Loading...
HomeMy WebLinkAboutWPO201600083 Inspection 2018-05-11COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMPNESCP PERMIT SITE INSPECTION REPORT Project Name: Better Living Berkmar Dr ProjectMPO Number: WP02016-00083 Project Address: Berkmar Dr DEQ Permit Number (If applicable): VAR10J882 Project Operator: Kenridge Construction Operator Telephone #: 434-676-8221 Project Contact: John Nunley Contact Telephone #: 434-974-8111 Contact E-Mail: Jnunleym5(fi_)b�m Qualified Personnel (QP): Dina Goodman — 36773 Inspector: Jonney Otto Weather (Wet/Dry/Rain): Sunny, dry Disturbed Acreage: 4.2 Inspection Date & Time: 5111118-1:00 Single -Family: ❑ Yes No Stage of Construction: Pre -Construction Meeting Building Construction ❑ Final Grading ❑ ❑ Notice of Termination ❑ Other. Lj Initial Clearing & Grading Lj Construction of SWM Facilities Rough Grading ❑ Final Stabilization Re -Inspection: ❑ Yes emo COVERAGE & POSTING REQUIREMENTS Yes No N/A Reviewed during re-inspection?EfYes ❑No Comments/Descripdon Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A) f (9VAC25-870-310)(Alb. Co. Code §17-300, 17-302) 2 A copy of the notice of coverage letter is posted conspicuously near the main entrance of the construction activity? (CGP Part II.C) Notice of the location of the SWPPP is posted near the site's entrance, if ,e 3 applicable, and information for public access is provided? (9VAC25-870- 54.G)(CGP Part II D.2 & 3) SWPPP AVAILABILITY AND CONTENTS Yes No N/A Reviewed during re -inspection? ❑Yeses No CommenWDescrlptlon 4 The SWPPP is on -site or made available during the inspection? (CGP Part II D.1 & 2x9VAC25-870-54.G) The SWPPP contains a signed copy of the registration statement? 5 (CGP Part II A.1.a) 6 The SWPPP includes, upon receipt, a copy of the notice of coverage letter and the CGP? (CGP Part II A.1.b & c) Page 1 of 7 The SWPPP includes a narrative description of the nature of the j 7 i construction activity, including the function of the project? (CGP Part II ! A.1.d) The SWPPP includes a legible site plan identifying all appropriate 8 measures and that includes the locations of support activities and the onsite rain gauge, when applicable? (CGP Part II A.1.e(1-7)) 9 The SWPPP contains the name, phone number and qualifications of "Qualified Personnel" conducting inspections? (CGP Part II A.6) 10 The SWPPP contains an approved erosion and sediment control plan? (9VAC25-870-54.BXCGP Part II.A.2) The SWPPP contains an approved stormwater management plan or an has i 11 existing construction site a stormwater management plan that ensures compliance with the water quality and quantity requirements? j (9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria ILB ❑ ILC ❑ I !2 The SWPPP contains an adequate pollution prevention plan? (9VAC25- r 870-54.D)(CGP Part II.A.4) I The SWPPP identifies impaired water(s), approved TMDL, pollutants) of 13 concern, exceptional waters and the additional controls measures applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a-b)) 14 Delegation of Authority is provided and signed in accordance with Part III 1 K? (CGP part II A.7) i 15 The SWPPP is signed and dated in accordance with Part III K? (CGP Part; I j 11 A.8) I !!I SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES Yes No N/A Reviewed during inspection? ❑Yes 0fo Comments/Description Is. the SWPPP being amended whenever there is a change in the design, f 16 ponstruction, operation, or maintenance that has a significant effect on the �ischarge of pollutants to surface waters? (CGP Part II B(1))(9VAC25-870- j f 5 ;Has the SWPPP been amended if inspections or investigations by the 17 perator's qualified personnel, or by local, state or federal officials find that i xisting control measures are ineffective in minimizing pollutants in I ischarges? (CGP Part 11 B(2))(9VAC25-870-54.G) ?8 ontractor(s) that will implement and maintain each control measure are I I dentified? (CGP Part 11 B(3))(9VAC25-870-54.G) Have there been updates to the SWPPP when any modifications to its ! E i mplementation have occurred, including a record of dates when major ; 19 grading activities occur, construction activities temporarily or permanently ease on a portion of the site or stabilization measures are initiated? (CGP E j Part 11 B.4(a))(9VAC25-870-54.G) 20(CGP Is there documentation in the SWPPP of replaced or modified controls? r Part 11 B.4(b))(9VAC25-870-54.G) i j 21 Is the SWPPP updated to indicate areas that have reached final stabilization? (CGP Part 11 B.4(c))(9VAC25-870-54.G) Is the SWPPP updated to indicate properties that are no longer under the 22 egal control of the operator and the dates on which the operator no longer i �had legal control over eachproperty? (CGP Part II B.4(d))(9VAC25-870- ! I 54.G) Does the SWPPP identify the date of any prohibited discharges, the 23 {volume released, actions taken to minimize the impact of the release and imeasures taken to prevent the recurrence of any prohibited discharge? i(CGP Part II BA(e-f)) (9VAC25-870-54.G) 24 Jamendments, modifications, or updates to the SWPPP are signed in ccordance with Part III K? (CGP Part 11 B(5))(9VAC25-870-54.G) INSPECTIONS AND CORRECTIVE ACTIONS Yes No N/A Reviewed during inspection? ❑Yes Imo Comments/Description Page 2 of 7 Inspections required by the SWPPP are conducted at the required 25 frequency, including a modified frequency for impaired water(s), approved TMDL(s), and exceptional waters when applicable? (CGP Part II F (2)) (CGP Part II A.5.b.3) 26 Inspection reports are completed and signed in accordance with CGP Part II F (3-4)? (CGP Part II F (3-4)) 27 Corrective actions are taken consistent with the requirements