HomeMy WebLinkAboutWPO201600083 Inspection 2018-05-11COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
VSMPNESCP PERMIT SITE INSPECTION REPORT
Project Name:
Better Living Berkmar Dr
ProjectMPO Number:
WP02016-00083
Project Address:
Berkmar Dr
DEQ Permit Number (If
applicable):
VAR10J882
Project Operator:
Kenridge Construction
Operator Telephone #:
434-676-8221
Project Contact:
John Nunley
Contact Telephone #:
434-974-8111
Contact E-Mail:
Jnunleym5(fi_)b�m
Qualified Personnel (QP):
Dina Goodman — 36773
Inspector:
Jonney Otto
Weather (Wet/Dry/Rain):
Sunny, dry
Disturbed Acreage:
4.2
Inspection Date & Time:
5111118-1:00
Single -Family: ❑ Yes No
Stage of Construction: Pre -Construction Meeting
Building Construction ❑ Final Grading ❑
❑ Notice of Termination ❑ Other.
Lj Initial Clearing & Grading Lj
Construction of SWM Facilities
Rough Grading
❑ Final Stabilization
Re -Inspection:
❑ Yes emo
COVERAGE & POSTING REQUIREMENTS
Yes
No
N/A
Reviewed during re-inspection?EfYes ❑No
Comments/Descripdon
Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A)
f
(9VAC25-870-310)(Alb. Co. Code §17-300, 17-302)
2
A copy of the notice of coverage letter is posted conspicuously near the
main entrance of the construction activity? (CGP Part II.C)
Notice of the location of the SWPPP is posted near the site's entrance, if
,e
3
applicable, and information for public access is provided? (9VAC25-870-
54.G)(CGP Part II D.2 & 3)
SWPPP AVAILABILITY AND CONTENTS
Yes
No
N/A
Reviewed during re -inspection? ❑Yeses No
CommenWDescrlptlon
4
The SWPPP is on -site or made available during the inspection? (CGP
Part II D.1 & 2x9VAC25-870-54.G)
The SWPPP contains a signed copy of the registration statement?
5
(CGP Part II A.1.a)
6
The SWPPP includes, upon receipt, a copy of the notice of coverage
letter and the CGP? (CGP Part II A.1.b & c)
Page 1 of 7
The SWPPP includes a narrative description of the nature of the
j 7 i construction activity, including the function of the project? (CGP Part II
!
A.1.d)
The SWPPP includes a legible site plan identifying all appropriate
8 measures and that includes the locations of support activities and the
onsite rain gauge, when applicable? (CGP Part II A.1.e(1-7))
9
The SWPPP contains the name, phone number and qualifications of
"Qualified Personnel" conducting inspections? (CGP Part II A.6)
10
The SWPPP contains an approved erosion and sediment control plan?
(9VAC25-870-54.BXCGP Part II.A.2)
The SWPPP contains an approved stormwater management plan or an
has
i
11
existing construction site a stormwater management plan that
ensures compliance with the water quality and quantity requirements?
j
(9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria ILB ❑ ILC ❑
I
!2
The SWPPP contains an adequate pollution prevention plan? (9VAC25-
r
870-54.D)(CGP Part II.A.4)
I
The SWPPP identifies impaired water(s), approved TMDL, pollutants) of
13
concern, exceptional waters and the additional controls measures
applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a-b))
14
Delegation of Authority is provided and signed in accordance with Part III
1
K? (CGP part II A.7)
i
15
The SWPPP is signed and dated in accordance with Part III K? (CGP Part;
I
j
11 A.8)
I
!!I
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES
Yes
No
N/A
Reviewed during inspection? ❑Yes 0fo
Comments/Description
Is. the SWPPP being amended whenever there is a change in the design,
f
16
ponstruction, operation, or maintenance that has a significant effect on the
�ischarge of pollutants to surface waters? (CGP Part II B(1))(9VAC25-870-
j
f
5
;Has the SWPPP been amended if inspections or investigations by the
17
perator's qualified personnel, or by local, state or federal officials find that i
xisting control measures are ineffective in minimizing pollutants in
I
ischarges? (CGP Part 11 B(2))(9VAC25-870-54.G)
?8
ontractor(s) that will implement and maintain each control measure are
I
I
dentified? (CGP Part 11 B(3))(9VAC25-870-54.G)
Have there been updates to the SWPPP when any modifications to its
!
E
i
mplementation have occurred, including a record of dates when major
;
19
grading activities occur, construction activities temporarily or permanently
ease on a portion of the site or stabilization measures are initiated? (CGP
E
j
Part 11 B.4(a))(9VAC25-870-54.G)
20(CGP
Is there documentation in the SWPPP of replaced or modified controls?
r
Part 11 B.4(b))(9VAC25-870-54.G)
i
j 21
Is the SWPPP updated to indicate areas that have reached final
stabilization? (CGP Part 11 B.4(c))(9VAC25-870-54.G)
Is the SWPPP updated to indicate properties that are no longer under the
22
egal control of the operator and the dates on which the operator no longer
i
�had legal control over eachproperty? (CGP Part II B.4(d))(9VAC25-870- !
