography should be field verified by engineer within the past year. Rev 2 — Addressed B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. No Objection Rev 2 — Acknowledged C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is approved, and the reasons are provided in the comments below. Engineering Review Comments Page 2 of 9 NOTE: All BMPs must be placed within a Stormwater Management Facility Easement with SWM maintenance agreement. Rev 2 — Acknowledged NOTE: 26.09 acres indicated as Forest/open space for VRRM spreadsheet compliance must be protected within a SWM Forest and Open Space easement. Please provide exhibit indicating areas which may already be conserved within an easement within phase I, and areas within Phase H that are to be placed under "SWM Forest and Open Space" easement for VRRM water quality compliance. Conserved areas must be platted along with deed of dedication and SWM maintenance agreement. Rev 2 — Acknowledged Proposed grading contours should be shown with a different line weight/opacity/type than existing contours. Rev 2 — Addressed Zt. _ .--1' ,1. J Vide the storage and routing calculations for each basin. This can be provided as a supplemental document digitally or in hard copy. Rev 2 — Addressed. 5. Provide elevations for 100yr, IOyr, and 2 yr WSE for each BMP. Elevations are shown on the plans, but the numerical elevation is not provided. Rev 2 — Addressed Maintenance access roads should be provided for each structural BMP with maintenance access easement. Please provide, or present more clearly, BMP maintenance access roads. Proposed access road grading should be provided. Rev 2 — Addressed [Sheet SWM-4] Notes regarding on and off site TP removal for I1 show inconsistencies between Supplemental Water Quality Compliance Documentation, Notes on Plan view, and notes within Treatment Volume calculations shown on the left side of Sheet SWM-4. Please correct. Rev 2 — Addressed [Sheet SWM-20] long term maintenance notes should be provided for SWM forest and open ,!n..P .nd compost amended soils. Rev 2 — Addressed Blocks G and F Provide a detail/cross section for permanent diversion identified at the northeast property boundary for block G. Provide proposed grading contours. Detail OP for channel where it discharges into ev;ct;na etr- ohngnel. Provide related stormwater calculations. Rev 2 — Addressed 2. [isivir u i j L3 uuuet invert indicated for BMP G1 does not appear to match contours on plans. US invert cannot be lower than DS invert. Positive drainage must be maintained. Rev 2 — Addressed 3. [Detail for BMP G1] show outfall pipe on cross section view. Rev 2 — Addressed 4. [BMP G2] Please provide water quality orifice elevation. Rev 2 — Addressed, no orifice for this facility 5. [Detail for BMP G2] Please show riser structure and outfall pipe on cross section, and slope of side slopes In addition, correct issues with biofilter layers (don't seem to match elevations, additional layers added and not identified). Rev 2 — Addressed 6. [BMP G3] Provide US and DS outfall invert elevations. Rev 2 — Addressed Engineering Review Comments Page 3 of 9 Additional Rev 2 Comments 1. WSEs presented for BMPS G1 and G2 do not match between the hydrology summary tables and profile views. Please clarify Rev 3 - Addressed 2. 10yr Discharge value for BMP G2 inconsistent between hydrology summary table (5.14 cfs) and calculations block (7.15 cfs). Please clarify. Rev 3 - Addressed Block I 'RASP TIT11 tPlPS,I`P show riser structure and outfall pipe on cross section. Rev 2 — Addressed 2. [BMP I2/13] Please show sub -drainage areas for BMP in order to show DA's don't exceed 2.5 acres/cell. Rev 2 — Addressed 3. [BMP I2/I3] For level 2 designs the SFP/L ratio must be 0.8 or greater. As shown, the SFP/L for BMP I2/I3 is 0.45 which is not adequate. This is especially the case since the inlet discharging stormwater from the largest drainage area is the inlet with the shortest flow path to the outlet structure. Rev 2 — Addressed ,)uting sub -drainage areas to each pond inlet, or provide acreages. Rev 2 — Addressed w more clearly the location of 84" riser structure associated with pond on plan Rev 2 — Addressed 6. [Sheet SWM - 1Ul Provide elevations for high flow spillways associated with forebay #2. Provide f high flow channel. Rev 