HomeMy WebLinkAboutWPO201700076 Application WPO VSMP 2017-11-22 A/�J ( �'" • Community Development Department
i/ �i t'�rl Cour / 401'Vl' ti re Road Charlottesville,VA22tIO2-4596
Sore �ce:(434)296-5832 Fax:(434)972-4126
* 4 Planning Application
PARCEL/OWNER INFORMATION
TMP 07500-00-00-06300 Owner(s): UNIVERSITY OF VIRGINIA FOUNDATION
Application# WP0201700076
PROPERTY INFORMATION
Legal Description IACREAGE BIRDWO00GOLF MIME
Magisterial Dist.1Samuel Miller Land Use Primary Public
Current AFD INot in A/F District Current Zoning Primary RI. Residential
APPLICATION INFORMATION
Street Address 502 BIRDWOOD DR CHARLOTTESVILLE,22903 Entered By
:Jennifer Smith :
Application Type Water Protection Ordinances1122017
Project TEMPORARY GOLF COURSE CONNECTOR ROAD
Received Date 11/21/17 Received Date Final Submittal Date Total Fees 1350
Closing File Date Submittal Date Final Total Paid 1350
Revision Number
Comments
Legal Ad
SUB APPLICATION(s)
Type Sub Applicatiio Comment
Stormwater Management/BMP Plan 11/21/17
Erosion end Sediment Control Plan 11/21/17'
APPLICANT /CONTACT INFORMATION
ContactType Name Areas I CityState Zip Phone PhoneCell
ownert UNIVERSITY OF VIRGINIA FOUNDATION iP 0 BOX 400218 CHARLOTTESVILL 22904-
=Tim ry Ccr+tact DEVIN KEELER 4805 LAKE BROOK DRIVE, GLEN ALLEN,VA 23060 8042053321
Signature of Contractor or Authorized Agent Date
`d+
Virginia Stormwater Management Program (VSMP)
Application for Albemarle County:
Project Name: Temporary Golf Course Connector Road
(The name should be the same as it appears on plans)
Is this an amendment to an approved plan? Yes 0 No
Is this a revision or resubmission for review? Yes 0 No El
County File Number: (to be provided by the County for new applications)
The following are required elements of new applications[from code section 17-401]. For revisions or
amendments,please indicate which items are being amended. Signatures must be provided for any
submission.
® A. Signature of the Property Owner for each parcel: (Required with every submission or revision, NOT
TO BE SIGNED BY AN AGENT OR CONSULTANT)
By signing this application as the owner,I hereby certify that all requirements of these plans and permits will be
complied with,and I have the authority to authorize the land disturbing activities and development on the subject
property. I hereby grant the County of Albemarle the right to en upon the property as required to ensure
compliance with the approved plans and permits.
TMP 75-63 Chris Schooley, UVAF OP
Tax Map&Parcel Print Name of Property Owner Signature of I wne all Date
Tax Map&Parcel Print Name of Property Owner Signature of Owner Date
Tax Map&Parcel Print Name of Property Owner Signature of Owner Date
Tax Map&Parcel Print Name of Property Owner Signature of Owner Date
Contact Information for the Owner(s)to receive correspondence:
Print Name Chris Schooley do University of Virginia Foundation
Address PO Box 400218
City Charlottesville State VA Zip 22904
Daytime Phone(434) 982-3777 E-mail cds7c@virginia.edu
7/1/14,Revised:7/10/14, 1/7/14 Page 1 of2
NNW' 'Nod
assigned or delegated to the manager in accordance with
Item 7:MS4 Information. corporate procedures.
If stormwater is discharged through a municipal separate storm sewer b. For a partnership or sole proprietorship: by a general partner or
system(MS4),provide the name of the MS4 operator.The name of the the proprietor,respectively.
MS4 operator is generally the Town,City, County, Institute or Federal
facility where the construction activity is located. c. For a municipality,state,federal,or other public agency: by either
a principal executive officer or ranking elected official. For purposes
Item 8: Construction Activity Start and Completion Date of this part,a principal executive officer of a public agency includes:
Information.
(i)The chief executive officer of the agency,or
Provide the estimated start date (month/day/year) of the construction
activity. Provide the estimated completion date (month/day/year) of (ii)A senior executive officer having responsibility for the overall
the construction activity. operations of a principal geographic unit of the agency.
Item 9:Construction Activity Area Information.
Provide the total area (to the nearest one-hundredth acre) of the
development (i.e.., the total acreage of the larger common plan of
development or sale). Include the total acreage of any off-site support
activity to be covered under this general permit.
Provide the estimated area (to the nearest one-hundredth acre)to be
disturbed by the construction activity. Include the estimated area of
land disturbance that will occur at any off-site support activity to be
covered under this general permit.
Item 10:Common Plan of Development or Sale Information.
