Loading...
HomeMy WebLinkAboutSDP201700070 Review Comments Final Site Plan and Comps. 2018-05-16COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Project: HTC Hotel — Comfort Inn — Final Site Plan Plan preparer: Peter Russell/Justin Shimp, Shimp Engineering, 201 E. Main St. Suite M, Charlottesville, VA 22902 [iustin=,shimp-en in�g com] Plan received date: 29 Nov 2017 (Rev. 1) 23 Apr 2018 Date of comments: 19 Dec 2017 (Rev. 1) 16 May 2018 Reviewer: Bobby Jocz (Rev. 1 /John Anderson) Project Coordinator: Paty Saternye SDP2017-00070 1. ISMP plan approval required prior to Final Site Plan Approval. (Rev. 1) Applicant acknowledges; requirement for VSMP approval prior to FSP approval persists. 2. Drainage plan including stormwater calculations should be included in FSP. (Rev. 1) Not addressed. Provide drainage plan, flow patterns, and storm sewer calculations; utilize VDOT table format. 3. Bumper blocks should be provided for parking abutting 5' sidewalks. Bumper blocks are required for any parking abutting sidewalks <6' in width. (Rev. 1) Not Addressed. Bumper blocks required for 30 typ. + 3 HC parking spaces fronting hotel and proposed 5' sidewalks; see ACDSM, p. 17 (link: http://www.albemarle.org/unload/images/forms_center/departments/community development/forms/design standards_ manual/Albemarle_County Design Standards _Manual _2015-04-25_draft.pdf ). 4. In the northwestern parking lot, the CG-12 and detectable warning strip should be centered on handicap access isle. (Rev. 1) Addressed. 5. Stop sign should be provided at intersection of two private travelways. Stop sign should stop cars traveling northeast to southwest. (Rev. 1) Partially addressed. As follow-up: Provide stop signs or stop bars at SW ends of parking aisles, at intersection with private travelway. Allow thru motion on private travelway with stop required just beyond hotel entrance canopy, and at same location in 47 space parking lot to the NW. 6. [Sheet C5] Ensure all new and existing easements are labeled. Some easement labels are misaligned or conflict with other labels making them illegible. Please correct. (Rev. 1) Addressed. 7. `dentify/label gutter type to be used along new travelways. (Rev. 1) Addressed. 8. ,urb with gutter should be utilized wherever stormwater is to be conveyed. (Rev. 1) Addressed. 9. Engineering details for curbing (CG-6, CT-3, etc.) should be provided. (Rev. 1) Addressed. 10. Agreement must be made/provided related to access and construction of private travelways located outside limits of parcel. (Rev. 1) Not Addressed. Comments on Exhibit Dated 12/18/17 1. Scaling is incorrect making it difficult to verify contours/slopes. (Rev. 1) Uncertain if addressed; please provide copy of revised exhibit. 2. Entrances must be a max of 4% grade for the first 40 feet from the intersection. (Rev. 1) Uncertain; please provide exhibit. Engineering Review Comments Page 2 of 2 New 5/16/18: 1. Title Sheet: Recommend revise signature block to read Albemarle County Engineer. Sheet C4 2. Provide VDOT detail for CG-12, 2-ramp configuration (ramps at termini, ped xing pavement markings). 3. Provide VDOT ref to pedestrian crossing pavement marking specifications. Provide detail showing bar width; paint type, etc. (Note: experience with accelerated wear of pavement markings on Meeting Street lends justification to need for specification /detail.) 4. Provide Auto -turn for dumpster. Use typ. local vendor truck wheelbase. Design cannot be approved unless trucks can access and service dumpster without 3-point turn. Access must be direct, and cause no damage to curb when truck is reversing. Current dumpster orientation appears problematic. 5. Identify New GV feature, northernmost parking space. Locate any gas appliance outside parking spaces, for safety and ease of servicing. New GV is inaccessible if a vehicle occupies this parking space. C5: 6. Reverse direction of flow arrow between storm sewer structures B 1 and ST7. 7. New 10' X 6' water vault will not fit in 5' sidewalk; revise to show proper scale. 8. Provide bedding detail for HDPE in trafficked condition; structural backfill should extend (at a minimum) from the top of the pipe to 6-inches above the pipe (ref. hus://www.prinsco.copyw - content/uploads/2014/06/Minimum-and-Maximum-Burial-Depth-per-AASHTO-Tech-Note3.pdf ). 9. C7: Provide Detail 3 on C7 (dumpster pad concrete slab detail). Detail 3 is ref. on sheet 10. 10. C10: Revise Parking Area Pavement detail. Provide pavement design based on VDOT Pavement Design Guide, rev. Feb 2014. Provide Dr, DP, using ADT =200. Note: 3" of SM-9.5A and 8" VDOT 21A base stone would satisfy design criteria and meet VDOT design guidelines. Other options are also available. Please call if any questions: 434.296-5832 —x3069 Thank you SDP201700070-HTC Hotel FSP rev051618.doc