Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO201700058 Plan - Stormwater WPO VSMP 2018-01-31
of A COUNTY OF ALBEMARLE ��s _ Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Tel.(434)296-5832 • Fax(434)972-4126 Stormwater Pollution Prevention Plan (SWPPP) Project Name: Sparrow Hill Subdivision Address: 5442 Rockfish Gap Tpke. Charlottesville, VA 22903 TMP 05600-00-00-108A0 APPROVED Prepared by: by the Aiben;F r!e County Commune±. Oo1O!o),il{;Ilt Department Shimp Engineering P.C. Date L�File_J�,� ��o S„ Prepared for: Adelaide C-ville,LLC SWPPP Preparation Date: 1/22/2018 (This document is to be made publicly available according to 9VAC25-880-70, Part II, section D) Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County CONTENTS: (from Albemarle County Code Sec. 17-405) 1. Registration vokii,,i2.r2. Notice of general permit coverage 3. Nature of activity 4. Erosion and Sediment Control Plan. 5. Stormwater Management Plan 6. Pollution Prevention Plan. 7. Discharges to impaired waters, surface waters within an applicable TMDL wasteload allocation, and exceptional waters. 8. Qualified personnel 9. Signed Certification 10. Delegation of authority. 11. General permit copy 12. Inspection logs m m Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Albemarle County Section 1. Registration statement ' ✓ Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Albemarle County Registration Statement General VPDES Permit for Discharges of Stormwater from Construction Activities (VAR10) (Please Type or Print All Information) 1. Construction Activity Operator: (General permit coverage will be issued to this operator. The Certification in Item #12 must be signed by the appropriate person associated with this operator.) Name:Adelaide C-Ville LLC Contact:Kyle Redinger Mailing Address:250 W Main Street,Suite 201 • City:Charlottesville state:VA Zip:22902 Phone: Email address(if available): Indicate if DEO may transmit general permit correspondence electronically: Yes 0 No MI 2. Existing General Permit Registration Number(for renewals only): 3. Name and Location of the Construction Activity: Name:Sparrow Hill Address(if available):5442 Rockfish Gap Turnpike City:Charlottesville State:VA Zip:22903 County(if not located within a City):Albemarle Latitude(decimal degrees):38°03'05.4"N Longitude(decimal degrees):78°41'26.6"W Name and Location of all Off-site Support Activities to be covered under the general permit: Name: Address(if available): City: State: Zip: County(if not located within a City): Latitude(decimal degrees): Longitude(decimal degrees): 4. Status of the Construction Activity(check only one): Federal❑ State❑ Public❑ Private IN 5. Nature of the Construction Activity(e.g.,commercial,industrial,residential,agricultural,oil and gas,etc.): Now Residential 6. Name of the Receiving Water(s)and Hydrologic Unit Code(HUC): Name:Mechums River- Beaver Creek Name: HUC:020802040102 HUC: 7. If the discharge Is through a Municipal Separate Storm Sewer System(MS4),the name of the MS4 operator: 8. Estimated Project Start and Completion Date: Start Date(mm/rid/yyyy):03/01/2018 Completion Date(mm/dd/yyyy):03/01/2020 9. Total Land Area of Development(to the nearest one-hundredth acre):34.98 Estimated Area to be Disturbed(to the nearest one-hundredth acre): 14.92 10. Is the area to be disturbed part of a larger common plan of development or sale? Yes❑ No is 11. A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the General VPDES Permit for Discharges of Stormwater from Construction Activities prior to submitting this Registration Statement By signing this Registration Statement the operator is certifying that the SWPPP has been prepared. 12. Certification: "I certify under penalty of law that I have read and understand this Registration Statement and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." Printed Name:Kyle J Redinger Title:Manager (Adelaide Cville LLC Signature: `) Date: 10/13/2017 1 (Please sign in INK. is Certification must be signed by the appropriate person associated with the operator identified in Item#1.) 01/2014 Page 1 of 1 Section 2. Notice of general permit coverage (This notice is to be posted near the main entrance according to 9VAC25-880-70, Part II, section C.) Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County Section 3. Nature of activity THIS SITE ISA WOODED LOT OFF ROUTE 250 IN ALBEMARLE COUNTY BEING DEVELOPED INTO A SINGLE-FAMILY SUBDIVISION. THE TOTAL AREA OF DISTURBANCE IS 14.92 ACRES. THE PROPERTY IS BORDERED TO THE EAST AND WEST BY SMALL SUBDIVISIONS. ROUTE 250 FORMS THE SOUTHERN BORDER,AND TO NORTH LIES UNDEVELOPED LAND WITH STREAM BUFFERS. THE FOLLOWING ARE THE PROPOSED MANAGEMENT STRATEGIES AND DETAILED SEQUENCE OF CONSTRUCTION: STAGE 1 1. INSTALL CONSTRUCTION ENTRANCE OFF RTE 250.TRUCKS SHALL BE CLEANED PRIOR TO LEAVING SITE. 2. INSTALL SILT FENCE, DIVERSIONS,AND SEDIMENT TRAPS,AND SEDIMENT BASIN AS SHOWN ON THIS SHEET. 3.CONTACT THE ENGINEER AND ALBEMARLE COUNTY FOR INSPECTION AND APPROVAL OF ALL E&S CONTROL MEASURES. STAGE 2 CONTACT THE ENGINEER AND ALBEMARLE COUNTY FOR INSPECTION AND APPROVAL OF ALL E&S CONTROL MEASURES. STAGE 3 1. UPON APPROVAL OF E&S CONTROL MEASURES, BEGIN SITE WORK. 2. MAINTAIN PERIMETER CONTROLS UNTIL ROAD CONSTRUCTION IS COMPLETED AND AREA HAS ACHIEVED TEMPORARY STABILIZATION. 3. INSTALL NEW CONTROL MEASURES AS SHOWN ON SHEET C6. 4.AS STORM STRUCTURES ARE CONSTRUCTED, INSTALL INLET AND OUTLET PROTECTION. STAGE 4 1.AS AREAS ARE BROUGHT TO GRADE,APPLY MULCHING,TEMPORARY SEEDING AND PERMANENT SEEDING. 2. ESTABLISH AND MAINTAIN PERMANENT STABILIZATION, INCLUDING VEGETATION OF ALL SLOPES AND GRASSED AREAS. 3.AFTER COMPLETION OF STORM SEWER INSTALLATION AND SITE STABILIZATION,CLEAN OUT ALL SEDIMENT BUILDUP IN THE STORM SEWERS AND BMPS. 4.WHEN SITE HAS REACHED STABILIZATION, REMOVE PERIMETER CONTROLS. virre Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Albemarle County Section 4. Erosion and Sediment Control Plan. `w.. Now Awe Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Albemarle County I m1 1 I I I I 1 a *= iax - Im o ® o ,L - f 1 I I I I I I + ®1t f n 5S1kE } a ' H I I I I f I 1— q N 1 1 1 1 1 1 � I OA Cx D V O mZAOm 1Om 9 Zj< O 2OV r''''' nD A 0ir yD n4 mZ m UO" :c i '1'., 1,.' `i AmnO O C r• + f A VO O O F VA 1A S O OOvG • D g N N Z Z 4C LN N I L (AS m O K D m r ; mN A y D D O 2 @ m T, Am AF, A D m m t N M S OO MK ii I= Ai O ; JC D A ti)DDDO ZO O Frg N0r5,4,. Dmm A V O i < g A OC D r m Z 't n O D Z T• O O A Z ; / mO r mm �, yCMOrm m 21 m M<y OO A A m . N Z -. y oOZ p 11 x <D mf. O -, O ym m Z Z to D N Rri 1 O m $ 2 2 O O � m Om Oo ZF n m _a rn z > I- nC> nnnnnnnC> nnnnnc) nn $; e 5p g $1 I i I i I i i I I I I i I i I i i 4 000coCPrnrnrn < rnrnrnn000CXrnn m * .i.rnrnK -1737Jrn — CPU73 CO s 7" H -I 0007a =1nCn0 > > > > coCP < g n — zzo, � CPCPDD � rnCP � a � � a � rn y m -. Z \ ) O -1 -1 K00 CP (POzzzz < z � � - _ D OOvCPzZrna- Dria ) � nCP I O r ) zz rnC> C� zzoc„-, DDDD n = � ,�t1w �. „� .4„ -+ rnrnOzzzz001rn 171 Oat N 0 � � r-n 20000 z —I 3 70 —1 0 0 _ a —0 QO � V73Kz i i /V CIH --I —CI < _I Z �p (— O O 70 _r_, � rn �O00rn � < 0II_ � - 0 0 y Vrn`' — CP Q 1- K CP Z —i -i < z m # e m % I ) rn O 0 r--- CP rn mrnrnz — CDrnrnrn -orn X 0 ' '_1 - 1- zzzz . p > 7.1 • O O1- D � � N Dzrn „ ? o fo , 71 aO � � m rn► 0 = ��m ^� ( — N rn z 0 00 r— o mcg C > -V•t's 31 J Z F„?. - ...3.n Y 3 on'3'4 _oo_▪ m--1^^m A4D O Z w� / 0 0 3 _ m -=3 H ' «,3,- » 0-- - 0 3 _0 m W N i too E@ =?m 0 CO g t .,3 u - - _ °'- [..„ - 0 O _ 5 7,0Z,;:-'0' 'zoom C C p�� rn.Ai pmZyA a ��o __ � m;G oR _- _ r �3oN -miv-q. _ =p'� =-8.. , Z a O o�= = Z Dm„ „ mo_ m XI '" .2 _ Q - ,3 - o3zQ3�30 • 0 .. oo Dvo v � u,z? mm '146 A aA 3' -neo = =_`°3.`_ - - 53 Z 0 0 og get -<F41"-AZ mm,n Q ^ m'3 m u N K N C A G 03 3N• °3 '^ Z A f n1, Nog°m 3 3 ,34°- �.3 vo353N 01•7 0 N3 - m Sm r,-.'0,.. v _m NDNi Ctj� nen D C 'S `= y 03 3'1 �..3 y Cl) m �>m A oNm A u m ^� _s ;7,-2.1.t- = 3''' • Q c - n'k m = o^Eo h -9 q s_ - - m �:, oil n '1 o r V ) 3 n'S 3<• o? _ T = ^30 -. =c - __ °3 n - v '`60 `M' - - z` O N _ I� • 3 i 2 _ ro :g:.-4 n o 3'm 3 `;' 'n a `D' m A m - - _ a'3 - - =n x- n x g'; ° 2° n _ .- _ ,n s m i A 3ni. 9.n 3 a - -: : i E C u= V sn O ,'p Z s - ° '3 ono_ o� '-3N 3,'0 - 0 ,:-.12-0,!,a_' - = ” - o' m3 -- - - ,TA..' '�. 2 - - -^3j3oj3a 3 _ oia Z - - z j - f o -- 0 dill = - Q - - ~ n3om3 9 .�n E. y 5Z• - ,o e; a o s._ a n T `3 o Q = _ t _- __- _ z Z 3 _ -Sa.° H §399....I-6-:1-5-9_,g!'_15--Vg- - o _m” = i• f 2 g 30 o 0 Z NQ ' 3^ -3--3 - -03'N3 nO» A =0. 2.77.s42- '" g � O �' - °3n 'IT.--, . Qc m ° 3Filli 0 »�o' . o �n 40 3 ' 3 _ � R'° o3o - ��a°�o3 O Cl) off• 77 g cc-i^� ��n - - Qc o _ _ n9 s° g0- T. a. ::eP"i' �`4 iLL0.I%IN vis 2oP Z m g� - 330 0 == .- r _gFi'ciRg.-ger `3 o c v 2 x 3 3 3 • ,b ao II X7 'd ill l: B ', f o C N ,n] n3 ne n D3 - 3,0 - ,q4;-,F 1 ,Z -;E!,!, irr h. o$µ 2 - Z 33a3 Eoi s = �3. 3 R y 3ts. ID Qfl m6 at m m p ¢ O i Si- l` " tri6'1 n 36 - 3 - !3 _ .. 3 it i lr AifZ ^ 2 ,s- : N R 00 ° v°-71 3n -t $ m -. m 1 34; r a m nn m g cg a g o \mo i g • 3 n 5 �vs a 7" . C -01'i 0 F o ;3 w o 3 , a - - - - 3 - _ N¢amu gg P & �'�: r '�e3 'S 3 �Y.g▪ 7 S�1 R dr'� m . - ,-..3 - ' 76. ' �' 3 - 3 I. m 2- ^ S'S �, O4v, e 1-4' VSMP PLAN FOR yy0 �-�'i F n il z , COVER SHEET a ,2 r SHIMP�NGINEERIN P,C, P up SPARROW HITT ReV r Date Description r d 0 0 i i o/os/n county c°mments ,T ENGINEERING-LANDPLANNJNG-PROJECT AfANAGEMENT 01 Ti tJ 2 12/08/17 County Comments '" U 3 01 22/18 County Comments Co J ALBEMARLE COUNTY, VIRGINIA Fk w1N1 ~` SUITE M CHARLOTTESVILLE. VA 22902 JVSTINOSHIMP-ENGINEERING COM 'fmoff'''�/..• ,y .'4 t" mg > ....f1, ti UErig- z o ^ 9 / -;'"•/, ://-- - f 1 i \ 'S ---4,- ;:-.---------"e9 r;,/;:iii=d/ ^!'�"lh',/ ;'--' - --;-',414Z-4 . s',T ---= __ -"b6 `,°--\`--:-1,--11- /:''''r,' s D IU i, p_L - _ l `,';', 7 �� > _ it :t7" / B,,,,k4,,,,-.;_-_____ -- ,• r,i 6 - � ti 4_Y_ '" "�'1J -'4'111.---r1,:„,,,-„%/7.,:r,",",, ;, ,e-0 ,�-/-' - w G--- s r,-. _;�+ft� ff fE a '1,/ ,;+r/~ niui ','I - rr t -1 i - _,„M V y r,. - t f ,F} k3 -[3� • / / , �$va coy ill,`' ,l,,,s, , . _- yl -,o, rS• -c "Q `ter Es31Pe•3z£- w' i r�r�•pT , / ;,, j ;$�! f„1, ,[t;ll;;��� ,,. w `5‘,5'..,:.:49,,:::::.-4, v _ �s �y`'" k -::*-t4-:-.:------------_ �y ii3�3����t°•p.� [ 1. U7:;7:2f 4i'/' J l,t / 4 . A /6V,:_-� - ,`� l' `'FJ -.l,',^ « T�-- , `y�CT `• :I , /i i K Rr,iY '/ / �Ca / // / � ''..'.---7:_-;:--",::: ::::::::---:;':.;'-;---:4e x c s e.4Yt3; 33 71313 \ I 's / / // /AAi ,� ;rr..� /_-;--;-,-..- -•_-1-7-- - "'y- � i LfRJE 'sr .s' 'Gt?- �' - _ Y ;111/1,74,k2, �, °i iii /, /'j - - a . s-�]�. py -cYki'� �y \. :.!://,,,,'111,,'//,,. r•-'5.--;',•, -7 :',./'',','%;,',',':%,%/' :/' ;- -/ � QA - _"s _ _ _- '„' _ _ / 'P' f-t-t• - cfY.ET+J e, ,: \\s,C .4 _%,7,,„,/;,,,,,,,,,1' /----_:,- .:-.:----7,a,,t'./.'/..- • i Ph, /•Az:,----›•'•-=- ---:------, -------------------,:----:-,-----------,---, ,,,--"----;------t--''--- '// ,/--/----41;----'--‘"CI' '040sko '',,V ,• 'Is\', 1 'f,'';;-:-•-•';%;';'-•;';',616,(' / /,--4'/'•,•-%;,,,,*,i.f'=-=--;---,_-----:7---:-..S-- ---lH_:-._:_:,:_=_=-'3.:-.---,T.:1--. z.4:---:=---=_-:=_.:',,i/;:=7,5:•--;."--:----- .,--;--:=-::-__,, ,---=----',-- 1 ' ''-',Zs‘,'°rg,,v, ,,,),,,,,,I ,,,/01: \ _10,-,. ,i,,,,,/,;,_- ,,,,,, ,4,„ ,.0,,,,,, ,_,..,..„ _,,,,,,.4.#, ,,,,,,,_____ _ __,,,,______________-----:._,,,_....:,:,_::...„.__„..,,...„,„,_, _,„______,„.,____4,,,,,,,......;:_ __________ \,..:„.. ,,,o, 0,‘„„„,,, ,,,,,„„,„,,t„1, ,.-,51,-4„ \ \ 4„,„-.."1:-.-;/1:''--'--,'//, ‘9' -c---7•---5r " ---%%,,,,?;',.1.2,;2, 46:•,,':::•.--- _ - -:--------__=_-:_-:--=--1---..,."-:.--;:::-,_-::_-- �`Y ,,.•��%/h;;l, ,a,/ %l .'/ '�'.�"---17/.7"'''''''''''''• ��,;5;,' -------- -- __ - -- -_ '-=" ess __--_-_-_-_-_-•'--_-_-_:: .... -- \ ,\\„ it\,0,'40,!;:;': .y'Iy� / � 1 �, . �'%,% r;;1' ',..1'44%%/4;;';//2//,---Y,'/ %%/ff. // 1/ ,/ ::a\'; /,y, 1 i './/'• :% _ _ _--'27----:\r;'/ _ ---- - I %I' ;il"}, i, '1 l !!• //' • -- /:'- \‘ss‘si„` \„`-,I'll-- /,„•-,';;?'"74%,'•,''i,•,',',4','//44"54N- ' ' 7 / \\ // '‘',62',//• /,-•23----„_,---;---_:-_:--„:-_:-_‘:::-_-_--------------------------------_-,-- --_____-----_„_ ',,).1,L.;.; ,.\\,1(14;'((iiiit:1:1\‘,,' �' ;;i ;at SSS %`✓ ! / V - -��\7{;,\G; /' //,/,/,'",/,----:-------- ,,/;;;;4/1;',//,---",-----:_-.-,_-/ E �n;\;`?n11111f 1 J , 1;. , r - t/ ' ,'/.:::i%f' /;�a.�,�',:' , '/..; yl i,,:� '.✓,j I -- -fc'2_e_�,,21, i l '/: ,_ _ ---_ - ___ ____ _ _ $^.-- L �S'i;;y�F1;��,;�/;6:,�/ ;', ;/�,,,/ • / I// �sii 4di„ _a ,/'i,, 'a , / `'' ,,,,,,/,,f1/((-;;;),`, m m ?/;/.;�/,r�,�,y ''/1` i; , ! / '011� , m �- Nm fil, /< Via 1 z R, ;/•;/ !, !/// i ---- --' _ - - `,r ,,zo�6\� `e,,' 1gz $<su fi1�.%ilil5!'/h,"1 l 1;9,,,I,+;( r,' oF G:(a'I i 1%,4!%'/n'i'"''/,//,//��', _ --- Ial4 // ---,' - ''-' -- - _ - _ a,.,,,,all Q• (..' I I' // ,/ Pon, 1,41/4'1,7;',/h,"174. ,,40,,'/r , '` J �i ii, //,';' [ J / � Q `,M"S`: �y,, \., \, _',;‘;;K,;\,', / '_•=z' 1 ;11,41,,vf�"„'"` '; f ‘iii r 1”i ... ...,a\."4, ..,r` ,_ i/ moi:. .' _-...:-..;411(_,:.:://--/I',-,1:a 6°/5 • // ,/ / / / �soo,_ # r ice, i \I / _ „,--.--0❑❑ I ....._______} \ ,i,,i: ____; _j\-- /. / /-- / /L 595 590_�- / ., p. _J-p- •cep-= �S4 n ❑pp ❑ ■a ■ 0f� nnn t FA / k / / / I a ❑_ag21i❑ •, lin ar 1 i— I / /� / I / � . -- i ■ II ❑11$• mgr. saaa.` ■,.-� 1 \ /y�/ / / / / I / fs J 1-- Q lEs���■= e �1 ga�/ `• a )3,E. r I Li.!.,.1‘,E., //- / / I j/ / /' __ y-- -i off-.. • 1 .. t• ►\ CI) ,),' ...- / / �/ --- a • to a mi II 1 ���a // / �/ / ���/ // �,' - F 1 �� ;r.• -4. . �- m •■ r / // / r, i\Razl 1 1\ 1 411 5 k _____6, , _. . . .... 1 11 1 C I I/ // ///,/// // � /oaiice ,. 11 I zs ` sa I A , lig\u Irl LA) II 4,_ _, ii, ,,,\, •,,c,,. . . , , , ,/ / , , , , , ( ..... . __ a , ,, //,/ ,,,,/,,'-' / 1 101 1CO11\.\/ t }lip ■ / / 1/ 1r/ I / / / / ,/,�� `�'I / „3 v1r \ / � l a 1 I CiL17 / / // / / , I \ r`\ r-- Q 1 \ ■ ■ e'y°„, ,,,,,, ,,,,4,, ,,, -1• /5 A' 7// / // /1 / �/46` ����� / \/ / "� t�•i-= �;a - - -.�� �`/ - l\ I \/ 11 !` .../.4, rsr---000.7. / 2, / / /5, / / .:Yj /,�•i ”-, 'n•d' — ••■'� ' --_ 1 I® 1 I / / s. 1 /1 /, �/ / // ' ''''' -.. 40' 77-1, I 1 � � 1 tI' 1, ' 1 \ © s- I / I /pill l / . r / i l / 1 \ 1 \ 0u ■ I / 1 / I It / °,a���1dI1j✓/ // t /'7V-, / / �.` \\ \.\ �. `� / I �I 11 1 1`�,di iI_7d C __. ❑❑.,11 1 1 II, 11111111‘ , / /' aa`? % / ^ 77/40./� ® I I/ __-----°,'. \ ,' 1 `61>_1 ❑CJ❑Ip p�❑I 1 ❑ ■ � / / / �ri ,d "/ �\/ I - -- I ' ■ L�❑ ph7 GT❑ ❑' . / 1 //' /l�a1'�!�j' / Qi / / /..._\jar 4 6q I 1 IF / �11 1 1 ii ❑�7�L7 1❑� ❑ ❑ \C 1 ',�� l; I 1/ dr , 1 ,/ /os �'' / y ❑ ❑�] ❑ - ) \ 655 I \ ei) / -—--7 _ . - i I , / Mit ' lifi \) 4 1,4,,.,, 1;1„.:lr (k)bolt,.no a al — :, —4 --../- AiLlik- rli t\f/i \\ @3,-, i 1 \„ , , , , , w \ -,44,, 1 1 v• \ \ 11 � I 1 �iN Y ` \ 1 �� - 7 1 l I � e 1 / ire0 \ 1 , , iiiii 11'... II i,✓ \ yy Pill S9 Ii WI HOPI b r-- V I AI j 11 I il I I.1� v 7 i'I\ L \ \\\\ .. \ \I 1 ISI \ \\\TI Oti ,I 1 i, I \ \ 615 1 111 \A 1 1 / 1P 1 , %`1111 ) . 1 10.-- 6, 1 620 2 �\ I1] 11��\ VIII __/ I li \ \ �\ I I I �- , .. , ___, , , c) i , , , , ‘ , 1 /41 / ,, __ , / ,, . : , , ,, ___ \, ,,, . .0 , WW1 lip j„ 1 S I / I I�.. i I _ I\I� g \ Qo , , ,,,..„,, ! H'1P! >*I r—_.. 1 I\— 1 i�_JJY-- �. I �• ,.\ I1 a• I ,, a z I 111 I \I : \ 1 /\`y,. -� r. ) .\\�� ti -- N I I ` i 1_ ■ . u 1 ' I % / I\ I ---•--- 1 --.) N ilECNIIIIMIll II I Irism---_--_-- ------- - N NII \\ / ad / III I ): i n�, �� --s-� m! 'i �:r\ \\ \ / / `1111:. ..._1..4 e / ,/ a \\ © j I :, 1 /-1 I din, 1 . ti... ?..,.Art ,441:01•SVArliiii;\ .--- i WI / ,,., ` \. I fits _. ^9---------- \1 �, i` l l N N (t I.dp ''''\ di 1 i. ,irs _ _-m_ ,... , ,..... • , \ „ 1 , 11"1/11111"/,/ Iilli / 4 \ ., . , , , , :,, „ „ –,..., / , • , ,/ ® / , , 1 11 \ , \ / . , . . , .....,,,, , ,_ • i /Li— _ __/- , , • , ,, ,,,, , , ‘,,, \ \, ,, , „ 1 , , / . , ,f , . , , --.wage" 411 1 , \ NI *44,4 N "- •"•••-::::- ii,„„,,,„,,,;:,, , / , \ / `"f. N \ `, 0 \- -111PERT/4 , it N • 1 \ \ \ W. 1 11.4) /. i --- aa.a "Air N rn uszoininz a ,,,, rn ',,-8L,`2,,, m z ^ \ I 1411111:44N• / Cl / n x , 0„ r\'" ' f C -----t 0 ) =,_ , o �z N= A l 63's ,-\ \• • ` f y • in 35 rri nojris AI .� $ o • d \ I A' C4.Gq • 1 •N� as Q I0.1 I A \• 4 Sl p .r+ s 16 ...ij... =ME''s'.' i�i f■44 . 0 .ate / r. a O FINAL CONSTRUCTION PLANS FOR yyM '6,- �� SHIMP�NGIN�ERI 'G.PC V - SUBDIVISION OVERVIEW s o z y r F w o SiI ' 4I?I?O J)J7Jj[JJ Dnte Description Uy O O 1017 17 Count Comments mS cn N n z n Cant Comments a� �p ENGINF,ER/NG-LANDPLANN/NG-PROJb'CT ANAGGEMENT is N - O ® 01/22/18 County Comments II '2*yltl\9� J ALBEMARLE COUNTY, VIRGINIA c- 201E MAIN ST. M PHONE: (.So) 227-5140 CHARLOTTESVILLE.SUITE 22802 TIN®SMIMP—E GINEERING.COM ,' m - i - - NitiP"-/-7 \''' 000 • r ''i4 . 101111 111. / II '' 014 -4' \\\ -,---',--- ' Alr--c-\ ---_-7.vii- -, 7-e---, == — -, __,_ • / -1 Iv ', ' 1 4 -1 1 _,.:1-11. ,I ilL. &- , ilf 'i' 'i ‘i ', '\N\N 4 i NNN --. ---I-------`N, .-..- -- -- 41 1, '' _ org, _ r\ ,/„°� a s i//' ��1.���il r � ' ��--� � u111 j' � 9 J •iiijililJP !t ay ,,1`-1 Iii �-�'\1\\\\, / / I \ ::\\ I ` : / // 1 'a '.fi:i tib h I ��\\ </ 1'1 IPAP'� ia�NZ: \ 1 4i. . \ 1\s !1 / \n. / / • /,. iii, -\ 1 s.-b P1 • \ \1Q \ I” / / r.'-''' ..-''' '' 1 lir'1 / I 1 r I �\ `/ / / m £; -�I - �' �" r _ , 'moi 1 I-o� o Ip �! ._. r"f��tig=3• �1.01o�iMPIs / ,I�I t'n \ 1 ,I\ I hew ,,i` r _. // / y/! 1 p i yl ��ll�_1+lliiQl�l1wC1rt =1� z \I� I / 1 I t . \ t < mu i._-_.__y`/ 6AIPAIIMi■1liV1;G __• I I I1 / g 4/' :°x a\ _\ \ — ` �-�— \ 1 /, T . ,,, \ - \ \ I m _ .. , aC 5.°, �/ // / / ��. __Iii- 1. \ ,� __ -\ ��`\t\ \ ( 1 ' 01 1 i / n .1 4 Q \\ t // / r,-, •• 'i ,.--:-1. \:; % 1�`-="� IV 7 ii1 i a ��� I 1 645 —_— / � _ ( �) // // /1 • \�1.�:•� 1 , I I III 1 /i/ A -� Dm. ; j/ / mo ^1,P, 1 1 I � \ N\$ Y \\ I :1 �_- -7 r.„,,,. I \\\k\ \\' 1 I I1 I ! / u 4�s � iW2 \ I I�� 1 \ - I �I JJIF-_____ f 1 • ri , 164 ). ��I \ \ \\ ` ��� � �• 9\�� ii � I��� I I i. p \ \ \ \ \ / t / -T'1 1 I I I 11 1) J - � 1HI I t \6' - ,,\ \ \.\ A , \-- i' ;.-6.--- ,... \ - }b�- __ 1 11 t .. r1 F . ast i\�\ • • ,aq • I �:i f I , i •'1 1 1\� �� �� I �—°° cil A �) �— ` ` ' `�... I \ /, I r \ `�\\\\ I �:f �:I I I r I API , 1I ti/1 11 £ l \ \\ 1 \ \\ s I ir Er:, iijil a1Li:l..I ' / • G � )• 4) 4iii / / 1 \ I/ / j I �";�il� ►vii / / 2i HDPE _„__ N _ .I1 , ioaw wq W-/ //. \\\\\�\\ /// / ! // I �� 11-, - -------/ �/ / VA��' 1 ads® / / -,o + 1 \\ \\ \\6 / 1/ / l l /1 p111 1 I 'II'_ _ /a //I \ \ it �f i_ I.\ . €j !: _ �: /, !� i��J` �� . \\\ ,Ni.„-....,..��\\\ 1. 1 1 1 \\ • ��I , / / dF/ 7/I '"J� `�� 61 Ili 1111): ,/ gu f: j/� � � �y / r"�r_ \ -O"', s�N. .,JSP \ \, \���1 • I I _ a—4 / -. .., wJin —e—SSDR-226 SAN_SEWER (iggr ..,_i • - 1 ���\ , • \ois' ,, „' \,�'.� 1 ( s ,� i ,/ 8 ///" g(�' s�xt--I /-'-,- !"--4,-.__ I igr � s.<J�-q,11'.-!__:__79,/,_/_//// :‘,-.. 411l�.�9/////i N __!II% r \ _ 4� \\..„,N. ,`..N. .,,,,,N., '' I"'"4..O• '-•. t eSs # ( 1 ..,4e , N\ �\\ ��\\\\ 41‘� c ler ( �F / / \ \ \/ y ...,:s.,,,,„,,,,,,,,,:/zr,„,,,i.,.:,..,... VAA\ AV ywvvvwwv ��®/� � \ I ti�G� I' i i,: // I ISI �� \Vi / A .I • / tr \ \\\, \ \\\\-,;——\,' _��ra►�.. i \ � , / 1 I l \\ ��\ Y / \ \ \ / \\\ 1111\ / .. �� / \ 1 \\. \\ I 111,1\\ \\''' N N ''''.5-.." / �'. '-4 ` 7 ���7 / I , r\,�� • \\ / // I. \. \1111 \111\1\\ o�, .....!".,t‘, s� �_ ' / ( \ \ \ \ \ 1 11 for 1. \ 1 \ \ \ \ \ \\\ \ I /rci,Ni.� \ • \ \\ / l \ \Nit \ \ 1 nv�o � ' 1 .1 .1. 1 1111 \ n ‘�♦ \ \ \ \ \I SDA \1 \A)z \ \\ \ \\ —\ \\�\�\\ \ pgo °9qa • �����, \ \ , \\ 11 \ '''\ \ 0m-, \ \ \ \\ \ \ \ \ \ \\\\ G \ ' �� zoo I \. \ \\ r; w+. ���r, \ \ 1 1 0 \ \ \ \ \\ 0\ k \N N I / ,\VS•1*%.* N \ \ \ \\ \\ \ \\I\ N2 \\\. `;\,\ 01 \\/::\-\\:( \\ 1 \ \\\ \ \ ♦`e\\A. \\ \ 1 m i< �Aa n a gym" ;!1 C� G� \ \\ \' ni $� �n =g Z3�o 0 rn \ \\ \\'. \\..:,so \\\- \N. \ 1 • I >`vC�r`.\� 1 H m H H HP n Z Z \S ' Ag a A \ \ $ T// 1IZp r_ =om Ag 0 0 N Q9,` _ ��� Z I. \ \ \ \\ \ Nt.,,,,,,,,, M H;: m Dox '2,-m \ \ \ \\ --% \N, -, ( 1 o i q-; M ms o 0A„ 0 g =, "No K" / 1 1 \ , \\\ \ 1 ,- m o d l I 1 1 ,� ,,v v mm s. _ 28m 7 or, sA� Am CmC 1\ \I II \\. \\\ \ N \\ \ o 57 71 m mm ego G \ .\ 1 \ \ \ \ \\::\ coo I • app `c Mo A n o o FINAL CONSTRUCTION PLANS FOR ti,' �.� GRADING&UTILITY PLAN z p 3 $, SHIMPENGINEERING, P,C. P J Rev Dale Description y SI-P141?1?O W HILL 9 ENGINEERING•IANDPLANN/NG, O 2 11 27 17 County Comments °J3 stip C11 N) o_ 3 01/22J18 County Comments FR tllc4\9 ALBEMARLE COUNTY, VIRGINIA 201 E MAIN ST. w:TE M PHONE 19.34, 227-5160 CHARLOTTESVILLE. VA 22902 JUSTIN®SHI MP-ENGINEERING.COM / /III II// \v-'% /�\ \ \\ // / /— ---1,_/ / /i I/ /11111 1\\5°5 / / •••••‘,/ \ \ _ / / \�- 2;an:N ///////4/////"----.--.---7; / ,-1� J\F\\may "\ -_ �/y !i r- �� \ I(=/ /// / / // /lam / / ���---- _ ,/ 'o iffl / ///fl II ''../�%//,i f/ I /J/ / I / i / I 1\\\ so° _.__ -----,-----"7-1,----,--------,.....- ---'/ 1 f I r// /// / / j II\\ % ice/ice\ / / ///'� 111 /i / �: I ) f ( \ \ �-- /� i ///G/ -. � �\ /�/ y'/ii// 1 11///� /',//' // / / / ( /y\1/\,,� /<-.7--------'-!/ ___�%"/ N / /,.,//\i////'/ '/,/1 j 1 I /,---'/ /' 2 // /,i// i\ �\ /// %''".�, I .4' 41 „,_______,:„._ „ ___ 1.„...., --.....41-mgilel;),....4... _-_,..7_;.,--,.. •• •••:11_ \ Ir- //I. II / //r1/ , / IIo Iilll/ _/i/1) /IJJ11 l,�7�j�/'/ /// // ////// 1111 ( V ! -. -- -_=sv � l/ 1111 LCA ////A7/ j ! ( �/ / / / , III / /I(�,�-_- 1 kid 1� / 7/'7-- \`•,.. //1 II /I / -,r! / / \ — - -- - /i /- / -- 4"gm ' // /' '��/,// // _.i / / ,� -_�/-. 11. - % ---- ... // / /// --SAIL ���- �1 - iW // y i/// -��\ _- / / lam/ /' -` �� / / ////G \ �;., �� r_ = y� A- //-�, ' / I// i !-- / / _ / , /�\ _ / ///J�ri /_ i/j// I.(;- ` / • ,rte - \ / ,/ / ) / - _ - /i -/ • ///�1 i 1 I hI �e�// \ / - / O\ / // � 7 \ % - -- .� _ _ — L.--- _ ... -- /i // l-Il/is�=--2e +O Q o ,; / �� 4TiTiI' 4 -, -V.----,----,-;-=-----=_-7\ 1 11',. .':.-„.--7„----=--- 1 I)I- / / '1/Ill '0/.., <> 0 s * '#.,4•77., 0 k /•7/ ' ----- . -'j>� •.•111 -66,41 r ,0 4\ \ \_ _ vim• . +rte,-♦ z _ O s ' 4,,, \0\ + ���� - - i,G 1 s -- - \ 4r' o0 -' • !Y ♦ 1.1.11#0-GJ- _ ♦ • 4/1". g +�B.'4. + ♦ • • \J • 1 1 1/ // -> - 2 %© , . -,P • 52. Q + • Q♦ ♦ '• ' *.6.�♦ v �� :\ -. w •* ..04,o4'. 111/// • SC+ 111 I g .'� -- .I 6O ._.-- ,6-. o 'ice �_ sm� —�� �`2\. \ \ \4 OilIr\p 11111Ij r§ _'-�54,_ �qs ----- ' s�♦•Q QQ 2"5m• a '' Q�� A ,a �'!` ....;,. 6.� �'� 0SO\.+•Q♦ ► 1111 )It O ♦ c ' w ry ;. -�-E_ #-Ri- +/♦ 2> •,-6- •• - •••• ♦4 -) 0-� 3. \ ••\ \ \.\1c\ + 1111V U � - r .6'1,I t . ',1' -- @i= \�+/*-- � -• •a �;�4. ✓'� <> 4 - °`a �_ � .\\"4 v°�„ \44: •4•\� S`4;1 l iilI � -�—- _ a s ,--_ = ' ell.♦4'• •;4 ♦'f♦ �i�” , -g^"P° • • • '4• �►,1•11111Ir1 1.� • (, - „sitar. „4„ -4,04.1- ii_ 9,- ..` --- \,• ♦, Q 'USC�\�+1 , 1111.1 1 � _ ,^—.—.--_--. I —i '\,'_ • `�!/.. 40% . / r►���iv- /�� ----_„.1, \\ �.1► W ♦1 11111. 1�J ampc r ' . :♦ .� Q,� 2 vAv _,, v„. 11� 4 �A ► 11111il 1II �', "rte/ , •� � ),i'.. -,,, ��10/Gr Aa 5 __ o-� v :� "o♦+• a• �.1r , Pas I ‘44N �+oQ (j l ulll 1 — polo. a ti66 Q 9Y,./. -�q �G�, �� - ?' �♦ • } • • KIM ,111\\ 1\ — — y < /.�f �i'� FE. y �� �� € ! o �♦ • Oi .\\C. m11 \11 1\I - --.._ ......_:711111.1-.1111.................- �_ u m a / Or£9-310 0 ♦ G •' yP 11 \\\\\d .mow �v jf oifit r‘i:,,,,„,,,,„ _,,,..,,..„:„„,,,,,,.... :....�,eI �/st�Q ^/ i ♦ ♦.1 Yd M�r 4. ♦ ♦ \\\ 0_ �� e” . /� .e' �� 1 , + • D A� ♦ 0 w A�►�} +A VAI , ` --_ ,I k'/ S /`/ �o��Al�� i ""s ' �!�iL�i400•� / oa 1 i/'4►♦ ♦u•Ne �+ 4' C\\\Ill I► _„... ..II A1C, �. ',Y•�"4 ���1Lt��'[ • ' ;, .dam s- t . • �. j w 4 ct/�- _ � �; �',654212 � �\'''w141411141 \\\, i�14, r' p• .i 4 li<1. 4'• :1 ` 0 . - � ♦ 1YYY1 + \ \nig --,,,.,-;'"'.1 `/ • J-1-1 9.312- �or ;` cz <I t J1 \_ - EtL � '1/ or .,` s - _ C __ 1\11 \14.6%141 .4,,,,•14,4,.\\ 10 11 ® moo ��./• - -- - t / s.oa / i- - .mv-1 i 1 '-'• :/ I .i 'c> i•mt4, ow \ \ �.� \ l` i. •vI -111 - - - i / - / -/ i _ _Ir' 9 - : /41- L -- � }�Q, ._..A1-_,........._. ��1 � - , I Al •f I \o sox 1Z- _ _ __ -` - ,{� • �� _ h�� ;'„,;',"2"4-z1 iii - - _ _ 0 �� N ► m, .00.001101113114-...miss. ' " �� 7„.-.-, te _ - _ s4....4,7,,4& ' 1\ •�s ,i p\ �4 � Lr'-- � ,a -, 0 1_ m$ camwL �� .W- w - _ _�S'— 1r� 1 �Ni: �vv� �;�>, i� • 1 \wavuggisT " „y ���� 1 II�. Sp; /��_ `� , .-\\ y -- --- . 4. rte: `- � -• \� \\ \ ' 1 I III 11 I (ll\\ • qli, _����� •, i_C �1 1 �,' \ \\ •\ I rtiv-'k �1 I I ,\ 1 \1 I I /��♦��' ��f-� _- L t0 IRLA � \\ \ \ �' 1 /J���.v 0\ • , I 11 I\ \ '; r \1 1 I III/ tee. _ + 1 ois 3a, s,'-T ,!t' Illi \ -1/ I J /7 {= 1! G7� ;!,....,11111-------I• i� __- - ► ► \ \ \ \\ 1 1 / y / 1 I / J�iji 1 1 /dill j � 1KIa - _ _^ �-- �1\ i. r'0 - - \ \ \ \ �. I I I ,^ I I/ / // `p , II 31 1 ya�� --- g� \ \ \ \'' \ 1 I I I\,, \\\\ \ I: °,111��%I - EMI- — 5,. — =I 1. ,1 \ p i 1 ci \ o \\ \ y'01 \ *1 i l) I I / \ IC '\\\� 11 `� �� s• _ a 1 L1.‘.11 X11 \\i I + �� �� __-_$g - � ��1\ 61� �1�� f _ "��® \I • 1 ':,,,,\C'\ \1 I -111��o: Ot>'♦ II//11111_ ,_ rim -i 11:m � o 1 ri , \ I � tI /. 'I 4' C°•o ♦ IlijIIIi• .• .- ----- �§�-'� I€ �\1��� ` � ��. . \\ � P I 1 / lII �'+� Ir /1111111_ 1 ► 1I` , II 1 \ .t\4' ♦41111 II ---��i' i' _ — _ _�_ Ss.■1®"11 1 _ \ �\_ \\ .tu 1 i 11\J SII I\ 1�\\\\\ :,,�°O y�• A 1111111 1 -1-1-1-11 1t.Vii. v-ttiori* � _. ` \ A re,-, \ \\ \ i \ CQ ♦111I1\ i 4\• • • )7), , 1111 1 1•. / I ' 'maw I% Vii £ 1 `I: I - , b,.- __ \ '7,40,:k01,44, ae 4 � � �. Q ♦• ♦ 'Y'/l10, O.-� ',CO \ -:-7,--,-i-1; yx h _ -• • '`C9 1 / 1 / • ;;. �d \�_Q� ( Q (p .V +♦ / o�� 1411 poriti:/". vvibil., `\�1��.= - 1!+a t '' �b�-® { � Cj \Z�j Qm>• 1 6,k \O; •� 111,\ i��'!�. - — - •�aiw1 -Y -1-, 4ad o�'-:","\d 44 4 o o ♦ 1111. 0111fil „ ,4 A a0\ c sd� gyp/ /9� /' r ♦ +•1 ► \O,► I1111• , ` ._,,A N. `C�° •• ;• m d'y��\ •Peli ; / /, // . - 58 1 \ . ...,,s, th,4. TT')11:1•11 ).-.,'4,6.4”,, 1,..',1 ,,,,,, tt,„miivim f- 4,,' • 4•\• 4, (,), 41',, 11, 1\---- , v oQA. 111 001) I' I r ....,,z la I /1 1 I / I // / I IN ---- i t � -�l Ililit+l� ►��g# �Vl..�•\• +.♦ `.). ,o , 0 + +♦•� •f„ +,�+��: ,o, 1 t, _1 I/ , //,.. i / I/ / a29s 0 5c I o�s5 I' \A.. : ._ \ ♦ 1_,..:____ �m010 ��\44'O �'�? ..j C{�� `�` ♦ °' \lit ,... , -illi I Z f //AI I / �� \ X't, k?iloirk<al,e,/.4,G14*-04,,,o/ IQ s • • / h v • ,' 11 II / I / / i 1 \ ,♦• 01 I 001i fs7/O // ♦•+/► ± m 11 % + I I ilif, ' •gym„, \ .•♦ �' gb, 4 ♦4 ll II I , I 1 1 I I / � �1 ”"L \� 1 ♦' ° o\ -• {y °`a ��O -_-\ 'I 1 L / I( / p. / / li e., N e.,x _�,,. 1 \\ `��•Ia1ep, �..4`'♦ .,•,, -.�,�1? ♦ '119 '4:A ' . ,�- kot. Ili illilli Nl _ ,,,,,_ ..,,. ,- , , 1 4 „,,b. po \ \,,, \ \\\ 1...,,, 0,xispi„.._v*I" 0\\04;-•c. ,.........---\ i..".. _______ g=1111 ,7-iiii... I o111 .4 ■. .. Y� -o.\ �, _ .- --- 1.--.--cams ? �� \ \\\ \\\\ -\\�'11II� �i� 0. :1 � iJ1 -•. 1 /�\ \ f� 1 APs 1 =II �Ya_4 I I— ni. IS11'\ - \ �\ A \ I\ 6fg3 a , • 111 1\ \\\ \1 \ \\\�\ �°' •_v N T. i . ■o /� �m,, \ -I 1 \, \ \ gi To O\\ S \ I�I I .'0111011110" �I n�IR-e \\••. N t=`'o>'_ �\ .. 1 /J/(- r y / .n A I ` I 1 \- \ m\ w \ -. \ I SWM ACCESS -� \ .1.,,,,,,,z_ \� J..t•_. - il / p ( \ -�� ([ \ \ \ \ \� ROAD 5 „.\--,,-_-- .�I\ \�'� I A /o�u I I , 1 \ \ \ \ \ `r7�Iej €*pliallili \ I •-I, - \\�\ ^ i� t..\t_;_ =_`-,I I ,/ �� ,. 'I �1 -”' \ \ ` ��11 sI �9 � �� '3\\\ ' �� \\ \� \•- ;fid! - r _ ! I �/ A 1y1 I \ \\ \ \r \ 13ib ' \lw �I�' \ I 1 i I \\ �� oo O FINAL CONSTRUCTION PLANS FOR yy0 n H4'1SHIMPENGI11EERING P,C. n o , • GRADING&UTILITYPLAN z r (JI I gRev/ Dale Description x SPARROWHILL 1 10t1l7 2 11217 County Comments County Comments '''le, " ENGINEERING-L9NDPLANNING-PROJECT MANAGEMENT N * w �U N O 3 01/228 County Comments FR VIC& -JALBEMARLE COUNTY, VIRGINIA 201 LMAIN ST, Al PHONE. (434) 227-5140 CHARLOTTESVILLE. VA 22502 JUSTIN®SHIMP-ENGINEERING.COM l Irl/ ',IS /' 1 I 1 \ 1 \ ` \:a, L. f: ` l \ I / / / 1 t \ / e' F G / \ ter, . \ I / l I P ss \ \ • (" - - 1- ' - • '��.Z — !m1k� o \ 1 \ /- ,1 .5-. "o.E\.- -�\\ NI; -ri, N . \* . • • VI. N \ N '' \ I I I I i 1 l\\ \� moo\. \\ \\\ I L, \ II .... I� 1 ��� AIi�1��'� \\lire ` �\��\ .9 ���/A \\\\ IN.Illi . i r o \ I / .4 111111 I/ • moo\p •r � .. 1 \ • \� s>\ \\ AA �\ \1 I 1 I • I l'£,. II f 3�sx- \ \\ \ \ \\ o I \ 4_ \ \\ \ 1 \ \ „Al• 1 \ \\ \• \• \ \ I 11 1 \\ \ 1 i i Si 0, i;l;�r► \ \ ej \\ \ *.i`�r I I1 II # -,---,—o____, -. . . . . . — / II. \ \\ .I 1 \. i 1 I xsoxi I " '�.\�� ` .1i13�'1\- N \ 1 __ E I • ,.0� _ 1__i a____ _14_ i� p --• r_--M �1��� I.---1- F-I--- '�� Nt 11 \18 �` I l/\\� m // r' / //I / f/ . o111 \ s. \ l \\' ,O'�. \ \\ o I1 / a� v .V SII. � // I r Ir. Ir affil \\ �� \\\. /\ e' — _�" // I I I \ \\ ��. • ip, „, •1 l. / �.,---—s ,•� ,, las I / \— ,,� \ __ I �� / d i, ,,fit \ \�„\\\\\l\\/ I.r 1 / t I \ Ito \\ f_04 , 1 (�. \\\ _�� \ \.`I / �_` / ii s.ex rs , it g.--,....-_ 17■___________,,,, ` V __, u , i, , ,, \ \ - - _ IN \ -/- s.Ox ��. , \ \\ u, _ _, ,1.: U, \ \ idir, - — 5 CROAD 5s• — N 4,7z, L b \ 1, „a i r ,, , , , lir ,,,,,, 1 ,, ,, _ , . , . , \ N _ — ,_.-- _-____ 1 Lim'1__ I _ y �' N. �S . v I -- ,,0 klt�t A \ el . / 1 6 ht, 4 ':::: \ \ \ r r,o _-:9- likt1 ii 1,,,_:(4,1_-: 11_ I 0 0 / ,46,Vi`., i 1 ii 1 ili',,5 i i z 7 / , r 9 444 I'' ',10. . .-- • '•Nt•%0%,. • • li 1 IMP APROB ; 1—'7—'1—* 2 -.' i /- / . Alive 1,..11)7/ '' / --+— — —— i: 114V I. ---.. .2-e--A- --___,4_1_111111kt — AI k. .€: I if /-• /1 \ \ I: / �,`J. L //011 :till" 1 ' i( flomm,..-woN.WISPAII; - m. to / 1. e , r :c/o __i ...... - '1/4 / __....-• __ .1„. ___ ' V. loll , / I 1!,•e / /F,-. 4 i �t -_ — sem, ~ r / , , // / r i ag„V%. ' `11- ---- r - , 1-"- i ' t•--,------- 7 A -- , / 71 9'6'i'- ir ..Ili; . I 6 5 I 1 14,* --- ..-- ,— ..800010.• 14 , x q.nct-- --- --- - ;P:-/-- ---"- ----4,1/. • x--- -°f, .,g ' / -.1q, /7 / 7"': le \ "__� 1 i All ., 33 111..., ri2m / — — . T/moi x/' / ,...../ / / _ Bo \I _-- — g ,/ ,x/---'"P-2 '' • 1-Z / • ,,/ so z ...____ I i /' .• 'off s srienc._�mJA -1 �a I.�� �. frith �� � ��- C'� OVA .--. \ a� a - .r- »_ =`*A4.41111V°4 ;7_ , ai r. �� —_ _ /�'�!,——- p _-- 11-1— JfSx"'--- l i\\ $ ��/ , �i /moi--- ----. A,7 1 \ Y£ \ �� - Fes^ / � - / / /.i�7. -�.1 ..., .,5'-• 4,e ,/ . ./ \ I . ,- % 'hi !••,.. ..-- //,..--- // ,///,7, ..,...„...,..__./ \II I ,I,t' '-'---— I Of it: * /- 44 i (11!" ' 7 • ,..„.... -----. .-///./....2 // \ ___. _- .0, ..- ..