Indicate if the area to be disturbed by the construction activity is part of
a larger common plan of development or sale. Larger common plan of
development or sale is defined as a contiguous area where separate
and distinct construction may be taking place at different times on
different schedules. Plan is broadly defined as any announcement or
documentation, including a sign, public notice or hearing, sales pitch,
advertisement, drawing, permit application, zoning request, etc., or
physical demarcation such as boundary signs, lot stakes, or surveyor
markings indicating that construction activities may occur.
Item 11:Stormwater Pollution Prevention Plan(SWPPP).
A Stormwater Pollution Prevention Plan(SWPPP)must be prepared in
accordance with the requirements of the General VPDES Permit for
Discharges of Stormwater from Construction Activities(VAR10)prior to
submitting this Registration Statement. By signing this Registration
Statement the operator is certifying that the SWPPP has been
prepared.
Item 12:Certification.
A properly authorized individual associated with the operator identified
in Item 1 of the Registration Statement is responsible for certifying and
signing the Registration Statement. Please sign the Registration
Statement in INK.
State statutes provide for severe penalties for submitting false
information on the Registration Statement. State regulations require
that the Registration Statement be signed as follows:
a. For a corporation: by a responsible corporate officer. For the
purpose of this part,a responsible corporate officer means:
(i) A president, secretary, treasurer, or vice-president of the
corporation in charge of a principal business function,or any other
person who performs similar policy-making or decision-making
functions for the corporation,or
(ii) the manager of one or more manufacturing, production, or
operating facilities, provided the manager is authorized to make
management decisions that govern the operation of the regulated
facility including having the explicit or implicit duty of making major
capital investment recommendations, and initiating and directing
other comprehensive measures to assure long-term compliance
with environmental laws and regulations;the manager can ensure
that the necessary systems are established or actions taken to
gather complete and accurate information for permit application
requirements; and where authority to sign documents has been
07/2014
Page 2 of 2
Nero v„r1
Registration Statement
General VPDES Permit for Discharges of Stormwater from Construction Activities (VAR10)
(Please Type or Print All Information)
1. Construction Activity Operator: (General permit coverage will be issued to this operator. The Certification in Item#12 must be
signed by the appropriate person associated with this operator.)
Name: University of Virginia Foundation
Contact: Chris Schooley
Mailing Address:PO Box 400218 •
City: Charlottesville State:VA Zip:22904 Phone: (434)-989-9752
Email address(if available): CdS7C@Virglnia.edU
Indicate if DEQ may transmit general permit correspondence electronically: Yes® No❑
2. Existing General Permit Registration Number(for renewals only):
3. Name and Location of the Construction Activity:
Name: Temporary Golf Course Connector Road
Address(if available): From Golf Course Drive to Berwick Drive
City: State: VA Zip: 22903
County(if not located within a City)Albemarle County
Latitude(decimal degrees): 38.0467 Longitude(decimal degrees): -78.5381
Name and Location of all Off-site Support Activities to be covered under the general permit:
Name:
Address(if available):
City: State: Zip:
County(if not located within a City):
Latitude(decimal degrees): Longitude(decimal degrees):
4. Status of the Construction Activity(check only one): Federal❑ State❑ Public❑ Private IN
5. Nature of the Construction Activity(e.g.,commercial,industrial,residential,agricultural,oil and gas,etc.):
Commercial
6. Name of the Receiving Water(s)and Hydrologic Unit Code(HUC):
Name:Moores Creek Name:
HUC: JR15 HUC:
7. If the discharge is through a Municipal Separate Storm Sewer System(MS4),the name of the MS4 operator:
8. Estimated Project Start and Completion Date:
Start Date(mm/dd/yyyy): 04/01/2018 Completion Date(mm/dd/yyyy): 07/31/2018
9. Total Land Area of Development(to the nearest one-hundredth acre): 2.10 acres
Estimated Area to be Disturbed(to the nearest one-hundredth acre): 2.10 acres
10. Is the area to be disturbed part of a larger common plan of development or sale? Yes❑ No
11. A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the General
VPDES Permit for Discharges of Stormwater from Construction Activities prior to submitting this Registration Statement.
By signing this Registration Statement the operator is certifying that the SWPPP has been prepared.
12. Certification: "I certify under penalty of law that I have read and understand this Registration Statement and that this document
and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and
evaluated the information submi o.-d. Based on my inquiry of the person or persons who manage the system or those persons
directly responsible for • er the information, the information submitted is to the best of my knowledge and belief true,
accurate, and complet= I a are that t ere re significant penalties for submitting false information including the possibility of
fine and imprisonment or kno no ,iolatior s:" n,
Printed Name: �- Title: U W /11‘�1/
Signatures 0�.✓(c SGL-'eo Date: tt' 1vitt 7(�
(Please sign in INK. This Certification must be igned by the appropriate person associated withe operator identified in
Item#1.)
