HomeMy WebLinkAboutWPO201700017 Inspection 2018-05-14COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 229024596
Phone (434) 296-5832 Fax (434) 972-4126
VSMP/VESCP PERMIT SITE INSPECTION REPORT
COVERAGE & POSTING REQUIREMENTS Yes No N/A Reviewed during re -inspection? ❑Yes ❑No
Comments/DescNpdon
1 Construction site has permit coverage? (Va. Code §62.1-44.15:34.A)
(9VAC25-870-310)(Alb. Co. Code §17-300, 17-302)
2 A copy of the notice of coverage letter is posted conspicuously near the I7
main entrance of the construction activity? (CGP Part II.C)
Notice of the location of the SWPPP is posted near the site's entrance, if
3 applicable, and information for public access is provided? (9VAC25-870-
54.G)(CGP Part II D.2 & 3)
SWPPP AVAILABILITY AND CONTENTS Yes No N/A Reviewed during re -inspection? ❑Yes ❑No
Comments/Descr/p8on
4 The SWPPP is on -site or made available during the inspection? (CGP up
Part II D.1 & 2)(gVAC25-870-54.G)
5 The SWPPP contains a signed copy of the registration statement? O J 1 1 0
(CGP Part II A.1.a)
5 The SWPPP includes, upon receipt, a copy of the notice of coverage
letter and the CGP? (CGP Part II A.1.b & c)
Page 1 of 7
The SWPPP includes a narrative description of the nature of the
7 construction activity, including the function of the project? (CGP Part II
A.1.d)
The SWPPP includes a legible site plan identifying all appropriate
8 measures and that includes the locations of support activities and the
onsite rain gauge, when applicable? (CGP Part II A.1.e(1-7))
9 The SWPPP contains the name, phone number and qualifications of
"Qualified Personnel" conducting inspections? (CGP Part 11 A.6)
10 The SWPPP contains an approved erosion and sediment control plan?
(9VAC25-870-54.B)(CGP Part II.A.2)
The SWPPP contains an approved stormwater management plan or an
11 existing construction site has a stormwater management plan that
ensures compliance with the water quality and quantity requirements?
rQvnr9F-stun-r,d rvrr-'D Dom.+ n e 4N rs..ti..o,. ,i t- ;.--; . n o n ii .• r-1
12
The SWPPP contains an adequate pollution prevention plan? (9VAC25-
870-54.D)(CGP Part II.A.4)
The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of '
13
concern, exceptional waters and the additional controls measures
applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a-b))
14
Delegation of Authority is provided and signed in accordance with Part II I
K? (CGP Part If A.7)
15
The SWPPP is signed and dated in accordance with Part III K? (CGP Part
11 A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES Yes No N/A
Reviewed during inspection? ❑Yes []No
Comments/Descripdon
Is the SWPPP being amended whenever there is a change in the design,
construction, operation, or maintenance that has a significant effect on the
G�i Ad p n n e
Y
16
discharge of pollutants to surface waters? (CGP Part II B(1))(9VAC25-870-
4.G)
Has the SWPPP been amended if inspections or investigations by the
17
qualified personnel, or by local, state or federal officials find that
�perator's
xisting control measures are ineffective in minimizing pollutants in
ischarges? (CGP Part II B(2))(9VAC25-870-54.G)
18
Contractor(s) that will implement and maintain each control measure are
identified? (CGP Part II B(3))(9VAC25-870-54.G)
Have there been updates to the SWPPP when any modifications to its
implementation have occurred, including a record of dates when major
19
3rading activities occur, construction activities temporarily or permanently
cease on a portion of the site or stabilization measures are initiated? (CGP
Part II B.4(a))(9VAC25-870-54.G)
20
Is there documentation in the SWPPP of replaced or modified controls?
(CGP Part II B.4(b))(9VAC25-870-54.G)
21
Is the SWPPP updated to indicate areas that have reached final
stabilization? (CGP Part 11 B.4(c))(9VAC25-870-54.G)
Is the SWPPP updated to indicate properties that are no longer under the
22
'egal control of the operator and the dates on which the operator no longer
had legal control over each property? (CGP Part II B.4(d))(9VAC25-870-
G)
Does the SWPPP identify the date of any prohibited discharges, the
23
volume released, actions taken to minimize the impact of the release and
measures taken to prevent the recurrence of any prohibited discharge?
(CGP Part 11 BA(e-f)) (9VAC25-870-54.G)
24Amendments,
modifications, or updates to the SWPPP are signed in
accordance with Part III K? (CGP Part 11 B(5))(9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS Yes No N/A
Reviewed during inspection? Dyes ❑No
Comments/Descripffon
Page 2 of 7
Inspections required by the SWPPP are conducted at the required
25
frequency, including a modified frequency for impaired water(s), approved
TMDL(s), and exceptional waters when applicable? (CGP Part II F (2))
(CGP Part li A.5.b.3)
26
Inspection reports are completed and signed in accordance with CGP
Part 11 F (3-4)? (CGP Part 11 F (3-4))
27
Corrective actions are taken consistent with the requirements of the
CGP? Part 11 G(1-2))
(CGP
ESC AND SWM PLAN IMPLEMENTATION
Yes No N/A Reviewed during inspection? ❑Yes []No
Comments/Descrip6on
28
Have stream buffers and steep slopes been protected as shown on the
plan?