§§,!... it....4&_ , - Alii; , .... IL4,„,,,s,,, ci ' / / \\ � ; •' . / / � / / / / - . — - \ ' ..... ce �' d [kiffir.d / / ,� i / —l ..,.... IY /' / � '"" / � � / / / / /� / �\ �,\_\ i,4,.,+ \ ___1( //// C \- / / - ..... i. No. /// ,-b/ ,�• b; / ` \ //�// /�/// / / 1 / / N\ �i\—\'•' / _/ /, ion-may. ��. / -r / / / // / Z < / - / .! v ' / I 1 I / / // / / / N / / •/ // I: %/ I I / / / �^/ < /� / �o�� / / ,,_� NN .;\, j / / • / it V / / m''='i M Nom,\\\\. __ , / I\N �// ir / 0 N . �N ,ate '!'41{• \ \ \ ---:-H,........,.:-, /. A rY ■--\ \ a�fit\ / \\ 1 ( \I -..ti5N \\.. /C"�`.", \ \ w Meyor p I \ ® /� / ZC TF \o \ _ A / SO \ \ F \ ora -C--04,1,_-- o yMo r as c , o z FINAL CONSTRUCTION PLANS FOR Z o $ SHIMPENGIN�BRING, pC. • GRADING&UTILITYPLAN h Fion Descriperi ii LT, MSP14]?}? HILL county Comments ��. g (s N 0 • . County Comments Fk u tl1�\9� ALBEMARLE COUNTY, VIRGINIA N ter. VA - E. PHONE: 227—5140 cHnPLoTresvrLLE, 22902 JusriNsHrMP—ENGINNciNeewrNe.COM `I.� w '-d O tri A WONmmU1�N LNADWDN�v/I •^ N9A� •n 9 ! ! mNzzoz maAovlAwayAiiz,,, »n $00�CIp•1DDD � Fo! R Apiivm9S^ crifozA aN zv < rp =g n ..yzo`g"5 i o«m=-, !!_?rl '9 _ '^o - o'''g53 ." =sss> - = mom= -g'mg'z„�mm nvn nino ' c�'^"�'6 I5 A9^�z.,yg 3 �og�z�� zo.=sn' g'$n FS FF'-�z, ��o,�> <Infy>mAp oy5z A�, m g TOA o��v,!_'.,^ _ `M _ mz om�_< O Zm Op0�3[z0 m=D�=z$^oi W->m;x?<zygv,yomz mm� ��mz - r0� y mzON �An �� �Z m Z Oz z w=T y y�, ..;c mr�Z VDI R�>ti A'n O�r m c i O> z n 8 $CON — z m c�z� z — �9zmAin' rpn � m myo zA al-:-2 � o N1�z� go ifiliP511 > cy�so`^a$ zm : g =��=gIz;m�cA;;iriir; D,rz„' $p'A -: g o L" O :iP:rirra- � iom �a �� i $ - Azo=�s'm >FAo$�sn gxAg�in�mavAo,; oo - � AFzn "� oo �,' y8 F $ D zmmv,99zo�g`ogam,><„i�v A zN-��oaz�Kv, ��zA� CoA0000� omoA 3 z cn>m'<"onf ?o vs,v " 'i^ i0�yp�m> or N�,o'�v',M,o.vlio�.� �.,zmo=�g'-N$�o� _! 1U`rH m is - m4" o F r i .. orz A g zaY'�''"�g mo m rN�A $ ninmm,>��ppsr'^ rr,5. i",z '° - As;zr; np pzvl� om o i _ o�ma�.,'i„oA o _ a� D� $=m:�oosm �' m pi '"W�''� 5 >'F i sf� � �� nAco im m Rc og �o'^vio mg�AA9oy-mTz a mz $$� vmim pH N m< s; oy o roi,;Aooc=oNAvcm,o'=9A �1'!ril a�Tvo�,_oIaH:o`>_v'iA 00009 -i,um $$".,m.,�,m.,� 3 o s gi 9 9 > - D � - �m D z o➢�ov�mtimti C -� z o O y �I Z= y AO C DA �O s0 ArA8mm�$'A.,� D�mmirmazg t^o�mOv,yAA o�^IL _ L1J i ;4i ovl �nza m oz ,Ov'y��n�a: ,>"o Fla<��znAo���DFi,�Am�zv_mi vn 9, 9 " �c ' s'4'' v, y m. ymp -Ix rj z,m^ !^z$m^'orm o :1,,4-, AA8 m m r,z., A a m� mp -om vmio wz _ AF$�p�g�g3o >Nlm.,�o> my 0iymy:t m9r�„ovl ur 994 Wok - v, mm o> r`.,,Dy 0 x� 9 > F�0om am vmm > ' m o � '"o c spp c-n_.nN i AS g,=,,!- m z Cv,O>eyD==mmA �n,aN ooA >Y^m'm5 ! ,1z" > _ ;m �y.—�J O< y O Z O Z m y 0 O -m p ~x a FZ 9i S n C o i W A m F m v z g g m v r Z -,z o m - zo m n 0 O Zm rm� rZ00 < -� I. - ZmyONOao mm N Opm On � R 99 mmZ rI - o n.7,1Pri , chi rmm0y IpOD m C$= Ai m i'g n o� Kz 7 m nmi cz eP n m 1 F>_< .;<09> moge 3o v,:r'< izi$= g oy .5,r., - z ^gym � gAm 8 �s gg Rg n> rz-y n'^ 'j' >->,-A� v 4v'-inooEoo � r im Z AD y- N Ni;� y-,�.�i^y O ro�A00z Niz'n0 mn0 > 2 S �^ Z �.•� n m ti OO o u, 'o v,m$O - S�O,a soz - O - Ai o SIL N� a �^ m l yz o loaf ayo I. zf A i v. gAogo$;m; -boyo ac-pn mv�,> m9�� ;PI >$ T�v, .vz+ ,>„ "; m5 oz Z � N oo n nA o m � g ri;i�zm��� �y ,-;,,ii, m�oN c >,�, ?=m `o A �' o-+ is -; c i s R - g=�rrm,F.,,A•, -i > cz,mr 5', 4", .::,1r!, ',4", m;a 5'.%`5 nN rzoi =o gF=rs = 3 ,n.,a - m 2ND A D ti� ti$O ca AX CI"_ }�i �; n 1"N i z ^5 zni y m o AQm �s=�i 9'; pg �� z ;� 0 ' 3y$ o `d 9 �3 s 9> P99 c o>o�oA y �z "� y z s Z mho o a am o000 m m $i y momz gm:o m »"+ R ' mn L/) 5 t� $` m�: W o 0 m A N v - U u N - ioN - s I•,o>. >v, a o-, s gg(^a9om-Ir t„�v.�.,> ; C A » � ��_0 3 39 9 9o�o> gg mg m�ggg> gomoo R�'om 993 = zggg Dag zm 9$m0=>04> R O ooy'^$o- - oc-s9 _ z p_p m g '> Ln gm >5.ir ~y'A"ACA.mA,...7. ,, r PAF, 'iot 5130 6';!Ir-_,a-nt$ �>DN 0 P _ i p i>a " r9 ,mo A9m<>$N gismo" 41�=$00`o<r4Al g! yrn KT _ ..am .z� g m �I ''o =in4 �� o0gg�F g'0,4MgD "55t0, Ag� > gg = r4Dm,maPg om y, msoz- Z Ngo=- gN,"� �Nm^�� - ' �v,NA��'z�^ a�yo =z -,,, g$ _0�'=1=,m9o�,A>�0 g - O �� =�zz�;:z - (A ��go mzA� '=9z $z m�"m�9g��my��o �.a io> �> ;r1-,r, N �2Aiig'mc � vlr- c mgzoz ;='£a,a;�Am oo =ms=_��Ao= 49r :: `317-,3- or 'off ; �~ z�zm 00 - m �i r Am o>9m _ €=mz$zygo a=Am >>>9.Y,o y,mNo 0 Wig; =90 09 499k45Q> ('��., '^ ter-949o4>Torzmocm��mao„>Z9>>' -z >o R 00900> 1�+�" 0 o >o 3m 9499>i5 >> - r o $mpg; x!Aom�< m�>7$7c000$' AgNm $> -io r,=m Aim gm6 :gi^ysx a s=z g$ 3 o3"Ngo>AA 09s 99nr$ A ti g� 9 m� >Am m=�� '^ _ hr Do rmSio �oso9mNo c� z D0 v,gg yR > of - � mmp�a mi�z �p � �A�Aom ",;.,�»i c,r,.,g� 'og -msyno> g; ,.,'off � z $mss fin,., �$'r",Azl�., r"o,F ,zy p sib < -mA A '��fn � gcm,4s�z, zz�o -- - >p - �=m $i$�F'„a ,- 44!.974,:;,12 om zoAommz y �$s y$�o� gyn z rio A o��g ii�gz = q'!,', m 'y= m 3 sAsom� AF H•-I o _ 5,P',' O > $ >99>$4>oop "A o99 �'32o>>99,,,o ag 9=_ n;g `J o T. g�a�m >o z��Am $-pNmo9N$m�=�mm� � gA s z�i Amo= _ n - o - i cz,2 $$' mi< $ 'o.,l$e'zs_,iT=Eov, $>!"� ,!ii: o:r o - 61 g � D�9 pi w : T4 4z ) )" /j '? / , / / 4 / -- - ----- I ,' 1 - - ;--i- -- - i/i '' ' - i / / 'I ---- -- ---- _ - -t - -1 ;;y4;', i'iii',/,/„i,, /' i/,�'' \� �,1 \i, .'/ �_��- � _ _ ___-__� .\\ ,1'. ,,I)�lil�l Ci] sys„4 '� II) 1 oil! I (f / /' - kti \ --- " " %' \ I) Iii ilLkIII ,%1 ,,/ ,--Jt ----- /_ /Tx-i-- /-' —4- ' -- -__--\--- U i --- 'i !! �; � �'' e '`�„�j�•2 rlll� i' %�(/�' /`—�\�,,'�- ���`��x��' ! o'/'. � i '.. _— I; I I ;���_�� \\ 1\�I I•� .\`. �'• _�'�1 i 11:� 1 I• r' ` I � � %; �� '�; 4�: ` \ �� �!-,1.�A 11.11 I ( / � / I \\ s/\ '/ 5 \',.S\\5 ' ' \ \ --—-- S • ' ' 'S '5 ' " 's \' 7, "\ 1 I \ tj ii __ II '\S5\\ II iJ//I !;; - - p \ - "j .1 0 i - I - - I - " os -/ / - - I.I` Cr) > > w C)— — I /-- ---- / " I ic- ---- J i__ .j ' I \. voonv�ovniNDN. o - : - --- —- I " / " ijI I I I \/ I g " / 1 \ ,- 4N.)/,/ F N, / I / / I ' / ' - /,','' ', 's S " / / 1 , - - m / / '_(fl - / I \ I I I I I / ♦f 0 - I ,- _, --- - / i--.J / I / - - f _ Hn !gH I ,4 _4S /'-_N\ __ -/ / /1/ Il / ./ - N: //' r-, - --! - / ( / L I - W 7' i ,' , (1) " ' - :,-'- 4 -' I' ,- / WI',. <C) /— N i o P! ® 1 t I I I " o ' • \\ \ i /'_ //�/,moi_ ---- - 1 / I / ® ® ® ® ® I 0 0 a F'L,ANJ FCI)F ESCPSTA GEl- ,, 0 MASS GRADING SHIMPENGINEERIN& RC. (0 SPARROWHILL Rxs 10 b ENcEww c- DPwwc-PRO TAIAA'AGEMEJVT u 3 01/22/16 County Cornr,en/x ,, ALBEMARLE COUNJTY VIRGINIA I / \�� ___ 'F ' -�-�1\ \\ // /' --600 /"- /•-� psis' /\ /\ _ / �./ /�-�/- h--_i * » •O/ , / —610/ -, /� ' / "• -/ .dr _AP- '..,- , / I /\// \ / /� l_i/ 590-" ••trig �/ /, ./-�1� / / / /\ /// I-585- i .� �� / / // 1 -/' ,/. istss 1960v"-�/--,,--:- i�� ��� �C_- _ os -_-- - 1: / / 1 / ./ i.-/ r. --/ \065- \ __ 59S - \ / g o / \I C 0 \ ,1, /1 // t' / / -.- 6 f 1 CO o=. moi••+ i \ .*V 1 ,,, _...4--- / I / i -.'56`11-----, E 1 - - .ria" _aA ---t- /i / I ,, , , / / / ,. 1 /_ --- ------Z; Ir l' - _ s�xr atW v V II / i / ' 1 STS--� ,Ir ;i/ / 1 /,i//' / i �f=3` 'Ji"•. '1,`/ -� / I 1 I S -i /-a/ A I - / - /,ider /:.+ • ,�8�\ ,�r•w--7,..4'..774111111 .‘,,,„,,,,4 1,z9 -v i�-- ---- 'V I 1 A I� A � n�a zs. ■T _72) 0 illi ) 0-' /' i •, /z- / / // // -I1, ; . .� ® \ � .____*4 X , \ i �,.\ \ t I I 1 i / / '�>. /' /, -:� L ti /- �" vii- ��\�/ ,,:r- 1 A, I\ \ ` I { / / 1 r 1. / // , !+�' _ ® , I 1 A, \ I I I '• /•/ // 1 / /// ' , / ;,v....„. ;.,i. ®// . ;_. -�� gip 1 / / ` / / / o;• t \ I - %� e,\ I„ 4 1 it I / ,A,A1 . -- --- , ; . 8 \\ .+ e'er r��Il • ' --,420. \ \ i .., ' \ ' , / , ---,i;) II /, ,,/1 z...-,....-. 1. / 1,,_/74,,, g i= , (// ipi ). is., _Nemo .'4't3 ii if .0 . .,. ����-z• '41 i • 19,/ • � •/ ,67- i i , r / i , Arzimpion. „iirr' � / - \ lily AD„ \\ L Q �b. 1\ ,. - ift R .ft 11 '/ j1 �- / \' � 655 /at D 11 \\ Y �+l `�' ^V'�'^� OO \.�.,_ /�1 I \ i� \ T l -� S 1 .1 II �I '®I°', \ \ -V ��-- 1 I i / /J/J �� n / ,.,.7 ri,-.- ii.-. 1 tirerrit-L, 1 . %. . , ,,,,, 1111 I.! _ \ '.,_,, D rtmll) I s 'hiriglita' 11 - ----: \' , . � 6 1 010 Mil I ✓ •'•FiIk.� hLiiu....i.41_ lr !i 1 /� / II •,\ O z�i z01_ C➢nmD e \ ' II �r ""IIH �' 1\ ( F / - i I I f l lir o.W�o➢moNnz „,,rm r'l c=C)2 7,2, `\ I II ff�'! i0 n IL. r \ \ \ l 'P ��i ('7 \ OmrT' Vfm1 �III�6 y II O men _,I 5� t D 1 y- I---- ' I 2!!:O:r CO! C 1 ) EF3_ I Domc-' m0 Z I ., ." 111111 p - cli. .'-fl . \\,,,..7. \-,-,,,=?-- _\._ } . -‘' ,ii://' yi ---- IDa) ,_. ''. --i. __, \ / 4 r4 / .ii!Ark -,,i: I® f / iiiiiiii / \ s. N .Tla O ,f • p �e Ni,,,_ I ' . , Z Z v m .�CI 5 `\ \ 464,', i ?. I'6 1� � ,• \- ,\_ 1 �'' % N _7D� •Ii/ dd o D O I .o Z041*rIll Z m m r z +A \\ \\\ `'�!/ ��© /if ` L'e irbil -i 1-11 om z N 7.411irmippr ampinvi, v.. . ,....- ,.,. .. 1) ›.n / �I \ \\ ///,moi v �y /+/ /�/' \ m m. rrr, O.. :: ' ik;7411! o ' ,____ ,,1 gifolofic // ,, / „..,„, ,/, „\ „:, _ • = OD 91-97 r♦ _ _ li) (ID O I) i *-.-.,'-‘ '''\'` W XJ 140 I Q ¢' e ? Z `Qin \„\ 90 . l ',` •,'�7 I `ti .0.• - m l,tyfY \ .` 0 r A N W W W W w W W W W W W _ WcW0N v n (O , ,, - o 40 O (11 W O� \ ' (� - II v v Tl(n(-) s z \ oz \�� 0 m000 (-, -1 oTo c v m O r” Z (n O 0 ZO n 1 °j� \rroo -1m m-t m ZA 10 ,-;OZ�n O \ �.\ N _ O -1 O K -( -i (n to D N ml C p '? \ -i pi _ D O m O O -•t -1 �•+ v, (n N I ... \ A Z O m D D D A' Z C C o `5-1 D Zi 7u �. 1 �,\ \ Z z m t ZJ A O O (7.. O O 4 \ . m m m o 0 -1N(n al- 2t i 6k Z O o O m z O Z ( O o ZSrri D� ,` -1O D r co O z m 3 N CO oO Z r ,.a CO A n o O n VSMP PLAN FOR: ESCP STAGE2- 5�ao �y O4 BMPANDLOTCONSTRUCTION z o. SIIIMPENGINEERING, P,C. (� ; SPARROW HILL Rev / Dole Description tion 2 El ENGINEERING-LANDPLAANlNG-PROJECT MANAGEMENT' , 10 09 17 Count Comments tr.r4 O N 2 12)08 17 County Comments - o 3 01/22/18 County Comments 00 ,,, ALBEMARLE COUNTY, VIRGINIA Fe 11.0 201 E MAIN ST, E: 227-5140 CHARLOTTESVILLE. JUSTINOSHI'na_ENGINEERING.COM Z To mrg D> x DA ana =,_.-,,-;. r Pei m D-0moI 2 8z- oz A F,,, Nm „,F„N 2 72 zmy -" jo u . z- DonAo cx2' N ' mo �o mim \ /o O� i *= a' crl n n c flip ov i',- -L-.Pi T • \ MI P o5 A S El \ I \ /i = V. 3-0. 5-0 \ ,\ ^= _oma l` mR, i VD pDln" r'-'-{rn c' ,' g ,tirark,,' _4„,4124_,Lti, „ ., _ .......,... __ = g' "Ktiall wiy.i. cr 2 N Nol!: _?, _laic ?°' .. f m A�oaA ovd 1`, VI O O 2 ' g' - A<G7 �I % x ;D mnZ I \ \� j[{\jf II N cryo x1 I I r; l eif---\ 00 _X01 m 1 ,. ..- -^'..,,,,, T, 1`` o III 1101 rri O _ ___ C*- yIII;Orn 0 v0 I I'.4114 0111111 ���•�•4.• �� _v.._� d 1111�� �. _� o / j� � p�A of mR o /Nbn� o VIES2p o' i; !rtai $( pco o I ) no / o /�J o� /A o 3 � / // \ \ 111 � �'� 1 ``\ y I n4 oxo onm➢>,o N'zo //-1------------ % /,r W NN A NNW F,33 mOr 'Y �i ^�•..�/1 1I i�//. DD D D Dm➢y D -~aO�. v_s-T • / •`\ � _ ■ 0.0000 D 2 g 0 m �'"'-' o �__- em mm mmm mm tim zcn)mm C ; » /� " ! ' , IIIIa - ➢VI VI VI N N N Vl Z D O~(N (,..-, ( ?Z*3 /1 j ■ o n m m t ,. , . / / ry)111,1 f // E:1 ill \-— ' C",'' 1 1 f /l �� 4 \ E I - 1 1 „qf 3it I cDi3R.s Iz I r E 0 o j I '' g —ii. I !1 .. fl 1 %`- \ per`_ X'1 I r` - ./m I ' v z 'ks,. \� +.L ---f I . 1'7/1 I X11 11 - 1 __-= _ I1 y l\ �1t/ .._...E. liI Ji i`I _ cl I1 G'1 ' � Jr, I :) I 410 . 1.:,11flifg' i 'III -(44''' '•.. • P 7 n \ \'.,,,,, ' - • !I 7, `"15"'•FS-P NI q a f N '-'7.`; 011 o n1.1 A 2 y R Ra pf o* 0 m m m n n n n n s D �} $5' 1 f ° S. c s v A a, z z z z z z to r y�K I R w .E -.^ t 1 - o2 z yn N 1n 1n N 0 0 o O O O 7,. yDODO��f5i` • 000 x 4 F O o O O£ O V J O; O m 0 m x, A .ROI A < < < < < < 5� 'ppC li i. 5 3 D n 5.?..2,15 '''z O z y< <. < < A ,R~i A A >Z Co $" Id $ 1'r jj- (� ',Sa ,1 O m`P ki: IU a i1; ".i.i 6 gS, o0 3 .. nn a£ v am Am m O Ut t fflflhW: c i : �› I! ij!J .z �:zn yc. N 0 0 n° ym N i r mDb tjf I111 oA A' eE ' 1 C • zN o m ,n T. n ,� Cy V `'2 R 1 A g r-?v 003� Q30 V'S y n c2i 2 o � 0 m o o r Q q- E p E t fi ..—...•"ee�� t E.rT o v o 3 o m ,R cl c o z (LI o v p n . g o )- s N ?I ^n a @ 7�.` $ y a n. D q ° "z C Z N rrl m: 1:, D m O. C:, _ i G -8 St .•Cv 3 9.. '. . r n . nZ:? o o g' x o * m n - - mnZ O -- r• 2. nnx < • • • < 0 N K OW 03 o Oio O n Z a p A lf° N .v Npso ? � *1 f oZzN ° .. um➢ r' , ynm ➢ 0 Ao mf v 1 r z N 2 0N 0 0 =1 ZrO ,1 -0 OO G27"g S a £ OO orU1OxO O '-2 m v 0mm Z C) •0a o Otnm > DI D _� c Nx D Om L 7 QO te° = -0NZ r.:1-IA m r - ;' mN S m rO „ mu, rz _.0 Z _. z ooo ao 30° o fl z Z O N o - N omm " z� zP. xx . xxx -0 m » z c -1� -10 Dm c " ' _19� S0OGO00055 6 Or , oNi ,, O n v m 3 m O m m O 01 -O -0 D n _I O _ o NDZN x TmQZ Z Z2r ,V D rn s C D _ pN = m WZ A O coC 2 7 m Z Tm 0NO E - m0, O0DZ0T) r -13. n °Zm r' D NaOa • -, Iwn =' OO Z rn 0 Z m _ 0 f m m Z 72 m 0 -I D ° ET � N rT1 m5 ° 3 w N N / / / ° _ '� Omm O e m roO' 0 0m -IO £ m j m m n N ON- O O OVI 3 81 ) , c C OHj�O p_. \/ AP PLAN FOR: MITIGATION& zy��. rH. �� SHIMPENGINErnTATc-I yPC �? _ LANDSCAPING PLAN a z r cin o spARRolki7 HILL Rev/ Dote Description mm m2 "N ENGINEERING-LAND PJANNJNG-PROJECT/MANAGEMENT 1 10 09 17 Count Comments `9 4 O N 2 12 DB County Comments g °o o ALBEMARLE COUNTY, VIRGINIA 3 D1))22)18 County Comments %E'' W VItk%0 201 E. M AIN ST. UITE SI ONE: (434) 227-5140 CHARLOTTESVILLEs VA 22902 JO STIN®SHIMR-ENGINEER NG.COM / / f I // / /\595 _.590-`� / _ c / tIJ— —; o\--- --065'- 595/ / __ co i— --- \\ �' I / / I I I / �� : 6 -- ,, \\ \ �\ \ , / �' / / / l \ I - - / i -t \ \ 1/ li /(/ / .. / / // / / - 600,/ 1 / \ ` \\ \ \\m\ \ r Art ,..„, , , $ , , , AL / / �� / /m / — —/ ..• t y_ /• 5 \ \ \ // / // / �/ /%��� 65 / j/% �- J — J /' f\ \\ \\ \ \\ 1 '400.1111 ' —— '' i / / / /, / z .,, _ tia i , , , , , , ..... .qqt i_ 10_,__ •1110111011111111.1111 ,I •NEMOIPOr°44 / 1 tog , , . r , , r // it /I ,/ // /// // ,__ i / �� vv vv vv 1 1 vv / l / I // 1 / / ///// /// y � 11. / 1 \\�� _fie. —_� 4 1 1 1 \ // // // / // //// ' i/ /// 4. �� // _® y__ _________ w--- __ 7 bas-- :N \ II \ ti s / ,,,, o , • / / , i,,,, \ \ ___.-----,320=0.-"'"1-------='— ----------------- •--•-*Alt\ .4.101.11.7 \ 1 / Itl / , _ d \ - - - i / ) / I 67 / / f . '-' '411k----/- ra / / ,�/*4f / ' 4 ,LT / / t yt� / \ / - 11.4\ - -1 \ I \ l \\ I J •/ 3n \ / I I ' 1111'='11 / / / \ m \ 1 I\ -\F / I 1 1 I 1 \ I a 11,1111 / 3 E 1 ;,s c.•/ ;, 660_\\\ 111. I \ 'Q£'. \ \, \ \I 1/ , , I / 1111 / I / 14:1‘,, U / 1 \ \\L— / / I — \ 1 \ \ \\\ I L— / /o N /3 11. / / ,WLII \ 6 I ( II m \. \ \ \ \ �.. \ \ r 1)ot ♦r Al-,:l 11.1 I II / - • - / / / I n \ I I — tvi11 / I / ppppp t 11111 / , , / „ , hiN lall I \ , : \, .. 0 II '1 I \ \\\ 6,55.\\ , \ \\ \ ,\01 \ I �.. \ \ \. -- 0111, \ I/ -5i I \‘,\, \ \ S 11 N :/, \,/ \ \ 9 ® \ L\ \ )''' / 1 \ A Mg 11 \ I r • Ml _ \ ,\ \ 1 • III N. Oy9 1 \ \ \ 1[y� \ 1• m 14 a C I , , g 4, _ V / . \ I 1 - / ) \ Ill -';4- s�o , — I �I I Vii, \\ IIIII /-duel 11m ii.. -/ ' 11 \ �' - I 640 ° \ \ \\�/\ / 1• Alt \\ 645- /m \ \ I Ikn L _� I \sS 1111 //� I ,,._______._._ �'._� � , . 1' I moi`/.,. i \ I \ \N. � Jill ' , I \ -\ i ... , \ / '/ ,I Iii......... g \ � �� fiD\z\ I/1 ! I 4 0 1 •,•-- / ' ' ..., , \ \y,, I 4 s .� Irl \ \ *,,. I I' A .:.,il/ Pi..,„,'' , / _ / / 4 /// mi \ /� •.� 71, 0 N. N. 11 11 / \ H F _ _—_—_—_ Ilk �\ fl u0i // i� �� kS \ \ v / 8l� / // m g m z v m i / / /' / y S m rn- m 0 ���� -� - y mm ”' cnD/ o m . zzrZ -.xiZm 1011. (5',' =n n o p J Z { D_ m r co N. / / (3 / -1 Z A r*-1 O 9 C.m O co A W 0 \ \\ / Com N A,Z -.1 X " Om = i- A C Zi Am Da' DU O cl= ZT m . • IIH Cssi • 1m `''� r= cam __I s,,,, c n N m o on T °hq n o z to Z m= m N o-5 C OAIMO' . �o N o o O �! VSMP PLAN FOR: y. z y y SHIMPENGINEERING, P,C. = R V PERMANENT SWM PLAN ,f z y 0 o spARRow HILL Rei N o1,� Descriptionome "x ENGINEERJNG-L9NDPLANN/NG-PRGIBCTMANAGEMENT 1 10 09 I7 Count Comments O 2 12108 17 County Comments S �' ,N5) 3 01122118 County Comments CD •,..1 ALBEMARLE COUNTY, VIRGINIA Fe wvtc�\`'� N ST. S ONE: (424) 227-5140 _ _ CHARLOTTESVILLE. VA 22902 STIN®SHIMP-ENGINEERING.COM %l.Iso F., g.,' F}, . . . . ,,,,. z 7,1, ,_, Ills7_--- \ (((( m° O o o �\II r�._ _ m I i1 I° v _ //�j/ r(/�/ O o �� �� , � 111\1� O 0 g \\II�����(I ,/ITI��( n o CI)1, i =I I'.'�,� 3 I' 1\ \\� ° C/� -<cn \^;\ d .04.10 " p 3 v LTJ _ - :i'4:, y �\ � `�♦�i1 9 m e N o o n 1le `\ f (IIS m / ‘441.111014 -I r o 0 o E p - \ z H (� y 1 I(((((((I m m o o ==S \ �7 H 7,.., �((((((((/ 1���(� 6 r �r�S;rrt� G g m 1 1 i,u//. c I. 1 IG••.11`I ,' \\ �Y/111 < \ Will; a3PO 111 bl ��((((((((((�(((� �(r,tr,( _ _ E i ti`r' \\ I I ����ii • b o 0 o r� IIII+ I' "YAW N (( s r ` � Ci SIJ 71-1 I\ ,s _ ®�//IAS y =1 111 a 11 'W It alley git''tl • �. A' "d 7 SII ':° �J Iar:�'rr EI (Th m= dog w p - --;---'—'1 117 .���..1 �IIL. All 0 c ip �v s�::rt{{}{{ �- \ ,`i,(/Y 1I5f r '�111 r m :1,j Yf s.%trh. l41 rrr :..,1 n N to SSS?;v}'•'•g4 •N•NrN: z G� i SYS•: 1 irrrrrrrrrrrrrrrrr 1:::::t ���� I 1 1 lit z N m m � r••N•••••• ...:: '''g mN nE m1T�ys�t''• U��i, ••rNNNr• �:::_C . 1 1 �� o o n :let/v �7�D A ::• r:.r ♦ r•NN•NN {••• ,'1„ ■■■■ - o o IIIg xtt tc- !••••••rrr•••••••r•m z r<i sYS r ` ri7iiiiiiii• M■■MMA F mgt VII= I )hSrrfR ;4 NNr ~ QF, hos rN•N•N•• �■■�■� m o'zz r, 1. trto) n m< ssv}�ss y� v ••Nr•Nru" �� `� �� IIII�Ii f �i~iitth•. m •NNN•N•' — C.� o m 'S^ }y1 f 73 i••••••••••••••iii ■ENNE aAv A �,,/1��� l r 'J y V N•MNNr• 40 =1 ♦� •y�H � 9cDS t A �itV Vl �rr..NNrrrrrr I�,, ,.Z m `a � /IP-C N B ;g f { , .1 -o •�!f,••• ■■■■1 "J y r o� Aiv 'yt t, 11 m •fit..N o aièsJ< •�•.� 1 1r'ifiS #. t. l� �iSS4 /-�. MI INIM y g z o • ., .: ' .••• I c yo r . lTJ �, cn 1 SOILd i' INN•NN• C/] m m ,r'' rS i �iriri'iririririririr �H. m e°e ° 1i�y �R�•j j1 y D l�il I it1 J ♦�6 ••Nr••Nir O �oFi Ii' �.!: 99 (� y. rrNNN•N Oply' 14/ I /et rr•NNrN m [ •Siiii�iiii�IVf�r.1r I.MA.4, ' I ® ro z K m <,. , , ,, o ° o �\ Z rN•NNN*/ - �i z o ''' F \\ /� •••••••••• Ji IIIL== p m �\ y II I < �k ., V ••N••••• / mo m li�s•NN} '� ' om ���I m 1 ,, � iJ ) � N•N••• ••i ISI n = 1 1 NII 11 ( �I 11 a '2 a A d a ii 1 g o?, o K �o � F y gggg a y y sS $s 'v, c ttudrill e ; ; e€6` c ve ' g O �� '� E gf i � z F i 11 s _ 0 i I I € f t. tm ci p r ID s=.1 1 4 o p . ..g �' .0. 0 1 5 WI m Y A ' '!r P. 1 4D 4 '' -' C t+. 11111, i'.CI 3 li I.O�CI n Srs g o _ - - - - Cw `'t 3_• - a 70 U fi IL _ X 5�p vc gg� 1. �' i I z -3 o 3 $�a�.n � a � s -Q o.g 242N �°cn :d [1 ; 2"2 Z H 2 A 111..3 1: Z:f k l' 3 s''m., r Id . ePs I O w g, 'a 'n ° N° r >S° & ��e$ c 97TH $ aG� IZ . �.s r" a b �, o N "5',y;58 o is64 gi !."...21...� 8.,, ':qk z z _ vi e..-s; 5 Y 10 1�1EQ� �� ��9 �Fa Id n r Q g.-I5 g,eesa ,1161 ag &Ea H III.j1.1' !i r; 16 I P - *-1E1 25 qua F.. .:,3• �c-iF Q a '�'. vo. Ivy 1(1 I1,1IGiE II i# _ xE g? <gaa� g s� � a g y@ Pt iii 1 iS Zi i w A p. C ,, NO Ort ?' ' 0 S " O O O O Et 1661 • ° 3�� 3i_ns szxz xs °n>; yI>. 9�yP Qc; u...0. Veg n'''',3 'g Q N b •°'. °•m °30°ns 2l i u•`3 0 ,. a A 8 d fes° k`.1c mafi y,. 5 ,•.i 7i i• -° �:4 � V ��,n.,-a' Q s Z I O C S .k g .�x! > '3 a c, O" P.54-.- D n e S o : z q !''•' \ , R-r �� spa It q 13r, SF? , iI , CZ/] "y 10 1 qF +'' { 7,:,.+5C4-0 � O �© - n s i s -..:,, ,,T O —Tr \ '\1 pi 1 u ( m rn o$$.c `I µ �•11.1 y ..2.t.., .y 7 N .-, - ...:, c ...--...— __M_ -6. - .,, -Zt'i o o N A o • m Cs7 I I s • i ; l� z `+ H �n o �n Z XI 'b'g.E?a. 1' 'i tor, N IT s r�! 1 5 t1 • Ana °n3 a: �a '-' H > 3 " ' V d C) n LIII.. _ Z 9( f� c#.as z " ' 7%4 A, O 47 °• o° ^' o a 1 ' m. .L,. ti d 1 m II,^nom. ? R g. 7 �o ] '- ct� N E _�u y = b f o ^° i �£ a� 352 1�i tl oma COf4f � o VSMP PLAN FOR: aya� o 3 SHIMPBNGIII�ERING, RC. o n EROSION CONTROL DETAILS a z z SPARK O W HILL Rev B Date Description N= o 10 09/17 County comments ENGINEERING-LANDPL INNING-PROJECT MANAGEMENT (r J N 2 12/DB/17 county comments g wro A1C O 3 01/22/18 County Comments CO ALBEMARLE COUNTY, VIRGINIA FR vtc��� 201 E MAIN ST, - GH ARLOTTESviLLES VAE22902 JUSTINOS,iIMv-ENGINEERING.GOM L., ,.....„ , U® z I x y tli IIIII� -L b012 NPo_ P I==111 4trq , ; `Ir 5 `�� o `I bc.i I III a !1111111 ii MI s = b pi „ z _.o '' o = Jar o z _.e� '� te CT] % RR¢ c e�a r.., �� -p ai ppRlcE¢a@ �, ! sig tl"�n� ei ;: Ti\ /� 4 k 11 .4 T— - -5 tB"-4 6 as 148sew�a��an ¢d tltl..R¢a�• ie °�¢ "A \�„<'...'"" \+ ; xa'xeg W ' 'j” Zv &. A;! i' _ ::; �.1x01, (( g:.. P !gg `n aI.eE I �¢�8�� a9" �;I1�2!� �PR �5, -,--. g P �—Irt 1 1ygI� ���� ai , !$Y ION T �n\\ '+ CIrn �/' 9 ���11 -I II I 41 V t i* 1 CI /y '� a 7ILr m � \ .l e,;, < IP !o �y�\\ fie; c> 1 I 3 M 1 CJ r1 R'¢:kg �_ z 7 m M I / sn nneewsseen Sii.. P il z y 1 zmo p —1 T$ $ m #a u,• q�b 11�1�1�1� o� R Sp LIW (I-1H— a' A I� lil 'eel �S Illilllll¢¢ O NO 2 Z ,�� iiI q d 6; tTi m v 5 : 4 rti isnII o' / ! - I{r� y y [may 1111110 C L-►. dr 0.0 �� N a 4---5,5,4*-` C ,\ll¢ dr{ Cay �11111� z i 1 � sA4,4,434-4;;,4;,4- ".1"1�`�'/I L L7 LTJ d 01 rn rn- cr, rn cr, cr, rn _,ON N W W A di620.45' cn o cn o cn o a 0 612.53 11 :� o I m per ' �v m 0000ca -lz 2 t l' • m in , CD CD 1: I-- 'ill z '7'n /� \ �C m fl o <� r n 11 S t7 0 PD iD .. ti 'N�or'4-''0.. G7 1 A n1� +,624.37 �� ! ' t O N O J p (D N '-(--'0 go Z ASItS 17. ,; Z o m Z X d ocn 621.50 in 1 ...;_. ' N ao o in w au o �, z ♦��h��i��.�1; y A G7 m 8.K. n 1 a y r� co o u a w o vo �, N > o ��!/ l�Iy����� c r 401 t'y 'b4 C p 5I t�-y+ c ' 111 ��li�•l:,ji!i�iire CO m .IA, $i m m n� T.. 1 I j P, \ IN c E w w w m m �„r •��' ._u,���+ ♦ 'ti cn Aad N --I L ml J'. I �n NJ 0 0 0 0 o O o �o 95 za0r t.,1 Db U ' -4.CO i u y� I rn O gm � C7 94� i „Z �e� c.„ I ,I �`i r V(o ,� N N. -----c) �. y �� 7��1 cz t=i - A.1- ti N o� Z ( „I I C„ �' -I cl (Ni1 (Nn (Nn o 0 0 (Ni1 O '�i0 1m`n 1- ,t!,. •O `. y 2 �; L~ o u >= ��£ z 628.1. III �I O w c,+ u rn rn cn w r_,,i y A yo,y s iSy t/j Z -,T O w O 627.6. x v { t J V J 0 0 0 J ,+ 0 `� o �1 . y o o C ... A A o Cr O 1 ' Al ce co O o O Ce �o - m [31 1. `o 0 .-3 :;i( z �o .D r m� u rn o m m rn ui ^.a 1 I Ciy o ` p la o t-' 0 0 0 0 0 0 0 �o . Rog -1 n �.. -i i.n. w LTJ a o a o a ti IcNn NJ `O 0 0 0 0 0 0 0 ? a� �♦ y co 0 s s O ,Ni,'i�:�min.����1♦ + 0 0 2 o o a.,�. IISIIl 1i•ii 41'1 rn rn rn rn rn rn rn 01. 1 a O U O ., O -.9411411,04 ipie 0 - .1 ,, d terelVaii•e' o J+\-- x o i 0��i7 f SI\_ Fa 4.t1 1 „\ ,, -;,,,#400, /As =-.. I till I I o CR „l'���� '�,,,e- �� ���► 4DIII11 �n 0tg,\ ; , , 9,,� 1, �,_, . :� —1 e,.C7 b< ! n 1-. t r— .210.��� I \ / °Qol V�O ar I c-)Iij t! b 1 I +q� + i/ III \\ 00 N IIII' Ii l m `U z ?Ott \ + v l K I +a_ n y 1c 1i -I o f ( ,. —III III—��ii :1�°i bN \ l/l�I `ti n �D D // m m tr2J �¢ 1 +yrGi1,� ti \ \` ^C�W\/I I III o y o 1\yV,�l1 N Z \\\. I� ` \\op �\ 1 Ir \\\vti�l1 ~lm o W ~fib �\ I mow,+= �- �\ O \\ �/� '° C r, i' �y 'b\\ \ \ \\0 7uaPooll� I \�j cN y \ /./ �.,1 e. �I I m 0 Z m ! L z M tiq �bt=j �tll \\\\.\ ice �. \ �` �� � I ^\\\\` yII m O 3 41 \I� �``' j/ ro IEii AT a oe /;' 1 \\\ \\ JIII/ \ •t y�� IIrrd i I �,_ - I / \\\\ I 11 I I \\\ le I if li INEILISIIIVLIWIRM .f--_. ,1 7:1 1 1 f n m \ \\ / I 1 I .A Z \\ � eer, se- �I .! 0 m Co 0 n z Z o o z��• ,-.:.5: SHIMPENGINEERING P,Ca " EROSION CONTROL DETAILS a z `� C7 VSMP PLAN FOR x .s `o SPARROW HILL Rev Y Dote Description e:.....N 0 o o/Ds/n county commentsENGINEERING-LANDPLANNING-PROJECT MANAGEMENT C71 N 2 12/08/17 County comments O0x " ALBEMARLE COUNTY, VIRGINIA 3 01/22/18 County Comments 4 wi 4S J Q VP'119 201 E. E N ST, 5 3 E: (64) 227-5160 CHARLOTTESVILLE. VA 22002 JUSTINOSIiiMP-ENGINEERING.COM Nilo', No rare & g o NV N 61900 96-CNP DETENTION PPE fa 11+6 • or,,,E, sla o+1150EoEo 000 620.00 ■ TMH 1' 9 N 629.I„�\i■",�,,,'i0P 434.25 1 •1 10.1614. 1 :1 I1 1• 1 `''iii 8 ;� �7.72r z 90....,...,..........1:. � T! 1� o© o, m 1 1 1 � -_ cn. - o m g Fr', m m a 2 m 12 q <n "8; ES-F a •n N 6341E 1 _ I - IN�3.�0�1\ 0 CI ASS J RIP-RAF'.. _ - I C) +o I ''''\STA, 10+00 00 I • 1 I I y 9fi CAW DETENTION o �f 8 TOP 606.0E INV OUi 63]90 © lot STA 10+00.00 I N•'IN 633.00 TOP 643.6 INV IN 60d.00 -- S1A 10.¢•I - 1 1 111111111 0 c II a'soft 26 I Jill • I - g I I � w e Li. 1 i:: SEWER - 6 1\ INV=610 69 I m • SJ +'. : I �' < 9'DIP WATERLINE ' ON 111 ' 1 I IINV 632.Z41SD SEWER 6�SOP 26 SA I I - � ly I I ,IN 12"'• �632200 y � INV=641.00 Ii C a.: 0 ...I I I E ARANO ,' I 1 R 1 . .1V NV OUT 634.30 01 36 2 6 iO �_ 1 i 17-• I • ILL 4...,--- J INV IN 634.50 IIIA-IOP 641 81 - e 1* 1',i r I 1 I I .I:I 1 w� :I Js T4 n436 1ni ( ri 1. I. I • g;.-; Z ,• • l ill , _,,.. ,. ,,,,, , p e•pp ATEREINE>. n ® I 1 INv 63769 L. �, 1 n INV IN 634.90 ,%;38641,.8W, OP 64�84 " Cl) I �� ^� .�, IM'our 6347E d>B E=6 15 I - .-oil c V1 {IA 11,69 11 8 NEW DI-7 i u Ca I "� m -- - �, �,• • INY OUT=63900 10+66 70 s • V o LTJ 8 I, I 11. . p �. of a R Z 1 I c b I I ` a_. mi triI1 g it 1 1I :111 1 1 �. • A S 0 - I I I D I 1 1 - - I f I -4,s111111. Continues on Profile 3 Below .-Ti 11 I •• 11 s" U o o - I I INV OUT 63550 = o INJ 01T 6450 , .■„"11© N II` 101'652.35 n 1 I 1 Cd I I 1 INV IN 6}S,U TOP 642154 ' © g 64..20 6TA,1p}1111 1 1 -5 A 12,2225 j 11 a I =III I ..j ( ,1 11111 1111 j C4: 1 II 1 • 1 1 1 m-16 L=8.IS-1 I I 1 1 I. I 1 IIJV OUT 65260 2,,,,r,45,2„2,41„.. v n INV IN 6528 1 ) - o i 1' td 1 �657�10ERI NE ® I:j I ( • 1( 1 .. 1 I_ NV OUT 630.44 � • 1_ I I i 1 MIN lY II wv IN.631.1 i 0 1..,........-..,.....,,o� SEPARATION - I, �' '� !! j F� - ( I I I Jli 65090 I � 1. l .. v; 8'SDR 26 1 1• I I WI - M IN 651!0,® &� �. : SAN SEWER 1 1sio ,- , : \ 1; , I. I 1{' INV 65220 • I 1 Mr OUT�6•�OU DI.-SB L-9'IS_ 1 1 1 l 4 _ INVOUT IN 63660 ,TOP7647 aU 0L 01 . . : :: 1 I • . TOP 65]13 ''SA 12+0409: l ! I 1011fl\011 • • I STA 12+1626 I _ z 1 P,g I z I 1 F ter, '1 � m o 1 E ,I 1 I•.I I II om 63zoo E o. m a m •r N I NV w 642.50�1 SDI 8 1 v N U > o NV IN NU 20 ., 1 ' IC 8 - . 1 o u, ( 1 (FROM ABA) I O 1 1 I € • I b ® � ES-1.9 CLASS Ai RIP-IUP I - 1 1 ,5 •''J I - 1 I A NV OUT 62790 STA 10«00.00 O 1��, - J I ....I Ir. I 1 .- . '1® 1 I. C/0 8 C/1 1 (� 1 1' ( .1 . I w 0 1 €.. o I 1 1I • II l I1 1I I 11I'' 1. LI 1111 1' '�R.. � II 11111II I ii : • I 11 ccoo- II ll I : iI. 11 1 1 tti7 _ ni .:1: I,., ( 1 �' Ill I 1 1 i5 ..i ■ _ 1 1 11 - d y • 11 0 `d - II Ijl 1 O y 1 1 $ s�i 7E4,,,I,,-,,..„14 1 11 1 MN 066 61261►�1 ingJI 1 0 y NI sa t I IAV IN 6sz 60 t I t I ! sTA ,3+E,43 1) h I "I/II = + CO I r t7 LTJ , I 1;;) I i. Continued rom aro Ile.2'above 11 I I C� t d 1 L:f;,-7'... F,' F,'• 3 E R E. ,, i _ I III INV Out 63390 ��DI"BBE 6 15-1 NV oJ1 630 00 -I - ■ 1 1 INV N 634-10 IOP 64151 "'� O DI 7 N ,!� td I 1 n INV N 64]90 1 SIA 13.3291 INV IN 6J]2 TOP 65024 g' I I i r1V DUL 62640 MH I I (14N41 g"OP WATERII,��NE IT INV IN 60.5.0 STA I0i0000 - ■ �+ (/� •I INV 64309 '1 (1806 A9) 11 ■ t� I INV IN 698.60 I 5,4 ,L O i I 1 j 1 F, I 1 SIA 0.9411 - I I MIN 12 I Cr, 6 e `�. + 1 I SEPARADON + 1 1 1 '1 11 • I 1 c� 504 srwrl ( C. o 1 LI- 1( -INV=636.51 I 1 • m 1 • INV our 629 d0 DI3C L 8 I$1 I I bUi 634-3E 01 369 16 IS 1 I 11 Ii INV IN 6J9.00( 10 1619 1 IAN IN 6345E�� lO64752 I S1A 11+1739 5'A 13+6h 91 • i • 8 SDA 26 1A 1 0- 1 INV 6 QJBR 1 1 1 - N. 1 MINI2 1 i I I 1 PA nDN I' I e'0 WATEIIOINE 1 1 ( ( ;I I • 1 1 ... 1 • 114V0IN 62950 31008361616 S a ' .. I ...: ,- , I.I + o _ i 1 1 II ' T T m 1 I'N OU#1654.10 i .STA 11+5079 • .1 '' 1 • I INVIN 55430 NNIIl.'I, 1 (I 10 I 11• 11 � I rtii,� z 1 �`-).■O/O - 2 1 W Fr o • 1 1 1\ I 1 I I1 1 0 • !I 11 C � p v(D 1 1 S:Ti : . . 0- v) 4, 7 • : , cn 7." 1 --- I ND •! B I R I I1 � IH 1111 P �Noo3 INV Our 631.30 Y11' ■ < N I 1 - 1 .�;' S + 4 8 NV N 50 TOP 63740 '� STA 1211568 1 •� 1 ... I ... v p .�-t .1 1 .1.. i'. I 7. 8V O )W I . -p -0 U : �B DIP wArEI1INE / Cn - INV DVT 655}D :D16-' I . I y i i 1 L 6105 y / 1 O n l� INV IN 65540 I�1" 1.- -dl r j D=.• a N u I I. ll�Il i� 1r'yIL 7 1 > : 7c a ■■■ '. + I III 8 +4 : IOP 6+220 T li I 1 _.. I 4'n 027 I I 1 4A 15+0_2S I ..I - O Cn Z ^ 1 td , , � • 1. o° IIr'''' o 2. I mOPIA T I I 1 • ' O 1 N OW 6sesE no Dw N loP 6s7 00 9 I 1 1 J . STA 12+9308 I 13 I 1 1 I M 1 1 - I1 I 1 I1 I 13 , �O_ • 1 11 i 1 i I I 'I 1 I I 1 g i _ _ C�-O g OJI�Sb`d.®�OP 65950 1 1 I I I( 1 1 .I ' 'Y co E/3 o 1 I_ STA 11+99.70.-:...11.3 :1 •� 1 I I X29 Nn,OP1l5T YARD DRAIN S)- 9 1; • 1 IOd642 50 S I i I 1 1 1 Iii .. _ STA 12+1036 0 o 81O2 Eli Or:' o o 7, o 2 o 2, o o Ei o E E D oma c ovo il :42 n 6-• 8.--)N �4. SHIMP�NGIN�RRING PC. � ' VSMP FLAN FOR STORM SEWER PROFILES a C'' "' co Rev 0 Dole Deseomm UN ENGINEERING-LAND PLANNING-PROJECT MAN,9GEMENT SPAR R O W HTT,T, 0/09/17 County Comments e x T. U4 -, N 2 12 08/17 County Comments 2 U7 o ALBEMARLE COUNTY, VIRGINIA 3 01/22/18 County Comments �4, w� .; 00 J FR V1N\� ST. SUITE E. MAIN M PHONE; (434) 227-5140 CHARLOTTESVILLE, VA 22902 .1UST1NG1SHIMP-ENGINEERING.COM 'rr./ '\.r✓ .../i I I I . r /: �, yc.* 1 1 J j I ( � � RFs °` � ;:F:N� m ;� S. /rye\ l / I ,. 40 gm I 3 F1 I(5-<:,,,q0, ./ : 4 . I II - / t� F� I 'S 1 Ai �, / W OQ 1 r. �� gl mjiI:h % \ \ \ \ \ \gi I.-ci -,,,K i',4,,f1 I — -'73,TP I i gj I t.-'''s; r. a I Wi, 1 S es Iii 011 p rift 0 -t78 r9 40 1 - ' - . ,\,. r 114.;141424*:!1!4!2111,7111411ITOli, ill*e_111.. 4/- / / 111-0 U 43 I , r \ •IIFFA‘ I,':..':i.'!..'al figrr / / �.1 1 p, iiiu _ o plir . .�� 1�� A oGi I mm t '• I ( m ,re o,-'2S,ti,i��% A.QO�4, j l 9�,F�G . / l.. / `o Dn _ , cn� �.rip g IC., I jCC ! 7 rJ p +o I a� N mgq'm d. G`'� ' •O�.d11 y 'e I 'S ' .--I ©tml _ IN 61760......... ...I:..:..'- I ...._per "i_. 7... T 1 l I 73, :, I 'k4: ��`�b•{ I T VI ? +; .;1: l sm ��,, > / �' �d�;.l���li�ryt I I .I. I IW T CA a I .y 0 1 T tt $• 01 ^> +S- I i•� Nrn w�� ..N�Lo t,�Z.F.� S'Q I f^ 'N fzAmz��m �1 °° n ', � mov 6i I1..i° :pr .+�� FQ I I t��N _ i o �. y -r sJ 1`� . ell �/ ,`cy- ?"2..'�to =_�,o A 1 1 J' ,,Q I. I z! I 0;1's!'1� 1 I Fye I I I Cr' 'io•=fc� V, '^ r— �J I. I' NVti \ V'^ ;1'o t>1;* ::1 '14 II I \ ( �I- v o -" m 1 - N Al'� _ _ L ' I ,I, is \ I P. x Ila,',., �!.�lI cel I v \N m o I � I 11. s�n�1 �D1r-,1 �i yG�p� , . \ „_., \\, 9 I 8 • \,,, _, ,0 \ \ I ='X1''4 w ,L+jA \ °tip \ \ _ 1, E a g Fo n P �%1 t • A E gA 8-. S v .'._ 3.o.8, ,_n fig! s' �� 't \ \ \ \ \ \ 446 - ' ". ?--F^ O \\ I`C�O '. ' •, ,kt va',0�1N\ \ \ \ • ) 'A g — 7 L,-,,, grg, g.to \ \2,2 a 'IC.S7 4 IA 41 001*AIM*A' \ \ \ \ \ I• P \ \ \ II ; \ \z Iii '• es �*11W4F .• 2 a \_ 1\ W°4 k4Sc *14 rk#V44 \ \ \. • \ \\ ..(1 ,,/ '7:' /j-,Pd,,j;:4- r'. ..‘, 117k.4:.,"tL47:11rdhaAA'kiiiklb iii. \ \ \ i I f . I � I l�.\��, I►V\ \ \ \ \41\xi '1,:i ivo, 'I \ ,, =aT � A ,\ .��•,\ \ \ter, tt m II kfxIIIII--:* ,4-.-...® _yu I \ \ \ \ \il.t, \ ` j,,�s-\ 10101 rTs-�c a 1-e TI r o f z \ i \ \ St \ 74,474114 \ \ ,% ,, :L,i5 \I\ C5'2'\ ‘\\ \\\ \\ \\ \ \ : \\711;‘:;P:Ak\\ s \ \ ---.6,,F,. ''.._,'',, \ #t4itAk ' ! 