VSMP/VESCP PERMIT SITE INSPECTION REPORT
COVERAGE & POSTING REQUIREMENTS IYesl No IN/AI Reviewed during re -inspection? []Yes F_1No
1 Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A)
(9VAC25-870-310)(Alb. Co. Code §17-300, 17-302)
2 A copy of the notice of coverage letter is posted conspicuously near the
main entrance of the construction activity? (CGP Part II.C)
Notice of the location of the SWPPP is posted near the site's entrance, if
3 applicable, and information for public access is provided? (9VAC25-870-
54.G)(CGP Part 11 D.2 & 3)
SWPPP AVAILABILITY AND CONTENTS Yes, No IN/A, Reviewed during re -inspection? E]Yes DNo
4 The SWPPP is on -site or made available during the inspection? (CGP
Part 1113,1 & 2)(9VAC25-870-54. G)
5 The SWPPP contains a signed copy of the registration statement?
(CGP Part II A.1.a)
B The SWPPP includes, upon receipt, a copy of the notice of coverage
letter and the CGP? (CGP Part II A.1.b & c)
Page 1 of 7
FA.I.
WPPP includes a narrative description of the nature of the
7uction activity, including the function of the project? (CGP Part II
WPPP includes a legible site plan identifying all appropriate
8 res and that includes the locations of support activities and the
onsite rain gauge, when applicable? (CGP Part it A.1.e(1-7))
9 The SWPPP contains the name, phone number and qualifications of
'Qualified Personnel" conducting inspections? (CGP Part 11 A.6)
10 The SWPPP contains an approved erosion and sediment control plan?
(9VAC25-870-54.8)(CGP Part II.A.2)
The SWPPP contains an approved stormwater management plan or an
11 existing construction site has a stormwater management plan that
ensures compliance with the water quality and quantity requirements?
(9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria II.B ❑ 11.0 ❑
12 The SWPPP contains an adequate pollution prevention plan? (9VAC25-
870-54.D)(CGP Part II.A.4)
The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of
13 concern, exceptional waters and the additional controls measures
applicable? (9VAC 25-870-54.E)(CGP Part IIA.6 (a-b))
14 Delegation of Authority is provided and signed in accordance with Part III
K? (CGP Part II A.7)
15 The SWPPP is signed and dated in accordance with Part III K? (CGP Part
I1 A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES Yes No N/A Reviewed during inspection? ❑Yes ❑No
oCommenfs/Descrip6on
16 'Is the SWPPP being amended whenever there is a change in the design,
construction, operation, or maintenance that has a significant effect on the
ischarge of pollutants to surface waters? (CGP Part 11 B(1))(9VAC25-870-
.G)
Has the SWPPP been amended if inspections or investigations by the
17 perator's qualified personnel, or by local, state or federal officials find that
existing control measures are ineffective in minimizing pollutants in
ischarges? (CGP Part 11 B(2))(9VAC25-870-54.G)
18 Contractor(s) that will implement and maintain each control measure are
identified? (CGP Part I1 B(3))(9VAC25-870-54.G)
Have there been updates to the SWPPP when any modifications to its
.mplementation have occurred, including a record of dates when major
19 rading activities occur, construction activities temporarily or permanently
ase on a portion of the site or stabilization measures are initiated? (CGP
Part II B.4(a))(9VAC25-870-54.G)
20 Is there documentation in the SWPPP of replaced or modified controls?
(CGP Part II B.4(b))(9VAC25-870-54.G)
21 Is the SWPPP updated to indicate areas that have reached final
tabilization? (CGP Part 11 B.4(c))(9VAC25-870-54.G)
Is the SWPPP updated to indicate properties that are no longer under the
22 legal control of the operator and the dates on which the operator no longer
had legal control over each property? (CGP Part 11 B.4(d))(9VAC25-870-
)
Does the SWPPP identify the date of any prohibited discharges, the
23 olume released, actions taken to minimize the impact of the release and
measures taken to prevent the recurrence of any prohibited discharge?
(CGP Part 11 B.4(e-0) (9VAC25-870-54.G)
24 mendments, modifications, or updates to the SWPPP are signed in
ccordance with Part 1H K? (CGP Part It B(5))(9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS LesNoN/A Reviewed during inspection? ❑Yes ❑No
C ommen ts/Descrlpffon
Page 2 of 7
Inspections required by the SWPPP are conducted at the required
25 frequency, including a modified frequency for impaired water(s), approved
TMDL(s), and exceptional waters when applicable? (CGP Part II F (2))
(CGP Part II A.5.b.3)
26
Inspection reports are completed and signed in accordance with CGP
Part 11 F (3-4)? (CGP Part II F (3-4))
27
Corrective actions are taken consistent with the requirements of the
CGP? (CGP Part II G(1-2))
ESC AND SWM PLAN IMPLEMENTATION
Yes No N/A Reviewed during inspection? ❑Yes ❑No
Comments/DescripSon
28
Have stream buffers and steep slopes been protected as shown on the
d Ck ve
plan?
of the project is implemented in accordance with the
FSequencing
29
approved erosion and sediment control plan and stormwater managemenplans?
(9VAC25-870-54.B and C)
Have all denuded areas requiring temporary or permanent stabilization
been stabilized, and have stabilization requirements for impaired waters,
30
approved TMDL(s), pollutants of concern and exceptional waters, when
applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25
880-60) (CGP Part I F.1(a)) (CGP Part II A.5.b(1)) (CGP Part it A.2.c (8))
(CGP 11 E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected
31
with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part II
A.2(c)) (9VAC25-870-54.B)
A permanent vegetative cover has been established that is uniform,
r32
mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3)
(CGP Part It A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-54.13)
Have sediment trapping facilities been constructed as the first step in land
33
disturbance activities? (9VAC 25-840-40.4) (CGP Part 11 A.2(c)) (CGP II
E(1-2)) (9VAC25-870-54.8)
►"
Have earthen structures been stabilized immediately after installation?