I
54.G)
Does the SWPPP identify the date of any prohibited discharges, the
23
{volume released, actions taken to minimize the impact of the release and
imeasures taken to prevent the recurrence of any prohibited discharge?
i(CGP Part II BA(e-f)) (9VAC25-870-54.G)
24
Jamendments, modifications, or updates to the SWPPP are signed in
ccordance with Part III K? (CGP Part 11 B(5))(9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS Yes
No
N/A
Reviewed during inspection? ❑Yes Imo
Comments/Description
Page 2 of 7
Inspections required by the SWPPP are conducted at the required
25
frequency, including a modified frequency for impaired water(s), approved
TMDL(s), and exceptional waters when applicable? (CGP Part II F (2))
(CGP Part II A.5.b.3)
26
Inspection reports are completed and signed in accordance with CGP
Part II F (3-4)? (CGP Part II F (3-4))
27
Corrective actions are taken consistent with the requirements of the
CGP? (CGP Part II G(1-2))
ESC AND SWM PLAN IMPLEMENTATION
Yes
No
AFIA
Reviewed during Inspection? es []No
'
commentsMescripaon
28
Have stream buffers and steep slopes been protected as shown on the
plan?
Sequencing of the project is implemented in accordance with the
29
approved erosion and sediment control plan and stormwater managemen
f
plans? (9VAC25-870-54.13 and C)
Have all denuded areas requiring temporary or permanent stabilization
n9 60�0-r4:, e%MIA-Ant-ciA"� cty
been stabilized, and have stabilization requirements for impaired waters,
y2 bin � j(oy{ (,qC4_J-P_
30
approved TMDL(s), pollutants of concern and exceptional waters, when
applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25
CA w;ryr a� yas s
880-60) (CGP Part I F.1(a)) (CGP Part II A.5.15(1)) (CGP Part II A.2.c (8))
(CGP II E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected
31
with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part II
A.2(c)) (9VAC25-870-54.13)
A permanent vegetative cover has been established that is uniform,
W' ^� (9r L• Ut CA7, `_tt GO5,S
32
mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3)
C� u �_r { o z gOn i e s tN
(CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Have sediment trapping facilities been constructed as the first step in land
33
disturbance activities? (9VAC 25-840-40.4) (CGP Part II A.2(c)) (CGP II
E(1-2)) (9VAC25-870-54.B)
Have earthen structures been stabilized immediately after installation?
34
(9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
t
54.B)
Are sediment traps and basins installed in accordance with MS-6 and the
35
approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part II
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Are finished cut and fill slopes adequately stabilized to prevent or correct
36
excessive erosion? (9VAC 25-840-40.7) (CGP Part II A.2(c)) (CGP II E(1-
2)) (9VAC25-870-54.B)
Is concentrated runoff down cut or fill slopes contained in an adequate
37
permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part II
/
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Is adequate drainage or other protection provided for water seeps?
38
(9VAC 25-840-40.9) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Do all operational storm sewer inlets have adequate inlet protection?
39
(9VAC 25-840-40.10) (CGP Part II A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-
54.B)
Are stormwater conveyance channels adequately stabilized with channel
40
lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part 11 A.2(c))
/
(CGP II E(1-2)) (9VAC25-870-54.B)
Is in -stream construction conducted using measures to minimize channel
41
damage? (9VAC 25-840-40.12) (CGP Part 11 A.2(c)) (CGP 11 E(1-2))
(9VAC25-870-54. B )
Are temporary stream crossings of non -erodible material installed where
42
applicable? (9VAC 25-840-40.13) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
43
Is necessary restabilization of in -stream construction complete? (9VAC
2"40-40.15) (CGP 11 E(1-2)) (9VAC25-87M4.B)
Page 3 of 7
Are utility trench operations conducted and stabilized in accordance with
44
MS-16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54.6)
Are soil and mud kept off paved or public roads to minimize the transport
45
of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54.B)
Have all temporary control structures that are no longer needed been
j
46
removed and disturbed soil resulting from their removal permanently
!
i stVAC25-870VA4 B)5-840-40.18) (CGP Part II A.2(c)) (CGP II E(1-2))
Are properties and waterways downstream from development adequately
47
+ protected from erosion, sediment and damage in accordance with the
i
standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840-
40.19(a-n))
48
Permanent control measures included in the SWPPP are in place?
(9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a))
POLLUTION PREVENTION PLAN IMPLEMENTATION
Yesl
No
N/A
Reviewed during inspection? Pl�yes ❑No
Comments/Descrrpdon
Practices are in place to prevent and respond to leaks, spills, and other
releases including (1) procedures for expeditiously stopping, containing,
i
;
49
and cleaning up spills, leaks, and other releases; and (ii) procedures for
I
reporting leaks, spills, and other releases in accordance with Part III G?
(CGP Part II A.4.e(1))(9VAC25-870-56)
Practices are in place to prevent the discharge of spilled and leaked fuels
50
and chemicals from vehicle fueling and maintenance activities? (CGP Part II
i
A.4.e(2))(9VAC25-870-56)
i
Practices are in place to prevent the discharge of soaps, solvents,
e."J
51
detergents, and wash water from construction materials, including the
clean-up of stucco, paint, form release oils, and curing compounds? (CGP
J
Part II A.4.e(3)x9VAC25-870-56)
I
Practices are in place to minimize the discharge of pollutants from vehicle
52
I and equipment washing, wheel wash water, and other types of washing?
(CGP Part II A.4.e(4))(9VAC25-870-56)
53
Concrete wash water is directed into a leak -proof container or leak -proof
i n t LJ-RCI
settling basin? (CGP Part II A.4.e(5))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants froma
54
storage, handling, and disposal of construction products, materials, and
i
f
wastes? (CGP Part II A.4.e(6)X9VAC25-870-56)
Practices are in place to prevent the discharge of fuels, oils, and other
55
petroleum products, hazardous or toxic wastes, and sanitary wastes?
(CGP Part II A.4.e(7)(9VAC25-870-56)
Practices are in place to minimize any other discharge from the potential
L56
pollutant -generating activities not addressed above, when applicable?
r
(CGP Part II A.4.e(8))(9VAC25-870-56)
Inspector Signature: 4 Date: lI r
{
Page 4 of 7