1 \ \ \ \ \ \ ' ••,\ \\ \ 4 IfP44#A . ® I • +� m I ` _ kit _o I \ \ \ a\�l� ♦���AN, tri n 4 A qw I, \ \ \ \. \ \� :'�• ®`�r� . x o Flo o �' _ \ I _ J 3 A QEF \ \ \ �' \ r, ����,; �, x _ ,. tai ® \ 94,, 0- \ \ \ \ �I,�I� -, • \ e & \ \ \ a'• 2 I 'e, -75:Alki / I s'..-0,-,.. -Fs,�o\ I \ \ \ m-ii o o t o \ 1 \ -P<P<(: T 2 I 111 \ \ oQ..� �o ,. A _A$ amP \ I \nor' moi' "RE m;� vim' rur 3i„�OPo..OR�:ir �r• ` �( er - gig= \ arse 1 .\ . . ID mAm r �;..4.!.', �l z --I U,mn z _ :-1 , , PII CO Z n N ti &� M �o1. T 3 3 - $M Is p �i m o a m o 71 N c-) A m O \0\: Z eAFM o A \ m�cK1 -9c7 • f m' o t \'A Ili ��,��� >§ 9s v < Xi nnm z" � \ \ , •�� A cN C->on=z I \ P g t [Fr! i� v (r Ln �, D II aA 0 0 _ •aLr q'II �N o n .Tl Dr z m -1 'U o Z o mpg. g �5 ^gym moo x -7 11 w d -1 W T] n_<_< Z 0rn n 0 'Ir o a C7 Cn -70 < r t/] ---41---- oma coyMo O VSMP PLAN FOR: BMP sy�� z 3 �� SHIMPB TIINEERING,P,C. own \� o oz 'r o ' N ; SI?14}?.1?OWHILL R�/ teOmENGER/NGL9PNGPROJECTMANr1GEMENT U7 m O 2 12 22/10 County Comments b J 3 01/22 18 County Comments %R w It.47L° 201 E. N ST. SUITE M PHONE: (639) 227-5140 °o ALBEMARLE COUNTY, VIRGINIA F CHARLOTTESVILLE. VA 22902 JUSTINOSHIMP-ENGINEERING.COM • `r ■r0' Np f ! I -,74,'5' F m m m o e\1 u • . u••i••1• • c ,hYt ,gym• �A_ L.�� �(j• a A A ; c - oY49 ,i 'w.�5� � QQ sS ' ma oMnEo 10 i. �-� o ornm 2 vbn I 1H = o y .A 2 _ - —■ rr 1 I" I •Q I: f .i',--6.. lr m�cr• j hIII b .� e r ,, ii p • g o c� 4 I.. o a .2 o U I 1 cn- A o t + a d ,� P C7 m m _ riy ,'{ r;,,,°- -ti t' LTJ o n m on°P 6Az Hd •A. ta-T, I b 0 `,..�� : N ,1 C7 \\��., Pik* O )k 0, ° ' A _ .!;".• • F Z m\t : =fig N�z t�� 7. +°m o � RI m 7" zGtl �s0 o zK I � X', v-0 tml i n 't-_ a 0 a CO o {®� 46�ui�►il{O(; zlfo r=3> Q 0- • 73 M • A off' - ! Y�-• \ 1 �l, _ _ I � og 1 , E ar F9 NAN CmN �� �F A > a • I 13aa(e up®p m o • •� 1Nri4e•'• " ' _omamN`2'7:: z t)aaa \\ \ S'mam' •0 ,Ili 7 74 sT;f ::' -Aon gr.- - o$� m =m 4; icy A to D.ftA9 � I , • g ,: AG z z \ -I 9 A oho•s PV �t7 1 • • • • 9'^a ----- ice o I ® tri y '�r' t I t'-' -4: `Ti N. N CO D z o O 2C O A -i m m p U r m r • 17 ; IlleiM m x 7>K r K v. €€j6pG6 N 11-m'Zm-17 >�_ _�' FS, FyF op - a-] fiq�6�8� 7R ri I y m 1 >m� mop LmA ;Y4m mgP, _p5 ad p A m =D D, '�\� Z A m m m z o W .I�\\N.\t\\\ z,wave \\\ • D z G p- '---3 p Z] C7 D Z -1 C-J Nm—'Z m 0 N r=1m inn 4,1 1,3aaa O r C-. m -N -0 C3 m M zzo Z7 m m O n^: r .7 co< Z�� C -< z n � *4.4 SHIMPENGINEERING, P,C, n ^ 1 ° VSMP PLAN FoR DETENTION PROFILES s z cn Rev Dote Description m ENGJNEERING-LANDPLANN/NG-PROJECT MANr1GEMEN O D N SPARROW HILT♦ 1 10/09/17 County Comments M S ? U. m 2 12/08/17 County Comments CJ - o ALBEMARLE COUNTY, VIRGINIA 3 01/22/18 County Comments . w 4$ CO J FR VP° 201 E. MAIN ST, SUITE M PHONE: (434) 227-3140 CHARLOTTESVILLE, VA 22502 JUSTINOSHIMP-ENGINEERING.COM !1,`$11€!1111 ll p X11 1111= R• O m N 8 0 ID 111;111181 i s i 1 w S, ,11 lo• d C) I " r7 48 HDPE! .10 a ® I 10 1 ; �i 1 i Jt1IIIIi I ii : g I F "'i--� x ' o+oo.00 o r g 1---.'- 41 e 01111101 z m I= m o ,•:,::::tio,i' n $ 1', STA II, tri 7.;m L � � H' 11-7A Pi 11 9 i `£'g_m I151' 1 v7`Z to _b12' . ' 'i-.I $ SRIM 6'2°,+. r0 1--3 J3Cn ioiii 8 ilill $o=M �• "1. W . O me + P 11 , �/ >-� ILS n C) / 0 mo I o U o o zE 1 I 9s p gllm til w lu � : fit '171 i t-' i 15"HDPE IIIi . 1Ntai ` ONNVIN 61340 -t% a STA 10+37.0 ds 1131 -_ I a I W 19111 €� + �F _..... o m o+ I kX ® ,.5+.-leis,a" `. ys - aR INV N 6. 7 I 96 STAP10ar0000N � ByS �ipPi - 5N i= V : : c' "" m .._._. .. O OP 624.5 FI � S�I � atl II. ... ' ' 1� . u- NEM'DI-7 L J,-Ao . Y~w INV Dl' 61.' STA. 10+06,5Mp c �! 'I I s :E • RIM 626.40 u, u, - 'I 1 'a m TJ o SP a C7 ".� 'A- Pzi m 8 0 3�G.I. I' tip INV OU'q-.0 Io ♦ NE�"l MI-181: ,-�3 .;1.-01 _- F- o o ! I I r INV IN 30 STq'. 10+00 00 O t=i _ -� Lri r. INV m 'JG I 6IM 0o6.0c1 `c z • =1 I u lots { - u�' N a 09 g 'r a 1 -- it Ise 0 -E ti u u v,l 1 �ji --+ n m 2-1: -gig-- , 410 iR I n s C) .. = 41•4 ,F.AC I A I f 6!!{{'10+56.90 3 0 c -a \I . Ce INV OUT 11002 ^NEW MH-1: HIRAI 9, " � S 6@ • a o .� INV IN E 11.80 STA 10+00.09 1-3 o. ^ - r�rt�-d A u r/ INV IN 610.20 RIM 617 30 y�7 o .g,-1. z p a (FROM 01) I ... . --I u S 9il' rn-�,���' o Iia R. N ,o, o UI I 1 j ! t:,) n I O I I I u, LTJ O _ I-r p • 1 g IN'l 7:111 616.50 BMP B:96" M• U o N o ' a y-I \� a� ii C/3 STA. 10+36.33 •A• g O A 'm U F T. ,0 0 m rn 0 o' o o U o u, ±1I�V OUT 596-00 ; :CLASS 1 FIIP-RAP �� I N L"i O I 'T to+00 00 I - I I 1 i 3 1 y Al, 410 $ o, _ w> Fl n m +o� j9 ICM1'ldEfdNDONI� II) \ \ '� I - N� = o 9- 0 RIM 600 1 1 O I : N o s • 0 NEW cn .. OP 62150 n� (MOM Os 0 STA +J663 r `^ fNV IN 619 00 10+00 00 t� INV OUT 597.1 'I T50 STA. 1 +08.50 - - .� INY IN .41 MD 600 a oA RIM 62-.00 NV IN 8 w.'Y z NEW DI-7 i = co c �,_ INV OUT 6196 ." SEPARATION -'� o rn o 1n > a5 �� PVC SAN c® mg`a 7. •,-- j o ' STA- 10+57.63 I.I, p a I „ 0 NV zoz 00 1 I - \\\\\ = � m 0 n ov conz I I F. II rr I = O 0 D.m-O. .- I I I�• INV OUT 60600 NEW MH 1 ll o n O 5 CO Z m T.mi ,,'9^b^ 3"af IN0 IN 60720 TA 10+7248 O r n O r C)TJ X c ,v cn I 1. : I • RIM 61400 CO C m N O n W • �� PI n ,- at en m en of `� ' ! o m O-Q m o O I I.: I:: '® INV OUT 601. NEW E 1 .T m 7.m : 0' 9: q .P � "' c.n 0 h ''�1 10 c;AsS 1 Rip-op!; e o m v i z 1 I 17 '* $ y s<'. 10+0000 m� man� \T r 1 m CD m III C� .: low .. O %o0 ���� + I .. NN I II I. m �O -+O cn --i 1 I 8 ,7r: g I x � & ,I. I X 27 mA-I I.< g N 1 II P. ty I i_ m -61 OD �oF m�g��rr _ g. a m(n m n 6q ® Y 11 0 96"CMP OEYENTIONu, il I I I ,�' r+ I . [�] 1 Z)m m�.p - '7b 1p n nI CR17 NI.04.50 TOP 613.27 11 1 I I +b Dm n0 - 'i�,S° l'-'9STA. ,0+0000 W 23 Z Z --t-,.. t q�'10a O;11� INV OUT 605.00 „ NEW DI-7 I I I I 1 ' �I• n cy. A - 10P 61050 • j ^ p .._.._. _ ;.. I o A. 10+1086 _ V OUT 61000 NEN MH 1 I ::. _ _ S1 oINIy,�l x .d ' +o 'I INV IN 610 20 0 SiA 10+45 33 �O:/ I 1 e e m 7 � 1 1 aO I I '0, I • I I (FROM 02A) i ' • • o __HFI INV IN 6I RO 617 3 0 c C>7 uI n I C] NN _,--,•-• YL I • { 'r � v)0 1M • I o yN - ti I i g � I I o s • e - RER2 ,733 o o a ti p 9MP D:48"HDPE CZ - -... - `O. - 1 t ' A ,1+9B 14 d 0 , INV OUT 613 00 1 o + ! �I _ m o1- ...__INV-IN 613:00.... o ._ y ° a o o Ln o 3 o N o 3 g- 1I <y tri f Iaz z y Ilfll� y _ r' 3^"' R 9. o. 'b 1611 e m .� m m s m' 'n um n •: ;41 jF 1/ . < 2+1 a =1 Immm ,,, mmmmm A m D' % . ^i^ a �. l i 1 g. C A Z7 00. + I I _\ _ �N a Ni =3. Ill IIIA f o DOpA ,I ' .1 1 '16,1 1 .- o 0 0 0 0 0 o in o u, o fTT::.. r- 't ik f f f s 1 D A f1M1 I I S• I t.1 i_.. 012 ,1-ml S o 0 o m r ETT O in BMP A 96"CMP ,o n u 00 o, m o w N 0 M "E P x D z rvv our 613 50A n+663a 1 1 U m m j O III= 0 m m a 0' m m 0 .*s = O ti D f o o o W Z -II S . 'n_.. Z zA r S a_m$ d 1IIKI g _. DO --IID _ atil j Cx ' > w w w w u u u N. a u u CO N r T7 X 90 + -___-_. __ a o '-3 o m r c Z o _ - a - M r' D C� G7- N o u, o u' 0 1 I a o ti N w o ro A T N a COMM o o T T n o a D SEWER PROFILES I z ��� SHIMPENGINEERI• NG PC N SPARROW HILL �x ' Rev I Dote Description j r u O O D 1 10/09(17 County Comments �, ENGINEERING -PRGlET MANAGEMENT Ch m O 2 12/08(17 County Comments 14 ' 01 ALBEMARLE COUNTY, VIRGINIA 3 01/22/18 County Comments '�� stir V R v103 201 E. MAIN ST. SUITE M PHONE (a3a) 220-Stan CHARLOTTESVILLE, VA 22902 JUST'N®SHIMP-ENG'NEER'NG.COM Section 5. Stormwater Management Plan ,1. ALL ONSITE RUNOFF SHALL BE ROUTED INTO EXISTING STREAM CHANNELS AT RATES THAT COMPLY WITH 9VAC25-870-66-B(3). SINCE RUNOFF RATES MEETS THE ENERGY BALANCED EQUATION, NO DOWNSTREAM ANALYSIS IS REQUIRED. 2. ONSITE RUNOFF SHALL BE MANAGED USING UNDERGROUND DETENTION/INFILTRATION SYSTEMS. 3. WATER QUALITY WILL BE ADDRESSED BY THE COMBINED USE OF 1 VRRM COMPLIANT LEVEL 1 INFILTRATION BMP'S AND THE DEDICATION OF 18.59 ACRES OF EXISTING OPEN SPACE TO A SWM FOREST AND OPEN SPACE EASEMENT.THIS WILL MEET THE VRRM REDEVELOPMENT NUTRIENT REMOVAL REQUIREMENTS PER 9VAC25-870-65. Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Albemarle County PROJECT MANAGEMENT S w CIVIL ENGINEERING LAND PLANNING ,,, ENGINEERINGa yk January 22, 2018 Mr. David James Albemarle County Community Development 401 Miclntire Road, North Wing Charlottesville, VA 22902 Regarding: WPO 2017-58 Sparrow Hill Subdivision VSMP Calculation Packet Dear David, Enclosed is the stormwater calculation packet for the Sparrow Hill Subdivision. We were able to meet the runoff requirements set forth in 9VAC25-870-66-B(3) and 9VAC25-870-65 with the proposed stormwater design. The energy balance equation was met using six(6) BMP's that outlet to natural channels. One of these systems, BMP B, was designed as a Level 1 VRRM compliant infiltration basin per the requirements set by VA DEQ. The remainder of the required nutrient treatment will be achieved by the conservation of 18.59 acres within a protected SWM Forest and Open Space easement. For runoff quantity calculations, the front portion of Parcel 108A (the parcel shown on the VSMP plan Sheets)was used as the governing area. Please note that this 108A will be a combination of parcels 108A r and 26A2, totaling 19.96 acres. Although the subdivision plat will show 35.0 Acres within parcel 108A, for reasonable water quantity calculations only the parcel area being developed uphill of the intermittent stream is computed. This is the 19.96 acres listed for hydrologic calculations because the runoff conditions will only change within this section. Using this lot for development areas, the energy balance equation dictates a maximum 1-year site runoff rate of 2.02 cfs. For runoff quality calculations, the total area of future parcel 108A was used to determine nutrient removal rates because the owner wishes to dedicate area on the parcel outside the limits of disturbance into a conservation easement.A total of 18.59 acres of forest will be placed in a conservation easement. BMP B has been designed per the VRRM standards set forth in th3 2013 VADEQ Specification#8 for Level 1 conventional infiltration. The treatment volume was taken from the VRRM Spreadsheet. This treatment volume was provided as the total storage within BMP B by determining the depth at which this volume would occur and then placing the orifice invert at that depth. For BMP B, this point was located at elevation 619.25, 2.75' above the pipe invert for a total design storage depth of 3.75'. This depth is less than the 6' maximum for a conventional underground infiltration and is appropriate for a design infiltration rate of 0.56 in/hr—half the field-measured rate. Additional notes on BMP B can be found on Sheet C8 of the VSMP plan. 0 10 CP kilillii.e NW, ■ r■■ ..•II to iA -IN •. (P cn N co (II ui L' 1J• I' v (D C) C] > PI \ it �1 O > H 1-1 G G / N Z3 n n O n (1 H hh O hi C 1 ( \, G) 1 up \•",\ 0-, m o I T 1 . )s g�„\\ I ! �I- - -N, zzzz 1 \ it 11 it II t\ i i �1� ` `_ \\ \ornwcn \ i co co cn r \ \ cn \\ I \ o S1 -' \ \\ \ \*s I 41 \; it \ P hi I *41-1-\ I I � b. .i 0. ! , \ k / I o \\ \ - il � f `1� ?�-- — _ � `— --- — --so- -^— -� \ 1� * F -- —' -,-------1,..-z- ,_______,, _ ..,_ ^ ------ _� \ .s, Fit, I __ ,, _ t_. , _ -,..... _ ______,____,_ , , , . , __ , , , --11 J.1 .------ -----.0•041.-- W---.42 - 1._-_-.- -1.- -. . , lilt 2011 % ,;,A),41. .•.J - ,' b4i,1.4 J`1_,-k-<-J' L_L-.4-1-1,L,I "11 .../(n ..... _ _ ,__. , ,__ . , Ir----,--fir- Ii' - - s-, - \ 1/4------,---, Ic i **°41,D 0,_ _. _ . Q hS°r 1 = I L:I. �1 :; ' i if:Y lam\ \i -- '. W` _.*,. .. :\ G\\\\\_ \_, 1 / i , � ! / ACJ W\ \ t I%d c \ . �' 4 r 1 V v / v \-595. A ji �\ 1. I mm 1 I! '1W \ � \ 1��\•f\ \� � \. ' 1 1 V,.,r�. "fit I I.. Yom\ , \ \ _ �J \ . `k . 1<-1 illfflblir- IL ). 1 I i'•* )..-->-( '1 \, ,\* ,v01,, ,j,-i , ,j..-7-, , * .AL . ov,\ 41,,,.....:41:1:54 • sC:j>".- .:;C:1? -v .: .\ - --. 7- r\X )1 ./ 0 / ISI\ 1: \B.-Vi ` •Vir .;' •C9 ,AL„,.. J'� *\ \ ‹p J: f r� 1 \ I '\C::>. I 1 / IN ,. ' "moi'. , . . .��.: •'•/•'• I •, •�'•• \ J // i�i�� ►.4r a illr.. . . . ... �. . . . . , 1/ / /s%l�/-y'sio•'- i. I. t 1 i ::4:....:::...•:a.::.1,\:.,•.4...••:;.24,0,...".4::,,I.:::*, .• rc t: Fy ,, J� J l''-11 V (:/'•,.."--:: �:\-::;-15-1:://:::-/ `/'�J_i _ D O 0 I ftO.• : \ • `�� �: ( ,- , / Ate\ f�Tl r : . Q,......„0.... ...,..... ake.....:.......k•.•..•"*.•...•.•...•.•& •.•.•.•.•.•. •.•.•.- ,,,P. ) /-\c' ,, s: - •-z,. ...,..•.,,r*.c,,,v'',k.414, ........ ., .;,... ...... cl z '. f • • r --9 n AOi - � •, _I II4,,,,-\ . �6S-. es 2/,-' •0,-_-, a Vg — Itit Lk V1 1_U Ck C T - O II�� c O c O 1-7-:=1 J rJrJrJ o 0 0 0 - = r-1-- -• Ca. 0 4 is p I �. ) a UJ -, (A O - II o II II II II al � 0 0 LTH Cri `n• 4. E CO CM LA o o v, - N) CA ---„I — ,- 41110, : E > < 7 -. . :l: . hh���'�iii 0 0 - o • E E c E , 1 4 r y o m ■ ■ II- • :n ■ O 11 !ip o \ I I I � I / _ o b ` o / T 1 (�. s `� f \ 1 I 1 lk ' \ O \ \fief \ � \ 1 g c ; 10. 1 \ 1 / it� \ r a4 Z -' OP J �\> � Nv € . O I \ O D Ali m_ I +1 \\:635.. •--_ r OJ --I -- - -- D -:;\'' ri :11:1- O _ D °'I1r.:: . — . i � X70 .���`•��-�„ -;i ._�� (./) i 1 1 •s - - l��J��_ - Vim__ _\ s1 O O O :.I I I /� -- '� - ---- - '� _ � = 1 * 4 \ _o 0. ... _1,11ill '20012, '. 7 ,. W <C: :>...., I. ,_ . . .. b - 5 ..:_._ ,...157,-.., :::lf>,‘ . s, 'T,--:-1--2*.,, - ,,,,,_ _ -.• >:<1> __ ;2, 2.09e9, ,.....:-.-. 2,r,'.\-L" .1L 1.--k -;"\1 ---/ -- I I 44 -% \)\.:,t\ I I . :: .6it.i<4+Y "--4* .-Lrtik * \ ' •••. \ k \'. --/.• * / *4ii.-- *AL.4 IC? VVV\\\III DAA/ ! - I 1 *,r(. : . / J *;\ * ' I/VI : \ . \ , ; G‘\\\\- \\ � wo 1 r liiir -- A, IS ` I I / { i 1-i*; 4iit-L .'w ri\I \ \ r uhf. O.\ __ N /V ' I I . t‹,1 . .A* G, 7 , 4010, A *1 1 e \ ik \ \I ��/ -I \ \\ 1 IL i (, mo'" li\I ,� Ir \\I/\I , \ Q.' \\ \�\,\ 4,1s * * . - .,,, ,_> ,i,::: .N5. ...."744, - 'lir • -• • • • t ' -1r \\ / 1 1 ., i. L\ A : 'F 'b * \0\ \ '\ : a . , / •.. ' : : ' :' • ,::•• ' ' cS: �/ ki,i I e \i /r (Ir • /_ 5gp j , -oma . Qi ► _ � r \ �i J. . • /f' / // -/ aft 2.1. 4.�t410• I{4•?'•-• ✓ '-'43,• / / / -�-61Y—/\ I #, :•'• ' '•:• •:10. :•till'rs ....VS.6.':•:':':'.':' ':-"Ir.':•:':': Vii' . . �. i•���o{� �.• .����r�►� D�'��' �. .\\\ \ c ♦moi • • �� C. d`��S � /^\ •.. • •.�♦J:eavq,��• �y•� C co{ i® I 1. � "\. I e .* ¢r � // i q - - ‘�'�� � : •9ki �/ d' ‘, COO_ c, vz i i ,�q� \ c o ss- -r D cohtl DD (nn -7i Z O X �r C �/� rn m � "A t0 0 m E5 V1 c.,-) 0 O — ti CD o ; oC� o a ornoNo Q o000 0 0000 o O C 1_ f Nom.. Up '.pp NooinU7lop °' O00 -0p GAN p D D 3 OD ,0 D D D D 73 DDD ,J D D D oD = _ T p c) n 0 _, 0 0 n , 0 p 0 Q E E W F E .,:zii]> ur -. c rr/�� G_ d = = G G d2 = G G 22 G < = Gz. E j: C 1 . - o Cr) D o = O C/) D �. D C. C/7 D a E: E . . . . CD Cn v7 CD CD p (./) v7 CD p F E C�(� D W p G) D co D CO p C) �p p p E E > C CO CO OD ., F E 2 : r) • Cji 1111.1001 `ire �I ■ 1• ■■ ■ ■ II ■ y • • • • Iv 0 ll ■■ p (CD -I- T- rt o o I o 0 -• p o o CD I Ul p 1 1/44o i $ o I -, �, n m H • • • d II 0 71 77 > II II II cJ cn ton rNv o IT. � � � N 1/4 ;S oowwo o u! O G. 000 At coN60cD n 0 Oa < 5' C i--i H H Q. 1.p o (D 'D hi 6y O I c CJ cn cn N o p iL fD 1-h O C II I— O (,� G7 I 8 ./, * , II I I ss cin CO G� i I `,R! II ( __ CO / _ r`;\\ 11 I \\ II II II II I CO Lo cs, co cp 11 � ; \\ co N Lo (n Loh, Ul 1/4. ' &Ili\ \\I P, 11 v I 'V \ I I D Nt 1� i QI D - / § / I , \ \ � ODZ s+o _.imo 1 *'. ›,•: t T,� .,4\\.:6.:',__:---'------- r 00 -_-669- /- \�j. \ -- m _0 Q _�30--�, � 11 r \ /— ' --_ �� —/ ------^ :cO±C):(11)>1' 1 * 4 \ i i'''-.11.'"‹ ,• \ ' \ 4 P • -_` ; '�.� r-i- ...1 h. ;T;.� J _� \`�\_�`1 ' ` ♦ / ice\ O- \ 1\ \.\ \ ��(`,�_.�\\ �\ * _ 0 ass, 11,1. _ � \ , ;�: . : 1 ‹.1 ,1_,t , --. ..y OR' 114 .7 * _ ‘-" 5...,E._. .J'All.,\ \.(1%. ‘.\ \',.., 1 ..1 ' 11 I1 �/ "fix; � is-- :) i '�1� I _All<?$-* ,,W\ \ \\\ \\_> \_i %// I 1 +, I 1 ` SN!a 1\` \\ ( "��1 /� I\�I . . 1 ,. 1 � \ `11 1�,\ a \ I. I \ .4ti. 1' I 1 \ *I ilp \ \ N <11C'A .410E--7-= ,,, . lar/ '4 �� 3/ I I '0 "N• *' 1 , -, ,, \.,40=-.1-V,-1(\,&, , . '- -7 -•k - *A* _it I. `. ... , f 4 * •,%lift I' \ N / Wilt .-----V'. -\ \ ••11 T.i44 _ N -• * \,•i', •1 . 1 Q , /.44LIP•\** \, -9 —- ( w \% ,.* . / . ' )--s*\ ., ,,ii}.*\. ..,-,-' . 4. ..•..1..:40. *. .. ......... „....... ..:.:.... c4' ' '-'V'.'r.c. . \••.*•'t'•'• •.•.••••••••i•••.•••••b......... .,........W da , ..„), • ' 1 -. - 1 • .........1.12;k:-.4A:..•...:• ' •:•': :- :''.../:.......:... ...: .: • .:-/-./ � \ W / .' V -/----dsp --.. .* 1 J,(C/I(` - \ �(\� . �� / ...., , : . . ,i* �I�Iy /J�)^/ !/// // 660 ** ,....,*,,, iec 777 r / I- / rt i,lk).• • • l• )41&/';kr,, ,__...,.-,:::1.....J •\ ,•r •o 1� 14 •>m F.. 't / �r T• •4; ' •,'.' I /`.._.. '/f /,,, -, -"`�61Y,-/ . /l { F ( 111 + q ° `` A,1`. / ` - \ / ' .:.**'..-i .''..--..4 4.•••.:.:r- ..:.::...-f....\:::::::4,:..„4,....:.:.:.:.:.:N.:„..... ........0,0-. At.''...••‘1'.1.'•.#. ( '--,- \ \ Imple jI po. ..;;;Afe.......t ....... ............;. v...611 ....„....-4, 1 ao 1 ,- I t•I g * 4 \ A •-6, fr — 03 >. jIt p\ y m O En 17-I En AD Z m -< 1 - ohCD O-r -I �, m . OOm Q ,_..., 1 0 - -P. -I ornw •-•- -i 000 •x - o00 •-•- -1 0wooer o � o ; � 0O (f) --I I:/IBJ -� 4�o -0 ETN000 -Da FOOD -o a - . C"IN -00 O O O pDD _0 0 -, D D - D -, DD � O DD0D DD0 c) n c .< \ E E > w morn O � Drn -� —I7.1• (D o mc° o E CL < E >.. C = G7 0 O0 = G7 N O0 G7 G7 c7D = G7 c,D E E <WLJ (n p (n (n p W p (n (n p a F E H-� (Z7 G7 CO D G7 co p > Tye CO W ....• E E W E Cf) Nliaw 1 .CP / \ i P) 0 0 Fi 1T1 C 3 y • • • • ny CD ■ 1\I I N ((D ((D (fit OSD 0 l-i rt uu) ■ 1 I\ I I rrhh F�ii O A� a, . c z rt ■ U I t✓ N- N- � w m � w v cn t7 c~n ■ \ 11 II 1 O 0 (D P) 1- LQ Q, Cl) �] N V (n N - N ft N I N ` (n rrrr (D � W OH 2Fi R cn rr (D •• Fi 1 :1t 1--, G O. W •• F, P)O u) G NII (D £ ¢ ] • II Fm W F-• F- 1, U' IIS \ a\ O 0 (D y (D bd T� (n O F- In U) �Q > C) 1 \\ (D G o 0, 1 _ n ZZZZ \\ n II II II II 1C'3 , 1 \\ II (D I-' 0-, O) w) 110 O 1 N. Cn N .o CO O / \\ F (D G G / I \ Cn rfi F j , Itskr \ I I it 1 \ rt N \ I i - \ LP G rt II rr \\s � \\ \I N I-1 (D 1\ Ili / I i 1 N ., 1 ; \ z i D o 4 / \ \ N -- _ __ 1111 \‘-_ - - - - -_-_-_1-,--_-4--:- --,-_ - '• ,'-'--____'_-_;' .�_,`_ D III I 7 __ J 111 \r lir 411111k A?7 IV s/�-' �i-=--- �i��4116 irizi r``` -.. `..\\ \ i i �� .7-.got ,tiara.`/ - \ %1 f ,, / c v /�ft4 fir` ss;/•-t \_ \ \ r 1 / y , �4�S4A; N it-� t I -� \\ 1 44t 10010011.1111 Will4174e .tW.IS\\ - e&\ ,\ Th 'Iik \ ' 3°;:?"• * ,.,,4111 -- 6,- •,,, iso‘f, \ .-- Ab„. \\ \ y\ /ice,,..., \ �"d-4,,.;/,•\. ' '� �� ',,-,--,,i-,.__.l.-k0--_- =c_, _-,.,.r./.=..-.A•-, ,,:',\ ,,,_,, .1,,,1\11\ 6, 0/$,...,,oOe...- .,"-.0,,' sr,a-a._i_ra_-- rA74**...,i:#„t, ,„41i0.t, \-,:_„,1 )----N-. ,\1 \,_ -,.., , \ ..... .i., - / ti , , .. .? • ....., v ,\\ N.....„( , , 1 , . 4,, '‘ . ''*\\W4 4 ..,, \-:,...:____,, . ,,, ,,) ,, ,. .1,, ,0,07- v>0. - , 77 .... .. ''',464.411 A\SOP . . liNor /1 i \ _ �-0111111°11° X74 �*--._.-•,A—..',."..N. \,,",\''a,N4*,4iairi y _ i , . „,-,-.---_____!=--- ,,;,... .\\\, .f .„._._ \,__; . , \;‘) -e ‘.4,t‘k\ • -.11 I\41 y lig wi II*i i 0.._ , ,4. . .\\ ," ,\ t- A4 ..„.._-4 \ , . ,„.k \ .\\ / ,,,40` , • ,„ .,,, \, , 1 hisi, , , i { , ____,_____4,„,, ., 1\_k / i ss / i ° ia.''''''.. 1 v-"' \ tt • le,. ;e—i."7-..4 %.: ,A.4' 12"--,:,,,, ,, \/ i ii, Or ‘. s\\-'---- i , , \ ,, ,.,.e I 1 ' ,.'' ...„.431 ., Ay \I \ -," \ \ lk,--/ #: 11111.111/ / N.,, /11 ' a, ,Z,— "....,- - ,,,./^ i il, . ,,. t ' gip / -- . 470011t/11-19r1 Atli/ / / / 1/:\---:::_ )/ \ * ( 'i, . 04111$46,07404.,,Aiktri j) # heal/ ' // / _ _/ •40g.: ,,,,:y, -. \, , . ‘. , __ ____ ____ , .. ,,....,...,, „„. r- --I \I - • c.,\// r —.1 _ 1 r ‘116, * __,,,,e,„,, \ al , i -4., I ' *1 / /-/ ".----__--: \--- -I t) nu'--- * ,illAIKIIV. ., ..,- \,•\\ • ,w 1__._/1 y 1 r\ a 40 _ ilik i ( � \ i i Z N pc-li tiiiilp, ..,.. .1). /ht., . \ 8 .*\ , . .., ,„,,,. „ 01.4iESSM.4741, -"CV. \\'''` ._ 0 1 /.....:2„...)17 lir ........,, , re- , , , , 1I I •e__. -------I? '''' /.., 111$ -Are' , „ I. ..e.ere-°- -- Tr-_-'"'Fikh. ,r" c1, ii \ •\ 1 0 r,_, Dz e50 -er ..(a. 03\ (.7 _,_, ,_ _, _< ci, 0 ID/ 0 -9 U� _ 0 C) 0 0 < � r� rJ � r� rJrJo 0 0o I o 5000 `n o � o I < � nnn_ a (-D < • I �\ A o O — - 11 0 ' C7 co D o C7 O • D v n Ln W - n n u o -• c • N o II II II -. co • O O cfl N `� O (n -moi, N 0 , O CO O -F. II O CA O 0 Sn in D -` O C.n CJ7 7. 3 E E > < �, O OCD O / E. 4, , E. n Z7 _ �� CD -" rl n C E E -0 m r �//�� CD to7,, L-I G O' E E illio, `i N l — _ 1.•:.- .111111. I / ( `600` \\ ,- -------*--,N‘ / / i Cn■ 00 7 ! 7 ( �/ �/ �•� =% /� /�— _1. � _06q--- — •e•f!` _ •// -- - / , / . �«r `,\. `p ■ / / / v \ ' / / / , C4 hp xi -Ili , -. .., . ,.,„.„,,,,. / ,*3110- .4-'4„*__"._ m u) 4___. \ , ,v . .♦♦ ♦/'1' ♦. ►• , ♦ iii k fows. , III:* ► t k , �/ � / / T"p� .. , il ..,� 41 jt �L• ri�r a. ,1 1,♦♦.♦♦� ', a` �, fi � \•7 li l = d4111, .,: �// �/� f �/ q; I"404. , , � -%� �4 "4_` i ►! ` I_ ' ! ie .... "!'-- -r1� 7 • � ��'/ ..roke - . ` �' ; � �.- N .r -/ / , ✓ e • =� -.,��T ♦ . � IS �-r ♦j � $119 4, . ... li v ► ♦♦A � e �± , x.0i ♦,. � `� ' * . ,t � �j :.. _ �� � � �. u/ E f . % ♦ � �► �e' : : A. ♦ � � ; - i���� � �� ,/ �; o t�� ; y♦ ��� � • ♦� 1` t •/ o � ,, , ,/ , ♦.:' �-�.17 �• l,,t!t ` ,f , E ` O% `14 e4 �♦� �,� �Atit � Il*eee:ee�o: .f ta �< , . ♦ ♦ t _O1 *ii40 . , i _ 1 \ v.� . 1e � Y ' " \. 411 ti.:?.'73;77:' , ♦ I,j ♦ iS ♦ ♦ ; « 1►� ►��1%�� is 11 k /A4k4110,14‘444**"0#4.W iA L.7 1 4/4* j..Trg b'i ' . 1%,,... ..... .. -.'IN 1‘0 I I ` \/ . /t.et a « 4f, « r -. ► .P ►e 411 � 4\11 \ ',rot . , ) •• , ♦GSA :� �.Pli. .1- . .▪ . •y•* • , i trIA • al - . - Lii. d/Iifl4á7$tv ♦♦♦E. ! •� :. ! « ! - iJi= . ! '�1 r*t : • iii ,,, ! ,..m.,,,:,...,...,,k0A,,,,,,,, L , , , , ,,,,,,,: v. 0. cis,,,,1 iiiilloili a`l.�.y « - 't` N,......;,,,N ,�♦♦\ • 4\ EJ�� kf m: \'‘, 4h illi110::• i - ; ,,-_ � ♦_♦ i - .. ` �♦♦i♦e�,e♦�. . '< . _. eee♦�eE ,,#. \ v. Ole / 41* . \ + k ..' -.4 sHirowPoir rw.. i 4 N _____* ♦♦! ►♦e��► .e, ►/♦e► ' ` illip.. -�.♦ . wrE�a � a 1 t i♦� ♦�, .•, •.r. •�at aa t A. , ` * I 1 1 \ -...w.-1,0- mi. --% -,......,Ii,0 '•t •t` ' ♦e llj �►Ii�/� �� ` 4 .41P4 � 11,e4 :44,1*1 t' ♦ �♦ it < r !« , . ►. :iv �' t �_ ., <!l , �.=�,, � er a e , at \. ;`'1 . I► ♦ f t I► , :...,,,,,,,....:1....,.i ♦ I. i" ♦P � s � , l . � !t \ * ., . : . t ,,.; et p ►♦�►� � tt ' •♦ 4 ! !�!! 11 • ` %tit► , ! `` ... �i,44 4. „ F �k=, ' < ,I•r ii$ ♦ ♦ - , ' • iJ!gpni- A pl *It'd.... ` t-.; ' ' '7 Cj':!t 0'�� �-� ► l' ;01' ,, IIW1* PIile1at ! � '� ...I: tieai,I0 .w� ,' C N ► J1► 14ak „lc a. 4.eI ;►; , C` ) 4IP, t •� 1 '4 N . 11( . ' J� ! • ` E` ►�.� .,4'®��� ' t , ,, i t.►e1 Al' ,t•1 '4.4Pr, j e .ie - t .tEt� 1 � � ►l► '1 I .►► 1a.1 -�, v, t <Vir111 .♦, = ..iii, t < • k 4 I I. `�• ! e� ll�,�l . Ni♦� / ` 1` } `; . :kt J. ! , :117 /, :1.4 � t `- atiiiiii 'rli►#4I0a ! 'L1� ;, 1 4E 7.*9Piar«! r a � k' ►'� t � f\ ”' ►'', ♦! . ) Y. . t !1 . �1 ` ` c ► p ; • -, ., � 40. ►! !�If• ^ 7o / 14. ° ,, et` `.t t ^,.&MAW'•? I� � , . s ,, ♦4i , .' � . : :' ► � O♦`�fi, , ♦� e. k t ' t t • ` ,• ' ,. ' �l1: 0Y • � �► , : .����, ; t. • '_ ±. o ! E � _� � '' ♦: � ,�� �- � et ` > ` t '' �• ��i� t '♦���eq t w• J\ e , y ' ! aaa • « � t • t `®, � s «. « •t tomaa • �' . ta ` at A • • �•fir► a�. 4- ta ttct . t ` ` tp 1 •0 , . � li''''''`...., '.. ''''' 4011 ildlii 1r' 7 -MANI.*.•.* pii. � « • tmo' 'x ' t dallf //'w-.-41g-,F7af � `«` � ti � . ! 4•: Ia te°,���.�• .: ► !! : ,+� �s� . , !•��ee♦4 i t t.! t a\ t. ,a E «t �s♦♦ • o�r► _ 0441,4-#0- f •,_ _, • ,, , 44 4 40,4P- . . .,." '�1 . « • .a t: t . �♦♦ ►♦ ` • • • , �♦ ! t t ! a J�� �� af « ` t`a t \L♦♦. � ��" ' � i• E al t ���ak ` •\ t ` <'\ a t • �/� tor «/f 7.0,0,4i, �` t `41y�.J ewe♦j0i 110` � < ` .♦� ♦♦ � ♦ � Nam �1, \ �7/ l,,4E`�'"- • t At . ►I�1M • t •«''� � ` /1 • `�� •ttt:`a •trt. 'aEffI : kt • ` ,, '�. ` '♦. � -A � , // /e � ! • ft ' E • 'f ,�,e ♦ < �re' r� 'l \ 1S, \ta'tt t• `• ♦ a � •` .. .,.. ..it ! / / OO, 7.7 , S • ,. . ` ' ` 4,,• t /i ` r t < 44r�// 'rF � ta `•! f �♦ 0 iii, . , /,,,, « . ♦' a / : `r t! `` ` /� ' i-. ri . « . I /E t ® ./... , 0 , �// a ---_! a.k ,\ a , , , , .......I I / .•f « t , e C= I i \ �yF r S F1 TAI x'6, 1 l \� � �. , „,/ ---:-VI ii ''-- --_-%V ., - \\\- l�W �� \\\\\ / ,,f 1{I \_� .115 / 111,,,,/.4,- 1-,it 1/II k I 10 00,--- •----- ---'' ,-/,/ .,3, >4J ' /(1/1 ,h) %,iiII1i1(// /, // (t\\\,;.,..--_-_-_:_-- l - -::::;',„..4,s-----',5-------------'----='1 te=a - \ \ - � / _ -_ __ U1 CO ///�////./111W/” •://•:-• // >//fir>/ XI I / _ i l ' `.f CV r _ yi _ - Ill elf (/ >// / / jig _ z`_ � � --- c a 'q%. /i_ / / ---_-_"==_-=_-_ _77=a1.- -'� ! `` 1\i, 111171'----?,),/1///// / // IIf ,J ( � , CD ■ .,„11,0-_:_b,„„„, , „,I1 ' ),/ l/ //✓, 7i )IlliI/If < — /' I y` . . i' -- \\.� ...\\.. \\ / / JI` lll�Jl //'/ /�r//�l II)// > / \/ .\. i /�i�i-� �- moi/ L -- - - .. „„\\\\ \ \ ■ ������/i)��i//,///ices%`' \L / / �';� \�- ',' �_ ��'i% % i;' - _ ��\ `� \\�\ 1\ 11 ■ i''/>>///////////, //�//,/)II0\ \I'• 1/ \ L �/i - �\ �\ -/i \- iii�`/^▪ i. ', �.�\`\\ \ \ 1111\ Il ijj//jj>>//! ///> //// f1j1 \ \rQlfl -\\ j �_;�' - �� ---",3-;:_------. 7/,'//i' \_ i/--/ 1f 1111\ \\\ \\\ I CC ////// ///////// !f - ��' / T ,\ 1111 \\ III1 • '///// >/ I I \� �, 11 --Y ,� -- = =-=_ - - \ //' �✓ 7--/ _ r �`. � �� �\\�\\\ 1111 /;i.// > /,//,' I I /- / . i ----z------ _ \- /iii/i. � i .� \\� •t,\ ‘\,\\‘‘ i > / „ i . _` _ /. !;W _- \\ \\\ \ III ,„-,----->%;,-;-„,,,,/...;;;;";;;?..;;;,..2 / / l J 1/%> / ii/ : '"- ' ✓//.,../. `!�/ � / .r �`�\\ \\ 1`111\\1111\\ I''1 /i /i „-",,,:,,,:::„<",/,”/ ,moi' ,,,#:-.---..,-,-;-„:"-„,,,,----S.„-:_:----:----_ -_ ,,.\� l/ • -- �1 ..,--:,,.-,z,-/ i/ e// /i'' / 1 l/// ///,i/i7i i — e :' 3 _.. ' \%o//�.� ;,- - - 7 it,, �./ -'^". ' N. vii, t ec \\\11\1\\\\�\1 1i /,/,, / / //// „ ,r,,,,„;-,,--,---..._-_,-___/ p' a // r ! }' /” \ 1\ \. \1\ ,, `\\ \'Ii r-',/,///>�/ > / 1 //// 9''/, ii/ /,� // +1 /-/ - vii, \ 11 1 r 1 •"., r i >ii/�„ .�- ♦ • r +n i ./' "'`. `- \li `1 \\ \\\ \�\0‘0,,,\ \t,, I J / > ,• v�� 4 _ \ ;_ � 4j _ �� 1111 \II\1111; \ / (�rr�// / J ) / %� //>� /,,/i% !-� ,,r- -•„ " a ^. ✓/, . „ --� .11 \\ \\ \1\\ \U1 \ 1/i -- / / Gil i / //ice, , • - 1 �\ / t ' \\\11\ I\` 1\ // /:,/ of iii , , . .,� v'' Lr_ ,., ! _\�1 \ \ \{ // / ! .I I \ V/_>���, --moi/(\,�/i •'' - k's// aw _ G ��� \\\\I\\ 11U 11111,111;,\ \ (c::)° :///// I 1 \ sir/ \ ���”/i ,, -- . - / _ �� ' 1 \ / l / 0//-. -,;,.."•/:::;-•.„:724.,---/ ' ;'' wry '.. - -- //it _ .."`_ IL �,�, __ — \ \\1\\I\ \11'1\\\ \• / ,' I .. T► /, Iv _ ,, , \ \4\‘„,\1111,11\ / I / / �, , -„,/,„,,--., t�..a _ _ p `%- l` I 1 \\I I,111\ ` //„ ,,,,o,„,./ ///1,//,' /, ----1/(,////// / - ---%;"-%i, - ...,,„„,,,,,,....-51.---,--_-_-___; r/ '''''•,,‘‘,. .1).„ '�1, 111\\\\11111`'\\ \ / /b�''/ /, �/ r1\1 f l/ // // '' ' 7 - ' �r� ,110_ :13_9_-_____ + 'ri; \\\; . - �% _ II1 1� 1I II11\l IIS\`\ \ yq"%,%�� . _, , /411' / ♦''i i I I . �� T ,-- lU' � c. /��-' i1i > A 3 � ))`� AAAIV AVAVAV V' r 7? , l . �. )� 1` 111\ ice/ '//'ii _ , .,.,/ / / /, �_�,,�y� t �:'. �s„,...-i . ��`\\ 1I ''t\\ t\ Vii,// /i%/iij' „..7...• ,/ �' � ' yT,n eci // Y } �\\���`.\. III\\\ O �/ //' /./,// ��1�, ��> / . �� tey>r S-__ is ,, , 1 A O /,//,// i //> //i /� �:/ ��_ , ,6'x'01 - ���...1� ".`. A >�// ///i>////2-„,„ , . ,,i! ) • A = l Vt/410%,i..""*”. `�+'yyarczr�±a�' \ I \ �\\lii \� \ i ////iJ / ✓ y►"L \\\- \\\\,,,,p ' s.."rr' .S i. -- } . ` \ 1 Ill (1 i I �m //> 7,),%,".� -�\ ai''e/di,,,,I;/r/ i'"'i n1 '°"r. __- t}▪ ' ir' aL� \ \1 l l b ,.. kyr / ///•/ � / � ..,g1-,----. � " �% a V•y ,/ f { '-,_, i -� \ �j.a.x��41 1 I�IJ)/ i) ph 1�I� 1\ \4 /7,/ O ,/, // /r9• / /4 „O ., 40., /, . �' i/_ ` -_-_ . ` \p _ Ve;`I\ \IJ1\1l�il� It4�i`//\\\>\\ \ Iryii ` 1111\ ` \\\\\ \I I' /�/ '� �i` Imo ' I ! / / /'. „ - :' l411\ 1t1 , ///Il \ \ ,\ \\I \\\\\\I ;h.,'/ - ) �� \ � EL., s ^ \/� IID`\\�\ \\11 1\It111`\\ \JIi IIII / / , / �. ( / /, �;- ,• n>` ,111,,,l,„-, 1111 /////I I NI \\ �q 11' , / I' / ,� . % // /: > %x ifr,VSIP.„;'20.0#"(,i0, :/ * is/( /- / ! / ` k \14,e /� \\\ . J//� \ N t 1 c ,. .�, 1 / I / ..' 4\ , `� \ „\\ I 11,1,/,(;;',/\ \,`, ‘,1 \` \\\ ' / ji �.', �. I1 ! -. L L_/ I f f ' `` --7.4111 111 `i.^ /�Q� \ \'\II�III� \\\\))/I�f}\\\\\\\\l 'I // / i f s,+�+' . / �!���'�' S`�' ' '% j ' — t.'I' i �:\ I \/1\ \1 11,,,„l(,\. '\\\ \.1\\ 1)I ♦. , / / I , , \\\ \ I/ \\ 1111\\\\i\I u( // / /,/ l; r /sr l1 /_ 1 1Q 1111 \\\ \\\ \\ \\\,I';ahr/ l ` `,+'x �� •, _. / 1 I 1 Y1 11►� \71,1,t,\:,,,.\\L::::\ts\L‘\.1)\\; 1 \ d\ \, / !` �`','' 1 I l! Ii� Y�� .y� � ✓S �Y:.' 1 ( j > ' ( �a�j� "� \ 1\ \` \II/ s ♦ / t 1 1� `�I \ r1�1 \// ,, RI. / • �// l11J ( / ' J \r r� \ \ \I ) \\ \\J11^ 1 I 11� II1 J \ 11 / /. / y`/ / f ,', 7rI I I .. ..r. \\ ) / / , lGl1 .. rf'il \1 ,- "// - / // ,;is ► I1 I 7I 1 'T j )7v'� 1I \ II II1 J I/. / ",' 11'J� \\\INI . /�//// ':_\ i- \ 1'1111I VI' d. i f�N. I IT _ //1x1 ' \ 11 ' I / I1/ / / , 7\, 1,,11 ``�\ \ 1ItIlIL. ' \�v I I I �1 1II i I�( :it1C�! V � vv - � �l1 -'-- �' , I : H1 ;4 ' $' I111 \ V �.1— �`��1I:.a \ vy � :4‘‘ �I �' v`'� ii , a 11 \ \ x5J ��l --- \ 1\ \ — p, '�1r.11 I \ i� \1.,:, n' 1 \\�- l \`\\11, t \ \\ ''' 4s-)4,..'', ,1,,.) .\\\ \ \trial}t�.'�•.r )/ { s}„ \\ \ `� ` rrr / 1 , 1 Y`I ::. j �I '\\ l: • ` \ � - ` � :1 ) I `�s,Y '._:i,;;"St'73� 111 •� \ I o !/ w' ` .. (11 1 III l 111111 , ( .,,„,r„...,,,.,, _-, 7 ,E, -��w,e , _ } 4{ \ \ \. ( �� 7-'- `� ` \ \\ \ \ 1 . / I 1 ��'ci1 : i t \` \ M \ \ \ /I ' - .. ' dvtla'B /,,�� ) • \ \ \ \ 1111 \ 1 \ I ! r'I 1"11°1-11 II LV, 1 :� ,,iII- r l,�ii ��� • s -_ 1 / \, i\\,.\I \ \ , \ \ \ \ 1 \ �, I 11 ! MIX'S °:1 • \\,'4e \"a i;�E ,•.' c,- nlil _. � II\\\ / / \I .. I.. / \ \ \ \ \ \ 1. 1 1 Y,„� �) tri''�, Ind '_ .�� �'_� ta1 te.f• ., ._\ _ \����, // / /_- i \ 1 I \\ 1 \ 1 )ice: 1iI;. I 'a1j) �' �-\��\ ti. Ii �! % -'. ,/ , / -- JAI / J J J J 1 y� �� a�,t` or. 11 ‘ "/ i 1 —isisitill 11111111..sia A' Iptip-7.- -----,-,.. ------z:----zzz-” -...- ‘-- i / --_-_----c.\---_----_--' / • i i 1 1 , -_-,-,„ a 1 - - ....- ; „ Iv., ;,,v„,!•'-',4,:---"Ao" '''''-' ',1k •,5e' \ \N• .----.' .-1.-----,-"-:."--;,-,"-.....",l, ,/ ' -------- __„-- ___ ...---- , / Irl' ! —, r__, N \ ^ •• )--`--.,-..-. - -< --- ---_--- //,' ii i d i I i \N \ 141 1 J J 11! 1 I' , `\` �\ 1.:...--_-_,. . '7,-.. _ ) 111\��J \. �� "'.,�I)1," S f \ III 1 !I r-'"' 1� C \ \\ \__ _i _JI \ / �\�\ lti • .., .., ..... _ ill1�111 ''I I J t`i��'��r ' 1'�i '� ►\'I ,, �"`..,,��.".` - \ \ `\oS\\ \ .� \\�T _./-�' \'\ ���+tfj7f�+�r ( t„^.. �� lN� ,, \ \\ \ I I t g1 I \ • s, iP " _ _ \' \ III I 1 _ i i \ \ \ \ \' "\\ ✓-_ �j� 'fY�►•{� e � 1f J)ij7,;,, / r / iy / ■ 1. . / > 'd l \ S \ \ \ \\`\ \>J l -J �� 11�J111• , l: 1 J / 1' 1111 c ♦ / / ,/ �. I: .. 