of the CGP? (CGP Part II G(1-2)) ESC AND SWM PLAN IMPLEMENTATION Yes No AFIA Reviewed during Inspection? es []No ' commentsMescripaon 28 Have stream buffers and steep slopes been protected as shown on the plan? Sequencing of the project is implemented in accordance with the 29 approved erosion and sediment control plan and stormwater managemen f plans? (9VAC25-870-54.13 and C) Have all denuded areas requiring temporary or permanent stabilization n9 60�0-r4:, e%MIA-Ant-ciA"� cty been stabilized, and have stabilization requirements for impaired waters, y2 bin � j(oy{ (,qC4_J-P_ 30 approved TMDL(s), pollutants of concern and exceptional waters, when applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25 CA w;ryr a� yas s 880-60) (CGP Part I F.1(a)) (CGP Part II A.5.15(1)) (CGP Part II A.2.c (8)) (CGP II E(1-2)) Are soil stockpiles adequately stabilized with seeding and/or protected 31 with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part II A.2(c)) (9VAC25-870-54.13) A permanent vegetative cover has been established that is uniform, W' ^� (9r L• Ut CA7, `_tt GO5,S 32 mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3) C� u �_r { o z gOn i e s tN (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Have sediment trapping facilities been constructed as the first step in land 33 disturbance activities? (9VAC 25-840-40.4) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Have earthen structures been stabilized immediately after installation? 34 (9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870- t 54.B) Are sediment traps and basins installed in accordance with MS-6 and the 35 approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Are finished cut and fill slopes adequately stabilized to prevent or correct 36 excessive erosion? (9VAC 25-840-40.7) (CGP Part II A.2(c)) (CGP II E(1- 2)) (9VAC25-870-54.B) Is concentrated runoff down cut or fill slopes contained in an adequate 37 permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part II / A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Is adequate drainage or other protection provided for water seeps? 38 (9VAC 25-840-40.9) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870- 54.13) Do all operational storm sewer inlets have adequate inlet protection? 39 (9VAC 25-840-40.10) (CGP Part II A.2(c)) (CGP 11 E(1-2)) (9VAC25-870- 54.B) Are stormwater conveyance channels adequately stabilized with channel 40 lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part 11 A.2(c)) / (CGP II E(1-2)) (9VAC25-870-54.B) Is in -stream construction conducted using measures to minimize channel 41 damage? (9VAC 25-840-40.12) (CGP Part 11 A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-54. B ) Are temporary stream crossings of non -erodible material installed where 42 applicable? (9VAC 25-840-40.13) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) 43 Is necessary restabilization of in -stream construction complete? (9VAC 2"40-40.15) (CGP 11 E(1-2)) (9VAC25-87M4.B) Page 3 of 7 Are utility trench operations conducted and stabilized in accordance with 44 MS-16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.6) Are soil and mud kept off paved or public roads to minimize the transport 45 of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Have all temporary control structures that are no longer needed been j 46 removed and disturbed soil resulting from their removal permanently ! i stVAC25-870VA4 B)5-840-40.18) (CGP Part II A.2(c)) (CGP II E(1-2)) Are properties and waterways downstream from development adequately 47 + protected from erosion, sediment and damage in accordance with the i standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840- 40.19(a-n)) 48 Permanent control measures included in the SWPPP are in place? (9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a)) POLLUTION PREVENTION PLAN IMPLEMENTATION Yesl No N/A Reviewed during inspection? Pl�yes ❑No Comments/Descrrpdon Practices are in place to prevent and respond to leaks, spills, and other releases including (1) procedures for expeditiously stopping, containing, i ; 49 and cleaning up spills, leaks, and other releases; and (ii) procedures for I reporting leaks, spills, and other releases in accordance with Part III G? (CGP Part II A.4.e(1))(9VAC25-870-56) Practices are in place to prevent the discharge of spilled and leaked fuels 50 and chemicals from vehicle fueling and maintenance activities? (CGP Part II i A.4.e(2))(9VAC25-870-56) i Practices are in place to prevent the discharge of soaps, solvents, e."J 51 detergents, and wash water from construction materials, including the clean-up of stucco, paint, form release oils, and curing compounds? (CGP J Part II A.4.e(3)x9VAC25-870-56) I Practices are in place to minimize the discharge of pollutants from vehicle 52 I and equipment washing, wheel wash water, and other types of washing? (CGP Part II A.4.e(4))(9VAC25-870-56) 53 Concrete wash water is directed into a leak -proof container or leak -proof i n t LJ-RCI settling basin? (CGP Part II A.4.e(5))(9VAC25-870-56) Practices are in place to minimize the discharge of pollutants froma 54 storage, handling, and disposal of construction products, materials, and i f wastes? (CGP Part II A.4.e(6)X9VAC25-870-56) Practices are in place to prevent the discharge of fuels, oils, and other 55 petroleum products, hazardous or toxic wastes, and sanitary wastes? (CGP Part II A.4.e(7)(9VAC25-870-56) Practices are in place to minimize any other discharge from the potential L56 pollutant -generating activities not addressed above, when applicable? r (CGP Part II A.4.e(8))(9VAC25-870-56) Inspector Signature: 4 Date: lI r { Page 4 of 7