2 — Addressed Block J (East and West) 1. [BMP J1 and J2] cross sections reference "Low flow spillway weir crest" for both the low flow and high flow channels. Please correct. Rev 2 — Addressed 2. [BMP J1 and J2] For cross sections, please more clearly indicate the channel elevations for the low flow and high flow channels. Currently the channel elevations are indistinguishable from the WSL elevations. Rev 2 - Addressed 3. [BMP J 1] Check elevations or weir crests for high and low flow, as indicated the low flow weir crest is indicated as sitting higher than the "high" (mislabeled) flow weir crest. Rev 2 — Addressed 4. [BMP J5] Please clarify configuration of wester most inlet to BMP J5, as presented the inlet annears to snlit between 2 outlet structures. Rev 2 — Addressed 5. [SWM-15] Planting plan indicates BMP J5 to be of L2 design, however, BMP is designed to L1 specifications. Please clarify. Rev 2 - Addressed 6. [BMP J7] Compost soil amendment is not recommended where contributing impervious surface area is greater than that of the surface area of compost amended soils (0.20 acres imp. > 0.11 acres CAS). 57 stone should be used in diaphragm due to slope of contributing drainage area. In addition, compost amended soils are not recommended where soils are to be seasonally wet. BMP J7's proximity to wetlands and existing stream floodplain may cause issues. This design should be Engineering Review Comments Page 4 of 9 re-evaluated. Rev 2 — Addressed 7. [BMP J6 and J7] Sheet flow to preserved buffer must maintain 35 feet of 0.5-3% slope or 50 feet of 3-6% slope past the diaphragm, please provide on plans. See note regarding forest and open Rev 2 - Addressed Additional Rev 2 Comments: 1. The contributing drainage area presented in the calculations block (1.46 ac) and plan view (1.39 ac) differ for Bioretention facility J5. Please clarify. Rev 3 - Addressed 2. On cross section F-F for BMP J2 the surface area note identifies the BMP as a Level 1 wet swale, which differs from what is presented elsewhere in the submittal. Please correct. Rev 3 - Addressed 3. [SWM-14] Identify structure located at station 2+17 for BMP J1 Rev 3 - Addressed 4. [SWM-15] Conflicting contours/contour labels are shown for BMPs MR. Please correct. Rev 3 - Addressed 5. [SWM-16] 10yr discharge value inconsistent between hydrology summary and calculations block for BMP D. Please correct Rev 3 - Addressed 6. [SWM-18] Planting plan indicated BMP H1 as a level 1 facility where it is designed/indicated as level 2. Please correct. Rev 3 - Addressed D. Erosion and Sediment Control Plan (ESOP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESOP. This plan is approved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. Provide specific callouts for elements included in the "Phase I amendment" (i.e. what elements are being changed from the phase I approved plans). Rev 2 - Addressed Rev 2 — Addressed masterplan. our elevations. Rev 2 — Addressed 4. Identify diversion dikes conveying clean water as "clear water diversions" in replacement of a "right of way diversion". Ensure discharge is through stabilized outlet [Per VESCH spec. 3.12]. RWD should be indicated where CWD or DV crosses travelways/construction roadways/entrances. Rev 2 — Addressed Rearrange labels for blocks so that labels do not obstruct stormwater/E&S/proposed contour Features. Rev 2 - Addressed 6. r.xisung and proposed contours should be labeled with consistent line type/weight/opacity. Engineering Review Comments Page 5 of 9 Proposed contours other than those related to E&S measures are shown grayed out, making it difficult to differentiate between proposed and existing grades and evaluate proposed measures. Rev 2 - Addressed 7. Provide match lines or provide boarders around blocks to help differentiate between adjacent blocks. Another option would be to reduce opacity for structures/features/grading in blocks other than the block being represented in the current sheet. Rev 2 - Addressed 8. L,11JUll. 1..,11�1,1L1A1L wDeling of sheets related to blocks shown within the sheet. For instance, on sheet ES-8, E&S/SWM features for block J are not shown but are indicated to be shown on the 1 1,PvhP �P, f— the sheet. This is seen throughout the plan set. Rev 2 — Addressed 9. Provide detail and identify areas throughout E&S plan where dust control will be utilized. Rev 2 - Addressed 10. 