1 \ ) 1 • \\ \ 1 r ( .. Ill l l ) .3 (/"�' _ .' / I ) \ 6 \\ (.if� / � — / %�/Il/l/ll� i ' l -/, / .,t��� 1I!l �! _ ---/ / . / . ,. .,,/�/ ) 1 \\ \ \\ I ! (� 1 �'/r� iii -� f ll i ` li ' ,J///1///iii t i\\ .:...� ` / I �ItxGc. ., J ,-� ,/_/ / `�` l 1 1 w 1 I =1 f 1r' `\\ \II \ \ 7,1,-.i.- f : yv� i � �J , �ii=��_J�� , � �x f /J , J JJ I 1 5:) 1�I \ � !,/ • iii,`,.;r ,.. --T....0; ft' li _ • --- ,...e.' — , 7 ...... g , -",‘,t, / I.Winttil ElikV°C--'''aill '''.1.-%‘.ttl.V"" i it', — /• , 1r / e`,:-----""' \. - s:, , "It, , 511 r-4 ''' ,•,\, ) • 4,4* z 6 /14.t•.”,... ,,, i N if /AL:-- -- • t- ..f' , _ , ,grigrili i'•14f4.1W,F94 ,* \/ iliir \�.... ►�// �� hh . i/,) I f , // / I: - // -- II ` , L flill1. CJI! • -i / J ram I Ir `f!/ ( / i' ;61,i _____-4.°;_ J/, .0.,j _____.. ...,,, ..,- \\i 1/ // \\,\�‘,..,,,,,,s,„.,,,„„1;1 ',•. '4''%, \v,, ,,,..1„,,,..\.,,„(,‘„_ \ \'.!' rr� __"^.:ai)//// 4 \ \ , \, \ _ ' ka,` `��;; �Lliit /'/i'- /�'��i % r \ \\\\\\�\� � \ \ \ ' //ft l ,I'' \ , - _ Y�11i' IL/.r %moi /,/ii. . ,\ \ 1111"��N� m \ 1f�'' \ \ \- 1.` 014 / . \ ' \ .400#vi.t. 7 - w ' ', \ `•\\ N- ------. '''''' \ \ - ' i,---- - ____„..,—...04 i'' \ 111, .1\\ // ., ►.,,; \i y - s, „ -re' , i0 / , _, ,/j ///// '� cl vvv\v�•' . �vv i • - '��- // ;', � , i_ y/r1 : '7" 1 \ —a \ `\ \Nl I I / I 1 ) • \ \ \ \ \ ♦,, 1 \ / ti73 C Z\ \L \ ~\ \\ � -\LSI TF t \ \\ \ -FiNF \\ ,__.„, , t 6,....,„, 0.`, \\ \� 0,0 W > 00000 w W D > Structure > N cn A W> CO A co A W 'Number 0 0 00000 0 0 0 0 - w w W W w w w w w co N Inlet Type ▪ C) 0000w C) 0 0 0 m m CO CO CT) ro Co m o) w Curb Opening W 0 0 0 0 0 N O 0 0-� m v b) is a> a is iv o o CO P) A Catchment Area CO O O O N a) 01 Q) V 0 0 0 0 0 0 0 0 0 0 0 in o) m in m m 0) A V A V cn Runoff Coef N) V Q)CO V CO N O W A 0 0 0 0 0 0 — 0 0 0 r- Co to A N N N to O W N rn CA A 0 0 CO V CO A CO Co 0) N 0 V) V A V A V A AAAA V A V A V A V A 5 no inocno000ocno nocnocno CO Intensity A V O co NOO V A Cn N N -+ � 0 ti o ro m u V o0 0o N Ao V oCC n o m Q CatchmentFir N A W V CO N 0,6 0-• A o O) O V V CT in N (n cn Co W Q) _ T CO N co cn (n V V A" O o y o Q carryoverco A G p V O W N O O V A Cn N N j NA .0 N N -4O030000) 0N) 0Q) 00 V A07C OTotal N (n Cn O W O (n Cr, CD N W Cn Cn V V A 000000000000000000 -0'0 o 0 0 0 o O o 0 0 0 0 0 0 0 0 o N Mannings N 0 0 0)CO 0) O O T O) 0 0) Cr, O m o) 0) 0) 03 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ND N 0 0 0 0 0 oro b o O o 0 0 0 0 0 o v w Gutter Slope 0 0 0 0 0 0 0 CO CO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N N O o O o o O O O o O o o O o 0 0 -'Pave e X-slo (n 01 N N N N N N N N N N N N N N P O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 .0666666666 0 0 0 o O -Gutter X-slope co co co co co co co Do co co co co m co m co-= 0) P wwwwwwwwwwwwww (aw A N N 0) Total Gutter iv iv a'Spread 0 0 0 0 iv iv Depth at Curb N V V V 5 c 0 O W N 0 o o o m%Efficency 0 o m 0 C o o iD O intercepted O N N n O P Cn N CO 0 0 0 0 0 0coo N 00 o Q Bypassed A A 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 (n W W N N N Midpoint Depth Cn 0 W N 0) -4 A CO 0) V 0 CO Z Z 0 DD 66b 66 . ONo6No � 06b Curb Height CO 3 CD 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0) A Cn O000oO) A o) IT, (n is Ar NN,)D/H V A - 4, 0 0 0 0 CO N 01 W A 0 0 `< W A O N o A CD A a) N W -� o • v) ND N •4, CM o 0 A V w( mac o a Midpoint Spread cn T O 0 0 0 w w 0 0 co co W co co D D D D D D D D D D D D D D D 1 n o D 1 N W D W A (P N CO A (P 0) - N CO A O1 0) V co Co O N W D W C 0 n w c-) c-) o 00 co co co co co DDDDDDDDDDDD DD mi N co D co A - N co A U1 T - N co A U1 0) V Co Co V D E O 70 n D O O O O O O O O O O O O N O O O O 0 0 0 0 0 0 0 0 -+ O O -+ D Co O O W A A Co C) O CD CO N N N O W N O A O cO O O CD A CO O CO O C) Cj CO O O N CD —+ 1 0 O CD U1 O') 71 -- O V O O COW O V 0 0 0 CD 0 cn V — >.0 O O O O O O O O O O O O O O O O O O 0 E7 A 0) Cl O) 01 0) ' J A W A ' V A W 0) 6) Cn W W A 0 O O1 CO J CO O CO 0) O O 1 A CP CD J O CO O) O Ci O O O O 0 0 CO O O O O O O O O O O O O W N N N y A 0 01 (C) O O N 0) 1 N) ' CO NV 1 0) 01 n (D U1 - co J co O O (O J CO (0 C) CO Cl co O CO N CO Ci D O -+ 1 -+ O O CD O - 1 - 0 N N N N 1 1 -5. 1 0 O O D CO) *co Co CO W O1 N U1 A V J V O O 0) 01 Cn Co Co CO V N 0 0 0 0 N 010'co C7 6 U1 A ? A U1 J CO O CO CO CO A co U1 0) 0) O N N V J W CO G) CO CO O CO O1 01 01 cn CP U1 (P CP Co O CD CO CO 6) 0) C) C) 0) CD 0) O1 U1 cn 01 cn cn cn cn H -I O Co in O1 1 0 A O V J 6) in Co U1 A A Co N - O CO C) 0) A N O O V -- O O r- O W CO CO N O N O V N 0) A U1 U1 J - co N O N 1 CO CO O N 0 A O 0 CU Q N (O 0) 6) 0) O 01 C) O 6) cn O1 c11 O1 cn 0 6) 6) O) 6) 6) 0) O C) CD CD 0) 0) 6) 0) 5 (BD CO Co C11 0) O) V Co 0) CO 0) Co 0) H J Co A A A A in CP U1 0) 6) V J Co V CO CO O - CO O1 0) W -+ (O - J CO (0 N 01 CO -+ CO cn 07 i co O) CO CO O cn - V - -' N N O CD O W CO CO (W - W N Co CO (O U1 O 01 co co A N N -+ co Q) C) Q) C) -+ W N rn H W Co Co (D J CO J Co Co Co CO (O A (D A A W A A U7 W O) Co CO CO 01 0) O) a1 (O N CO CD N 01 O) O CO N J U1 W OLs., N) -+ -L Co CC) 0) W W 0) CO N O N O C) O o cn 0) O 0) 01 0) O) 0) 0) C) 0) 6) 0) O 0) 6) Cl 0) O 0) O 6) Cl C) 0) 01 O 0) Cl _�• CO W CO CO U1 CP CO W N N N W CO N CO CO CO CO CO W ? A U1 U1 CP CD W CO m 7 = (0 O CO CO O O A Cl CO Co CO --• N O N A A U1 O V O1 CO N A (P O1 CO CO -+ (p < C 3 O O in Co Co J Co CD A 'co Co Co 01 CD CO CO J in A O C Co O -' N J N N O < m7 o O O O O O O O O O O O O O 0 0 0 0 0 0 0 CD 0 0 0 0 0 O O74O 3 O O C) C) O C) O Cl Cl O Cl 0) Cl O C) Cl O) Cl Cl 0) C) Cl 0) Cl 0) CD Cl C) CO O W CO A (P co CO N N N N CO 1 N CO CO CO CO CO A A O1 O1 (P 01 co co m 7 W CO A -+ W N O A A V CO CO CO CO CO CO A A CP cn N 01 i N A O1 V co 1 (D < 0 '� O O CO V CO CP 1 (P Co O) O in U1 O Co Co 01 Co V Cl in N -+ N CO A N A < (D (1) O O Cl O O O CD O O O O CD O 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O• O CO N N N f CD -+ N A Cl -+ 0) A N A U1 co V A 1 (D C) A O1 r cn J A -+ (VO co Co W N (D CO J W CO J CO (0 Co ) CO N CO (P J CO N O ...+ -D O N Co fV CO CD A -+ 01 Co -+ U1 N J -+ CD 1 Co V O O W 1 AO N v CO O cn CO co co CD O A W O O O O O J O O A A N CO O W CO A CO 0W") -4 7 0 1 - 1 0 A O O 1 O -+ A l V (P W 0 - -+ --+ CO 1 1 - p P 1 OD ET OJ CO -+ 0) Cl -+ Cl O O CO (P O1 -+ O C) N N 1 - CO W Co < 0) 0) 0) -+ o O A CO A CO CO CO CO CP N CO CO V W CO N (0 N 1 CO J W -+ C) A N 0) co CO -O Cp o o e o o o o o e o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o a o 0 0 (D D. C N 1 N N N N N N N y N - . cn co co Co CP CP cn U1 A CO co cn CP A A A A A A A O1 in O1 CP CP 01 CP CP A 0 N O 0 0) $' f CP O1 J N 1 -` co O f (-`) '--+ N N W -+ N J J V (P CP Co ._, ) P O =,; O W CP N CO O) C11 A N Cl CO O CO A A O W in N -' CDCoCoCo . (P CP N N cn n A W CO m (D A A U1 CP J V C) U1 D7 0) V V V 01 O 0) V O CO A CP � " (D CD bi A CP N O H W Co N Co J *co 60 A N U1 J J A 4, A Co O CO m 01 CO O& 00 CCD 7 T O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O CO -' N C) W -+ 1 A N O O -+ 1 0 0 0 0 -' -+ 0 1 0 N N 1 N CP 1 V (D co 0) O1 U1 N N O N Cl O1 V N CO 1 W 6) V -5 W CO 1 Co CO W CO N 0) A 5 lD O CD o< U'i U1 A A W W �o v m CO D w D CO D NJCD 0 CD O O O O O o O O O O O n A W W W in A W in W A •A 0 n O Ui 0 V lD 0 to 0 CO J O C O O O O O O O O O O O O W Ol W NJ O W N NJ NJ W N D O CO V J l0 OD 0 LO 0 Ui Ui O O OO O O O O O O O O O O z O W NJ N N O N O N O N O 0 Ui W N N W NJ V 0 LD Cn CO jj g 0 D Q = O O O O O O O O O O O > Cl) ' W N N N O N O N O N O n 5 Un W N A W L0 V 0 LD OD 00 0 0 Ai CD Ui U U1 Ui Ui Ul Ui U1 Ui Ui Ul H N O O O O 0 O O CD O O O n i4 CD O 0 -O V V V V V V V V V V V CD ' b O O O O O O O O O O — O Ui Ui Ui Ln in Ui in U) U7 Ui LP O N O pi P N N O O O N O NO O N O 0 Q -O N A Ol V L.0 N W Ln-0Ol N VI A V U7 J lD W A N W V Ui V O Q n C0 I0 oN A W W W W W W W U) A W W 1 r a O cn JJ o O A W W W W W W W U1 A W W O Q II cn (I) O o) O O O O O O O O O O O O 71 C —, N O O O 0 O N O O O O> O T O �' Q 0 N Ui W N A W O LJ-1N N CD N C T (D 1 Q O O O O O O O O 0 O OO 71 U) a) 0 l--� �OUi OOi OUi UU) W ON NN 0 0 -"1 0 > 0 n < D 0 Oi A A A A A A A A A A A O CD CD O 0 O O O O CD O O 0 0' -. CD : 71 < 7 m0 O II N — O3 >, G) 3 O O O O O O O O O O CD O Cu N O O O O O O Ui O CD O 0 N NJ CO A Ln N V W W W CD Cu m A W N N N N W N N N Ui N O N V N Ui Ui O W NJ tD A N A UI O .. Cn NJ CD CO W A N Ol Co LD UI O 2. D II O -D O O O O O O O O O O O 0 OO co n Ui A A W W N W NJ LO W W W CD W V NJ Cn CO W OD CO NJ UI OD W < 3 (D r 7. 5 co 0 C i 0 0 01 CD CD Energy Balance Equation Summary @ POA 1 Sparrow Hill 24 Hr 1 year Storm Comparison: Qdeveloped5- I.F. *(Qpre-developed*RVpre-Developed)/RVdeveloped developed Qforested*RVforested)/RVdeveloped Drainage Area 1: °pre-developed = 3.67 RVpre-Developed = 0.532 Max °developed = 2.02 cfs RVDeveloped = 0.774,1 Achieved Post-Dev Max Runoff Qiyr= 1.99 cfs. Site complies with 9VAC25-870-66-(3)A Max. Allowed Qioyr= 32.42, Developed Qioyr = 29.09 cfs (predev) Q Q M �j O a7 O co C N Co CN. o 0 V a0 0 V C C (n Ss a) r 6 v LL ,� Cl N a •L r- N v Q co; Q i r Q Q. O 0- 0.3 Q Q Q� to VI O a 0 a v VII N n ' U II 3 L H.O › N N E E . cosi E II @ E w !Z II E i a O ›. E >` O E `> 0 a 0 0 o x O O = (% v 2 m O C ++ - CD 0 O = cc 0.s' O fC ui _o f0 - o In Q� a m U a) � a� a u U TD 0°- co▪ >` o > NN CO �` o > p N o W 02 i w ci cX; -1 III .4- W D A .-, II W M _ N �, N 7 v N I a C G O r a) I a w v ,.° > I` V ° - C C 0 II u ° M N C II- * > w 0>C o O 0 N ° o N aa o co o a j a c o m = C m = a 1 O to o x • 2 I II II 2 O 1._ ,��, - II I I I I a) a 3 7 6- - VI n v > 41 d NA a 3 a O W• O *• a ° a) Q C * -Oy i a) 2 LL O O ° ❑ X W O LL O O ° ❑ a L Vla v p v) L Vla >y `� a a o N (6 g Oco 0 a v CrCC z a g C� v p� a N o Q o Q -O > yd a, a) ro O Uao a) C coC m 0 QO O QEi Q CO C (p co 6 N Oco C N O 0 " en co 0 U r- • > n W v Q CV Nv < cn Q. CU ) O > a < Q. rn w /� L U LJ O U co U I I N p V ii r rt E w c IIu Q II E i 0 4- as E L a Cl E i. E O o x 00 o 0 c x O o Le) y, > v Cn N N > a 2 CO N Co ; ui o C CO $ 6 O8- CU > U N ,O 0 a) .C▪D >` o > M a) CD >` o > O a) W L r co m II O W L o \ O '� r.. v O - �� O R O IIV T i • lJ c C C 0 M U 2 a m M d 'RJ C N tzt *a cc — i. C leZr *a >>co O II N c * 00 o f6 N * ° .° ry ��1�M� T - w �. C y m d a I ".C".kNa' 7 C c0 > a a — aa CC O iT `o = v2 a II ii II cx6 a) = a2 c7 ii 11 II N N 41 - VI o a a O VI o ° y O W 0 * a - ,÷', o O Q C * a -y > o Q7 _ s- • LL W N ❑ x W 0 LL p a 1 d ❑ Q `i ��,_ ` O L - i �--i �0 'w ' x 0. o < 'O 0. o Q -O v m N v a) a) c7 az 3 C L Q Q ❑ 0 far-A01.4.-.V.'''. data input cells Project Name. Sparrow Hill Subdivision Date: 1/18/2018 s,, constant values Linear Development Project, NO calculation cells Site Information finale•BRs Post-Development Project(Treatment Volume and Loads) ,,or Enter Total Disturbed Area(acres) 4 frifjerlia Check: BMP Design Specifications List:2013 Draft Stds&Specs Maximum reduction required:IllNM= Linear project? No The site's net increase in impervious cover(acres)is:ME= Land cover areas entered correctly? s/ Post-Development TP Load Reduction for Site(lb/yr):®i Total disturbed area entered? a/ Pre-ReDevelopment Land Cover(acres) A Soils 8 Sods C Soils D Soils Totals _ Forest/Open Space(acres)--undisturbed, protected forest/open space or reforested land 6.33 23.23 29.56 Managed Turf(acres).-&storied,graded for yards or other turf to be mewed/managed 0.25 4.78 5.03 Impervious Cover(acres) 0.00 0.37 0.43 35.00 Post-Development Land Cover(acres) A Soils a Soils C Soils ()Soils Totals Forest/Open Space(acres)--undisturbed, 18.59 ' protected forest/open space or reforested land 633 12.26 Managed Turf(acres).-disturbed,graded for yards or other turf to be mowed/managed 0.22 11.64 11.86 Impervious Cover(acres) 007 448 4.55 Area Check OK. OK. OK. OK. 35.00 •Forest/Open Space areas must be protected In accordance with the Virginia Runoff Reduction Method Constants Runoff Coefficients(RA Annual Rainfall(inches) 43 A Soils R Soils C Soils D Soils Target Rainfall Event(Inches) 1.00 Forest/Open Space 0.02 0:03 0.04 0.05 Total Phosphoms ETP)EMC(mg/L) 0.26 Managed Turf 0.15 - 0.20 0.22 O.ZS Total Nitrogen(TN)EMC(mg/L) 1.86 Impervious Cover 0.95 0.95 0.95 0.95 Target TP Load Iib/acre/yrl 0.41 PI Iunnless correct on factor) 0.90 LAND COVER SUMMARY--PRE-REDEVELOPMENT LAND COVER SUMMARY--POST DEVELOPMENT Land Cover Summary-Pre Land Cover Summary-Post(Final) Land Cover Summary-Post Land Cover Summary-Post Pre-ReDevelopment Listed Adjusted' Post ReDev.8 New Impervious Post-ReDevelo pmen[ Post-Develapmen[New Impervious Forest/Open Space Covera Forest/Open Sp ace Lover Forest/Open Space (acres) 29.56 25.45 18.59 18.59 lanes) Cover(acres) Weighted Rvlforestl 0.03 0.03 Weighted Rv(forestl 0.03 Weighted Rv(fores i] 0.03 %Forest 84% 82% %Forest 53% %Forest 60% Managed Turf Cover(acres) 5.03 5.00 Managed Turf Cove 11.86 Managed Turf Cove 11.86 (acres) (acres) Weighted Re(turf) 0.20 0.20 Weighted Rs(turf) 0.20 Weighted Rv lturfl 0.20 ._- r %Managed Turf 14% 16% %Managed Turf 34"e %Managed Turf 38% ,fie, Impery ous Cover(acres) 0.41 041 Impervious Cover ) R D Impervious New Impervious Cover =*1'' Iamm 4.55 Cover(acre) 041 (ac s) Rv(impermous) 0.95 0.95 Rvlimpervious) 0.95 Rylimpervious) 095 Rv(impervaus) y. },. 1 %Impervious 1% 1% ac impervious 13% %Impervious 1% Total Site Area(acres) 35.00 30.86 Final Site Area(acres) 35.00 Total ReDev.Site Area 3086 cies) 1 Site Rv 0.06 0.07 Final Post DSite Rv 0.21 P50500itoys 031 Treatment Volume and Nutrient Lead Treatment Volume an--_I Nutt'en! Load Pre-ReDevelopment Treatment Volume Final Post-Development Post-ReDevelopment Post-Development (acre-ft) 0.1839 0.1732 Treatment Volume 0.5982 Treatment Volume 0.2704 Treatment Volume 0.3278 (acre-ft) (acreft) (acreft) Pre-ReDevelopment Treatment Volume Final Post-Development Post-ReDevelopment Post-Development (cubic het) 8,010 7546 Treatment Volume 26,056 Treatment Volume 11,779 Treatment Volume(rub, 14,277 (cubic feet) (cubic feet) feet) 1 Final Post- ReDevelopmem Development TP Load Pre-ReDevNopmem TP Load 5,03 4,74 * Development TP Load 16.37 a Post Load 7.40 Post De 897 (Ib/Tr) Ill/vrl (Ib/yr) Illahr). Pre-ReDerebpmenl TP Load per acre * Final Post.Development in pb/xre/wl 0.14 01s Load per acre 047 0.24 IIb/+vefn) Ob/acre/yr) Baseline re Load lib/yr) Mae.Reduction Required IO.e]IM/ave/vr applied topre-redevelopment ruda no gpe us 22 65 (Below 50% Land proposed for new imperoouscorm) Reoevelopmem load) 'Adjusted Lond Cover Summary. OP Load Reduction Tp Load Reduction Pre Re Development bed cover minus pervious land cover(/crest/o0en space or managed a Required for -5'25 Required for New 7.27 eurff acreage proposed for new Impervious cover. Redeveloped Area (Ib/yr) Impervious Area(Ib/yr) Adjusted total acreage is consistent with Post-ReDevelopment acreage(minus acreage of new impervious cover). 5 Reduction below new development load limrmfion not required Column I shows load reduction requriement for new impervious cover(hosed on new development load limit D.42 lbs/acre/year). Post-Development Requirement for Site Area TP Load Reduction Required(Ib/yr) 2.02 Nitrogen Loads(Informational Purposes Only) Final Post-Development TN Load Pre-ReDevelopment TN Load(Ib/yr) 36.00 (Post-ReDevelopment&New Impervious) 117.12 (Ib/yr) ...,Drainage Area B 402ioage Area A Land Cover lacres1 C=1=1 O. 0 43 0 03 manapdturflasms1 ISO ' 1117 0 20 1.38 1 38 0.95 Total Phosphorus Available for Removai in D.As El ilnhrl 384 Total 3 68 Post Development Treatment Volume in D.A.13fft., 6.n7 . .,Water Best Management Practices(RR=Runoff Reduction) ...ft.....Ode..liffs— Run. ....11.Impervious Volume/nom Runoff Raman.. ',MAIDS. Phosolmses p'hn'ha'" Phosphorus Remaining o*wn. p„,''.,...b. Nitrogen Nitrogen wad untr.t. 144rogen 4/4204/o/og pr„,„ n,d,„on cre,„n,„ cone,credit Upstream Reduction Runoff Treatment Removal up,,,...m :::::." Removed By Phosphorus r7p,:ed Removal from Upstream Nitrogen Load to Removed gy rosen ISA!) ,asres, Area(acres! Practice Ift) CM ,Come fft) Vnlurna Iff) ff.slens,PO ,,,,, p„„„ob) Pr... M Efficiency ISO Practises illss, ',wan.Coas) Israel,.0.1 Load(ff.) 1.Vegetated Root IRRI 1 a Vegetate.001811S045450 45 0 0 a , ono a. coo 888 Elill 888 s e vegetated PoolaSISoes SS, „ o o a o o a a oc o a M soo ow o on „ , o o a • n a ot a oo o oo °ea o aw a ors ova , wo aossot, a. ow a. a. o 000 ow ono a. so o a a ts . wo o w ow 15 0 0,0 OW 0 00 000 . 0 00 0. 545 15 000 OW 0 00 000 40 0 0 0 25 OW .00 GOO oo 0.00 000 OM 000 11 00:: so 0 0 0 So , 0 00 000 000 220 ./ 000 fOO 000 000 OM 000 0 00 OW o 000 000 000 000 / oross s',OrT41=75:'07:2Ze04/5 4/ " o a a ts o a ow 000 ono a o oo a a ow sal =111111111111111111111M a a sansoola vaanvetowsoava a a a a ° '22 . 888 888a28 '22 , ow von 000 ow ow ao° ==11MMIIIIIIIIIMMIIIII to o o a o a ono ' ow o oo o as to ow ow ono a a o a e o a oat ow o°a am to o oo o. ow a. 5.1),Swale IRRI s a Dry Swale el Nes NIO, a o e o o to ow 000 wo ow Mil 884 a' 111:11 80 a. 544 ow BC 1 IME 388 8' MEER 'IOW C .. .via '2.2a2a2V . . . . . •.Illmeten11019(RRI =IIIIIIIIIIIIIMM 0 9 0 0 O. a CO 0 00 0 in 0 0 0 0 „ 000 V 00 0 00 0 00 9..., 7. 9 ion(1110 ,9 0 0 a 0 zs 0 00 0 00 OM I IS 9 00 0 00 0 00 0 00 ,.Extendect Detention Pond(00) 0 0 0 0 IS O. 0. 0 90 O. ! 10 000 000 000 000 S S ED.ISP99 9E. :9 a a 0 0 99 0 00 0 00 0 00 0 00 . u. o N o no a oo o o o o o , a oo 0.00 0 CP 0 00 1=7::=0 0 00 0 00 O. 0 00 499, 0 0 0 0 o 0 00 O. OM 0 00 1,1999 94 „ 0 0 0 0 0 0 00 0 00 .00 000 19P99 99 8.1 TOT.IMPERVIOUS COVER TREATED(n. 1.38 AREA CHECK OK T.T.TUT.AT.A TREATED IA9) 1.87 AREA[HECK.OK TOT.RUNOFF ROXICTION 1N 0 A 11 01) 3.0S8 TOTAL PHOSPHORUS AVAILABLE FOR REMOVAL IN DA.B 1119/901 MEM TOTAL PHOSPHORUS REMOVED WITH RUNOFF REDUCTION pRACTICES IN OS B/19/9991111.1M TOTAL RUNOFF REDUCTION IN A.B WI WEN TOTAL PHOSPHORUS REMAINING AVTER APPLYING RUNOFF REDUCOON PRACTICES IN D.A.0 0/.9___I-L99. NITROGEN REMOVED WITH RUNOFF REDUCTION PRACTICES IN D.A.B(IV, 19,8_, SEE WATER QUALITY COMPLIANCE TAB FOE SITE COMPLIANCE CALCULATIONS SEE WATER QUALITY COMPLIANCE TAB FOR SITE CALCULATIONS(Information Only) IF OLCClAEI pims:=7:=:1: II.Ws91.0.12 ISp.9LE, 0 0 0 o O ar ono O. 000 a. i 99 n no 0 OC 9 0 0 0 0 . 000 0 00 0 00 0 00 , 0. 0 Oa 0 00 0 00 F: 000 000 ADO a. 12on .Cstructed Wetland Ina 0$11 o a _ a 0 so TN TO TO O. AR 50 0 EC SE 19 c.991999.9I w90904•31.999.31 ' 0 0 0 0 75 (104 0 0 00 0 00 EN ''' AN 0 00 OW LI ITTI =IIIIIIIIIII 0 0 0 9' 0 00 0 00 90 0 00 0. 000 000 , 0 0 0 0 IS 0 da 0 00 0 00 000 or 0 00 OM 0 00 0 00 a a 0 , . 0 00 I 00 0 0 000 . 0 00 0 00 000 O. 1.1.11Aanolactned Tres...Devices Ow RR) 1100 0.00 Dm O. 0 00 0 00 0 0 0 e zo 0 00 COO 0 00 0 00 0 00 0 00 %NW TOTAL IPAPERSIOUS COVER TREATED(89) 1.38 AREA Clif LIS 099. TOT.MANAGED TURF AREA TREATED I.) 1 87 AREA CHECK Ok. TOTAL PHOSPHORUS REMOVAL REQUIRED ON SITE 1119/9/9 i ,.. I raw PHOSPHORUS AVAILABLE TOR REMOVAL IN D.A.8 1119/yr 3.09, TOTAL PHOSPHORUS REMOVED WITHOUT AUNOFP REDUCTION PRACTICES IN D.A B,119/99 00C TOTAL PHOSPHORUS REMOVED WITH ALIN°.REDUCNON PRACTICES IN D.A.B(1,1yr SAO TOTAL PHOSPHORUS LOAD REDUCTION ACHIEVED IN D.A.Ti Obi, 2 ao TOI.PHOSPHORUS REMAINING ASTER APPLYING BPAP LOAD REDUCTIONS IN D A 0(99.9.9 1.. SEE WATER QUALITY COMPLIANCE TAB FOR SITE COMPLIANCE CALCULATIONS NITROGEN REMOVED WITH MAO.REDIECTION PRACTICES IN D.A.B(119/yr, 15 79 NITROGEN REMOVED WITHOUT RUNO.REDUCTION PRACTICES IN D.A.B(lb/y, C 00 TOTAL NITROGEN REMOVED IN D.A.B(119/yr, 15 79 .. .„ ,,,,,,-„,_ • . -s.,.. .,... 9 99 s .. .. . . .. Virginia Runoff Reduction Method Worksheet DEQ Virginia Runoff Reduction Method Re-Development Compliance Spreadsheet-Version 3.0 BMP Design Specifications List:2013 Draft Stds&Specs Site Summary Total Rainfall(in): 43 Total Disturbed Acreage: 14.92 % Site Land Cover Summary �I� Pre-ReDevelopment Land Cover(acres) _ A soils B Soils C Soils. ()Soils Totals %of Total Forest/Open(acres) 6.33 23.23 0.00 0.00 29.56 84 Managed Turf(acres) 0.25 4.78 0.00 0.00 5.03 14 Impervious Cover(acres) 0.04 0.37 0.00 0.00 0.41 1 35.00 100 Post-ReDevelopment Land Cover(acres) A soils B Soils C Soils D Soils Totals %of Total Forest/Open(acres) 6.33 12.26 0.00 0.00 18.59 53 e Managed Turf(acres) 0.22 11.64 0.00 0.00 11.86 34 Impervious Cover(acres) 0.07 4.48 0.00 0.00 4.55 13 "Forest/Open Space areas must be protected in accordance with the Virginia Runoff Reduction Method 35.00 100 Site Tv and Land Cover Nutrient Loads Final Post-Development Post- Pre- Final Post-Development Post-ReDevelopment TP Post- Adjusted Pre- ReDevelopment (Post-ReDevelopment ReDevelopment Development ReDevelopment TP Load per acre TP Load per acre Load per acre &New Impervious) (New Impervious) (lb/acre/yr) (Ib/acre/yr) (lb/acre/yr) Site Rv 0.21 0.11 0.95 0.07 0.15 0.47 0.24 Treatment Volume(fta) 26,056 11,779 14,277 7,546 TP Load(lb/yr) 16.37 7.40 8.97 4.74 Baseline TP Load(Ib/yr):12.654361983471"Reduction below new development food limitation not required 1" Total TP Load Reduction Required(Ib/yr) 2.02 -5.25 7.27 Final Post-Development Load - Pre- (Post-ReDevelopment&New Impervious) ReDevelopment TN Load(lb/yr) 117.12 36.00 Site Compliance Summary Maximum%Reduction Required Below 20% "Note:%Reduction will reduce post-development TP load to less than or equal to baseline load of 12.65 lb/yr(0.41 lb/at/yr) Pre-ReDevelopment Load (Required reduction for Post-ReOev.=Post-ReDev TP load-baseline load of 12.654361983471116/yd baseline load=site area x 0.41 lb/ac/yr Total Runoff Volume Reduction(ft) 3,058 Total TP Load Reduction Achieved(Ib/yr) 2.40 Total TN Load Reduction Achieved(Ib/yr) 15.79 Remaining Post Development TP Load (Ib/yr) 13.97 Remaining TP Load Reduction(lb/yr) 000 0•TARGET TP REDUCTION EXCEEDED BY 0.38 LB/YEAR 0* Required 'Reduction below new development load limitation not required Drainage Area Summary D.A.A D.A.B D.A.C D.A.D D.A.E Total Forest/Open(acres) 1.23 0.43 0.00 0.00 0.00 1.66 Managed Turf(acres) 2.70 1.87 1.14 0.18 0.36 6.25 Impervious Cover(acres) 1.60 1.38 1.29 0.09 0.09 4.45 Total Area(acres) 5.53 3.68 2.43 0.27 0.45 12.36 Drainage Area Compliance Summary D.A.A D.A.B D.A.C. D.A.D D.A.E Total TP Load Reduced(Ib/yr) 0.00 2.40 0.00 0.00 0.00 2.40 TN Load Reduced(lb/yr) 0.00 15.79 0.00 0.00 0.00 15.79 7 Summary Print Virginia Runoff Reduction Method Worksheet Drainage Area A Summary Land Cover Summary A Soils 13 Soils CSails El Soils Total %of Total Forest/Open(acres) 000 1.23 0.00 0.00 1.23 22 Managed Turf(acres) 0.00 2.70 0.00 000 2.70 49 Impervious Cover(acres) 0.00 1.60 0.00 0.00 1.60 29 5.53 IMP Selections Managed Turf Impervious TP bad from BMP Treatment Untreated TP Load TP Removed TP Remaining Downstream Treatment Practice Credit Area Cover CreditUpstream (aces) Area(acres) Volume(ft, Practices(Its) to Practice(Its) (Ib/yr) (Ib/yr) to be Employed Total Impervious Cover Treated(acres) 0.00 Total Tun Area Treated(acres) 000 Total TP Load Reduction Achieved in D.A. 0.00 (Ib/vel Total TN Load Reduction Achieved in D.A. (Ib/yr) 0.00 Drainage Area B Summary Land Cover Summary A Soils I Soils CSoils D Soils Total %of Total Forest/OP.(acres) 0.00 0.43 0.00 0.00 0.43 12 Managed Turf(acres) 0.00 1.87 0.00 0.00 1.87 51 Impervious Cover(acres) 0.00 138 0.00 000 1.38 38 3.68 BMP Selections Managed Turf Impervious TP Load from BMP Treatment Untreated TP Load TP Removed TP Remaining Downstream Treatment Practice Credit Area Cover Credit Upstream (acres) Area(acres) Volume(ft.) Practices(Its) to Practice(lbs) (Ib/yr) (Ib/yr) to be Employed 74.Infiltration*1(Spec MB) 1.87 1.38 6,116.55 0.00 3.84 2.40 1.44 Total Impervious Cover Treated(acres) 138 Total Turf Area Treated(acres) La/ Total TO Load Reduction Achieved in D.A. 2.40 (1b/Tri Total TN Load Reduction Achieved in D.A. (Ib/yr) 15.79 Drainage Area C Summary Land Cover Summary A oils BSoils CSoils D5oils Total %o/Total Forest/OPen(acres) 0.00 000 0.D0 0.00 0.00 0 Managed Turf(acres) 0.00 1.14 0.00 0.00 1.14 47 Impervious Cover(acres) 0.00 1.29 0.00 0.00 1.29 53 2.43 BMP Selections Managed Turf Impervious TP load from BMP Treatment Untreated TP Load TP Removed TP Remaining Downstream Treatment Practice Credit Area Cover CndkUpstream (acres) Area(saes) Volume(kt) Practices(Its) to Practice(Its) (Ib/yr) (Pb/yr) to be Employed Total Impervious Cover Treated(acres) 0.00 Total Turf Area Treated(acres) 000 Total TP Load Reduction Achieved in DA. 0.00 (lb/yr) Total TN Load Reduction Achieved in D.A. (lb/yr) 0.00 Drainage Area D Summary Land Cover Summary A Soils II Soils CSoils DSoils Total %of Total Forest/Open(acres) 0.00 000 0.00 000 0.00 0 Managed Turf(acres) 000 0.18 0.00 0.00 0.18 67 Impervious Cover(acres) 0.00 0.09 0.00 0.00 009 33 0.27 IMP Selections Managed Turf kmpeMcus BMP Treatment TP Load from Untreated TP Load TP Removed TP Remaining Downstream Treatment Practice Crack Area Cover CreditUpstream )acres) Area(acres) Volume(its) Practices(Its) to Practice(IW) (Ib/yr) (Ib/yr) to be Employed Total Impervious Corer Treated(acres) 0.00 Total Turf Area Treated(acres) 0.00 Total TP Load Reduction Achieved in DA. (lb/yr) 0.00 Total TN Load Reduction Achieved in DA. 0 00 (lb/yr) Drainage Area E Summary band Cover Summary A Soils B5uils CSoils 15oils Total %of Total Forest/Open(acres) 0.00 0.00 0.00 0.00 0.00 0 Managed Turf(acres) 0.00 0.36 000 0.00 036 80 Impervious Cover(acres) 0.00 0.09 0.00 0.00 009 20 0A5 BMP Selections Maeaged Turf ImpeMous IMP Treatment TP Load cram Untreated TP Load TP Removed TP Remaining Downstream Treatment Make [rock Area Craver Cndk Volume(Rt) upstream to Practice(lbs) (ib/yr) (lb/yr) to be Employed *11411.1 (acres) Area(acres) Practices(lb.) `� Total Impervious Corer Treated(acres) 0.00 Total Turf Area Treated(acres) 000 Total TP Load Reduction Achieved in D.A. (lb/yr) 0.00 Total TN Load Reduction Achieved in DA. (lb/yr) 0.00 Summary Print Virginia Runoff Reduction Method Worksheet Runoff Volume and CN Calculations 1-year storm 2-year storm 10-year storm Target Rainfall Event(in) 3.05 5.55 9.04 IklOre Drainage Areas RV&CN Drainage Area A Drainage Area B Drainage Area C Drainage Area D Drainage Area E CN 70 74 81 73 68 RR(ft3) 0 3,058 0 0 0 RV wo RR(ws-in) 0.74 0.94 1.35 0.89 0.65 1-year return period RV w RR(ws-in) 0.74 0.71 1.35 0.89 0.65 CN adjusted 70 69 81 73 68 RV wo RR(ws-in) 2.45 2.81 3.48 2.72 2.28 2-year return period RV w RR(ws-in) 2.45 2.58 3.48 2.72 2.28 CN adjusted 70 71 81 73 68 RV wo RR(ws-in) 5.37 5.87 6.73 5.74 5.12 10-year return period RV w RR(ws-in) 5.37 5.64 6.73 5.74 5.12 CN adjusted 70 72 81 73 68 Summary Print Sparrow Hill Orange cells need input,white cells are calculations. Basin 1 Step 1:Preliminary Design Top of Damp .&1W ter' Downstream Toe of Dam " . 111> Barrel length(ft) 11,0 Slope of principal spillway barrel(%) t 4'4, Step 2:Calculate Runoff Rational Method , �k9 Drainage Area(ac) C t ;fit 1 `W2 4 p 125 Q2(cfs) 9.8 Q25(cfs) 15.0 Step 3:Principal Spillway From Plate 3.14-8 Spillway Capacity with emergency spillway(cfs) 15.0 Riser Diameter(in)1141601 Actual head(ft) 100 Qp(max) Step 4:Emergency Spillway From Table 3.14-C Required spillway capacity 0.0 Hp 9O • b-Bottom width(ft) S-slope of exit channel(ft/foot) U1;1 X-minimum length of exit channel(f 4I„/,„ Step 5:Grade Basin Design Parameters Maximum Top of Dry Storage 627.4 Required Wet+Dry Storage(cf) 13,676 Wet Storage Required Volume(cy) 253 Required Volume(cf) 6,838 Minimum Standpipe Invert 621.5 Cleanout Required Volume(cy) 125 Cleanout Required Volume(cf) 3,368 Design Elevation Area(sf) Bottom of Wet Storage ."00.1 p z1 Basin 1 Cleanout Elevation NNW 0 IA 1:40 Top of Wet Storage + ; �+ M Cleanout Volume(cf) 4,343 Wet Storage Volume(cf) 6,983 Wet Storage Volume(cy) 259 Dry Storage Required Volume(cy) 253 Required Volume(cf) 6,838 Maximum Top of Dry Storage 628.0 Design Elevation Area(sf) Bottom of Dry Storage 625.1 2,625 Top of Dry Storage Dry Storage Volume(cf) 7,234 Dry Storage Volume(cy) 268 Step 6:Final Details Upstream Toe of Dam 621.5 Principle Spillway Elevation 628.4 Trash rack and anti-vortex device From Table 3.14-D: Diameter(in) Height(in) From Retention Basin Design and Plate 3.14-B: Head on barrel(ft) 7.9 Qp(max) 16.0 Barrel diameter(in) Dewatering Orifice Design Riser Height 5.9 h(ft) 1.1 S(cf) 7,234 Q(cfs) 0.33 A(sf) 0.065 d(ft) 0.287 Dewatering Orifice Diameter(in) 4 Flexible Tubing Diameter(in) 6 Baffle Calculation Length of Flow(L)(ft) Effective Width(We)(ft) 55 L/We 0.9 fir' NOAA Atlas 14,Volume 2, Version 3pi �� Location name: Charlottesville,Virginia, USA* "''' Latitude:38.0526°, Longitude:-78.696° 1 Ilir t Elevation:678.89 ft** "source:ESRI Maps 4,., , **source:USGS POINT PRECIPITATION FREQUENCY ESTIMATES Sire G.M.Bonnin,D.Martin,B.Lin,T.Parzybok,M.Yekta,and D.Riley NOAA,National Weather Service,Silver Spring,Maryland PF tabular I PF araphical i Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval(years) Duration 1 2 5 10 25 50 100 200 500 1000 0.339 0.405 0.478 0.539 0.609 0.663 0.714 0.763 0.821 0.869 5-min (0.307-0.375) (0.367-0.448) (0.432-0.528) (0.486-0.595) (0.546-0.671) (0.591-0.730) (0.633-0.788) (0.670-0.843) (0.713-0.912) (0.746-0.971) 0.541 0.648 0.766 0.862 0.970 1.05 1.14 1.21 1.30 1.37 10-min (0.490-0.600) (0.588-0.717) (0.692-0.846) (0.778-0.952) (0.871-1.07) (0.942-1.16) (1.01-1.25) (1.06-1.34) (1.13-1.44) (1.18-1.53) 0.677 0.815 0.968 1.09 1.23 1.34 1.43 1.52 1.64 1.72 15-min (0.612-0.749) (0.739-0.901) (0.876-1.07) (0.984-1.20) (1.10-1.35) (1.19-1.47) (1.27-1.58) (1.34-1.69) (1.42-1.82) (1.48-1.92) 30-min 0.928 1.13 1.38 1.58 1.82 2.01 2.20 2.37 2.60 2.78 (0.840-1.03) (1.02-1.25) (1.24-1.52) (1.43-1.74) (1.64-2.01) (1.80-2.22) (1.95-2.42) (2.09-2.63) (2.26-2.89) (2.39-3.11) 60-min 1.16 1.41 1.76 2.06 2.43 2.73 3.03 3.33 3.73 4.06 (1.05-1.28) (1.28-1.56) (1.59-1.95) (1.86-2.27) (2.18-2.67) (2.43-3.00) (2.68-3.34) (2.93-3.68) (3.24-4.15) (3.49-4.54) 2-hr 1.38 1.68 2.11 2.48 2.96 3.36 3.77 4.20 4.79 5.29 (1.23-1.55) (1.50-1.89) (1.88-2.37) (2.21-2.78) (2.62-3.31) (2.96-3.76) (3.29-4.22) (3.63-4.71) (4.09-5.39) (4.46-5.97) 3-hr 1.51 1.84 2.31 2.71 3.24 3.68 4.14 4.62 5.28 5.85 (1.35-1.72) (1.64-2.08) (2.05-2.61) (2.40-3.06) (2.85-3.65) (3.22-4.15) (3.60-4.67) (3.98-5.22) (4.48-5.98) (4.90-6.65) 6-hr 1.96 2.37 2.95 3.47 4.17 4.79 5.43 6.13 7.13 8.02 141100 (1.75-2.21) (2.12-2.67) (2.62-3.32) (3.08-3.90) (3.67-4.69) (4.18-5.37) (4.69-6.11) (5.23-6.91) (5.98-8.07) (6.62-9.10) 12-hr 2.49 3.01 3.75 4.44 5.40 6.26 7.19 8.22 9.75 11.1 (2.22-2.84) (2.68-3.42) (3.33-4.26) (3.92-5.04) (4.72-6.12) (5.41-7.09) (6.13-8.15) (6.91-9.33) (8.01-11.1) (8.98-12.7) 24-hr3.05 3.69 4.70 5.55 6.80 7.86 9.04 10.3 12.3 13.9 (2.74-3.42) (3.32-4.13) (4.22-5.26) (4.96-6.20) (6.03-7.58) (6.93-8.75) (7.89-10.0) (8.92-11.5) (10.4-13.6) (1t6-15.5) 3.59 4.35 5.52 6.48 7.87 9.03 10.3 11.6 13.6 15.3 2-day (3.23-4.01) (3.92-4.86) (4.96-6.16) (5.81-7.22) (7.00-8.75) (7.97-10.0) (9.01-11.4) (10.1-13.0) (11.7-15.2) (13.0-17.1) 3.82 4.63 5.87 6.89 8.35 9.58 10.9 12.3 14.4 16.2 3-day (3.47-4.25) (4.20-5.14) (5.32-6.51) (6.22-7.63) (7.50-9.24) (8.54-10.6) (9.65-12.1) (10.8-13.7) (12.5-16.0) (13.9-18.0) 4-clay 4.06 4.91 6.22 7.29 8.84 10.1 11.5 13.0 15.2 17.0 (3.71-4.48) (4.48-5.42) (5.67-6.87) (6.63-8.04) (8.00-9.74) (9.11-11.2) (10.3-12.7) (11.5-14.4) (13.3-16.8) (14.8-18.9) 4.71 5.67 7.09 8.24 9.88 11.2 12.7 14.2 16.5 18.3 7-day (4.32-5.15) (5.20-6.20) (6.48-7.75) (7.52-9.00) (8.97-10.8) (10.1-12.3) (11.4-13.9) (12.7-15.6) (14.5-18.1) - (15.9-20.1) 10-day 5.35 6.42 7.91 9.11 10.8 12.1 13.5 15.0 17.1 18.9 (4.92-5.80) (5.92-6.96) (7.28-8.57) (8.36-9.86) (9.85-11.7) (11.0-13.1) (12.3-14.7) (13.5-16.3) (15.2-18.7) (16.6-20.6) 20-day 7.02 8.37 10.1 11.4 13.3 14.7 16.2 17.7 19.7 21.3 (6.56-7.55) (7.82-8.99) (9.41-10.8) (10.6-12.3) (12.3-14.3) (13.6-15.8) (14.9-17.4) (16.2-19.0) (17.9-21.3) (19.2-23.1) 30-day 8.61 10.2 12.1 13.5 15.3 16.7 18.1 19.4 21.1 22.5 (8.09-9.20) (9.59-10.9) (11.3-12.9) (12.6-14.4) (14.3-16.3) (15.5-17.8) (16.8-19.3) (17.9-20.8) (19.5-22.7) (20.6-24.2) 45-day10.8 12.7 14.8 16.4 18.4 19.9 21.4 22.8 24.5 25.9 (10.1-11.4) (12.0-13.5) (14.0-15.7) (15.4-17.4) (17.3-19.5) (18.7-21.2) (20.0-22.7) (21.2-24.2) (22.8-26.2) (23.9-27.7) 60-day (11.9-13.3) 14.8 17.1 18.8 20.9 22.4 23.9 25.3 27.0 28.3 (11.9-13.3) (14.0-15.7) (16.2-18.0) (17.7-19.8) (19.7-22.0) (21.1-23.7) (22.4-25.2) (23.7-26.8) (25.2-28.7) (26.4-30.1) 1 Precipitation frequency(PF)estimates in this table are based on frequency analysis of partial duration series(PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90%confidence interval.The probability that precipitation frequency estimates(for a given duration and average recurrence interval)wii be greater than the upper bound(or less than the lower bound)is 5%.Estimates at upper bounds are not checked against probable maximum precipitation(PMP)estimates and may be higher than currently valid PMP values. Please refer to NOM Atlas 14 document for more information. Back to Top Section 6. Pollution Prevention Plan. §14,0,r'(reference County Code 17-404 and State Regulation 9VAC25-880-70 part II section A.4) A. Plan showing pollution activities and prevention practices Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County - - _ r\ / / -- \ . / ,' �/ / - / - // / i -__�- /^�_// r • /,---/ / / /v //� -/ D -::::1 -/ DC7 �J �7 J 1_ / /\V/ \-____-----// J /-",.