Sequencing of the project is implemented in accordance with the
29
approved erosion and sediment control plan and stormwater management
plans? (9VAC25-870-54.B and C)
Have all denuded areas requiring temporary or permanent stabilization
been stabilized, and have stabilization requirements for impaired waters,
30
approved TMDL(s), pollutants of concern and exceptional waters, when
applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.13) (9VAC25-
880-60) (CGP Part I F.1(a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8))
(CGP II E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected
(AJS I Z Q Of r
31
with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part 11
S'fd I ��
A.2(c)) (9VAC25-870-54.8)
A permanent vegetative cover has been established that is uniform,
32
mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3)
1K
(CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
33
Have sediment trapping facilities been constructed as the first step in land
disturbance
%17 V.14 4 it,8MJ .
40
activities? (9VAC 25-840-40.4) (CGP Part 11 A.2(c)) (CGP II
E(1-2))
On err Mioed F?
(9VAC25-870-54.B)
Loro /li V rA s
Have earthen structures been stabilized immediately after installation?
34
(9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-
54. B)
Are sediment traps and basins installed in accordance with MS-6 and the
35
approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part 11
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.13)
Are finished cut and fill slopes adequately stabilized to prevent or correct
36
excessive erosion? (9VAC 25-840-40.7) (CGP Part II A.2(c)) (CGP II E(1-
2)) (9VAC25-870-54.B)
Is concentrated runoff down cut or fill slopes contained in an adequate
37
permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part 11
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Is adequate drainage or other protection provided for water seeps?
38
((99Vg C 25-840-40.9) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870-
39
Do all operational storm sewer inlets have adequate inlet protection?
(9VAC 25-840-40.10) (CGP Part II A.2(c)) 11 E(1-2))
r ern f flea M I /� ��Q
P(lI
(CGP (9VAC25-870-
im ��� hq✓� �8�J8'i iA
54.8)
r C'C�W fl
Are stormwater conveyance channels adequately stabilized with channel
40
lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part 11 A.2(c))
(CGP II E(1-2)) (9VAC25-870-54.B)
Is in -stream construction conducted using measures to minimize channel
41 damage? (9VAC 25-840-40.12) (CGP Part II A.2(c)) (CGP 11 E(1-2))
(9VAC25-870-54. B)
Are temporary stream crossings of non -erodible material installed where
42 applicable? (9VAC 25-840-40.13) (CGP Part 11 A.2(c)) (CGP 11 E(1-2))
(9VAC25-870-54. B)
43 Is necessary restabilization of in -stream construction complete? (9VAC
{
25-840-40.15) (CGP II E(1-2)) (9VAC25-870-54.B)
{�
Page 3 of 7
Are utility trench operations conducted and stabilized in accordance with
44
MS-16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP li E(1-2))
(9VAC25-870-54. B)
Are soil and mud kept off paved or public roads to minimize the transport
45
of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54.B)
Have all temporary control structures that are no longer needed been
46
removed and disturbed soil resulting from their removal permanently
stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B)
Are properties and waterways downstream from development adequately
5 •Ine4i Can GLVC .i�
47
protected from erosion, sediment and damage in accordance with the
A� 1 *�
""iA q�p
standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840-
�a�e"�" Per`
40.19(a-n))
jc
48
Permanent control measures included in the SWPPP are in place?
(9VAC25-870-54.C) Part II F.1(a))
(9VAC25-880-60) (CGP
POLLUTION PREVENTION PLAN IMPLEMENTATION
Yes No N/A Reviewed during inspection? ❑Yes ❑No
Comments/Deswiption
Practices are in place to prevent and respond to leaks, spills, and other
Jigs &V CO /1 Cre e 177
49
releases including (i) procedures for expeditiously stopping, containing,
and cleaning up spills, leaks, and other releases; and (ii) for
i _ff--
�r �/1fl1C7oD
procedures
reporting leaks, spills, and other releases in accordance with Part III G?
,\� I�
LQDrIS e n tdj qCvn }
(CGP Part II A.4.e(1))(9VAC25-870-56)
Practices are in place to prevent the discharge of spilled and leaked fuels
50
and chemicals from vehicle fueling and maintenance activities? (CGP Part II
A.4. a (2)) (9VAC25-870-56)
Practices are in place to prevent the discharge of soaps, solvents,
51
detergents, and wash water from construction materials, including the
clean-up of stucco, paint, form release oils, and curing compounds? (CGP
Part II A.4.e(3))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from vehicle
52
and equipment washing, wheel wash water, and other types of washing?
(CGP Part II A.4.e(4))(9VAC25-870-56)
53
Concrete wash water is directed into a leak -proof container or leak -proof
�(f�
settling basin? (CGP Part II A.4.e(5))(9VAC25-870-56)
(b/
Practices are in place to minimize the discharge of pollutants from
54
storage, handling, and disposal of construction products, materials, and
wastes? (CGP Part 11 A.4.e(6))(9VAC25-870-56)
Practices are in place to prevent the discharge of fuels, oils, and other
55
petroleum products, hazardous or toxic wastes, and sanitary wastes?
(CGP Part If A.4.e(7)(9VAC25-870-56)
Practices are in place to minimize any other discharge from the potential
56
pollutant -generating activities not addressed above, when applicable?
(CGP Part II A.4.e(8))(9VAC25-870-56)
Inspector Signature: _ J 0 Date:
10
Page 4 of 7
Recommended Corrective Action:
Recommended Corrective Action Deadline:
Targeted Re -Inspection Date:
Comments:COrr4.e be ;c ren 1e� enclosC �n f �,�s lePe /�✓�f
be
Cc m f fx
The recommended corrective action deadline date applies to all conditions noted on this report unless otherwise noted. If listed condition(s) currently
constitute non-compliance and/or corrective actions are not completed by the deadline, other enforcement actions may be issued to the entity responsible for
ensuring compliance on the a ve pr ct.
J
Inspector Signature: Date:
Page 6 of 7