HomeMy WebLinkAboutWPO201600084 Inspection 2018-05-11COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
VSMPIVESCP PERMIT SITE INSPECTION REPORT
Project Name:
Lord Byrd Residence-VSMP
ProjectANPO Number:
WP02016-00084
Project Address:
8120 Rutherford Road
DEQ Permit Number (if
applicable):
VAR10J812
Project Operator:
Jill Lord
Operator Telephone #:
434-975-3334
Project Contact:
Justin Walton
Contact Telephone #:
434-806-5410
Contact E-Mail:
justin@elementbuild.com
Qualified Personnel (QP):
Kelsey Cox
Inspector:
Jonney Otto
Weather (Wet/Dry/Rain):
Sunny
Disturbed Acreage:
3.10
Inspection Date & Time:
5/11/2018-10.30
Single -Family:
Yes ❑No
Stage of Construction: LJ Pre -Construction Meeting LJ Initial Clearing & Grading LJ
❑ Building Construction ❑ Final Grading .Construction of SWM Facilities
❑ Notice of Termination ❑ Other.
Rough Grading
❑ Final Stabilization
Re -Inspection:
❑ Yes 2<10
Wes
COVERAGE & POSTING REQUIREMENTS
yes
No
WA
Reviewed during re -inspection? [--]No
Comments/Description
Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A)
1
(9VAC25-870-310)(Alb. Co. Code §17-300, 17-302)
2
A copy of the notice of coverage letter is posted conspicuously near the
main entrance of the construction activity? (CGP Part II.C)
Notice of the location of the SWPPP is posted near the site's entrance, if
/
3
applicable, and information for public access is provided? (9VAC25-870-
54.G)(CGP Part II D.2 & 3)
SWPPP AVAILABILITY AND CONTENTS
yes
No
WA
Reviewed during re -inspection? ❑Yes 0<0
Comments/Descdpdon
4
The SWPPP is on -site or made available during the inspection? (CGP
Part II D.1 & 2x9VAC25-870-54.G)
/
The SWPPP contains a signed copy of the registration statement?
/
5
(CGP Part II A.1.a)
6
The SWPPP Includes, upon receipt, a copy of the notice of coverage
/
letter and the CGP? (CGP Part li A.1.b & c)
Page 1 of 7
The SWPPP includes a narrative description of the nature of the
7
construction activity, including the function of the project? (CGP Part 11
A.1.d)
The SWPPP includes a legible site plan identifying all appropriate
8
measures and that includes the locations of support activities and the
onsite rain gauge, when applicable? (CGP Part 11 A.1.e(1-7))
9
The SWPPP contains the name, phone number and qualifications of
"Qualified Personnel" conducting inspections? (CGP Part 11 A.6)
10
The SWPPP contains an approved erosion and sediment control plan?
(9VAC25-870-54.8)(CGP Part II.A.2)
The SWPPP contains an approved stormwater management plan or an
i
!
existing construction site has a stormwater management plan that
/ f
11
ensures compliance with the water quality and quantity requirements?
(9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria ILB ❑ ILC ❑
12
The SWPPP contains an adequate pollution prevention plan? (9VAC25-
870-54.D)(CGP Part II.A.4)
i
The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of
13 j concern, exceptional waters and the additional controls measures
i applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a-b))
14 Delegation of Authority is provided and signed in accordance with Part II I
I
K? (CGP Part II A.7)
15
' The SWPPP is signed and dated in accordance with Part ill K? (CGP Pa
11 A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES
Yes
No
N/A
Reviewed during inspection? ❑Yes Blo
Comments/Description
Its the SWPPP being amended whenever there is a change in the design,
16
(construction, operation, or maintenance that has a significant effect on the
idischarge of pollutants to surface waters? (CGP Part 11 B(1))(9VAC25-870-
54.G)
,
Has the SWPPP been amended if inspections or investigations by the
I
17operator's
qualified personnel, or by local, state or federal officials find that
I
existing control measures are ineffective in minimizing pollutants in
ischarges? (CGP Part II B(2)x9VAC25-870-54.G)
18
ontractor(s) that will implement and maintain each control measure are
I
�I
dentified? (CGP Part II B(3))(9VAC25-870-54.G)
(Have there been updates to the SWPPP when any modifications to its
implementation have occurred, including a record of dates when major
(grading
19
activities occur, construction activities temporarily or permanently
lease on a portion of the site or stabilization measures are initiated? (CGP
l
'Part It B.4(a))(9VAC25-870-54.G)
20
Is there documentation in the SWPPP of replaced or modified controls?
CGP Part 11 B.4(b))(9VAC25-870-54.G)
21
Is the SWPPP updated to indicate areas that have reached final
stabilization? (CGP Part 11 B.4(c)x9VAC25-870-54.G)
Is the SWPPP updated to indicate properties that are no longer under the
22 egal control of the operator and the dates on which the operator no longer
Thad legal control over each property? (CGP Part II B.4(d))(9VAC25-870-
54.G)
Does the SWPPP identify the date of any prohibited discharges, the
'.
I
23
volume released, actions taken to minimize the impact of the release and
measures taken to prevent the recurrence of any prohibited discharge?
CGP Part 11 BA(e-f)) (9VAC25-870-54.G)
Amendments, modifications, or updates to the SWPPP are signed in
24
i
;accordance with Part III K? (CGP Part 11 B(5))(9VAC25-870-54.G)
!