-tel _ -- // M =1 D n // /' /- / DC7 // /^ ____-____ /\--v Z / / 1- - �i / DC7 // 1 I , / , O/ / ._-- i __ , DC7 \ i ___ _ �� ' / D C7 / / rSl O /__-- ` / ' /// /�/ /// / / //i// //'��-_li -ter r • -.. ..: A.. ,\�g� �,:'' fF •\ \\ \\ \\ 1:ç;- " ''..174.--/ /\ / / / }� I / / / / / , / vl / l• '+ r- �� { al ���; I 1 0.\ 1 1 \ \I I / / DC7 , / // l ,/ // // �j jai/ce, i 1 , �� "� i \�/ 0,-. , I y \ \ \ \ if \ D l I / / / / // /' /' / '��^��\� / r I 1 \ 1 \ n .4.11°14.,4‘‘iniiii\ / 1 / 1 / / , / «' 1 / , // , � � - Iti % / / / /1,/ / // /, //, / �`• \ 6_ /' ' \ ,', — - �C I \ / I i / '/ // // /�/// ' / /// F/ \ a .•- 1 O", ;Jo" .,. ,_1A "' �1 //J// / A /� ,/ / ft41 \ \ \ ,;.: :, , 41P0 / / , // ,/ //// --d \. /' �. _ o -g 1. �f 1 Y I i 1 / +1 / // //� i // // \\\-- d_✓ /7 Le=g ,�1 11 �v , C,;,� 1 1.-f v V / /� ,s� r -0 D 1 '1' I / / • t / m -/ ��11JJ 11„.\, �� r /, in c i - I 11 1 I / /� j t �� '/ / , - , 1 o�.f 0 / iZ w'' 3 Iv A ,, /1 I Il / I \j 1 I // / r \ 1,�, 21 / pty mol. 1D (/) �\ "1�z- % \ \ \ \ \ \ 1/ 1 1 / i A A r /rt$ IR / . ---.1. I-1 ( /1 z/ ' / jik /tat - --. '\. ' --. 0 ; V-/ / ( ,�! I i il \ - -- 1\ t ' I III II i� 1 I k 1 01 i,zi-I4-1\ \\-' 3-,\'' ”' ' tr\ \\' ------ 7/ -----'-' ' / I CO li \� - N Z__ \ INI M/ � �V I \ . ` �����1 4 /� _ +' i� I h-�\\ -� �\ 1 - l \` ---- `\ j VIII ' � I/' 4 `\� m \\ u Y L \\ \• Dm I• Ij � f--- 1I I" 6 a � I Z �" rI III "*°,f'-.w , a \ _ .4 / I m \ \ I} . \ I J Z o . _ Al /i I,-(}, t I --------)_,_ L "."." ,,i IL P:-_---...•=-_-=. I e- = - _, _,...., ( I ,' fil : N, i ( , ..... ...\ \ tllI A / ,f- 'k.I ,,1 N ,--- 1 V - --4 ----* -.‘\'''''. '^- t---- I ,J tz_4_ IlW ...' ________ ::I k: ‘ I • \ 1/^`I i i. ( I ` \ ` r �B \ Il iy - / w \ , V A / / �.1 I/r �1 '7�� D Z�� / .��,�� ti+`..,.�., V �/ � I-4 S.-4,1 a0-4s , I/� ®sso I _ _� O Z 40 , JTo/ _ L__ - 1 -, 14,3 • - —' - 7. r,„ '--' ' '_• , T v, •.,-,":..„..._11117,,, teg, , \ /_i ., 4 / )\ - r: ,v . ,, \� �� v �.►�.0' f I84 I ). // _1_. ( ���`yyc / �,I -r--.:1.*-,./ �+ r✓ -"!! `\ \ \ • -j7/ 1 111. / / 1 ` ' '' �:. -�" i� i' t 11" "v"'-`-1P-, *,•' ? , - -- (/ X O Dr- O v / I I � d / / 0Cf, 116L IlliS IIII* N '', \ 04, , ZO 1 .4\ /c ,/q00 ( / I t •.0 0 \ -., , .....*-- ' %/0 i --, '\''' a=-2j 00 D 1 • ;• • O r- D 70 Z �\ • �� a D X • CO) O � Cn >. G-) A � � i , ••• a \ p I u ••00 p OZ I \ I - w w w w w w w w w w w RI r �_ Z� K > i., w w ; - - o 0 0 0 o Z O_ IN) O D tii / r 0 0 -I m O cn N a w v cn w NJ o o `n 3 Z C1- rn o m o m D O rTl —I �1 m o 3 m m o m m - In 0 0 Z OZ m >" C4 0 o m --1 = s o m o o _ v) w G7 O � yZZ'), c O z -1 70 z, -a m z, m n m 0 �7 Z m m xi m„ a Z] (Zj C C 0 D D T 2J' > -4 < p -, m 1 Z Or" Z75 (/) mCmn m 0r RI m o mo 2 Z Z - 0 O CAD rr1 -� � � rG � s p s r�* z o z XIm O = pC� f— � ZQ cZi Z vAi o Q mz � DOzc7 D 0 m Fl D 3 '0= -0 c-I o z z m D Q D - zc� r� 7 CO Z = _1 • U) KFri Z r m C D —I r B. Sources of Pollutants, locations, and prevention practices Pollutant, oltutantreveution Practices, Slime Generating Aeti� Lc►cahon on site ?control easures tY r C. Sources of Pollutants continued. Common activities and minimum control and prevention practices SwipePonta<'tllt, tr 'ollutant 'rvention Practices, I,t)catton on Slte; Generatui Activity Control Measures Follow Erosion and Sediment Control Clearing,grading,excavating,and un- Land disturbance area Plan. Dispose of clearing debris at stabilized areas acceptable disposal sites. Seed and mulch, or sod within 7 days of land clearing Cover storm drain inlets and use drip pans Paving operations Roads and driveways and absorbent/oil dry for all paving machines to limit leaks and spills Direct concrete wash water into a leak- Concrete washout and Current location and detail shown on proof container or leak-proof settling basin cement waste plan that is designed so that no overflows can occur Enclose or cover material storage areas. Mix paint indoors in a containment area or Structure construction,stucco, Structures in a flat unpaved area.Prevent the painting, and cleaning discharge of soaps,solvents,detergents and wash water,paint,form release oils and curing compounds. Water shall be filtered,settled or similarly Dewatering operations Dewatering sites shown on plan treated prior to discharge as shown on plan. Designated areas for material delivery and Material delivery and storage Designated area shown on plan storage. Placed near construction entrances,away from waterways and drainage paths Material use during building process Building areas Follow manufacturer's instructions. MSDS's attached. Waste collection area will not receive a substantial amount of runoff from upland Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Pollutant,olr Pol$tanf s ' S e Het on Practices Glitterat�u Actlilty LQ�at�oa on sits �{ N, ' '; �ol�easures areas and does not drain directly to a Current designated container areas on waterway. Containers have lids covered Solid waste disposal plan before periods of rain,or are in a covered varea. Scheduled collection to prevent overfilling.MATERIALS NOT TO BE BURIED ON-SITE Convenient and well-maintained portable sanitary facilities will be provided,and Sanitary waste Current locations shown on plan located away from waterways or inlets. Such facilities shall be regularly maintained. Apply fertilizers in accordance with Landscaping operations Landscape areas shown on plan manufacturer's recommendations and not during rainfall events To be treated in a sediment basin or better control as specified on plan.Minimize Wash Waters Wash areas shown on plan the discharge of pollutants from equipment and vehicle washing Vehicle and equipment washing Designated areas and details shown on Provide containment and filtering for all plan wash waters per the plan Minimization of exposure to precipitation and stormwater.Minimize the exposure of building materials,building products, construction wastes,trash,landscape materials,fertilizers,pesticides,herbicides,detergents,sanitary waste,and other materials present on the site to precipitation and to stormwater. (Identify all non-stormwater discharges to occur on your site. Keep this plan up-to-date with ongoing site changes and inspections. See CGP, 9VAC25-880-70 section E for examples of non-stormwater discharges.) Stowe D. Non-stormwater discharges Rise arge Pollutants or 'o to nt Location on Site Constituents Dust Control Treatment chemicals Designated areas and details shown on plan bitime E. Persons responsible for pollution prevention practices Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP) Albemarle County To be determined when contractor is selected. Sloe F. Response and reporting practices Minimize discharges from spills and leaks. Minimize the discharge of pollutants from spills and leaks and implement chemical spill and leak prevention and response procedures as follows. To the extent practical, do not store oils, chemicals, or other potential contaminants on site. When storage of potential contaminants is required, provide secondary containment, such as spill berms or spill containment pallets. These should be located within the drainage areas to a sediment trap or sediment basin. Direct concrete wash water into a settling basin, dispose of hardened concrete with other construction waste debris to an appropriate waste facility. Respond to all spills, leaks and discharges as follows. Spills of oil, petroleum products, sanitary wastes, and substances listed under 40 CFR parts 110, 117, and 302 should be cleaned up as soon as possible while protecting worker safety. Construct an earthen dike around any spills on dirt to prevent spreading. If a spill occurs during rainfall, cover it with a tarp or another impermeable cover to prevent contaminating runoff. Do not bury any spills or wash them with water. Maintain a spill kits in a readily accessible location. A spill kit shall consist of a lined drum with bags of universal sorbents in the bottom, accessible without tipping the drum, sorbent socks above the bags, and personal protective equipment on the top. All materials used to remove the contaminants, including any water used to rinse equipment, and all dirt removed must be treated as contaminated. Textiles, such as from coveralls, may be sent to a certified laundry facility. Waste must be disposed of according to the standards of Albemarle County and the Commonwealth of Virginia. Store hazardous materials and wastes in covered containers. Report all spills, leaks and discharges as follows: All spills, leaks, and discharges shall be recorded in the inspection logs. If construction activity results in a discharge of contaminants that may be reasonably expected to enter surface waters, the operator shall notify the Department of Environmental Quality immediately or within 24 hours, and shall submit a written report within five days. For significant spills that cannot be controlled by personnel in the immediate vicinity, notify the local emergency response by dialing 911. Albemarle County must also be notified, and potentially some of the following agencies: the Fire Department, the Public Works Department, the Coast Guard,the Highway Patrol, the County Police Department, Department of Toxic Substances, OSHA, etc. For spills of federal reportable quantities, in conformance with the requirements in 40 CFR parts 110, 119, and 302,the contractor should notify the National Response Center at(800)424-8802. G. Pollution Prevention Awareness The engineer, project superintendent, and contractor shall have weekly meetings to review on-site conditions and advise contractor of potential risks that should be addressed. Contractor will be responsible for following procedures on a daily basis and applying appropriate waste management and prevention practices to be in compliance with the conditions of the general permit. Employees shall be informed of the danger to nature and to human health of various chemical spills. Section 7. Discharges to impaired waters, surface waters within an applicable TMDL wasteload allocation, and exceptional waters. Nime Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP)Albemarle County Water discharges into an impaired water: Meachums River—Beaver Creek. Beaver Creek was listed as impaired due to Benthic-Macroinvertebrate Bioassessments for E-Coli and Fecal Coliforms. Site work shall be in compliance with the following requirements: 1. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; 2. Nutrients shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events; and 3. In accordance with Part I B 4 and Part I B 5, inspections shall be conducted as follows: I. Inspections shall be conducted at a frequency of(i) at least once every four business days or(ii) at least once every five business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day; and II. Representative inspections used by utility line installation,pipeline construction, or other similar linear construction activities shall inspect all outfalls discharging to exceptional waters. Section 8. Qualified personnel The following personnel are responsible for inspections: To Be Determined. The Operator or duly authorized representative will serve as the qualified personnel. This may include delegating this responsibility to other contractors as they become involved with the project. The SWPPP will be updated when contractor is hired. Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP)Albemarle County 2014 Impaired Waters 1cirn ► DEPARTMENT O.DEF Category 4 & 5 by Impaired Area ID* 4%4,0r ENVIRONMENThL QUALITY James River Basin Cause Group Code:H23R-02-BEN-Lickinghole Creek Location: Lickinghole Creek from the headwaters downstream to its confluence with the Mechums River. (Start Mile: 8.94 End Mile:0.00 Total Impaired Size:8.94 Miles) City/County Albemarle Co. Use(s): Aquatic Life Causes) Benthic-Macroinvertebrate Bioassessments/5A VA Category: This segment is impaired due to violations of the General Standard for Benthics at station:2-LKN000.02(Impaired for VSCI) and 2-LKN-LKNO1-SW(Impaired for VSCI based on Level III benthic data from StreamWatch). Initial Listing Date:2010. Cycle Cause DL Assessment Unit Water name Location Description Category Cause Name First Schedule Size Listed Lickinghole Creek from the Benthic- VAV-H23R_LKNO1A00 Lickinghole Creek headwaters downstream to 5A Macroinvertebrate 2010 2022 8.93 its confluence with the Mechums River. Bioassessments Lickinghole Creek Estuary Reservoir River Impaired area ID:VAV-H23R-02 (sq.miles) (acres) (miles) leltrrr' Benthic-Macroinvertebrate Bioassessments/5A 8 93 Aquatic Life Total impaired size by water type: Sources: • Non-Point Source *Narrative descriptions,location and city/county describe the entire extent of the impairment.Sizes may not represent the total size of the impairment. Section 9. Signed Certification Skew* CERTIFICATION "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Owner/Operator Name: Kyle J Redinger Company: Adelaide Cville LLC Title: Manager Signature: Date: 10/13/2017 tilyr Niro' Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP)Albemarle County Delegation of Authority ilerve I, (name), hereby designate the person or specifically described position below to be a duly authorized representative for the purpose of overseeing compliance with environmental requirements, including the Construction General Permit, at the Sparrow Hill construction site. The designee is authorized to sign any reports, stormwater pollution prevention plans and all other documents required by the permit. (name of person or position) (company) (address) (city, state,zip) (phone) By signing this authorization, I confirm that I meet the requirements to make such a designation as set forth in the Construction General Permit (CGP), and that the designee above meets the definition of a "duly authorized representative". Operator Name: Company: Title: Signature: ''Date: 'fir Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Albemarle County Section 11. General permit copy r Issued— 10/2014 Stormwater Pollution Prevention Plan (SWPPP)Albemarle County t il COMMONWEALTH of VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY General Permit No.: VAR10 Effective Date: July 1, 2014 Expiration Date: June 30, 2019 GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES AUTHORIZATION TO DISCHARGE UNDER THE VIRGINIA STORMWATER MANAGEMENT PROGRAM AND THE VIRGINIA STORMWATER MANAGEMENT ACT In compliance with the provisions of the Clean Water Act, as amended, and pursuant to the Virginia Stormwater Management Act and regulations adopted pursuant thereto, operators of construction activities are authorized to discharge to surface waters within the boundaries of the Commonwealth of ',kiwi Virginia, except those specifically named in State Water Control Board regulations that prohibit such discharges. The authorized discharge shall be in accordance with this cover page, Part I - Discharge Authorization and Special Conditions, Part II - Stormwater Pollution Prevention Plan, and Part III - Conditions Applicable to All VPDES Permits as set forth herein. iii.r General Permit No.: VAR10 Page 1 of 23 PART I *411or'' DISCHARGE AUTHORIZATION AND SPECIAL CONDITIONS A. Coverage under this general permit. 1. During the period beginning with the date of coverage under this general permit and lasting until the general permit's expiration date, the operator is authorized to discharge stormwater from construction activities. 2. This general permit also authorizes stormwater discharges from support activities (e.g., concrete or asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal areas, borrow areas) located on-site or off-site provided that: a. The support activity is directly related to the construction activity that is required to have general permit coverage for discharges of stormwater from construction activities; b. The support activity is not a commercial operation, nor does it serve multiple unrelated construction activities by different operators; c. The support activity does not operate beyond the completion of the last construction activity it supports; d. The support activity is identified in the registration statement at the time of general permit coverage; e. Appropriate control measures are identified in a stormwater pollution prevention plan and implemented to address the discharges from the support activity areas; and f. All applicable state,federal, and local approvals are obtained for the support activity. B. Limitations on coverage. 1. Post-construction discharges. This general permit does not authorize stormwater discharges that originate from the site after construction activities have been completed and the site, including any support activity sites covered under the general permit registration, has undergone final stabilization. Post-construction industrial stormwater discharges may need to be covered by a separate VPDES permit. 2. Discharges mixed with nonstormwater. This general permit does not authorize discharges that are mixed with sources of nonstormwater, other than those discharges that are identified in Part I E (Authorized nonstormwater discharges)and are in compliance with this general permit. 3. Discharges covered by another state permit. This general permit does not authorize discharges of stormwater from construction activities that have been covered under an individual permit or required to obtain coverage under an alternative general permit. 4. Impaired waters and TMDL limitation. Discharges of stormwater from construction activities to surface waters identified as impaired in the 2012 § 305(b)/303(d) Water Quality Assessment Integrated Report or for which a TMDL wasteload allocation has been established and approved prior to the term of this general permit for (i) sediment or a sediment-related parameter (i.e., total suspended solids or turbidity)or(ii) nutrients(i.e., nitrogen or phosphorus) are not eligible for coverage under this general permit unless the operator develops, implements, and maintains a SWPPP that minimizes the pollutants of concern and, when applicable, is consistent with the assumptions and requirements of the approved TMDL wasteload allocations. In addition, the operator shall implement the following .rrr items: General Permit No.: VAR10 Page 2 of 23 a. The impaired water(s), approved TMDL(s), and pollutant(s) of concern, when applicable, shall be identified in the SWPPP; b. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; c. Nutrients shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events; and d. The applicable SWPPP inspection requirements specified in Part II F 2 shall be amended as follows: (1) Inspections shall be conducted at a frequency of(i)at least once every four business days or (ii) at least once every five business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day; and (2) Representative inspections used by utility line installation, pipeline construction, or other similar linear construction activities shall inspect all outfalls discharging to surface waters identified as impaired or for which a TMDL wasteload allocation has been established and approved prior to the term of this general permit. 5. Exceptional waters limitation. Discharges of stormwater from construction activities not previously covered under the general permit issued in 2009 to exceptional waters identified in 9VAC25-260-30 A 3 c are not eligible for coverage under this general permit unless the operator implements the following: �.r a. The exceptional water(s)shall be identified in the SWPPP; b. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; c. Nutrients shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events; and d. The applicable SWPPP inspection requirements specified in Part II F 2 shall be amended as follows: (1) Inspections shall be conducted at a frequency of(i)at least once every four business days or (ii) at least once every five business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day; and (2) Representative inspections used by utility line installation, pipeline construction, or other similar linear construction activities shall inspect all outfalls discharging to exceptional waters. 6. There shall be no discharge of floating solids or visible foam in other than trace amounts. C. Commingled discharges. Discharges authorized by this general permit may be commingled with other sources of stormwater that are not required to be covered under a state permit, so long as the commingled discharge is in compliance with this general permit. Discharges authorized by a separate state or VPDES permit may be commingled with discharges authorized by this general permit so long as %fte all such discharges comply with all applicable state and VPDES permit requirements. General Permit No.: VAR10 Page 3 of 23 D. Prohibition of nonstormwater discharges. Except as provided in Parts I A 2, I C, and I E, all discharges covered by this general permit shall be composed entirely of stormwater associated with construction activities. All other discharges including the following are prohibited: 1. Wastewater from washout of concrete; 2. Wastewater from the washout and cleanout of stucco, paint, form release oils, curing compounds, and other construction materials; 3. Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance; 4. Oils, toxic substances, or hazardous substances from spills or other releases; and 5. Soaps, solvents, or detergents used in equipment and vehicle washing. E. Authorized nonstormwater discharges. The following nonstormwater discharges from construction activities are authorized by this general permit when discharged in compliance with this general permit: 1. Discharges from firefighting activities; 2. Fire hydrant flushings; 3. Waters used to wash vehicles or equipment where soaps, solvents, or detergents have not been used and the wash water has been filtered, settled, or similarly treated prior to discharge; 4. Water used to control dust that has been filtered, settled, or similarly treated prior to discharge; ha.►, 5. Potable water sources, including uncontaminated waterline flushings; 6. Routine external building wash down where soaps, solvents or detergents have not been used and the wash water has been filtered, settled, or similarly treated prior to discharge; 7. Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurred (or where all spilled or leaked material has been removed prior to washing); where soaps, solvents, or detergents have not been used; and where the wash water has been filtered, settled, or similarly treated prior to discharge; 8. Uncontaminated air conditioning or compressor condensate; 9. Uncontaminated ground water or spring water; 10. Foundation or footing drains where flows are not contaminated with process materials such as solvents; 11. Uncontaminated excavation dewatering, including dewatering of trenches and excavations that have been filtered, settled, or similarly treated prior to discharge; and 12. Landscape irrigation. F. Termination of general permit coverage. 1. The operator of the construction activity shall submit a notice of termination in accordance with 9VAC25-880-60 to the VSMP authority after one or more of the following conditions have been met: General Permit No.: VAR10 Page 4 of 23 a. Necessary permanent control measures included in the SWPPP for the site are in place and functioning effectively and final stabilization has been achieved on all portions of the site for which Sore the operator is responsible. When applicable, long term responsibility and maintenance requirements shall be recorded in the local land records prior to the submission of a notice of termination; b. Another operator has assumed control over all areas of the site that have not been finally stabilized and obtained coverage for the ongoing discharge; c. Coverage under an alternative VPDES or state permit has been obtained; or d. For residential construction only, temporary soil stabilization has been completed and the residence has been transferred to the homeowner. 2. The notice of termination should be submitted no later than 30 days after one of the above conditions in subdivision 1 of this subsection is met. Authorization to discharge terminates at midnight on the date that the notice of termination is submitted for the conditions set forth in subdivisions 1 b through 1 d of this subsection. Termination of authorizations to discharge for the conditions set forth in subdivision 1 a of this subsection shall be effective upon notification from the department that the provisions of subdivision 1 a of this subsection have been met or 60 days after submittal of the notice of termination, whichever occurs first. 3. The notice of termination shall be signed in accordance with Part Ill K of this general permit. G.Water quality protection. 1. The operator must select, install, implement and maintain control measures as identified in the SWPPP at the construction site that minimize pollutants in the discharge as necessary to ensure that the operator's discharge does not cause or contribute to an excursion above any applicable water quality standard. 