'onstruction access road construction. Rev 2 — Adequately Addressed 11 Ited throughout plans. Currently not included. Rev 2 — Adequately Addressed 12. Ensure cross section labels (i.e. Cross section D'-D') are presented consistently through phases, blocks. Currently they are shown on all Phase I plans, but sporadically on Phase H plans. Rev 2 - Addressed 13. Overly buffer preservation areas proposed in mitigation plan to ensure grading/clearing will not �rrnr in ora rn•­' — 1— rn- rved. Rev 2 — Adequately addressed Additional Rev 2 Comments: 1. [ES-2 & 3]Remove BMP cross section callouts A -A, B-B. It appears the layer was mistakenly included. Rev 3 - Addressed 2. [ES-5] Sediment trap GS3 shows a contributing DA of 1.21 ac; however, the drainage area delineation callout identifies the DA to the measure to only be 0.92 ac since the 0.29 acres from DA GS3a drain to the west. Please clarify. Rev 3 - Addressed Blocks G and F 1. Provide contour elevations Rev 2 — Addressed 2. ike GS3 appears to run uphill for first 200 feet. Please correct. Rev 2 — Addressed pion GS4 appears to run uphill for first 100 feet. Please correct. Rev 2 - Addressed 4. [Phase I] Provide stage/storage elevations for sediment basins/traps. Rev 2 — Addressed hould not be installed across detention structure outlets/spillways. Rev 2 — Addressed Blocks I and J 1. Provide contour elevations Rev 2 — Addressed 2. [rnase ii wenn> y contour interval, currently defined as N/A. Engineering Review Comments Page 6 of 9 Rev 2 — Addressed 3. [Phase I] For consistency, label sediment trap IS 1. Rev 2 — Addressed 4. [Phase I] Diversion channels IS 1 a and IS 1 d are one structure, and should be calculated/labeled as cnch Rev 2 — Addressed. Still shown separately due to difference in slope. Lrlla6l�_, 11 _ insure silt fence is kept a minimum of 5' from LUY ", �'ucaiII banks. Rev 2 — Addressed [Phase I] Provide stage/storage elevations for sediment basins/traps. Since no emergency spillway is provided the crest of the principle spillway must be 3' below the height of the embankment (currently 2' is provided for basins SBI1 and SB12). Provide Qp and the 25 year design high water elevation to show that it is less than the peak flow from the 25 year storm. Rev 2 — Addressed [Phase I] Silt fence should not be installed across detention structure outlets/spillways as shown across outlet of SBI2. Rev 2 — Addressed 8. [Phase I] Minimum flow path length for SBI2 appears incorrect. Baffles should be provided to prevent short circuiting of flows. Baffles may be included but obstructed by cross section D'-D' symbol. Rev 2 — Addressed 9. [Phase I] Time of concentration calculation for basin IS213 references the wrong diversions, no diversion 12a appears to exist. Please correct. Rev 2 — Addressed 10. [Phase H] check narrative for correct block/structure references. References made to Block G, and non-existent structures within the block (basin CS2?). Rev 2 — Addressed 11. [Phase H] Remove cross section E'-E', it appears not to be related to any structure presented on the sheet. Rev 2 — Addressed 12. [Phase H] Silt fence should not be installed across detention structure outlets/spillways. Rev 2 — Addressed 13. [Phase H] Ensure silt fence is kept a minimum of 5' from top of stream banks. Rev 2 — Addressed 14. [Phase H] Define E&S measure identified with the symbol RR. It is not currently defined in the legend. Rev 2 — Addressed 15. [Phase H] Identify contour interval, currently defined as N/A. Rev 2 — Addressed 16. [Cross sections] show location of barrel structure in cross section. It appears for SBI1 outfall invert will be higher than riser barrel outlet on structure, creating a negative drainage. Rev 2 — Addressed 17. [Cross sections] Cross section for SB2 indicates that stage 1 is to be a sediment trap, whereas in the profile view and calculations it is identified as a basin. Please clarify. Rev 2 — Addressed. 