INSPECTIONS AND CORRECTIVE ACTIONS
i
Yes No N/A
Reviewed during inspection? []Yes 2116
Comments/Description
Page 2 of 7
Inspections required by the SWPPP are conducted at the required
25
frequency, including a modified frequency for impaired water(s), approved
TMDL(s), and exceptional waters when applicable? (CGP Part II F (2))
(CGP Part 11 A.51.3)
26
Inspection reports are completed and signed in accordance with CGP
Part II F (3-4)? (CGP Part II F (3-4))
27
Corrective actions are taken consistent with the requirements of the
/
CGP? (CGP Part II G(1-2))
ESC AND SWM PLAN IMPLEMENTATION
Yes
No
N/A
Reviewed during Inspection? Yes ❑No
Comments/Description
28
Have stream buffers and steep slopes been protected as shown on the
plan?
Sequencing of the project is implemented in accordance with the
29
approved erosion and sediment control plan and stormwater management
plans? (9VAC25-870-54.6 and C)
Have all denuded areas requiring temporary or permanent stabilization
] �. �,�,��, LAA>
been stabilized, and have stabilization requirements for impaired waters,
30
approved TNIDL(s), pollutants of concern and exceptional waters, when
applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.13) (9VAC2
880-60) (CGP Part I F.1(a)) (CGP Part II A.5.b(1)) (CGP Part 11 A.2.c (8))
(CGP II E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected
31
with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part II
A.2(c)) (9VAC25-870-54.B)
A permanent vegetative cover has been established that is uniform,
" N
32
mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3)
✓���
(CGP Part it A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-54.8)
Have sediment trapping facilities been constructed as the first step in land
33
disturbance activities? (9VAC 25-840-40.4) (CGP Part II A.2(c)) (CGP 11
E(1-2)) (9VAC25-870-54.B)
Have earthen structures been stabilized immediately after installation?
34
(9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-
54.6)
Are sediment traps and basins installed in accordance with MS-6 and the
35
approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part 11
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Are finished cut and fill slopes adequately stabilized to prevent or correct
36
excessive erosion? (9VAC 25-840-40.7) (CGP Part it A.2(c)) (CGP II E(1-
2)) (9VAC25-870-54.B)
Is concentrated runoff down cut or fill slopes contained in an adequate
37
permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part 11
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Is adequate drainage or other protection provided for water seeps?
38
(9VAC 25-840-40.9) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870-
/
54.B)
Do all operational storm sewer inlets have adequate inlet protection?
39
(9VAC 25-840-40.10) (CGP Part It A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-
54.6)
Are stormwater conveyance channels adequately stabilized with channel
40
lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part II A.2(c))
(CGP II E(1-2)) (9VAC25-870-54.B)
Is in -stream construction conducted using measures to minimize channel
41
damage? (9VAC 25-84040.12) (CGP Part 11 A.2(c)) (CGP 11 E(1-2))
/
(9VAC25-870-54. B )
Are temporary stream crossings of non -erodible material installed where
/
42
applicable? (9VAC 25-840-40.13) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54.B)
43
Is necessary restabilization of in -stream construction complete? (9VAC
25-840-40.15) (CGP 11 E(1-2)) (9VAC25-870-54.B)
Page 3 of 7
Are utility trench operations conducted and stabilized in accordance with
44 MS-16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54.B)
Are soil and mud kept off paved or public roads to minimize the transport
45 of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP li E(1-2))
(9VAC25-870-54. B)
Have all temporary control structures that are no longer needed been
f g ,(L,�
removed and disturbed soil resulting from their removal permanently
i 46
stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP II E(1-2))
i (9VAC25-870-54.B)
Are properties and waterways downstream from development adequately
' protected from erosion, sediment and damage in accordance with the
47 standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840-
f
40.19(a-n ))
48
Permanent control measures included in the SWPPP are in place?
��
C,.�rr v'! `! ; n S i'tt'`'1 r3M
(9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a))
i
POLLUTION PREVENTION PLAN IMPLEMENTATION
jYes: No
N/A:
Reviewed during inspection? []Yes Ejlio
Comments/Description
Practices are in place to prevent and respond to leaks, spills, and other
i
releases including (i) procedures for expeditiously stopping, containing,
49
and cleaning up spills, leaks, and other releases; and (ii) procedures for
` reporting leaks, spills, and other releases in accordance with Part III G?
!
'
!
I (CGP Part II A.4.e(1))(9VAC25-870-56)
Practices are in place to prevent the discharge of spilled and leaked fuels
50 and chemicals from vehicle fueling and maintenance activities? (CGP Part 11
A.4.e(2))(9VAC25-870-56)
Practices are in place to prevent the discharge of soaps, solvents,
51
detergents, and wash water from construction materials, including the
I clean-up of stucco, paint, form release oils, and curing compounds? (CGPE
Part II A.4.e(3))(9VAC25-870-56) i
Practices are in place to minimize the discharge of pollutants from vehicle ;
52
and equipment washing, wheel wash water, and other types of washing?
(CGP Part 11 A.4.e(4))(9VAC25-870-56)
l/
53
Concrete wash water is directed into a leak -proof container or leak -proof
settling basin? (CGP Part II A.4.e(5))(9VAC25-870-56)
r/
Practices are in place to minimize the discharge of pollutants from
54 i storage, handling, and disposal of construction products, materials, and
I wastes? (CGP Part 11 A.4.e(6)x9VAC25-870-56)
Practices are in place to prevent the discharge of fuels, oils, and other
55 petroleum products, hazardous or toxic wastes, and sanitary wastes?
(CGP Part II A.4.e(7)(9VAC25-870-56)
'
Practices are in place to minimize any other discharge from the potential
56 pollutant -generating activities not addressed above, when applicable?
(CGP Part 11 A.4.e(8))(9VAC25-870-56)
6�r
Inspector Signature: -w, bao Date:
Page 4 of 7