2. If it is determined by the department that the operator's discharges are causing, have reasonable potential to cause, or are contributing to an excursion above any applicable water quality standard, the department, in consultation with the VSMP authority, may take appropriate enforcement action and require the operator to: a. Modify or implement additional control measures in accordance with Part II B to adequately address the identified water quality concerns; b. Submit valid and verifiable data and information that are representative of ambient conditions and indicate that the receiving water is attaining water quality standards; or c. Submit an individual permit application in accordance with 9VAC25-870-410 B 3. All written responses required under this chapter must include a signed certification consistent with Part Ill K. General Permit No.: VAR10 Page 5 of 23 PART II liko"' STORMWATER POLLUTION PREVENTION PLAN A stormwater pollution prevention plan (SWPPP) shall be developed prior to the submission of a registration statement and implemented for the construction activity, including any support activity, covered by this general permit. SWPPPs shall be prepared in accordance with good engineering practices. Construction activities that are part of a larger common plan of development or sale and disturb less than one acre may utilize a SWPPP template provided by the department and need not provide a separate stormwater management plan if one has been prepared and implemented for the larger common plan of development or sale. The SWPPP requirements of this general permit may be fulfilled by incorporating by reference other plans such as a spill prevention control and countermeasure (SPCC) plan developed for the site under§ 311 of the federal Clean Water Act or best management practices (BMP) programs otherwise required for the facility provided that the incorporated plan meets or exceeds the SWPPP requirements of Part II A. All plans incorporated by reference into the SWPPP become enforceable under this general permit. If a plan incorporated by reference does not contain all of the required elements of the SWPPP, the operator must develop the missing elements and include them in the SWPPP. Any operator that was authorized to discharge under the general permit issued in 2009, and that intends to continue coverage under this general permit, shall update its stormwater pollution prevention plan to comply with the requirements of this general permit no later than 60 days after the date of coverage under this general permit. A. Stormwater pollution prevention plan contents. The SWPPP shall include the following items: 1. General information. Niro, a. A signed copy of the registration statement, if required, for coverage under the general VPDES permit for discharges of stormwater from construction activities; b. Upon receipt, a copy of the notice of coverage under the general VPDES permit for discharges of stormwater from construction activities (i.e., notice of coverage letter); c. Upon receipt, a copy of the general VPDES permit for discharges of stormwater from construction activities; d. A narrative description of the nature of the construction activity, including the function of the project(e.g., low density residential, shopping mall, highway, etc.); e. A legible site plan identifying: (1) Directions of stormwater flow and approximate slopes anticipated after major grading activities; (2) Limits of land disturbance including steep slopes and natural buffers around surface waters that will not be disturbed; (3) Locations of major structural and nonstructural control measures, including sediment basins and traps, perimeter dikes, sediment barriers, and other measures intended to filter, settle, or similarly treat sediment, that will be installed between disturbed areas and the undisturbed vegetated areas in order to increase sediment removal and maximize stormwater infiltration; (4) Locations of surface waters; General Permit No.: VAR10 Page 6 of 23 (5) Locations where concentrated stormwater is discharged; *"' (6) Locations of support activities, when applicable and when required by the VSMP authority, including but not limited to (i) areas where equipment and vehicle washing, wheel wash water, and other wash water is to occur; (ii) storage areas for chemicals such as acids, fuels, fertilizers, and other lawn care chemicals; (iii) concrete wash out areas; (iv) vehicle fueling and maintenance areas; (v) sanitary waste facilities, including those temporarily placed on the construction site; and (vi)construction waste storage; and (7) When applicable, the location of the on-site rain gauge or the methodology established in consultation with the VSMP authority used to identify measurable storm events for inspection purposes. 2. Erosion and sediment control plan. a. An erosion and sediment control plan approved by the VESCP authority as authorized under the Erosion and Sediment Control Regulations (9VAC25-840), an "agreement in lieu of a plan" as defined in 9VAC25-840-10 from the VESCP authority, or an erosion and sediment control plan prepared in accordance with annual standards and specifications approved by the department. Any operator proposing a new stormwater discharge from construction activities that is not required to obtain erosion and sediment control plan approval from a VESCP authority or does not adopt department-approved annual standards and specifications shall submit the erosion and sediment control plan to the department for review and approval. b. All erosion and sediment control plans shall include a statement describing the maintenance responsibilities required for the erosion and sediment controls used. c. A properly implemented approved erosion and sediment control plan, "agreement in lieu of a Soo, plan," or erosion and sediment control plan prepared in accordance with department-approved annual standards and specifications, adequately: (1) Controls the volume and velocity of stormwater runoff within the site to minimize soil erosion; (2) Controls stormwater discharges, including peak flow rates and total stormwater volume, to minimize erosion at outlets and to minimize downstream channel and stream bank erosion; (3) Minimizes the amount of soil exposed during the construction activity; (4) Minimizes the disturbance of steep slopes; (5) Minimizes sediment discharges from the site in a manner that addresses (i) the amount, frequency, intensity, and duration of precipitation; (ii) the nature of resulting stormwater runoff; and (iii) soil characteristics, including the range of soil particle sizes present on the site; (6) Provides and maintains natural buffers around surface waters, directs stormwater to vegetated areas to increase sediment removal, and maximizes stormwater infiltration, unless infeasible; (7) Minimizes soil compaction and, unless infeasible, preserves topsoil; (8) Ensures that stabilization of disturbed areas will be initiated immediately whenever any clearing, grading, excavating, or other land-disturbing activities have permanently ceased on any portion of the site, or temporarily ceased on any portion of the site and will not resume for a period exceeding 14 days; and �rr General Permit No.:VAR10 Page 7 of 23 (9) Utilizes outlet structures that withdraw stormwater from the surface (i.e., above the permanent pool or wet storage water surface elevation), unless infeasible, when Nine from sediment basins or sediment traps. 3. Stormwater management plan. a. New construction activities. A stormwater management plan approved by the VSMP authority as authorized under the Virginia Stormwater Management Program (VSMP) Regulation (9VAC25- 870), or an "agreement in lieu of a stormwater management plan" as defined in 9VAC25-870-10 from the VSMP authority, or a stormwater management plan prepared in accordance with annual standards and specifications approved by the department. Any operator proposing a new stormwater discharge from construction activities that is not required to obtain stormwater management plan approval from a VSMP authority or does not adopt department-approved annual standards and specifications shall submit the stormwater management plan to the department for review and approval. b. Existing construction activities. Any operator that was authorized to discharge under the general permit issued in 2009, and that intends to continue coverage under this general permit, shall ensure compliance with the requirements of 9VAC25-870-93 through 9VAC25-870-99 of the VSMP Regulation, including but not limited to the water quality and quantity requirements. The SWPPP shall include a description of, and all necessary calculations supporting, all post- construction stormwater management measures that will be installed prior to the completion of the construction process to control pollutants in stormwater discharges after construction operations have been completed. Structural measures should be placed on upland soils to the degree possible. Such measures must be designed and installed in accordance with applicable VESCP authority, VSMP authority, state, and federal requirements, and any necessary permits must be obtained. 4. Pollution prevention plan. A pollution prevention plan that addresses potential pollutant-generating Now activities that may reasonably be expected to affect the quality of stormwater discharges from the construction activity, including any support activity. The pollution prevention plan shall: a. Identify the potential pollutant-generating activities and the pollutant that is expected to be exposed to stormwater; b. Describe the location where the potential pollutant-generating activities will occur, or if identified on the site plan, reference the site plan; c. Identify all nonstormwater discharges, as authorized in Part I E of this general permit, that are or will be commingled with stormwater discharges from the construction activity, including any applicable support activity; d. Identify the person responsible for implementing the pollution prevention practice or practices for each pollutant-generating activity(if other than the person listed as the qualified personnel); e. Describe the pollution prevention practices and procedures that will be implemented to: (1) Prevent and respond to leaks, spills, and other releases including (i) procedures for expeditiously stopping, containing, and cleaning up spills, leaks, and other releases; and (ii) procedures for reporting leaks, spills, and other releases in accordance with Part III G; (2) Prevent the discharge of spilled and leaked fuels and chemicals from vehicle fueling and maintenance activities (e.g., providing secondary containment such as spill berms, decks, spill containment pallets, providing cover where appropriate, and having spill kits readily available); err' General Permit No.: VAR10 Page 8 of 23 (3) Prevent the discharge of soaps, solvents, detergents, and wash water from construction materials, including the clean-up of stucco, paint, form release oils, and curing compounds N,. (e.g., providing (i) cover (e.g., plastic sheeting or temporary roofs) to prevent contact with stormwater; (ii) collection and proper disposal in a manner to prevent contact with stormwater; and (iii) a similarly effective means designed to prevent discharge of these pollutants); (4) Minimize the discharge of pollutants from vehicle and equipment washing, wheel wash water, and other types of washing (e.g., locating activities away from surface waters and stormwater inlets or conveyance and directing wash waters to sediment basins or traps, using filtration devices such as filter bags or sand filters, or using similarly effective controls); (5) Direct concrete wash water into a leak-proof container or leak-proof settling basin. The container or basin shall be designed so that no overflows can occur due to inadequate sizing or precipitation. Hardened concrete wastes shall be removed and disposed of in a manner consistent with the handling of other construction wastes. Liquid concrete wastes shall be removed and disposed of in a manner consistent with the handling of other construction wash waters and shall not be discharged to surface waters; (6) Minimize the discharge of pollutants from storage, handling, and disposal of construction products, materials, and wastes including (i) building products such as asphalt sealants, copper flashing, roofing materials, adhesives, and concrete admixtures; (ii) pesticides, herbicides, insecticides, fertilizers, and landscape materials; and (iii) construction and domestic wastes such as packaging materials, scrap construction materials, masonry products, timber, pipe and electrical cuttings, plastics, Styrofoam, concrete, and other trash or building materials; (7) Prevent the discharge of fuels, oils, and other petroleum products, hazardous or toxic wastes, and sanitary wastes; and Nitre (8) Address any other discharge from the potential pollutant-generating activities not addressed above; and f. Describe procedures for providing pollution prevention awareness of all applicable wastes, including any wash water, disposal practices, and applicable disposal locations of such wastes, to personnel in order to comply with the conditions of this general permit. The operator shall implement the procedures described in the SWPPP. 5. SWPPP requirements for discharges to impaired waters, surface waters with an applicable TMDL wasteload allocation established and approved prior to the term of this general permit, and exceptional waters.The SWPPP shall: a. Identify the impaired water(s), approved TMDL(s), pollutant(s) of concern, and exceptional waters identified in 9VAC25-260-30 A 3 c, when applicable; b. Provide clear direction that: (1) Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; (2) Nutrients shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events; and (3) A modified inspection schedule shall be implemented in accordance with Part I B 4 or Part I B 5. General Permit No.: VAR10 Page 9 of 23 6. Qualified personnel. The name, phone number, and qualifications of the qualified personnel conducting inspections required by this general permit. 7. Delegation of authority. The individuals or positions with delegated authority, in accordance with Part Ill K, to sign inspection reports or modify the SWPPP. 8. SWPPP signature.The SWPPP shall be signed and dated in accordance with Part Ill K. B. SWPPP amendments, modification, and updates. 1. The operator shall amend the SWPPP whenever there is a change in the design, construction, operation, or maintenance that has a significant effect on the discharge of pollutants to surface waters and that has not been previously addressed in the SWPPP. 2. The SWPPP must be amended if, during inspections or investigations by the operator's qualified personnel, or by local, state, or federal officials, it is determined that the existing control measures are ineffective in minimizing pollutants in discharges from the construction activity. Revisions to the SWPPP shall include additional or modified control measures designed and implemented to correct problems identified. If approval by the VESCP authority, VSMP authority, or department is necessary for the control measure, revisions to the SWPPP shall be completed no later than seven calendar days following approval. Implementation of these additional or modified control measures must be accomplished as described in Part II G. 3. The SWPPP must clearly identify the contractor(s) that will implement and maintain each control measure identified in the SWPPP. The SWPPP shall be amended to identify any new contractor that will implement and maintain a control measure. 4. The operator shall update the SWPPP no later than seven days following any modification to its implementation. All modifications or updates to the SWPPP shall be noted and shall include the Jnr following items: a. A record of dates when: (1) Major grading activities occur; (2) Construction activities temporarily or permanently cease on a portion of the site; and (3) Stabilization measures are initiated; b. Documentation of replaced or modified controls where periodic inspections or other information have indicated that the controls have been used inappropriately or incorrectly and where modified as soon as possible; c. Areas that have reached final stabilization and where no further SWPPP or inspection requirements apply; d. All properties that are no longer under the legal control of the operator and the dates on which the operator no longer had legal control over each property; e. The date of any prohibited discharges, the discharge volume released, and what actions were taken to minimize the impact of the release; f. Measures taken to prevent the reoccurrence of any prohibited discharge; and g. Measures taken to address any evidence identified as a result of an inspection required under Norse Part II F. General Permit No.: VAR10 Page 10 of 23 5. Amendments, modifications, or updates to the SWPPP shall be signed in accordance with Part III K. C. Public Notification. Upon commencement of land disturbance, the operator shall post conspicuously a copy of the notice of coverage letter near the main entrance of the construction activity. For linear projects, the operator shall post the notice of coverage letter at a publicly accessible location near an active part of the construction project (e.g., where a pipeline crosses a public road). The operator shall maintain the posted information until termination of general permit coverage as specified in Part I F. D. SWPPP availability. 1. Operators with day-to-day operational control over SWPPP implementation shall have a copy of the SWPPP available at a central location on-site for use by those identified as having responsibilities under the SWPPP whenever they are on the construction site. 2. The operator shall make the SWPPP and all amendments, modifications, and updates available upon request to the department, the VSMP authority, the EPA, the VESCP authority, local government officials, or the operator of a municipal separate storm sewer system receiving discharges from the construction activity. If an on-site location is unavailable to store the SWPPP when no personnel are present, notice of the SWPPP's location must be posted near the main entrance of the construction site. 3. The operator shall make the SWPPP available for public review in an electronic format or in hard copy. Information for public access to the SWPPP shall be posted and maintained in accordance with Part II C. If not provided electronically, public access to the SWPPP may be arranged upon request at a time and at a publicly accessible location convenient to the operator or his designee but shall be no less than once per month and shall be during normal business hours. Information not required to be contained within the SWPPP by this general permit is not required to be released. Slime E. SWPPP implementation. The operator shall implement the SWPPP and subsequent amendments, modifications, and updates from commencement of land disturbance until termination of general permit coverage as specified in Part I F. 1. All control measures must be properly maintained in effective operating condition in accordance with good engineering practices and, where applicable, manufacturer specifications. If a site inspection required by Part II F identifies a control measure that is not operating effectively, corrective action(s) shall be completed as soon as practicable, but no later than seven days after discovery or a longer period as established by the VSMP authority, to maintain the continued effectiveness of the control measures. 2. If site inspections required by Part II F identify an existing control measure that needs to be modified or if an additional control measure is necessary for any reason, implementation shall be completed prior to the next anticipated measurable storm event. If implementation prior to the next anticipated measurable storm event is impracticable, then alternative control measures shall be implemented as soon as practicable, but no later than seven days after discovery or a longer period as established by the VSMP authority. F. SWPPP Inspections. 1. Personnel responsible for on-site and off-site inspections. Inspections required by this general permit shall be conducted by the qualified personnel identified by the operator in the SWPPP. The operator is responsible for insuring that the qualified personnel conduct the inspection. 2. Inspection schedule. a. Inspections shall be conducted at a frequency of: General Permit No.: VAR10 Page 11 of 23 (1) At least once every five business days; or (2) At least once every 10 business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted no later than the next business day. b. Where areas have been temporarily stabilized or land-disturbing activities will be suspended due to continuous frozen ground conditions and stormwater discharges are unlikely, the inspection frequency may be reduced to once per month. If weather conditions (such as above freezing temperatures or rain or snow events) make discharges likely, the operator shall immediately resume the regular inspection frequency. c. Representative inspections may be utilized for utility line installation, pipeline construction, or other similar linear construction activities provided that: (1) Temporary or permanent soil stabilization has been installed and vehicle access may compromise the temporary or permanent soil stabilization and potentially cause additional land disturbance increasing the potential for erosion; (2) Inspections occur on the same frequency as other construction activities; (3) Control measures are inspected along the construction site 0.25 miles above and below each access point (i.e., where a roadway, undisturbed right-of-way, or other similar feature intersects the construction activity and access does not compromise temporary or permanent soil stabilization); and (4) Inspection locations are provided in the report required by Part II F. Sale 3. Inspection requirements. a. As part of the inspection, the qualified personnel shall: (1) Record the date and time of the inspection and when applicable the date and rainfall amount of the last measurable storm event; (2) Record the information and a description of any discharges occurring at the time of the inspection; (3) Record any land-disturbing activities that have occurred outside of the approved erosion and sediment control plan; (4) Inspect the following for installation in accordance with the approved erosion and sediment control plan, identification of any maintenance needs, and evaluation of effectiveness in minimizing sediment discharge, including whether the control has been inappropriately or incorrectly used: (a) All perimeter erosion and sediment controls, such as silt fence; (b) Soil stockpiles, when applicable, and borrow areas for stabilization or sediment trapping measures; (c) Completed earthen structures, such as dams, dikes, ditches, and diversions for stabilization; General Permit No.:VAR10 Page 12 of 23 (d) Cut and fill slopes; Slow (e) Sediment basins and traps, sediment barriers, and other measures installed to control sediment discharge from stormwater; (f) Temporary or permanent channel, flume, or other slope drain structures installed to convey concentrated runoff down cut and fill slopes; (g) Storm inlets that have been made operational to ensure that sediment laden stormwater does not enter without first being filtered or similarly treated; and (h) Construction vehicle access routes that intersect or access paved roads for minimizing sediment tracking; (5) Inspect areas that have reached final grade or that will remain dormant for more than 14 days for initiation of stabilization activities; (6) Inspect areas that have reached final grade or that will remain dormant for more than 14 days for completion of stabilization activities within seven days of reaching grade or stopping work; (7) Inspect for evidence that the approved erosion and sediment control plan, "agreement in lieu of a plan," or erosion and sediment control plan prepared in accordance with department- approved annual standards and specifications has not been properly implemented. This includes but is not limited to: (a) Concentrated flows of stormwater in conveyances such as rills, rivulets or channels that have not been filtered, settled, or similarly treated prior to discharge, or evidence thereof; (b) Sediment laden or turbid flows of stormwater that have not been filtered or settled to *4160, remove sediments prior to discharge; (c) Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that discharge to surface waters. Inlets and catch basins with failing sediments controls due to improper installation, lack of maintenance, or inadequate design are considered unprotected; (d) Sediment deposition on any property (including public and private streets) outside of the construction activity covered by this general permit; (e) Required stabilization has not been initiated or completed on portions of the site; (f) Sediment basins without adequate wet or dry storage volume or sediment basins that allow the discharge of stormwater from below the surface of the wet storage portion of the basin; (g) Sediment traps without adequate wet or dry storage or sediment traps that allow the discharge of stormwater from below the surface of the wet storage portion of the trap; and (h) Land disturbance outside of the approved area to be disturbed; (8) Inspect pollutant generating activities identified in the pollution prevention plan for the proper implementation, maintenance and effectiveness of the procedures and practices; (9) Identify any pollutant generating activities not identified in the pollution prevention plan; and �rrr General Permit No.: VAR10 Page 13 of 23 (10) Identify and document the presence of any evidence of the discharge of pollutants prohibited by this general permit. 4. Inspection report. Each inspection report shall include the following items: a. The date and time of the inspection and when applicable, the date and rainfall amount of the last measurable storm event; b. Summarized findings of the inspection; c. The location(s)of prohibited discharges; d. The location(s)of control measures that require maintenance; e. The location(s) of control measures that failed to operate as designed or proved inadequate or inappropriate for a particular location; f. The location(s)where any evidence identified under Part II F 3 a(7)exists; g. The location(s) where any additional control measure is needed that did not exist at the time of inspection; h. A list of corrective actions required (including any changes to the SWPPP that are necessary) as a result of the inspection or to maintain permit compliance; i. Documentation of any corrective actions required from a previous inspection that have not been implemented; and j. The date and signature of the qualified personnel and the operator or its duly authorized `41000, representative. The inspection report and any actions taken in accordance with Part II must be retained by the operator as part of the SWPPP for at least three years from the date that general permit coverage expires or is terminated. The inspection report shall identify any incidents of noncompliance. Where an inspection report does not identify any incidents of noncompliance, the report shall contain a certification that the construction activity is in compliance with the SWPPP and this general permit. The report shall be signed in accordance with Part Ill K of this general permit. G. Corrective actions. 1. The operator shall implement the corrective action(s) identified as a result of an inspection as soon as practicable but no later than seven days after discovery or a longer period as approved by the VSMP authority. If approval of a corrective action by a regulatory authority (e.g., VSMP authority, VESCP authority, or the department) is necessary, additional control measures shall be implemented to minimize pollutants in stormwater discharges until such approvals can be obtained. 2. The operator may be required to remove accumulated sediment deposits located outside of the construction activity covered by this general permit as soon as practicable in order to minimize environmental impacts. The operator shall notify the VSMP authority and the department as well as obtain all applicable federal, state, and local authorizations, approvals, and permits prior to the removal of sediments accumulated in surface waters including wetlands. General Permit No.: VAR10 Page 14 of 23 PART III CONDITIONS APPLICABLE TO ALL VPDES PERMITS NOTE: Discharge monitoring is not required for this general permit. If the operator chooses to monitor stormwater discharges or control measures, the operator must comply with the requirements of subsections A, B, and C, as appropriate. A. Monitoring. 1. Samples and measurements taken for the purpose of monitoring shall be representative of the monitoring activity. 2. Monitoring shall be conducted according to procedures approved under 40 CFR Part 136 or alternative methods approved by the U.S. Environmental Protection Agency, unless other procedures have been specified in this general permit. Analyses performed according to test procedures approved under 40 CFR Part 136 shall be performed by an environmental laboratory certified under regulations adopted by the Department of General Services (1 VAC30-45 or 1 VAC30-46). 3. The operator shall periodically calibrate and perform maintenance procedures on all monitoring and analytical instrumentation at intervals that will ensure accuracy of measurements. B. Records. 1. Monitoring records and reports shall include: a. The date, exact place, and time of sampling or measurements; b. The individual(s)who performed the sampling or measurements; Same c. The date(s)and time(s)analyses were performed; d. The individual(s)who performed the analyses; e. The analytical techniques or methods used; and f. The results of such analyses. 2. The operator shall retain records of all monitoring information, including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation, copies of all reports required by this general permit, and records of all data used to complete the registration statement for this general permit, for a period of at least three years from the date of the sample, measurement, report or request for coverage. This period of retention shall be extended automatically during the course of any unresolved litigation regarding the regulated activity or regarding control standards applicable to the operator, or as requested by the board. C. Reporting monitoring results. 1. The operator shall update the SWPPP to include the results of the monitoring as may be performed in accordance with this general permit, unless another reporting schedule is specified elsewhere in this general permit. 2. Monitoring results shall be reported on a discharge monitoring report (DMR); on forms provided, approved or specified by the department; or in any format provided that the date, location, parameter, method, and result of the monitoring activity are included. General Permit No.: VAR10 Page 15 of 23 3. If the operator monitors any pollutant specifically addressed by this general permit more frequently than required by this general permit using test procedures approved under 40 CFR Part 136 or using other test procedures approved by the U.S. Environmental Protection Agency or using procedures specified in this general permit, the results of this monitoring shall be included in the calculation and reporting of the data submitted in the DMR or reporting form specified by the department. 