18. [Cross sections] Cross section for SB2 should show riser structure and barrel. Additional cross section may be necessary. Rev 2 — Addressed Additional Rev 2 Comments: Engineering Review Comments Page 7 of 9 1. [ES-8] Provide proposed contour elevations for sediment trap STIS1. Rev 3 - Addressed 2. [ES-8] Elevations for SBIS2 presented in calculations block do not match elevations presented in basin plan view. Bottom elevation is noted at elevation 340 in calculations block, but presented at 346.5 on plan view. Please correct. Rev 3 - Addressed 3. [ES-8] Drainage area sizes presented for diversions IS1g and IS2b are not consistent between calculations block and plan view delineations. Please correct or clarify. Rev 3 - Addressed 4. [ES-8] Callout related to sediment basin IS2 baffle missing page reference, currently points to sheet XX. Please correct Rev 3 - Addressed Block J (East) - ---` ----- -'---ations. Rev 2 — Addressed 2. [Phase I] Provide stage/storage elevations for sediment basins/traps. Rev 2 — Addressed 3. [rrica�c Lui feet labeling inconsistencies. Label sediment traps. Ensure block labels are not drainage area labels. Rev 2 — Addressed - D) diversion JS2a appears to convey drainage uphill. Please correct/clarify Rev 2 — Addressed 5. [Phase I] diversions discharging into ST JS2 are labeled as ROW diversions. Since they are Iatent water they should be indicated as DVs. Please label diversions Rev 2 - Addressed 6 aending between traps appears to cross stream section. Please correct/clarify. Rev 2 — Addressed Block J (West) itions. Proposed grading contours are missing for ST JS4 and ST JS3. Rev 2 — Addressed !e/storage elevations for sediment basins/traps. Rev 2 — Addressed 3. [Phase I] Please correct labeling inconsistencies. Label sediment traps. Ensure block labels are not covering drainage area labels. Rev 2 — Addressed ZI pence is kept a minimum of 5' from top of stream banks. Rev 2 — Addressed could not be installed across detention structure outlets/spillways. Rev 2 — Addressed 6. [I-nase it Identify/label ROW diversion crossing construction roadway to the south of TSCI. Rev 2 — Addressed 7. �)) diversion JS5a appears to convey drainage uphill. Please correct/clarify. Rev 2 — Addressed dway name from construction access roadway. Rev 2 — Addressed 9. [Phase it liiversion JS5a crosses drainage area delineation line. Please correct. Rev 2 — Addressed Engineering Review Comments Page 8 of 9 10. [Phase H] Super silt fence should remain though Phase H to prevent sediment from entering stream during Phase II rough grading of BMPs. This is shown on previous sections, but not this one. Rev 2 — Addressed It. [Phase I &II] Shift viewing extent to show southern portion of LOD. Rev 2 — Addressed 12. [Cross sections] Correct label for diversion channel cross section detail. Title references the wrong features. Rev 2 — Addressed 13. [Cross sections] Clarify reference to structure "H". Is this the already approved ST from phase I? Please label structure and include cross section labels on plan views. Rev 2 — Addressed Additional Rev 2 comments 1. [ES-14] Bottom elevation for sediment trap JS3 is inconsistently presented in Calculations block at elevation 344. It is presented at elevation 342 in the cross section and plan views. Please clarify. Rev 3 - Addressed E&S Details 1. Provide detail for pump around/stream diversion practice related to construction of BMP I1. Rev 2 — Addressed 2. Detail for riser structure and ant vortex device related to SB2 should be provided similar to that shn—n fnr S'B 1. Rev 2 - Addressed E. Mitigation Plan Plan which meets the requirements of section 17-406 that describes how encroachments into a stream buffer will be mitigated through runoff treatment, revegetation, the addition of extra buffer areas, or other appropriate best management practices. A mitigation plan may be a component of a VSMP permit, or an erosion and sediment control plan if the land disturbing activity is subject solely to the VESCP. 1. Provide table summarizing acres impacted and acres proposed for conservation/restoration. Rev 2 — Addressed Additional Rev 2 Comments: 1. Include or provide callout to location [E&S sheets] of details for the construction entrance, temporary/permanent seeding and pump around. Rev 3 - Addressed The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate Engineering Review Comments Page 9 of 9 request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle.org/dpptforrns.asp?dgpartment=cden,gwpo Matt Wentland Albemarle County Community Development — Engineering rjocz@albemarle.org (434) 296-5832 ext. 3458