07/2014
Page 1 of 1
Instructions for Completing the Registration Statement
General VPDES Permit for Discharges of Stormwater from Construction Activities (VAR10)
GENERAL The entities that are considered operators will commonly consist of the
owner or developer of a project(the party with control of project plans
A.Coverage Under this General Permit. and specifications)or the general contractor(the party with day to day
operational control of the activities at the project site which are
Any operator applying for coverage under this general permit who is necessary to ensure compliance with the general permit).
required to submit a Registration Statement (see Section B below)
must submit a complete Registration Statement to the Department. Provide the legal name(do not use a colloquial name),contact,mailing
The Registration Statement serves as a Notice of Intent for coverage address, telephone number, and email address (if available) of the
under the General VPDES Permit for Discharges of Stormwater from construction activity operator;general permit coverage will be issued to
Construction Activities(VAR10). this operator. Indicate if the Department may transmit general permit
correspondence electronically.
B.Single-family Detached Residential Structures.
Item 2:Existing General Permit Registration Number.
Operators with an existing stormwater discharge or proposing a new
stormwater discharge associated with the construction of a single- For reapplications only,provide the existing general permit registration
family detached residential structure are not required to submit a number for the construction activity. This item does not need to be
Registration Statement or the Department of Environmental Quality completed for new construction activities applying for general permit
(DEQ)portion of the general permit fee. coverage.
Operators of these types of discharges are authorized to discharge Item 3: Name and Location of the Construction Activity
under this general permit immediately upon the general permit's Information.
effective date of July 1,2014.
Provide the official name,street address(if available),city or county(if
C.To Apply for Permit Coverage. not located within a City)of the construction activity. Also,provide the
latitude and longitude in decimal degrees of the approximate center of
1. New Construction Activities. Any operator proposing a new the construction activity(e.g.,N 37.5000,W 77.5000).
stormwater discharge from construction activities shall submit a
complete Registration Statement to the Department prior to the Name and Location of Off-site Support Activity Information.
commencement of land disturbance, unless exempted by Section B
above. Any operator proposing a new stormwater discharge from This general permit also authorizes stormwater discharges from
construction activities in response to a public emergency where the support activities (e.g., concrete or asphalt batch plants, equipment
related work requires immediate authorization to avoid imminent staging yards, material storage areas, excavated material disposal
endangerment tohuman health or the environment is immediately areas, borrow areas) located on-site or off-site provided that (i) the
authorized to discharge under this general permit and must submit a support activity is directly related to a construction activity that is
complete Registration Statement to the Department no later than 30 required to have general permit coverage;(ii)the support activity is not
days after commencing land disturbance; documentation to a commercial operation, nor does it serve multiple unrelated
substantiate the occurrence of the public emergency must construction activities by different operators; (iii) the support activity
accompany the Registration Statement. does not operate beyond the completion of the construction activity it
supports; (iv) the support activity is identified in the registration
2. Existing Construction Activities. Any operator that was statement at the time of general permit coverage; (v) appropriate
authorized to discharge under the general permit issued in 2009, control measures are identified in a SWPPP and implemented to
and who intends to continue coverage under this general permit, address the discharges from the support activity areas; and (vi) all
shall submit a complete Registration Statement to the Department applicable state, federal, and local approvals are obtained for the
on or before June 1,2014,unless exempted by Section B above. support activity.
D.Where to Submit Registration Statements. Provide the official name,street address(if available), City and County
(if not located within a City) of all off-site support activities to be
All Registration Statements should be submitted to: covered under this general permit. Also, provide the latitude and
longitude in decimal degrees of the approximate center of the off-site
Department of Environmental Quality support activities (e.g., N 37.5000, W 77.5000). Also, if an off-site
Office of Stormwater Management,10th Floor support activity is going to be covered under this general permit the
P.O.Box 1105 total land area of the off-site support activity and the estimated area to
Richmond,VA 23218 be disturbed by the off-site support activity need to be included in Item
#9.
LINE-BY-LINE INSTRUCTIONS
Item 4:Status of the Construction Activity.
Item 1:Construction Activity Operator Information.
Indicate the appropriate status (Federal, State, Public, or Private) of
"Operator" means the owner or operator of any facility or activity the construction activity.
subject to the Stormwater Management Act and regulations. In the
context of stormwater associated with a large or small construction Item 5:Nature of the Construction Activity.
activity, operator means any person associated with a construction
project that meets either of the following two criteria:(i)the person has Provide a brief description of the construction activity, such as
direct operational control over construction plans and specifications, commercial,residential,agricultural,oil and gas,etc.This list is not all
including the ability to make modifications to those plans and inclusive.
specifications or(ii) the person has day-to-day operational control of
those activities at a project that are necessary to ensure compliance Item 6:Receiving Waters(s)and HUC Information.
with a stormwater pollution prevention plan for the site or other state
permit or VSMP authority permit conditions(i.e.,they are authorized to Provide the name of the receiving water(s)and corresponding HUC for
direct workers at a site to carry out activities required by the all stormwater discharges including any stormwater discharges from
stormwater pollution prevention plan or comply with other permit off-site support activities to be covered under this general permit.
conditions). Hydrologic Unit Code or HUC is a watershed unit established in the
most recent version of Virginia's 6th order national watershed boundary
dataset.
07/2014 Page 1 of 2