4. Calculations for all limitations which require averaging of measurements shall utilize an arithmetic mean unless otherwise specified in this general permit. D. Duty to provide information. The operator shall furnish, within a reasonable time, any information which the board may request to determine whether cause exists for modifying, revoking and reissuing, or terminating this general permit or to determine compliance with this general permit. The board, department, EPA, or VSMP authority may require the operator to furnish, upon request, such plans, specifications, and other pertinent information as may be necessary to determine the effect of the wastes from his discharge on the quality of surface waters, or such other information as may be necessary to accomplish the purposes of the CWA and the Virginia Stormwater Management Act. The operator shall also furnish to the board, department, EPA, or VSMP authority, upon request, copies of records required to be kept by this general permit. E. Compliance schedule reports. Reports of compliance or noncompliance with, or any progress reports on, interim and final requirements contained in any compliance schedule of this general permit shall be submitted no later than 14 days following each schedule date. F. Unauthorized stormwater discharges. Pursuant to § 62.1-44.5 of the Code of Virginia, except in compliance with a state permit issued by the department, it shall be unlawful to cause a stormwater discharge from a construction activity. G. Reports of unauthorized discharges. Any operator who discharges or causes or allows a discharge of sewage, industrial waste, other wastes or any noxious or deleterious substance or a hazardous substance or oil in an amount equal to or in excess of a reportable quantity established under either 40 CFR Part 110, 40 CFR Part 117, 40 CFR Part 302, or§ 62.1-44.34:19 of the Code of Virginia that occurs during a 24-hour period into or upon surface waters or who discharges or causes or allows a discharge that may reasonably be expected to enter surface waters, shall notify the Department of Environmental Quality of the discharge immediately upon discovery of the discharge, but in no case later than within 24 hours after said discovery. A written report of the unauthorized discharge shall be submitted to the department and the VSMP authority within five days of discovery of the discharge. The written report shall contain: 1. A description of the nature and location of the discharge; 2. The cause of the discharge; 3. The date on which the discharge occurred; 4. The length of time that the discharge continued; 5. The volume of the discharge; 6. If the discharge is continuing, how long it is expected to continue; 7. If the discharge is continuing, what the expected total volume of the discharge will be; and 8. Any steps planned or taken to reduce, eliminate and prevent a recurrence of the present discharge or any future discharges not authorized by this general permit. General Permit No.: VAR10 Page 16 of 23 Discharges reportable to the department and the VSMP authority under the immediate reporting requirements of other regulations are exempted from this requirement. H. Reports of unusual or extraordinary discharges. If any unusual or extraordinary discharge including a "bypass" or "upset," as defined herein, should occur from a facility and the discharge enters or could be expected to enter surface waters, the operator shall promptly notify, in no case later than within 24 hours, the department and the VSMP authority by telephone after the discovery of the discharge. This notification shall provide all available details of the incident, including any adverse effects on aquatic life and the known number of fish killed. The operator shall reduce the report to writing and shall submit it to the department and the VSMP authority within five days of discovery of the discharge in accordance with Part III 12. Unusual and extraordinary discharges include but are not limited to any discharge resulting from: 1. Unusual spillage of materials resulting directly or indirectly from processing operations; 2. Breakdown of processing or accessory equipment; 3. Failure or taking out of service of some or all of the facilities; and 4. Flooding or other acts of nature. I. Reports of noncompliance. The operator shall report any noncompliance which may adversely affect surface waters or may endanger public health. 1. An oral report to the department and the VSMP authority shall be provided within 24 hours from the time the operator becomes aware of the circumstances. The following shall be included as information that shall be reported within 24 hours under this subdivision: a. Any unanticipated bypass; and b. Any upset that causes a discharge to surface waters. 2. A written report shall be submitted within five days and shall contain: a. A description of the noncompliance and its cause; b. The period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time it is expected to continue; and c. Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The department may waive the written report on a case-by-case basis for reports of noncompliance under Part III I if the oral report has been received within 24 hours and no adverse impact on surface waters has been reported. 3. The operator shall report all instances of noncompliance not reported under Part III 11 or 2 in writing as part of the SWPPP. The reports shall contain the information listed in Part III 12. NOTE: The reports required in Part III G, H and I shall be made to the department and the VSMP authority. Reports may be made by telephone, email, or by fax. For reports outside normal working hours, leaving a recorded message shall fulfill the immediate reporting requirement. For emergencies, the Virginia Department of Emergency Management maintains a 24-hour telephone service at 1-800-468- 8892. Sure General Permit No.: VAR10 Page 17 of 23 4. Where the operator becomes aware of a failure to submit any relevant facts, or submittal of incorrect information in any report, including a registration statement, to the department or the VSMP authority, the operator shall promptly submit such facts or correct information. J. Notice of planned changes. 1. The operator shall give notice to the department and the VSMP authority as soon as possible of any planned physical alterations or additions to the permitted facility or activity. Notice is required only when: a. The operator plans an alteration or addition to any building, structure, facility, or installation that may meet one of the criteria for determining whether a facility is a new source in 9VAC25-870- 420; b. The operator plans an alteration or addition that would significantly change the nature or increase the quantity of pollutants discharged. This notification applies to pollutants that are not subject to effluent limitations in this general permit; or 2. The operator shall give advance notice to the department and VSMP authority of any planned changes in the permitted facility or activity, which may result in noncompliance with state permit requirements. K. Signatory requirements. 1. Registration statement. All registration statements shall be signed as follows: a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar tikkor policy-making or decision-making functions for the corporation; or(ii)the manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for state permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures; b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. For purposes of this chapter, a principal executive officer of a public agency includes: (i) the chief executive officer of the agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency. 2. Reports, etc. All reports required by this general permit, including SWPPPs, and other information requested by the board or the department shall be signed by a person described in Part Ill K 1 or by a duly authorized representative of that person. A person is a duly authorized representative only if: a. The authorization is made in writing by a person described in Part Ill K 1; b. The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position *411kr, having overall responsibility for environmental matters for the operator. (A duly authorized General Permit No.: VAR10 Page 18 of 23 representative may thus be either a named individual or any individual occupying a named position); and c. The signed and dated written authorization is included in the SWPPP.A copy must be provided to the department and VSMP authority, if requested. 3. Changes to authorization. If an authorization under Part III K 2 is no longer accurate because a different individual or position has responsibility for the overall operation of the construction activity, a new authorization satisfying the requirements of Part III K 2 shall be submitted to the VSMP authority as the administering entity for the board prior to or together with any reports or information to be signed by an authorized representative. 4. Certification. Any person signing a document under Part III K 1 or 2 shall make the following certification: "I certify under penalty of law that I have read and understand this document and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." L. Duty to comply. The operator shall comply with all conditions of this general permit. Any state permit noncompliance constitutes a violation of the Virginia Stormwater Management Act and the Clean Water Act, except that noncompliance with certain provisions of this general permit may constitute a violation of the Virginia Stormwater Management Act but not the Clean Water Act. Permit noncompliance is grounds for enforcement action; for state permit termination, revocation and reissuance, or modification; or denial of a state permit renewal application. The operator shall comply with effluent standards or prohibitions established under § 307(a) of the Clean Water Act for toxic pollutants within the time provided in the regulations that establish these standards or prohibitions or standards for sewage sludge use or disposal, even if this general permit has not yet been modified to incorporate the requirement. M. Duty to reapply. If the operator wishes to continue an activity regulated by this general permit after the expiration date of this general permit, the operator shall submit a new registration statement at least 90 days before the expiration date of the existing general permit, unless permission for a later date has been granted by the board. The board shall not grant permission for registration statements to be submitted later than the expiration date of the existing general permit. N. Effect of a state permit. This general permit does not convey any property rights in either real or personal property or any exclusive privileges, nor does it authorize any injury to private property or invasion of personal rights, or any infringement of federal, state or local law or regulations. O. State law. Nothing in this general permit shall be construed to preclude the institution of any legal action under, or relieve the operator from any responsibilities, liabilities, or penalties established pursuant to any other state law or regulation or under authority preserved by§ 510 of the Clean Water Act. Except as provided in general permit conditions on "bypassing" (Part III U) and "upset" (Part III V), nothing in this general permit shall be construed to relieve the operator from civil and criminal penalties for noncompliance. P. Oil and hazardous substance liability. Nothing in this general permit shall be construed to preclude the institution of any legal action or relieve the operator from any responsibilities, liabilities, or penalties to which the operator is or may be subject under§§ 62.1-44.34:14 through 62.1-44.34:23 of the State Water Control Law or§ 311 of the Clean Water Act. General Permit No.: VAR10 Page 19 of 23 Q. Proper operation and maintenance. The operator shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances), which are installed or used rte, by the operator to achieve compliance with the conditions of this general permit. Proper operation and maintenance also includes effective plant performance, adequate funding, adequate staffing, and adequate laboratory and process controls, including appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems, which are installed by the operator only when the operation is necessary to achieve compliance with the conditions of this general permit. R. Disposal of solids or sludges. Solids, sludges or other pollutants removed in the course of treatment or management of pollutants shall be disposed of in a manner so as to prevent any pollutant from such materials from entering surface waters and in compliance with all applicable state and federal laws and regulations. S. Duty to mitigate. The operator shall take all steps to minimize or prevent any discharge in violation of this general permit that has a reasonable likelihood of adversely affecting human health or the environment. T. Need to halt or reduce activity not a defense. It shall not be a defense for an operator in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this general permit. U. Bypass. 1. "Bypass," as defined in 9VAC25-870-10, means the intentional diversion of waste streams from any portion of a treatment facility. The operator may allow any bypass to occur that does not cause effluent limitations to be exceeded, but only if it also is for essential maintenance to ensure efficient operation. These bypasses are not subject to the provisions of Part III U 2 and 3. '161w 2. Notice. a. Anticipated bypass. If the operator knows in advance of the need for a bypass, the operator shall submit prior notice to the department, if possible at least 10 days before the date of the bypass. b. Unanticipated bypass. The operator shall submit notice of an unanticipated bypass as required in Part III I. 3. Prohibition of bypass. a. Except as provided in Part III U 1, bypass is prohibited, and the board or department may take enforcement action against an operator for bypass unless: (1) Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage. Severe property damage means substantial physical damage to property, damage to the treatment facilities that causes them to become inoperable, or substantial and permanent loss of natural resources that can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production; (2) There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass that occurred during normal periods of equipment downtime or preventive maintenance; and Same (3) The operator submitted notices as required under Part III U 2. General Permit No.: VAR10 Page 20 of 23 b. The department may approve an anticipated bypass, after considering its adverse effects, if the department determines that it will meet the three conditions listed in Part III U 3 a. V. Upset. 1. An "upset," as defined in 9VAC25-870-10, means an exceptional incident in which there is unintentional and temporary noncompliance with technology-based state permit effluent limitations because of factors beyond the reasonable control of the operator. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation. 2. An upset constitutes an affirmative defense to an action brought for noncompliance with technology- based state permit effluent limitations if the requirements of Part III V 4 are met. A determination made during administrative review of claims that noncompliance was caused by upset, and before an action for noncompliance, is not a final administrative action subject to judicial review. 3. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventative maintenance, or careless or improper operation. 4. An operator who wishes to establish the affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating logs or other relevant evidence that: a. An upset occurred and that the operator can identify the cause(s)of the upset; b. The permitted facility was at the time being properly operated; c. The operator submitted notice of the upset as required in Part III I; and gym,,. d. The operator complied with any remedial measures required under Part III S. 5. In any enforcement proceeding, the operator seeking to establish the occurrence of an upset has the burden of proof. W. Inspection and entry. The operator shall allow the department as the board's designee, the VSMP authority, EPA, or an authorized representative of either entity (including an authorized contractor), upon presentation of credentials and other documents as may be required by law to: 1. Enter upon the operator's premises where a regulated facility or activity is located or conducted, or where records must be kept under the conditions of this general permit; 2. Have access to and copy, at reasonable times, any records that must be kept under the conditions of this general permit; 3. Inspect and photograph at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this general permit; and 4. Sample or monitor at reasonable times, for the purposes of ensuring state permit compliance or as otherwise authorized by the Clean Water Act or the Virginia Stormwater Management Act, any substances or parameters at any location. For purposes of this section, the time for inspection shall be deemed reasonable during regular business hours, and whenever the facility is discharging. Nothing contained herein shall make an inspection unreasonable during an emergency. Vim.e General Permit No.: VAR10 Page 21 of 23 X. State permit actions. State permits may be modified, revoked and reissued, or terminated for cause. The filing of a request by the operator for a state permit modification, revocation and reissuance, or ice, termination, or a notification of planned changes or anticipated noncompliance does not stay any state permit condition. Y. Transfer of state permits. 1. State permits are not transferable to any person except after notice to the department. Except as provided in Part Ill Y 2, a state permit may be transferred by the operator to a new operator only if the state permit has been modified or revoked and reissued, or a minor modification made, to identify the new operator and incorporate such other requirements as may be necessary under the Virginia Stormwater Management Act and the Clean Water Act. 2. As an alternative to transfers under Part Ill Y 1, this state permit may be automatically transferred to a new operator if: a. The current operator notifies the department at least 30 days in advance of the proposed transfer of the title to the facility or property; b. The notice includes a written agreement between the existing and new operators containing a specific date for transfer of state permit responsibility, coverage, and liability between them; and c. The department does not notify the existing operator and the proposed new operator of its intent to modify or revoke and reissue the state permit. If this notice is not received, the transfer is effective on the date specified in the agreement mentioned in Part III Y 2 b. 3. For ongoing construction activity involving a change of operator, the new operator shall accept and maintain the existing SWPPP, or prepare and implement a new SWPPP prior to taking over operations at the site. Z. Severability. The provisions of this general permit are severable, and if any provision of this general permit or the application of any provision of this state permit to any circumstance, is held invalid, the application of such provision to other circumstances and the remainder of this general permit shall not be affected thereby. General Permit No.: VAR10 Page 22 of 23 DEFINITIONS r`,,• "Business day" means Monday through Friday excluding state holidays. "Commencement of land disturbance" means the initial disturbance of soils associated with clearing, grading, or excavating activities or other construction activities (e.g., stockpiling of fill material). "Construction site" means the land where any land-disturbing activity is physically located or conducted, including any adjacent land used or preserved in connection with the land-disturbing activity. "Final stabilization" means that one of the following situations has occurred: 1. All soil disturbing activities at the site have been completed and a permanent vegetative cover has been established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieved that is uniform (e.g., evenly distributed), mature enough to survive, and will inhibit erosion. 2. For individual lots in residential construction, final stabilization can occur by either: a. The homebuilder completing final stabilization as specified in subdivision 1 of this definition; or b. The homebuilder establishing temporary soil stabilization, including perimeter controls for an individual lot prior to occupation of the home by the homeowner, and informing the homeowner of the need for, and benefits of,final stabilization. 3. For construction projects on land used for agricultural purposes, final stabilization may be accomplished by returning the disturbed land to its preconstruction agricultural use. Areas disturbed that were not previously used for agricultural activities, such as buffer strips immediately adjacent to surface waters, and areas that are not being returned to their preconstruction agricultural use must meet the final stabilization criteria specified in subdivision 1 or 2 of this definition. "Immediately" means as soon as practicable, but no later than the end of the next business day, following the day when the land-disturbing activities have temporarily or permanently ceased. In the context of this general permit, "immediately" is used to define the deadline for initiating stabilization measures. "Impaired waters" means surface waters identified as impaired on the 2012 § 305(b)/303(d)Water Quality Assessment Integrated Report. "Infeasible" means not technologically possible or not economically practicable and achievable in light of best industry practices. "Initiation of stabilization activities" means: 1. Prepping the soil for vegetative or nonvegetative stabilization; 2. Applying mulch or other nonvegetative product to the exposed area; 3. Seeding or planting the exposed area; 4. Starting any of the above activities on a portion of the area to be stabilized, but not on the entire area; or 5. Finalizing arrangements to have the stabilization product fully installed in compliance with the applicable deadline for completing stabilization. This list is not exhaustive. General Permit No.: VAR10 Page 23 of 23 "Measurable storm event" means a rainfall event producing 0.25 inches of rain or greater over 24 hours. iw "Stabilized" means land that has been treated to withstand normal exposure to natural forces without incurring erosion damage. fir/ �.r Section 12. Inspection logs Issued— 10/2014 Stormwater Pollution Prevention Plan(SWPPP)Albemarle County Sparrow Hill SWPPP Grading Log Inspection: err Date Time Instructions: Fill out this sheet as grading events occur. Record grading events and their respective locations on this log. Summary: Event on record: Location(s)on Site: • Major Grading Activities: • Construction Activities Cease: o Temporarily: o Permanently: %la.r • Stabilization Measures Initiated: • Other Grading Activity Notes: Inspector Signature Date Operator Signature Date Sparrow Hill SWPPP Inspection Log Inspection: Last Rainfall: lase Date Time Date Rainfall Amount Summary(requirements on back of sheet): Locations of: • Prohibited discharges • Controls needing maintenance • Failed controls: +410100. • Evidence that ESCP has not been properly implemented: • Additional measures needed: Corrective actions required: Unimplemented corrective actions from previous inspection: Inspector Signature Date Operator Signature Date "If this report does not identify any incidents of non-compliance, I certify that the construction activity is in compliance with 1k the SWPPP and Construction General Permit." • Inspections shall be completed at least once every 5 business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days,the inspection shall be conducted on the next business day. Representative inspections used by utility line installation, pipeline construction,or other similar linear construction activities shall inspect all outfalls discharging to exceptional waters.Where an inspection report does not identify any incidents of non-compliance,the report shall contain a certification that the construction activity is in compliance with the SWPPP and general permit. Inspection requirements: Describe discharges at time of inspection Record land-disturbing activities outside approved ESCP Inspect proper installation, maintenance needs, and effectiveness of: — Perimeter controls, such as silt fence — Soil stockpiles and borrow areas — Completed earthen structures (dams, dikes, ditches, diversions,etc.) — Cut and fill slopes — Sediment basins and traps,sediment barriers, etc. — Channels,flumes, slope drains, etc. — Operational storm inlets — Construction vehicle access routes Areas at final grade or to remain dormant for more than 14 days: — Initiate stabilization activities — Complete stabilization activities within 7 days of stopping work Evidence that ESCP has not been properly implemented: — Concentrated flows of stormwater in conveyances such as rills,rivulets or channels that have not been filtered, settled, or similarly treated prior to discharge,or evidence thereof; — Sediment laden or turbid flows of stormwater that have not been filtered or settled to remove sediments prior to discharge; — Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that discharge to surface waters. Inlets and catch basins with failing sediments controls due to improper installation, lack of maintenance,or inadequate design are considered unprotected; — Sediment deposition on any property(including public and private streets)outside of the construction activity covered by this general permit; — Required stabilization has not been initiated or completed on portions of the site; — Sediment basins without adequate wet or dry storage volume or sediment basins that allow the discharge of stormwater from below the surface of the wet storage portion of the basin; — Sediment traps without adequate wet or dry storage or sediment traps that allow the discharge of stormwater from below the surface of the wet storage portion of the trap; and — Land disturbance outside of the approved area to be disturbed Pollutant generating activities from PPP: implementation, maintenance, and effectiveness Pollutant generating activities not identified in PPP Sparrow Hill SWPPP Inspection Log Inspection: Last Rainfall: r✓ Date Time Date Rainfall Amount Summary(requirements on back of sheet): Locations of: • Prohibited discharges • Controls needing maintenance • Failed controls: 440110, • Evidence that ESCP has not been properly implemented: • Additional measures needed: Corrective actions required: Unimplemented corrective actions from previous inspection: Inspector Signature Date Operator Signature Date "If this report does not identify any incidents of non-compliance, I certify that the construction activity is in compliance with the SWPPP and Construction General Permit." Inspections shall be completed at least once every 5 business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days,the inspection shall be conducted on the next business day. Representative inspections used by utility line installation,pipeline construction,or other similar linear construction activities shall inspect all outfalls discharging to exceptional waters.Where an inspection report does not identify any incidents of non-compliance,the report shall contain a certification that the construction activity is in compliance with the SWPPP and general permit. Inspection requirements: Describe discharges at time of inspection Record land-disturbing activities outside approved ESCP Inspect proper installation, maintenance needs, and effectiveness of: — Perimeter controls, such as silt fence — Soil stockpiles and borrow areas — Completed earthen structures (dams,dikes, ditches, diversions, etc.) — Cut and fill slopes — Sediment basins and traps,sediment barriers, etc. — Channels,flumes, slope drains, etc. — Operational storm inlets — Construction vehicle access routes Areas at final grade or to remain dormant for more than 14 days: — Initiate stabilization activities — Complete stabilization activities within 7 days of stopping work Evidence that ESCP has not been properly implemented: *110 — Concentrated flows of stormwater in conveyances such as rills,rivulets or channels that have not been filtered, settled,or similarly treated prior to discharge,or evidence thereof; — Sediment laden or turbid flows of stormwater that have not been filtered or settled to remove sediments prior to discharge; — Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that discharge to surface waters. Inlets and catch basins with failing sediments controls due to improper installation, lack of maintenance,or inadequate design are considered unprotected; — Sediment deposition on any property(including public and private streets)outside of the construction activity covered by this general permit; — Required stabilization has not been initiated or completed on portions of the site; — Sediment basins without adequate wet or dry storage volume or sediment basins that allow the discharge of stormwater from below the surface of the wet storage portion of the basin; — Sediment traps without