34
(9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP it E(1-2)) (9VAC25-870-
54. B)
Are sediment traps and basins installed in accordance with MS-6 and the
35
approved plan? (9VAC 25-840-40.6) (CGP Part 11 A.2.c (9)) (CGP Part II
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Are finished cut and fill slopes adequately stabilized to prevent or correct
3fi
excessive erosion? (9VAC 25-840-40.7) (CGP Part 11 A.2(c)) (CGP II E(1-
2)) (9VAC25-870-54. B)
Is concentrated runoff down cut or fill slopes contained in an adequate
37
permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part I I
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Is adequate drainage or other protection provided for water seeps?
38
(9VAC 25-840-40.9) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.8)
Do all operational storm sewer inlets have adequate inlet protection?
39
(9VAC 25-840-40.10) (CGP Part 11 A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-
54.B)
Are stormwater conveyance channels adequately stabilized with channel
40
lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part li A.2(c))
r
(CGP 11 E(1-2)) (9VAC25-870-54.B)
41
Is in -stream construction conducted using measures to minimize channel
damage?
(9VAC 25-840-40.12) (CGP Part II A.2(c)) (CGP 11 E(1-2))
(9VAC25-870-54. B)
42
Are temporary stream crossings of non -erodible material installed where
applicable? (9VAC 25-840-40.13) (CGP Part II A.2(c)) (CGP 11 E(1-2))
(9VAC25-870-54. B)
43
Is necessary restabilization of in -stream construction complete? (9VAC
25-840-40.15) (CGP II E(1-2)) (9VAC25-870-54.B)
Page 3 of 7
trench operations conducted and stabilized in accordance with
44
�Areutility
(9VAC 25-840 40.16) (CGP Part II A.2(c)) (CGP it E(1-2))
5-870-54. B)
Are soil and mud kept off paved or public roads to minimize the transport
45
of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54.B)
0�
Have all temporary control structures that are no longer needed been
46
removed and disturbed soil resulting from their removal permanently
stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP 11 E(1-2))
(9VAC25-870-54. B)
Are properties and waterways downstream from development adequately
47
protected from erosion, sediment and damage in accordance with the
standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840-
40.19(a-n))
48
Permanent control measures included in the SWPPP are in place?
f�
T�
(9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a))
t`
POLLUTION PREVENTION PLAN IMPLEMENTATION
Yes No NIA Reviewed during inspection? ❑Yes ❑No
CommenfsVescripdon
Practices are in place to prevent and respond to leaks, spills, and other
releases including (i) procedures for expeditiously stopping, containing,
cleaning up spills, leaks, and other releases; and (ii) procedures for
�49and
reporting leaks, spills, and other releases in accordance with Part III G?
(CGP Part II A.4.e(1))(9VAC25-870-56)
Practices are in place to prevent the discharge of spilled and leaked fuels
50
and chemicals from vehicle fueling and maintenance activities? (CGP Part 11
A.4.e(2)) (9VAC25-870-56)
Practices are in place to prevent the discharge of soaps, solvents,
51
detergents, and wash water from construction materials, including the
clean-up of stucco, paint, form release oils, and curing compounds? (CGP
Part It A.4.e(3))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from vehicle
52
and equipment washing, wheel wash water, and other types of washing?
(CGP Part 11 A.4.e(4))(9VAC25-870-56)
53
Concrete wash water is directed into a leak -proof container or teak -proof
settling basin? (CGP Part II A.4.e(5))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from
54
storage, handling, and disposal of construction products, materials, and
wastes? (CGP Part 11 A.4.e(6))(9VAC25-870-56)
Practices are in place to prevent the discharge of fuels, oils, and other
55
petroleum products, hazardous or toxic wastes, and sanitary wastes?
(CGP Part II A.4.e(7)(9VAC25-870-56)
Practices are in place to minimize any other discharge from the potential
56
pollutant -generating activities not addressed above, when applicable?
(CGP Part 11 A.4.e(8))(9VAC25-870-56)
Inspector Signature:
Date:
Page 4 of 7
Notes:
CONSTRUCTION GENERAL PERMIT SITE INSPECTION REPORT
REQUEST FOR CORRECTIVE ACTION
Project Name:
Checklist #
Regulatory
CitationtLegal Occurrence
requirement'
Permit Number (if applicable):
Observation:
Date:
Observation/Recommended Corrective Action
Recommended Corrective Action:
Observation:
Recommended Correcdve Acdon
Observation:
Recommended Corrective Action
Observation:
Recommended Corrective Acton:
Observation:
t Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and
Sediment Control Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for
Discharges of Stormwater from Construction Activities (9VAC25-880).
Page 5 of 7
Recommended Corrective Action:
Recommended Corrective Action Deadline:
Targeted Re-lnsoection Date:
Comments: MOs r r � e � P�% J� Q�E Obv-- hC CSC
ke
The recommended corrective act' n deadline date applies to all conditions noted on this report unless otherwise noted. If listed condition(s) currently
constitute non-compliance andl -or five actions are not co m feted by the deadline, other enforcement actions may be issued to the entity responsible for
ensuring compliance on the a e pr ct.
)'4
Inspector Signature: Date: