HomeMy WebLinkAboutWPO201800008 Approval - County 2018-05-17COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP Permit plan review Project: Old Trail Village Block 7 Phase 2 — VSMP Plan Project File Number: WP0201800008 Plan preparer: Roudabush, Gale & Associates [bledbetternroudabush.com ] Owner or rep.: March Mountain Properties LLC [davena,oldtrailvilla eg com ] Plan received date: 30 Mar 2018 (Rev. 1) (Rev. 2) 17 May 2018 (RGA Link to .PDF) Date of comments: 14 May 2018 (Rev. 2) 17 May 2018 improved Reviewer: John Anderson County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is Approved. Please submit four (4) full-size copies for stamped approval. Also, please send revised digital (.xls) copy of Compliance Tracking Ledger to Emily Cox, of this office. We appreciate the care and attention to detail. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. Please provide updated location of VAR100043 SWPPP. Confirm SWPPP is available for inspection. Confirm VAR100043 includes acreage disturbed with this plan (block 7, phase 2). Most recent VDEQ permit activity appears to be for blocks 10 and 16-18; Application Approved date, 2/8/18; Est. Area to be disturbed (Ac.) =113.73. Please provide an updated overall development VPDES Map for Old Trail Village showing block 7, phase 2 is covered by current VPDES permit VA100043. (Rev. 2) Addressed. Applicant writes: "The SWPPP is located in the Old Trail offices at 1005 Hearthercroft Circle, Suite #400. This area was included with the Block 28/29 plans area of disturbance as we included all the west end for the grading, erosion control and WPO plan." 9WM Plan 1. Sheet T Please revise Old Trail Village Water Quality Compliance Tracking Ledger to ref. Block 7, Phase 2 submittal, rather than Block 31B & C SWM. (Rev. 2) Addressed; as follow-up, please send .xls to Emily Cox, Engineering. 2. Provide copy of recordation of any required (temporary /permanent) drainage easement, prior to VSMP plan approval. (Rev. 2) Addressed; sent w/email 5/17/2018 1:55 PM; plat recorded at BK5031/PG779-B. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. See A., above. (Rev. 2) Addressed. C. Erosion and Sediment Control Plan (ESCP) — (Rev. 2) All comments addressed. Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is Approved. Engineering Review Comments Page 2 of 3 Sheet 3: 1. Show contour 682.5' contour upslope of ST -1. 2. Include Note that ST -1 will not be removed or replaced with 1% stabilized channel until all upslope areas are stabilized. 1% channel may not convey sediment -laden runoff to Upper Ballard Pond. 3. Label ST -1 floor dimensions to aid construction and inspection (41' X 91'). 4. Provide or maintain IP (installed with Block 7, Phase 1) at storm inlet structures Ex. 203 (A, B), 211 (A, B), Ex. 215, and Ex. 223 —show inlet protection on plan sheet. 5. Sheet 4: Revise `channel at 1%' label to include "V -ditch", reference ditch section detail on sheet 7. 6. Sheet 4: Channel at 1% is SWM conveyance until final build -out and conveyance system connection with pond, via Ex. Str. 226. Provide non-erosive conveyance to lake edge (lined grass channel), or provide energy dissipation (level spreader, etc.) to prevent sediment transport streamward of riprap shown at end of channel. A small sediment trap downstream of riprap (shown on plan) may also work. Goal: prevent sediment reaching Upper Ballard Pond, through final build -out. 7. Sheet 7: Compare road plan sheet 8 storm sewer computations, Str. 7, channel @ 1% sta. 12+87 (4.7 fps) with VESCH Std. & Spec. 3.36. Road plan discharge velocity at this point appears to require EC -3, Soil Stabilization Blanket Treatment 2. Confirm velocity and stabilization blanket design. (Rev. 2) Addressed; Applicant writes: "As discussed with via email, if any problems with erosion are discovered in the channel after construction, the heavier channel lining, EC -3, will be installed." Process After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue apermit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturbed, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; Ifyou have any questions or concerns, please contact me either by email (janderson2galbemarle.org) or by phone at 434.296-5832 ext. 3069. Thank you. Engineering Review Comments Page 3 of 3 J. Anderson, Engineering Division WP0201800008_OTVblock7-phase2_VSMP 2018-05-14_rev051718.doc