adequate wet or dry storage or sediment traps that allow the discharge of stormwater from below the surface of the wet storage portion of the trap; and — Land disturbance outside of the approved area to be disturbed Pollutant generating activities from PPP: implementation, maintenance, and effectiveness Pollutant generating activities not identified in PPP Sparrow Hill SWPPP Inspection Log Inspection: Last Rainfall: Date Time Date Rainfall Amount Summary(requirements on back of sheet): Locations of: • Prohibited discharges • Controls needing maintenance • Failed controls: li✓ • Evidence that ESCP has not been properly implemented: • Additional measures needed: Corrective actions required: Unimplemented corrective actions from previous inspection: Inspector Signature Date Operator Signature Date "If this report does not identify any incidents of non-compliance, I certify that the construction activity is in compliance with the SWPPP and Construction General Permit." Inspections shall be completed at least once every 5 business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days,the inspection shall be conducted on the next business day. Representative inspections used by utility line installation, pipeline construction,or other similar linear construction activities shall inspect all outfalls discharging to exceptional waters.Where **1110 an inspection report does not identify any incidents of non-compliance,the report shall contain a certification that the construction activity is in compliance with the SWPPP and general permit. Inspection requirements: Describe discharges at time of inspection Record land-disturbing activities outside approved ESCP Inspect proper installation, maintenance needs, and effectiveness of: — Perimeter controls,such as silt fence — Soil stockpiles and borrow areas — Completed earthen structures (dams,dikes, ditches, diversions,etc.) — Cut and fill slopes — Sediment basins and traps, sediment barriers, etc. — Channels,flumes, slope drains, etc. — Operational storm inlets — Construction vehicle access routes Areas at final grade or to remain dormant for more than 14 days: — Initiate stabilization activities — Complete stabilization activities within 7 days of stopping work Evidence that ESCP has not been properly implemented: 14110 — Concentrated flows of stormwater in conveyances such as rills,rivulets or channels that have not been filtered, settled,or similarly treated prior to discharge,or evidence thereof; — Sediment laden or turbid flows of stormwater that have not been filtered or settled to remove sediments prior to discharge; — Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that discharge to surface waters. Inlets and catch basins with failing sediments controls due to improper installation, lack of maintenance, or inadequate design are considered unprotected; — Sediment deposition on any property(including public and private streets)outside of the construction activity covered by this general permit; — Required stabilization has not been initiated or completed on portions of the site; — Sediment basins without adequate wet or dry storage volume or sediment basins that allow the discharge of stormwater from below the surface of the wet storage portion of the basin; — Sediment traps without adequate wet or dry storage or sediment traps that allow the discharge of stormwater from below the surface of the wet storage portion of the trap; and — Land disturbance outside of the approved area to be disturbed Pollutant generating activities from PPP: implementation, maintenance, and effectiveness Pollutant generating activities not identified in PPP Sparrow Hill SWPPP Inspection Log Inspection: Last Rainfall: Date Time Date Rainfall Amount Summary(requirements on back of sheet): Locations of: • Prohibited discharges • Controls needing maintenance • Failed controls: • Evidence that ESCP has not been properly implemented: • Additional measures needed: Corrective actions required: Unimplemented corrective actions from previous inspection: Inspector Signature Date Operator Signature Date "If this report does not identify any incidents of non-compliance, I certify that the construction activity is in compliance with 'Skop, the SWPPP and Construction General Permit." Inspections shall be completed at least once every 5 business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days,the inspection shall be conducted on the next business day. Representative inspections used by utility line installation, pipeline construction,or other similar linear construction activities shall inspect all outfalls discharging to exceptional waters.Where iy40110 an inspection report does not identify any incidents of non-compliance,the report shall contain a certification that the construction activity is in compliance with the SWPPP and general permit. Inspection requirements: Describe discharges at time of inspection Record land-disturbing activities outside approved ESCP Inspect proper installation, maintenance needs, and effectiveness of: — Perimeter controls, such as silt fence — Soil stockpiles and borrow areas — Completed earthen structures(dams,dikes, ditches, diversions,etc.) — Cut and fill slopes — Sediment basins and traps,sediment barriers, etc. — Channels,flumes, slope drains, etc. — Operational storm inlets — Construction vehicle access routes Areas at final grade or to remain dormant for more than 14 days: — Initiate stabilization activities — Complete stabilization activities within 7 days of stopping work Evidence that ESCP has not been properly implemented: *110 — Concentrated flows of stormwater in conveyances such as rills,rivulets or channels that have not been filtered, settled,or similarly treated prior to discharge, or evidence thereof; — Sediment laden or turbid flows of stormwater that have not been filtered or settled to remove sediments prior to discharge; — Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that discharge to surface waters. Inlets and catch basins with failing sediments controls due to improper installation, lack of maintenance,or inadequate design are considered unprotected; — Sediment deposition on any property(including public and private streets)outside of the construction activity covered by this general permit; — Required stabilization has not been initiated or completed on portions of the site; — Sediment basins without adequate wet or dry storage volume or sediment basins that allow the discharge of stormwater from below the surface of the wet storage portion of the basin; — Sediment traps without adequate wet or dry storage or sediment traps that allow the discharge of stormwater from below the surface of the wet storage portion of the trap; and — Land disturbance outside of the approved area to be disturbed Pollutant generating activities from PPP: implementation, maintenance, and effectiveness Pollutant generating activities not identified in PPP Sparrow Hill SWPPP Inspection Log Inspection: Last Rainfall: vow Date Time Date Rainfall Amount Summary(requirements on back of sheet): Locations of: • Prohibited discharges • Controls needing maintenance • Failed controls: Now • Evidence that ESCP has not been properly implemented: • Additional measures needed: Corrective actions required: Unimplemented corrective actions from previous inspection: Inspector Signature Date Operator Signature Date "If this report does not identify any incidents of non-compliance, I certify that the construction activity is in compliance with Sino, the SWPPP and Construction General Permit." Inspections shall be completed at least once every 5 business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days,the inspection shall be conducted on the next business day. Representative inspections used by utility line installation, pipeline construction,or other similar linear construction activities shall inspect all outfalls discharging to exceptional waters.Where an inspection report does not identify any incidents of non-compliance,the report shall contain a certification that the construction activity is in compliance with the SWPPP and general permit. Inspection requirements: Describe discharges at time of inspection Record land-disturbing activities outside approved ESCP Inspect proper installation, maintenance needs, and effectiveness of: — Perimeter controls,such as silt fence — Soil stockpiles and borrow areas — Completed earthen structures (dams,dikes, ditches, diversions, etc.) — Cut and fill slopes — Sediment basins and traps,sediment barriers, etc. — Channels,flumes, slope drains, etc. — Operational storm inlets — Construction vehicle access routes Areas at final grade or to remain dormant for more than 14 days: — Initiate stabilization activities — Complete stabilization activities within 7 days of stopping work Evidence that ESCP has not been properly implemented: — Concentrated flows of stormwater in conveyances such as rills,rivulets or channels that have not been filtered, settled, or similarly treated prior to discharge,or evidence thereof; — Sediment laden or turbid flows of stormwater that have not been filtered or settled to remove sediments prior to discharge; — Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that discharge to surface waters. Inlets and catch basins with failing sediments controls due to improper installation, lack of maintenance,or inadequate design are considered unprotected; — Sediment deposition on any property(including public and private streets)outside of the construction activity covered by this general permit; — Required stabilization has not been initiated or completed on portions of the site; — Sediment basins without adequate wet or dry storage volume or sediment basins that allow the discharge of stormwater from below the surface of the wet storage portion of the basin; — Sediment traps without adequate wet or dry storage or sediment traps that allow the discharge of stormwater from below the surface of the wet storage portion of the trap;and — Land disturbance outside of the approved area to be disturbed Pollutant generating activities from PPP: implementation, maintenance, and effectiveness Pollutant generating activities not identified in PPP Sparrow Hill SWPPP Inspection Log Inspection: Last Rainfall: Awe Date Time Date Rainfall Amount Summary(requirements on back of sheet): Locations of: • Prohibited discharges • Controls needing maintenance • Failed controls: Niro' • Evidence that ESCP has not been properly implemented: • Additional measures needed: Corrective actions required: Unimplemented corrective actions from previous inspection: Inspector Signature Date Operator Signature Date "If this report does not identify any incidents of non-compliance, I certify that the construction activity is in compliance with i`,, the SWPPP and Construction General Permit." Inspections shall be completed at least once every 5 business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days,the inspection shall be conducted on the next business day. Representative inspections used by utility line installation, pipeline construction,or other similar linear construction activities shall inspect all outfalls discharging to exceptional waters.WhereNINO an inspection report does not identify any incidents of non-compliance,the report shall contain a certification that the construction activity is in compliance with the SWPPP and general permit. Inspection requirements: Describe discharges at time of inspection Record land-disturbing activities outside approved ESCP Inspect proper installation, maintenance needs, and effectiveness of: — Perimeter controls,such as silt fence — Soil stockpiles and borrow areas — Completed earthen structures(dams,dikes, ditches, diversions,etc.) — Cut and fill slopes — Sediment basins and traps, sediment barriers, etc. — Channels,flumes, slope drains, etc. — Operational storm inlets — Construction vehicle access routes Areas at final grade or to remain dormant for more than 14 days: — Initiate stabilization activities — Complete stabilization activities within 7 days of stopping work Evidence that ESCP has not been properly implemented: *041/1 — Concentrated flows of stormwater in conveyances such as rills,rivulets or channels that have not been filtered, settled, or similarly treated prior to discharge, or evidence thereof; — Sediment laden or turbid flows of stormwater that have not been filtered or settled to remove sediments prior to discharge; — Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that discharge to surface waters. Inlets and catch basins with failing sediments controls due to improper installation, lack of maintenance, or inadequate design are considered unprotected; — Sediment deposition on any property(including public and private streets)outside of the construction activity covered by this general permit; — Required stabilization has not been initiated or completed on portions of the site; — Sediment basins without adequate wet or dry storage volume or sediment basins that allow the discharge of stormwater from below the surface of the wet storage portion of the basin; — Sediment traps without adequate wet or dry storage or sediment traps that allow the discharge of stormwater from below the surface of the wet storage portion of the trap; and — Land disturbance outside of the approved area to be disturbed Pollutant generating activities from PPP: implementation, maintenance, and effectiveness Pollutant generating activities not identified in PPP Sparrow Hill SWPPP Inspection Log Inspection: Last Rainfall: low Date Time Date Rainfall Amount Summary(requirements on back of sheet): Locations of: • Prohibited discharges • Controls needing maintenance • Failed controls: *tome_ • Evidence that ESCP has not been properly implemented: • Additional measures needed: Corrective actions required: Unimplemented corrective actions from previous inspection: Inspector Signature Date Operator Signature Date "If this report does not identify any incidents of non-compliance, I certify that the construction activity is in compliance with .r the SWPPP and Construction General Permit." Inspections shall be completed at least once every 5 business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days,the inspection shall be conducted on the next business day. Representative inspections used by utility line installation, pipeline construction,or other similar linear construction activities shall inspect all outfalls discharging to exceptional waters.Where an inspection report does not identify any incidents of non-compliance,the report shall contain a certification that the construction activity is in compliance with the SWPPP and general permit. Inspection requirements: Describe discharges at time of inspection Record land-disturbing activities outside approved ESCP Inspect proper installation, maintenance needs, and effectiveness of: — Perimeter controls, such as silt fence — Soil stockpiles and borrow areas — Completed earthen structures (dams,dikes, ditches, diversions,etc.) — Cut and fill slopes — Sediment basins and traps, sediment barriers, etc. — Channels,flumes, slope drains, etc. — Operational storm inlets — Construction vehicle access routes Areas at final grade or to remain dormant for more than 14 days: — Initiate stabilization activities — Complete stabilization activities within 7 days of stopping work Evidence that ESCP has not been properly implemented: — Concentrated flows of stormwater in conveyances such as rills,rivulets or channels that have not been filtered, settled,or similarly treated prior to discharge, or evidence thereof; — Sediment laden or turbid flows of stormwater that have not been filtered or settled to remove sediments prior to discharge; — Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that discharge to surface waters. Inlets and catch basins with failing sediments controls due to improper installation, lack of maintenance,or inadequate design are considered unprotected; — Sediment deposition on any property(including public and private streets)outside of the construction activity covered by this general permit; — Required stabilization has not been initiated or completed on portions of the site; — Sediment basins without adequate wet or dry storage volume or sediment basins that allow the discharge of stormwater from below the surface of the wet storage portion of the basin; — Sediment traps without adequate wet or dry storage or sediment traps that allow the discharge of stormwater from below the surface of the wet storage portion of the trap;and — Land disturbance outside of the approved area to be disturbed Pollutant generating activities from PPP: implementation, maintenance, and effectiveness Pollutant generating activities not identified in PPP Sparrow Hill SWPPP Inspection Log Inspection: Last Rainfall: Date Time Date Rainfall Amount Summary(requirements on back of sheet): Locations of: • Prohibited discharges • Controls needing maintenance • Failed controls: Nome • Evidence that ESCP has not been properly implemented: • Additional measures needed: Corrective actions required: Unimplemented corrective actions from previous inspection: Inspector Signature Date Operator Signature Date "If this report does not identify any incidents of non-compliance, I certify that the construction activity is in compliance with N,, the SWPPP and Construction General Permit." Inspections shall be completed at least once every 5 business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days,the inspection shall be conducted on the next business day. Representative inspections used by utility line installation,pipeline construction,or other similar linear construction activities shall inspect all outfalls discharging to exceptional waters.Where an inspection report does not identify any incidents of non-compliance,the report shall contain a certification that the construction activity is in compliance with the SWPPP and general permit. Inspection requirements: Describe discharges at time of inspection Record land-disturbing activities outside approved ESCP Inspect proper installation, maintenance needs, and effectiveness of: — Perimeter controls, such as silt fence — Soil stockpiles and borrow areas — Completed earthen structures(dams,dikes, ditches, diversions,etc.) — Cut and fill slopes — Sediment basins and traps, sediment barriers, etc. — Channels,flumes, slope drains, etc. — Operational storm inlets — Construction vehicle access routes Areas at final grade or to remain dormant for more than 14 days: — Initiate stabilization activities — Complete stabilization activities within 7 days of stopping work Evidence that ESCP has not been properly implemented: — Concentrated flows of stormwater in conveyances such as rills,rivulets or channels that have not been filtered, settled,or similarly treated prior to discharge, or evidence thereof; — Sediment laden or turbid flows of stormwater that have not been filtered or settled to remove sediments prior to discharge; — Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that discharge to surface waters. Inlets and catch basins with failing sediments controls due to improper installation, lack of maintenance,or inadequate design are considered unprotected; — Sediment deposition on any property(including public and private streets)outside of the construction activity covered by this general permit; — Required stabilization has not been initiated or completed on portions of the site; — Sediment basins without adequate wet or dry storage volume or sediment basins that allow the discharge of stormwater from below the surface of the wet storage portion of the basin; — Sediment traps without adequate wet or dry storage or sediment traps that allow the discharge of stormwater from below the surface of the wet storage portion of the trap; and — Land disturbance outside of the approved area to be disturbed Pollutant generating activities from PPP: implementation, maintenance, and effectiveness Pollutant generating activities not identified in PPP Sparrow Hill SWPPP Inspection Log Inspection: Last Rainfall: ..r Date Time Date Rainfall Amount Summary(requirements on back of sheet): Locations of: • Prohibited discharges • Controls needing maintenance • Failed controls: ``✓ • Evidence that ESCP has not been properly implemented: • Additional measures needed: Corrective actions required: Unimplemented corrective actions from previous inspection: Inspector Signature Date Operator Signature Date "If this report does not identify any incidents of non-compliance, I certify that the construction activity is in compliance with iw„r the SWPPP and Construction General Permit." Inspections shall be completed at least once every 5 business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days,the inspection shall be conducted on the next business day. Representative inspections used by utility line installation,pipeline construction,or other similar linear construction activities shall inspect all outfalls discharging to exceptional waters.Where an inspection report does not identify any incidents of non-compliance,the report shall contain a certification that the construction activity is in compliance with the SWPPP and general permit. Inspection requirements: Describe discharges at time of inspection Record land-disturbing activities outside approved ESCP Inspect proper installation, maintenance needs, and effectiveness of: — Perimeter controls, such as silt fence — Soil stockpiles and borrow areas — Completed earthen structures (dams,dikes, ditches, diversions, etc.) — Cut and fill slopes — Sediment basins and traps,sediment barriers, etc. — Channels,flumes, slope drains, etc. — Operational storm inlets — Construction vehicle access routes Areas at final grade or to remain dormant for more than 14 days: — Initiate stabilization activities — Complete stabilization activities within 7 days of stopping work Evidence that ESCP has not been properly implemented: — Concentrated flows of stormwater in conveyances such as rills,rivulets or channels that have not been filtered, settled, or similarly treated prior to discharge, or evidence thereof; — Sediment laden or turbid flows of stormwater that have not been filtered or settled to remove sediments prior to discharge; — Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that discharge to surface waters. Inlets and catch basins with failing sediments controls due to improper installation, lack of maintenance,or inadequate design are considered unprotected; — Sediment deposition on any property(including public and private streets)outside of the construction activity covered by this general permit; — Required stabilization has not been initiated or completed on portions of the site; — Sediment basins without adequate wet or dry storage volume or sediment basins that allow the discharge of stormwater from below the surface of the wet storage portion of the basin; — Sediment traps without adequate wet or dry storage or sediment traps that allow the discharge of stormwater from below the surface of the wet storage portion of the trap; and — Land disturbance outside of the approved area to be disturbed Pollutant generating activities from PPP: implementation, maintenance, and effectiveness Pollutant generating activities not identified in PPP Sparrow Hill SWPPP Inspection Log Inspection: Last Rainfall: vie Date Time Date Rainfall Amount Summary(requirements on back of sheet): Locations of: • Prohibited discharges • Controls needing maintenance • Failed controls: Nitioe • Evidence that ESCP has not been properly implemented: • Additional measures needed: Corrective actions required: Unimplemented corrective actions from previous inspection: Inspector Signature Date Operator Signature Date "If this report does not identify any incidents of non-compliance, I certify that the construction activity is in compliance with %Noe the SWPPP and Construction General Permit." Inspections shall be completed at least once every 5 business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days,the inspection shall be conducted on the next business day. Representative inspections used by utility line installation, pipeline construction,or other similar linear construction activities shall inspect all outfalls discharging to exceptional waters.Where an inspection report does not identify any incidents of non-compliance,the report shall contain a certification that the construction activity is in compliance with the SWPPP and general permit. Inspection requirements: Describe discharges at time of inspection Record land-disturbing activities outside approved ESCP Inspect proper installation, maintenance needs, and effectiveness of: — Perimeter controls, such as silt fence — Soil stockpiles and borrow areas — Completed earthen structures(dams,dikes, ditches, diversions,etc.) — Cut and fill slopes — Sediment basins and traps, sediment barriers, etc. — Channels,flumes, slope drains, etc. — Operational storm inlets — Construction vehicle access routes Areas at final grade or to remain dormant for more than 14 days: — Initiate stabilization activities — Complete stabilization activities within 7 days of stopping work Evidence that ESCP has not been properly implemented: *11119 — Concentrated flows of stormwater in conveyances such as rills,rivulets or channels that have not been filtered, settled,or similarly treated prior to discharge, or evidence thereof; — Sediment laden or turbid flows of stormwater that have not been filtered or settled to remove sediments prior to discharge; — Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that discharge to surface waters. Inlets and catch basins with failing sediments controls due to improper installation, lack of maintenance,or inadequate design are considered unprotected; — Sediment deposition on any property(including public and private streets)outside of the construction activity covered by this general permit; — Required stabilization has not been initiated or completed on portions of the site; — Sediment basins without adequate wet or dry storage volume or sediment basins that allow the discharge of stormwater from below the surface of the wet storage portion of the basin; — Sediment traps without adequate wet or dry storage or sediment traps that allow the discharge of stormwater from below the surface of the wet storage portion of the trap; and — Land disturbance outside of the approved area to be disturbed Pollutant generating activities from PPP: implementation, maintenance,and effectiveness Pollutant generating activities not identified in PPP Sparrow Hill SWPPP Inspection Log Inspection: Last Rainfall: Date Time Date Rainfall Amount Summary(requirements on back of sheet): Locations of: • Prohibited discharges • Controls needing maintenance • Failed controls: '`,_ • Evidence that ESCP has not been properly implemented: • Additional measures needed: Corrective actions required: Unimplemented corrective actions from previous inspection: Inspector Signature Date Operator Signature Date "If this report does not identify any incidents of non-compliance, I certify that the construction activity is in compliance with •, the SWPPP and Construction General Permit." Inspections shall be completed at least once every 5 business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days,the inspection shall be conducted on the next business day. Representative inspections used by utility line installation, pipeline construction,or other similar linear construction activities shall inspect all outfalls discharging to exceptional waters.WhereNtiov an inspection report does not identify any incidents of non-compliance,the report shall contain a certification that the construction activity is in compliance with the SWPPP and general permit. Inspection requirements: Describe discharges at time of inspection Record land-disturbing activities outside approved ESCP Inspect proper installation, maintenance needs, and effectiveness of: — Perimeter controls,such as silt fence — Soil stockpiles and borrow areas — Completed earthen structures (dams,dikes, ditches, diversions,etc.) — Cut and fill slopes — Sediment basins and traps,sediment barriers, etc. — Channels,flumes, slope drains, etc. — Operational storm inlets — Construction vehicle access routes Areas at final grade or to remain dormant for more than 14 days: — Initiate stabilization activities — Complete stabilization activities within 7 days of stopping work Evidence that ESCP has not been properly implemented: — Concentrated flows of stormwater in conveyances such as rills,rivulets or channels that have not been filtered, settled,or similarly treated prior to discharge,or evidence thereof; — Sediment laden or turbid flows of stormwater that have not been filtered or settled to remove sediments prior to discharge; — Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that discharge to surface waters. Inlets and catch basins with failing sediments controls due to improper installation, lack of maintenance,or inadequate design are considered unprotected; — Sediment deposition on any property(including public and private streets)outside of the construction activity covered by this general permit; — Required stabilization has not been initiated or completed on portions of the site; — Sediment basins without adequate wet or dry storage volume or sediment basins that allow the discharge of stormwater from below the surface of the wet storage portion of the basin; — Sediment traps without adequate wet or dry storage or sediment traps that allow the discharge of stormwater from below the surface of the wet storage portion of the trap; and — Land disturbance outside of the approved area to be disturbed Pollutant generating activities from PPP: implementation, maintenance, and effectiveness Pollutant generating activities not identified in PPP