Loading...
HomeMy WebLinkAboutWPO201700076 Preconstruction Form WPO VSMP 2018-04-24 of At Request for Pre-construction Meeting and Grading Permit �''i�►y t. from Albemarle County AP Approved Plan Number: WPO- 2017 boo?(„ Approved Plan Name: Unkre;l /1 l/t jir jinrei("�u�1ci�(?c �Tc�tU(�lYurL Go 11(aetv, Coyvec:(U-- bad (Plans must be approved prior to a pre-construction meeting.) Bond approved date: 4/Lid-/ I (Bonds must be approved and posted prior to a pre-construction meeting or permit) Responsible Land Disturber: Print Name: t)hl l la ,.)Ico i-t- Ieon C. by r LO rI S�"Yl l C�'1 L�`") i State Certification Number: R LD C)6 2.2-41-- Address Z4Address (2,11a1 7 15 - 2 6I 1/cc( 6-et 1 City I, a 1*'svl Ile State Un Zip 22903 2 03 Daytime Phone(434-) L-626 —1 qe o E-mail he.-i he.- la 60 eon y"( 9 lj l }'L-1 E,-/Or) Primary Contractor: COrint Name Ciill-DIA Ir' (.'.oils I 'iid or) 1 Li__ Address ( ( 1 J•- r e Pi(1 Cr.+ 511 ee I-- City a ha/f P j es V i I /e State V Zip 2-2—(103 Daytime Phone(04-) 4-66) • Icl8() E-mail 5hei la 6.0 Con t-Durcwins/ 2(G�-roil • i1� Permit Issuance and First Year Maintenance Fees: (Request must include payment) Total acres proposed to be disturbed is contained on the approved plan and application: VSMP: Acres to be disturbed Fee Due at Grading Permit Less than 1 $63.80 1 and less than 5 $594.00 5 and less than 10 $748.00 10 and less than 50 $990.00 50 and less than 100 $1,342.00 100 and more $2,112.00 For plans exempt from VSMP,VESCP fees were paid with the application. 7/1/14,Revised:8/29/14 Page 1 of 3